×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
Download -
Walter Wuensch, CERN CLIC Project meeting, 29 September 2015 X-Band: test stand and structure program
Download
Top Related
CLIC Post-Collision Line and Dump Edda Gschwendtner, CERN for the Post-Collision Team Rob Appleby (CERN & Cockcroft Institute), Armen Apyan (CERN), Barbara
7/12/09 CLIC Module WG: “CLIC Quadrupoles Prototype Status” Michele Modena – CERN TE/MSC
CLIC Project breakdown structure: organization - Indico - Cern
Paths to CLIC power and energy efficiency Philippe Lebrun CLIC Workshop 2014 CERN, 3-7 February 2014 EnEfficient
CLIC Kickers - CERN
J.L. Navarro (CERN), for the CLIC/CTF3 collaboration
Course B: rf technology Normal conducting rf Overall Introduction and Part 1: Introduction to rf Walter Wuensch, CERN Seventh International Accelerator
CLIC Workshop, 03-07 February, CERN. I. Syratchev Roadmap for CLIC high-efficiency klystron development I. Syratchev, CERN