dpti - department of planning, transport and ... · port adelaide created from 2013 to present tim...

91

Upload: others

Post on 16-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing
Page 2: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing
Page 3: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing
Page 4: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Applicant Name Applicant Type Summary

Vickie Chapman MP MP

All briefing minutes prepared for Ministers (and ministerial staff), the Premier (and staff) and/or Deputy Premier (and staff) in respect of the Riverbank precinct for the period 2010 to present

Corey  Wingard MPTotal patronage at Millswood Station, and Wayville Station (individually) for each day from 1 October 30 November inclusive

Steven Marshall MPCopies of all documents held by DPTI regarding the proposal to shift a government agency to Port Adelaide created from 2013 to present

Tim Whetstone MPThe total annual funding spent on the Recreation and Sport Traineeship Incentive Program and the number of students and employers utilising this program since its inception

Tim Whetstone MPA copy of all reports or modelling for the establishment of an indoor multi‐sports facility in South Australia

Tim Whetstone MPAll traffic count and maintenance reports for timber hulled ferries along the River Murray in South Australia from 1 January 2011 to 1 June 2015

Corey Wingard MP Vision of rail car colliding with the catenary and the previous pass on the down track

Rob Brokenshire MLC MP Speed limit on SE freeway during a time frame in September 2014

Steven Griffiths MP MP

Request a copy of the final report/independent planning assessment undertaken into the Hills Face Zone. I believe the former Planning Minister, the Hon Paul Holloway MLC commissioned the report in 2010

File 2018/15258/01 – Document 001

Page 5: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Tim  Whetstone MP

All submissions and correspondence, from the 2013/14 and 2014/15 financial years to date, to the Minister for Racing and the Office for Recreation and Sport, opposing and supporting jumps racing in South Australia

Corey  Wingard MP MP Top ten crash intersections in the state ‐ Jan 2012 to Dec 2014

Steven Marshall MP MP

All documents regarding the expression of interest process for a lease where Crown Land has been made available to the market for the construction of proposed State Government Office at Port Adelaide

Sam Duluk MPDocuments held by the Department in regard to costings and correspondence between the Minister's Office and the Department in relation to a Park and Ride facility in Bellevue Heights

Dan van Holst Pellekaan  MP

Provide all documents relating to a business case for the facilitation of a port solution as part of the Regional Mining and Infrastructure Plan

Corey Wingard MPAll correspondences, plans, and documents detailing or referencing incident points not working and signalling failures on the rail network over the past 12 months

Corey Wingard MPAll details and/or all copies of correspondence, reports, and documents pertaining to ‐Penalties and fines issued to bus contractors

Corey  Wingard MP

Copies of all and any reports, analysis, and correspondence to or by the Department ofPlanning, Transport and Infrastructure relating to the upgrade and maintenance of level and graded crossings around the State in the last five years

Corey Wingard MP

Copies of the Maintenance and Support Services for the Adelaide Metropolitan Passenger Railway Network AMPRN Overhead Line Equipment report pertaining to the contractors Laing ORourke Australia Pty Ltd

Corey Wingard MPRequest for access to copies of all traffic counts and modelling around the Oaklands Crossing Intersection

Corey Wingard MP MP Copies of the Halcrow Report on Rail Electrification 

Sam Duluk MP MPCorrespondence and evaluations of the intersection of East Tce and Main Road,Hawthorndene

David Pisoni MP MP Documents relating to the Career and Workplace Development Centre, Warradale

Page 6: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Robert Brokenshire MP Crash stats for leaner's permits and motor cyclists 2012/13 ‐ 2014/15

Vickie Chapman MPA copy of the contract and tender documents for the relocation of Rail Signal andCommunication Infrastructure for the new Biomedical Precinct.

Vickie Chapman MP MPA copy of the contract and tender documents for the Relocation of Rail Signal andCommunication Infrastructure for the new Biomedical Precinct

Robert Brokenshire MLC MP

Time frame: each financial year 2012/13; 2013/14; 2014/15; No of Learners Permit applica ons made and crash stats for Learners Permit holders

Corey Wingard MP MP The number of p‐plate drivers involved in fatal and non‐fatal accidents since July 2014

Corey Wingard MP MPThe number of p‐plate driver involved in fatal and non‐fatal accidents between 30 June 2013 and 1 July 2014

Corey Wingard MP MP Copies of DPTI 2016 train service planCorey Wingard MP The assaults on Tram 108. Complaints of Road Rage on Tram 106.

Corey Wingard MPPlease provide a copy of all reports done to or by the government/DPTI pertaining to the level crossing train and car at Oaklands Park referred to as Oaklands Park Crossing

Rob Brokenshire MLC MP Speed limits on SE Freeway between 5.00pm and 5.15pm on September 23 2014

Corey Wingard MP

Copies of documents and correspondence discussed during the 20 March 2015 RailCommissioner Steering Committee Meeting. Specifically relating to reports from the Deputy Rail Commissioner

Corey Wingard  MPThe number of calls received during Thursday the 19th of February's GovChat total.

Corey Wingard MPPlease provide copies of all email correspondence to and from the email address [email protected] dated 30 June 2014 onwards.

Kelly Vincent MLC MP Accessibility on public transportTammy Franks MLC MP Animals Australia advertising campaigns

Corey Wingard MPPlease provide details of the Incident Investigation ‐ Dry Creek Interlocking Failure as per the 29 May 2015 Rail Commissioner Steering Committee Meeting minutes agenda point 7.1.

Corey Wingard MP

Please provide a copy of the Rail Safety Performance and Compliance Report and Rail Safety Reporting as at 4 June 2015 as per the 26 June 2015 Rail Commissioner Steering Committee Meeting minutes. agenda point 10. 

Page 7: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Corey Wingard MP

Please provide details for the changes in RISSB Structure and Ownership and copies of documents signed but the Rail Commissioner as per the 24 April 2015 Rail Commissioner Steering Committee Meeting Minutes, agenda point 14.1. 

Corey Wingard MP

Please provide a copy of the report provided to the Rail Commissioner regarding the discussion on testing of 4000 Class EMU route acceptance to Gawler Central as per the 29 May2015 Rail Commissioner Steering Meeting minutes, agenda point 15.5

Corey Wingard MP

Please provide details of the signalling issues discussed in the 24 April 2015 Rail Commissioner Steering Committee Meeting minutes, agenda point 6.1 and the start date for the Automatic Train Protection System 

Corey Wingard MP

Please provide copies of all documents and correspondence referencing the discussion with Bombardier on contract for roof repairs as per the 29 May 2015 Rail Commissioner Steering Committee Meeting minutes, agenda point 15.8

Corey Wingard MPPlease provide details of the discussion on key risks with level crossings as per the 29 May 2015 Rail Commissioner Steering Committee Meeting minutes, agenda point 2

Corey Wingard MPPlease provide details of the discussed risk issue of a closed switch at Lonsdale as per the 24 April 2015 Rail Commissioner Steering Committee Meeting minutes, agenda point 14.4

Corey Wingard MP

Please provide a copy of the Six Point Rail Plan for Improved Performance and the Management Team Rail Outpits ‐ Progress Report as per the 29 May 2015 Rail Commissioner Steering Committee Meeting minutes, agenda point 15.2

Corey Wingard MP

Details of the report from the Deputy Rail Commissioner ‐ Asset Management, Engineering and Project Delivery update and any documents pertaining to the electrification of the Gawler Line, LORAC wire issue, Finance Report, and Dry Creek investigation 

Corey Wingard MP

Please provide a copy of the Rail Commissioner Safety Policy distributed to staff and referenced in the 24 April 2015 Rail Commissioner Steering Committee Meeting minutes, agenda point 4.1

Corey Wingard MP

Please provide a copy of the draft DPTI Rail Safety Accountability Organisation Structure for the Rail Commissioner as per the 26 June 2015 Rail Commissioner Steering Committee Meeting minutes, agenda point 4 and any subsequent reports. 

Page 8: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Corey Wingard MPPlease provide details and documents pertaining to the car wash at Seaford as per the 29 May 2015 Rail Commissioner Steering Committee Meeting minutes, agenda point 15.3

Corey Wingard MP

Please provide details and copies of documents relating to Investigation Reports ‐ Collision at Chidda and Damaged Tram Pantographs as per the 26 June 2015 Rail Commissioner Steering Committee Meeting Minutes, agenda point 11 

Corey Wingard MP

Please provide details and copies of documents and correspondence relating as per the 26 June 2015 Rail Commissioner Steering Committee Meeting minutes, agenda point 14.7 and 14.8

Corey Wingard MP

Please provide copies of the ATP monthly status report as per the 29 May 2015 Rail Commissioner Steering Committee Meeting minutes, agenda point 7.1 and all subsequent reports

Corey Wingard MPPlease provide a copy of the Asset Management Maturity Audit as per the 24 April 2015 Rail Commissioner Steering Committee Meeting minutes, agenda point 14.2

Corey Wingard MP

Please provide copies of the presentation provided on the Catenary Wire Failure ‐ 2 June 2014 and 15 May 2015 as per the 29 May 2015 Rail Commissioner Steering Committee Meeting minutes, agenda point 8.

Corey Wingard MPPlease provide copies of all surveys (quick and full) submitted to the Adelaide Metro Website's rate your ride section from 1 July 2015 to today

Corey Wingard MPPlease provide copies of documents stating the total monthly patronage data for the MtBarket Doubel Decker Bus Service 

Corey Wingard MPPlease provide a copy of the CCTV footage of the inside of the T40 bus departing the Zone A Dutton Park n Ride‐ 17889 stop on Thursday the 10th and Friday the 11th of September

Corey Wingard MPPlease provide copies of all documents outlining the service delivery standards set by the department for Tram, Train and Bus drivers and staff

Corey Wingard MP

Please provide details of and copies of documents relating to the Diesel rolling stock capacity being tight with retirement of 2000s class and other items as per the 26 June 2015 Rail Commissioner Steering Committee Meeting Minutes, agenda point 5. 

Corey Wingard MP Wayvile Tender docs ‐ Duplicate to be withdrawn see File 2015/06740/01 ‐ Active 

Page 9: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Stephan Knoll MP

Please provide details about any new electronic devices or appliances installed in the Department in the last six months to 1st Sept 2015 with a value greater than $500

Stephan Knoll MP

‘Any script notes, ‘cheat sheets’, ‘talking points’ provided to staff to prepare for taking callswith this GovChat and the process by which people’s personal information is stored, processed for a response, and if it is stored past a conclusion to their issue, how that information is used; is it added to a database to more easily disseminate DPTI information to those that have called for this GovChat.’

Tammy Franks MLC MP Animals Australia advertising campaign ‐ 1 Sept to 30 Sept 2015

Corey Wingard MPPlease provide a copy of DPTI's Risk Management Policy and a copy of the Risk Management Policy issued by the Commissioner for Public Sector Employment.

Corey Wingard MPPlease provide details, documents, and correspondence relating to any legal action between the State Government and Bombardier Inc.

Corey Wingard MPPlease provide copies of all OHS reports and documents relating to hand rails coming loose and/or failing on new electric trains

Stephan Knoll MPAll complaints submitted to the Passenger Transport Board, and their resolution from July 1st 2014 til June 30th 2015

Stephan Knoll MP

Please provide details including number of days, number of employees and cost relating to special leave with pay granted to employees of the department since 1 July 2013; if a scheduleexists that could be sufficient

Stephan Knoll MP

Please provide details including number of days, number of employees and cost relating to moving days granted to employees of the department since 1 July 2013; if a schedule exists that could be sufficient

Peter Treloar MP Boston Rural Living DPA Statement of Intent

Corey Wingar MPPlease provide a summary of all SPADS events for trains relating to how many signals were passed at danger and how many red lights were run for the last 12 months.

Corey Wingard MPCopies of documents stating the total monthly patronage data for the Mount Barker bus ‐revised to trips taken as per data in previous FOI 

Stephan Knoll MPAll schedule of the number of taxi drivers (or the like) expelled, and the reasons for, for the years 2013, 2014 and 2015 till present.

Page 10: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Stephan Knoll MP MP

Please provide all documents rela ng to the below request:

All invoices and details of travel by business class taken by director level and above (excl CE) for the financial years 2013/14, 2014/15

Stephan Knoll MP

Please provide copies of correspondence between the Department and the traditional owners of the Anagu‐Pitjantjatjara Yankunytjatjara (APY) Lands in regards to the $106 million road upgrade project, since January 2014

Stephan Knoll MP

Please provide a copy of the Deed of Agreement, signed letter of consent or similar with the traditional owners of the Anangu‐Pitjantjatjara Yankunytjatjara (APY) Lands in regards to the $106 million road upgrade project

Michael Atkinson MP All names and contact details of people with a taxi plate or taxi license. 

Robert Lucas MLC MPCopies of all documents including emails since 1 January 2015 relating to an estimate of total costs for renovation of 16th floor of State Admin Building

Robert Lucas MLC MPCopies of all documents including emails since 1 January 2015 relating to a payment of any expense associated with the renovation of 16th floor of State Admin Building

Page 11: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application Type Application Description ApplicantApplicant NameApplication Asbestos in houses owned or managed by DPTI MP Mark ParnellApplication All building reports since 2012, including condition reports, for Parliament House and its precinct. MP Stephan Knoll

ApplicationA copy of the contract and tender documents for the Relocation of Rail Signal and Communication Infrastructure for the new Biomedical Precinct MP Vickie Chapman

Application

I request access to any documents, reports, notes, letters, emails or correspondence containing advice provided to the Minister for Planning (Hon John Rau MP) relating to the retention of land for agricultural purposes within the District Council of Lower Eyre Peninsulas Boston Rural Living DPA Statement of Intent. MP Peter Treloar

ApplicationCopy of the draft Development Planning Amendment by the Minister dated 8 September 2015 which was prepared for consideration by councils included in the inner and Middle Corridor Development Plan Amendment MP David Pisoni

Internal Review All documents that refer to sites for a second city high school since 30 March 2014 MP David Pisoni

ApplicationAll correspondence between DPTI and Walker Corpooration including but not limited to representatives of that company acting as lobbyists for the period 2010 to present MP Vickie Chapman

Application

1. Copies of all safety audits done for the Adelaide Convention Centre stage two extension which include the deconstruction of the Plenary building._2. All documents evidencing estimated completion date for the Adelaide Convention Centre extension including revised completion dates_3. All documents evidencing estimated budgets for the project including changes to the budget forecast and any reason why budget forecasts may have been changed. Timeframe  June 30, 2014 to current date MP Robert Brokenshire

ApplicationPlease provide copies of receipts for any duplicate payments made through DPTI's online banking facility and Basware between 1 July 2013 and 30 June 2015. MP Corey Wingard

ApplicationPlease provide copies of the ten highest value invoices that were auto approved without certification from agencies receiving the service between 1 July 2013 and 30 June 2015, as identified in the Auditor General's Report 2015, Part B, Page 322. MP Corey Wingard

Application Please provide copies of the ten highest value duplicate invoices as identified by the Auditor General's Report 2015, Part B, p317. MP Corey WingardApplication Please provide copies of account statements from the Boating Facilities Fund from 1 July 2013 to 30 June 2015. MP Corey Wingard

Application

(1) The total number of credit cards on issue by the Department to staff of the Department during each of the 2012/13, 2013/14, and 2014/15 financial years, sorted by the credit limits applicabale to the Card, and then, (2) Details of any investigation, and outcome thereto, of appropriate credit card usage since 1 July 2011 (with names and other indentifying information removed) MP Robert Brokenshire

Application Please provide copies of DPTI account statments and invoices made for the 'Rail Replacement Program' MP Corey Wingard

ApplicationAll invoices and details of travel by business class taken by director level and above (excl CE) for the financial years 2013_14 and 2014 15. MP Stephan Knoll

ApplicationAny documents identifying the manufacturer or manufacturers of all aluminium cladding used in the construction of the new Royal Adelaide Hospital including the country of manufacture MP Duncan McFetridge

Application

Reports relating to the balance of the Facilities Fund (Marine) as at 30 June 2014 and 30 June 2015, as well as facilities levies collected on the registration, inspection or survey of vessels for the periods 1 July 2013 ‐ 30 June 2014 and 1 July 2014 ‐ 30 June 2015. MP David Ridgway

ApplicationI request access to all documents created during 2015 that identify the total number and value of DPTI or Office of Motor Registration customers managed under the 'Hardship Program' or similiar. MP Stephan Knoll

External ReviewAll emails, reports, memorandums discussion papers or any other document which refers to the Port Stanvac Jetty from December 2013 to the present day. MP Michelle Lensink

ApplicationA copy of all Comparative Performance Management Data provided to the Office of Local Government from the Local Government Association from 1 January 2014 to present. MP John Darley

ApplicationRequest a copy of all DPTI travel reports for the 2014_15 financial years. Personal or identifying details of the reports authors are not required. MP John Darley

File 2018/15258/01 – Document 002

Page 12: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

ApplicationPlease provide details including number of days, number of employees and cost relating to  moving days granted to employees of the department since 1 July 2013  if a schedule exists that could be sufficient MP Stephan Knoll

ApplicationPlease provide details including number of days, number of employees and cost relating to special leave with pay granted to employees of the department since 1 July 2013_ if a schedule exists that could be sufficient MP Stephan Knoll

Internal Review Documents that refer to the sale of Department of Education building in Flinders Street since 30 March 2014 MP David Pisoni

ApplicationProvide me with a summary document outlining the most recent odometer reading, and date of the reading for each bus owned by DPTI used as part of the Adelaide Metro Fleet. MP John Darley

Application Correspondence between DPTI and Infrastructure Australa since 30 6 2013 MP Vickie ChapmanInternal Review Quote & tender for Wayville train station, quote & tender Marion train station. MP Corey Wingard

ApplicationAll details of the Old maintenance and new maintenance contracts for the electric train line through construct and post construct between the state government and laing o'rourke MP Corey Wingard

Internal ReviewMaintenance and Support Services for the Adelaide Metropolitan Railway Network ‐ Overhead Line Equipment pertaining to Laing O'Rourke Australia Pty Ltd MP Corey Wingard

ApplicationPlease provide reports showing the number and value of fare evasion infringement notices (or similar) issued on public transport for the years till 30th June for 2012, 2013, 2014 and 2015. The schedule should show the number, value and type of transport. MP Stephan Knoll

Internal Review Total Fines Issued and Paid MP Corey WingardInternal Review Fines for fare evasion, outstanding amounts and revenue raised for past 18 months MP Corey Wingard

Application

I request that you provide to me a summary document outlining injuries sustained by the public on public transport in South Australia from 1 January 2010 to present. I request details of date of injury, brief description of injury, brief description of how injury was sustained and a brief description of what, if any, follow up action was taken. MP John Darley

Internal Review Parking at the Paradise Interchange MP John Gardner

ApplicationPlease provide total patronage numbers on the J1X double decker bus service between 1 December 2014 and 1 November 2015 shown in monthly increments MP Corey Wingard

ApplicationThe number of trips taken by the Mt Barker Double Decker Bus (Vehicle number 3401) for the patronage data supplied in the previous FOI 2015 14434 01. MP Corey Wingard

ApplicationA copy of all documents or final reports on any and all independent overviews reviews of Adelaide electrification dated between June 2010 and July 2014. MP Corey Wingard

Internal Review DPTI 2016 train service plan including all variations and updated editions MP Corey WingardInternal Review Master Plans for each incarnation of the Adelaide Rail Electrification program MP Corey Wingard

ApplicationPlease provide all incident reports and any documents or correspondence relating to issues around towing EMUs in the Adelaide rail‐yard and along the Adelaide metro rail network MP Corey Wingard

Internal Review Temporary speed restrictions on the rail network for past 12 months MP Corey Wingard

Application

A) The number of times the new electric trains have broken down since coming into operation. B)Itemised information about each breakdown and service request for each train from the date it commenced service to today (1 December 2014). C) The number of times broken down electric trains or train maintenance issues have delayed public transport services in the last six months (may 2014 to October 2014)_ and the reason for each delay. D). The number of electric trains that have been towed to the Dry Creek Depot. MP Corey Wingard

ApplicationPlease provide a summary of all SPADS events for trains relating to how many signals were passed at danger and how many red lights were run for the last 12 months MP Corey Wingard

ApplicationPlease provide copies of Herms Reports, Blue Reports, or Transit Performance System Reports relating to reports or logs around driver's seats on the 4000 series trains coming loose or unscrewed MP Corey Wingard

Application Please provide copies of reports or logs indicating issues with driver vision being impaired on train platforms due to low lighting MP Corey WingardExternal Review Train Horns on Electric Trains MP John DarleyApplication Agreements with Adelaide Oval regarding public transport levy and payments MP Corey Wingard

Page 13: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application Please provide copies of all OHS reports and documents relating to hand rails coming loose and/or failing on new electric trains. MP Corey Wingard

Application Please provide copies of all OHS reports and documents relating to train driver seats coming loose on any new electric trains MP Corey Wingard

ApplicationNames and contact details of all people who are licensed to drive taxi cabs in South Australia and Names and contact details of all people who own a taxi plate in South Australia. MP Michael Atkinson

Application

TIME FRAME 2010_11, 2011_12, 2012_13, 2013_14 and 2014_15._1. the number of taxi drivers disqualified or suspended for each financial year in the time frame_ and_2. the reason for the disqualification or suspension_ and_3. whether the driver was reported to the police. 4. reports into the taxi industry in South Australia during the time frame MP Robert Brokenshire

Application All schedule of the number of taxi drivers (or the like) expelled, and the reasons for, for the years 2013, 2014 and 2015 till present. MP Stephan KnollApplication Please provide copies of all bridge inspection reports carried out over the past five years. MP Corey Wingard

Application1 The schedule of steel reinforcement works_ and 2 Engineers designs for piers 208 and 209 as related to the North‐South Corridor Sough Road Superway  project MP Mark Parnell

External Review

All plans, reports, costings, topographical maps, agendas, minutes, meetings and briefing notes held by the Department during the time frame concerning possible safety modifications or other minor improvement to the Gepps Cross Intersection (Main North Road, Port Wakefield Road and Grand Junction Road)_ and All reports  or outcomes of requests or deliberations on the possibility of Black Spot funding or any other Federal funding being provided for future works on this intersection (or works scheduled to commenced, but not yet commenced, at the time this request was made). Time Frame  1 January 2012 to date of this request. MP Robert Brokenshire

ApplicationPlease provide documents relating to 'Copies of any consultations, investigations and costings or similar with regard to a third arrestor bed on the South‐Eastern Freeway MP Stephan Knoll

ApplicationStatistics outlining the amount of Optispan streetlights currently in operation in South Australia and the following__Optispan annual maintenance budget (including wages and maintenance) Optispan annual operation budget MP David Ridgway

Application Copies of all long term planning done on the viability of driverless autonomous cars operating in South Australia MP Corey Wingard

ApplicationCopies of all documents and costings around the proposed trial of the Volvo XC90 SUV on the Southern Expressway in November 2015. MP Corey Wingard

Application Copies of all documents relating to government spending required for hosting the International Conference on driverless cars 2015. MP Corey Wingard

ApplicationPlease provide copies of the on‐board vision including the dash camera vision from the driverless car demonstration from the 6th of November 2015 MP Corey Wingard

ApplicationI request copies of all correspondence received by the Department from the Hon Tung Ngo in relation to Uber and/or the Taxi Council of South Australia MP David Ridgway

Application

Outcomes of workplace drug and alcohol testing for each of (a) bus drivers, (b) tram drivers, (c) train drivers and (d) other Departmental staff, including the results in each circumstance of testing (eg. random, after a workplace incident) Timeframe: for each of the 2012, 2013, 2014 and 2015 calendar years (to date) Documents should include but not be limited to e‐mails, letters, briefings and reports concerning the same. Names of individuals and other personally identifying information may be removed.  MP Robert Brokenshire

Application Please provide information relating to the balance of the Facilities (Marine) Fund as at 30 June 2015 MP Stephan Knoll

ApplicationPlease provide copies of correspondence between the Department and the traditional owners of the Anangu‐Pitjantjatjara Yankunytjatjara (APY) Lands in regards to the $106 million road upgrade project, since January 2014. MP Stephan Knoll

ApplicationPlease provide a copy of the Deed of Agreement, signed letter of consent or similar with the traditional owners of the Anangu‐Pitjantjatjara Yankunytjatjara (APY) Lands in regards to the $106 million road upgrade project MP Stephan Knoll

Application a list of contributions to the Planning & Development Fund in 2014‐2015 by value and post code MP Stephan Knoll

ApplicationA schedule showing all complaints submitted to the Passenger Transport Board regarding Taxis and their resolution from July 1st 2014, till Sept 30th 2015. Personal details of complainants or defendants aren't needed.   MP Stephan Knoll

Page 14: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

ApplicationThe full leasing cost and conditions (including commencement date of lease and term of the lease) of the building in which the Career and Workplace Development Centre, Warradale is located. MP David Pisoni

Application

All documents, files, emails and notes of telephone conversations prepared by the Department in relation to the Park Lands Zone Development Plan Amendment approval process – approved Gazetted 17 September 2015.RE Scoped to:‐ Public submissions in relation to Park Lands Zone Development Plan Amendment approval process – approved Gazetted 17 September 2015. MP Rachel Sanderson MP

Application

Original Scope: All briefings and reports relating to sports venues in SA from 2014 to date and; all briefings and reports relating to the Commonwealth Games from 2014 to date.Amended on 16/12/2015 to – “All briefing and reports relating to sports venues linked to the Commonwealth Games in SA from 2014 to date.”

MP Tim Whetstone

ApplicationA breakdown of $50 sports vouchers redeemed per postcode (the child's postcode) and a list of how many vouchers have been deemed in individual sports since the programs inception to the current date (16/12/2015). MP Tim Whetstone

Application All reports and audits from 2012 to current date in relation to South Australia hosting the Youth Olympic Games. MP Tim Whetstone

ApplicationI request all documents, files, emails and notes of telephone conversations prepared by the Department in relation to the Park Lands Zone Development Plan Amendment approval process ‐ approved Gazetted 17 September 2015 MP Rachel Sanderson MP

Application

Please provide documents created in regards to fraud as noted in the Annual Report 

Taken from the 2015 report for FOI reference: FraudIn accordance with Public Sector Regulation (2010) there were three instances of fraud confirmed during the year. One instance involved unauthorised access to a departmental system, another to falsification of timesheet records with disciplinary action taken in both instances. The third involved the inappropriate accumulation of reward points for personal benefit, with the case currently being finalised.In addition to direct disciplinary action taken, the department continues to assess and test controls as part of its internal audit processes.Recommendations for improvement in the affected areas have been, or will be, issued and monitored. The department’s fraud control framework strategies for fraud prevention, detection, investigation, awareness, training and reporting, based on the Australian Standard 8001–2008 Fraud and Corruption Control will continue to be improved and strengthened during 2015‐16, with the department continuing to promote appropriate behaviour in line with Code of Ethics for the South Australian Public Sector. MP Stephan Knoll

ApplicationCopies of all documents including invoices since 1 January 2015 relating to payment of any expenses associated with the renovation of the 16th floor of the State Admin Building MP Rob Lucas

ApplicationCopies of all documents including emails since 1 January 2015 relating to an estimate of total costs for renovation of 16th floor of State Admin Building  MP Rob Lucas

ApplicationA copy of all materials given or supplied to the Minister for Planning in relation to his consideration and decision on the Park Lands Zone Development Plan Amendment (approval of which was Gazetted on 17th September 2015). MP Mark Parnell

Application All reports, presentations and materials produced as part of 13 consultancies on the attached schedule.  MP Stephan Knoll

ApplicationTop 10 black spots for motor vehicle accidents where speed was the primary factor in each of 2013, 2014 and 2015 calendar years to date. MP Robert Brokenshire

ApplicationPlease provide statistics on the Blackwood Roundabout including traffic flows and crash statistics since 1 January 2012 until the present MP Sam Duluk 

ApplicationPlease provide statistics on the intersection at Waite Street and Shepherds Hill Road, Blackwood, including traffic flows and crash statistics since 1 January 2012 until the present. MP Sam Duluk 

Page 15: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

ApplicationPlease provide statistics on the intersection at Sargent Parade and Shepherds Hill Road, Bellevue Heights, including traffic flows and crash statistics since 1 January 2012 until the present. MP Sam Duluk 

Internal ReviewPlease provide any document that details plans, including costings that has been devised or proposed to the Department of Planning Transport and Infrastructure to make alterations to the Blackwood Roundabout since 1 January 2012 until the present MP Sam Duluk 

ApplicationAll documents in relation to any road safety reports, traffic surveys and discussion of future plans for the Regency and Prospect Roads intersection, Prospect. MP Rachel Sanderson MP

ApplicationAll documentation regarding the costing of the O'Bahn project including a breakdown of all costs, details on how the cost benefit ratio was calculated and alternative projects costed and considered to improve the reliability and speed of the O'Bahn.  MP Rachel Sanderson MP

ApplicationPlease provide details including number of days, number of employees and cost relating to ‘special leave with pay’ for the category of ‘Trade Union Training’ taken by employees of the department since 1 July 2013; if a schedule exists that could be sufficient.  MP Stephan Knoll

Application

‘All documentation relating to the manufacturing and procurement of high voltage cable for the overhead wiring system of the Seaford Railway Line Electrification Project, specifically:•Procurement documentation, particularly QA/QC requirements stipulating engineering standards for products delivered;•Cable manufacturers ISO 9001 certification or compliance statement;•Cable manufacturer’s mill and mechanical testing certificates; and •Cable manufacturer’s data reports (MDRs)’

MP Stephan Knoll

ApplicationSummary of vandalism, including but not limited to graffiti, on public transport vehicles or public transport infrastructure (bus stop, train stations etc) from beginning 2010 until present.  MP David Pisoni

ApplicationSummary of assaults on public transport staff or members of the public which occurred on public transport vehicles or at public transport infrastructure (bus stops, trains stations etc), from beginning 2010 until present. MP David Pisoni

Application

Summary of breakdowns to public transport vehicles/infrastructure which caused service disruption or delay, including the reason for the breakdown, from beginning of 2010 until present.

Scope refined on 05 February 2016 to: 

All failings (mechanical, electrical or similar) to either public transport vehicles or infrastructure which caused service disruption or delay from 2013 onwards.  MP David Pisoni

ApplicationSummary of complaints, including number and subject of the complaint, from the public regarding the Metrocard from its introduction until present.  MP David Pisoni

Application Summary of internal reports/audits/reviews into problems with the Metrocard from its introduction until present. MP David Pisoni

Application All briefings provided to the Minister regarding ‘point to point’ transport, Uber and/or taxis from 1 January 2015 until present. MP David Pisoni

Application

All correspondence between 1 January 2015 and 1 January 2016 between Bombardier and the Department of Planning, Transport and Infrastructure regarding the train horns on electric trains

All internal documents since 1 January 2015 and 1 January 2016, including briefing notes (minutes), e‐mails, memos and reports relating to the horns on electric trains.

MP David Speirs

ApplicationCorrespondence with INTERSTATE Ministers regarding the ‘point to point’ transport, Uber, and/or taxis from 1 January 2015 until present.  MP David Pisoni

ApplicationSummary of traffic infringement notices issued to Adelaide Metro Public Transport Drivers, including number and subject of the notice, from beginning 2010 until present.  MP David Pisoni

Page 16: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

ApplicationSummary of the number of vehicles which have passed roadworthy inspections that had previously been written off since beginning 2012 until present.  MP David Pisoni

ApplicationAll correspondence between the State Government and Federal/interstate governments regarding the electrification of the Adelaide metropolitan area train lines from beginning 2010 until current.  MP David Pisoni

Application

Any documents including, but not limited to, letters, emails, memos, logs, ministerial directives or notes that refer to any fault or failure or other related incidences at level crossings along the Belair railway line in the past twenty‐four months. Any documents that refer to repairs or maintenance work on level crossings along the Belair railway line in the past twenty‐four months.  MP Sam Duluk 

ApplicationDetails of ‘operational issues’ referred to in tweets from the AdelaideMetro SA twitter account on 27 January 2016, 21 January 2016, 9 January 2016, 8 January 2016, 7 January 2016, 24 December 2015 and 15 December 2015.  MP David Pisoni

ApplicationThe specific dates of commencement and completion of asbestos testing at the Ascot Park and Lonsdale Substations between 1 July 2015 to present. MP David Pisoni

ApplicationThe date when asbestos warning signs were placed on infrastructure at the Ascot Park and Lonsdale Substations from 1 January 2015 to present. MP David Pisoni

Application

Copies of all documents, including reports, briefings, presentations and advice relating to the Torrens Junction grade separation. Including all proposed solutions or variations thereof.

Scope clarified on 25 February 2016 to:

Copies of any consulting reports and briefings relating to the Torrens Junction grade separation on all projects over the last five years MP David Ridgway

Application

I request all correspondence between the Department for Planning, Transport and Infrastructure and the Town of Walkerville regarding the northbound right hand turning lane on Hackney Road at the intersection of Hackney Road and Park Terrace, Gilberton between 1 January 2015 and 2 February 2016. MP Rachel Sanderson MP

Application

I request all documents and correspondence between 1 January 2011 and 2 February 2016 in relation to any road safety reports, traffic surveys and resulting recommendations; discussion of future plans; and projected or quoted costing of future plans regarding the intersection of Hackney Road and Park Terrace, Gilberton. MP Rachel Sanderson MP

ApplicationI request access to a list of each bus with registration number and age of manufacture in use on the Metropolitan Adelaide Public Transport Service each year from 2011 until present.  MP David Pisoni

ApplicationI request access to passenger numbers on trains, trams and buses (reported individually for each transportation method) in metropolitan Adelaide each year from 2006 until present.  MP David Pisoni

Application

The number of employees recognised as being accredited by the relevant union in accordance with clause 19.1 who have exercised clause 19.2 of the Rail Commissioner Tram Operations Enterprise Agreement 2011 and the total number of hours paid to those employees, the total value of those payments, and dates for which those payments were made. MP David Pisoni

ApplicationAll memos, correspondence, reports on the infrastructure that has been installed on the Gawler Line since 2008, particularly but not limited to the electric wire poles in place north of the Elizabeth Railway Station. MP David Pisoni

ApplicationThe number of reports of tradespeople, contractors or any other related workers coming into contact with asbestos/suspected asbestos during works relating to the Noarlunga Rail Line since 2012 until present. MP David Pisoni

ApplicationThe number of hours of pay granted to union officials in accordance with clause 19.1 of the Rail Commissioner Tram Operations Enterprise Agreement 2011. MP David Pisoni

ApplicationI enclose a request for access for the number of recommissioned diesel train carriages since beginning 2008 until present and summary of any works relating to the refurbishments and/or upgrades required.  MP David Pisoni

Application I enclose a request for access for the total cost of maintaining the diesel train fleet each year since 2008 MP David PisoniApplication I enclose a request for records of current timber sleepers on metropolitan rail network tracks.  MP David PisoniApplication I enclose a request for access for the asbestos register for all State Government Hospitals MP David PisoniApplication I enclose a request for access for the asbestos register for the state Administration Building MP David Pisoni

Page 17: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

ApplicationI enclose a request for access for the number of bus crashes reported annually involving Adelaide Metro (or equivalent) buses from 2006 until present.  MP David Pisoni

ApplicationI request access to the number of Tram Operations employees trained by year since 2008 as per clause 48.3 of the Rail Commissioner Tram Operations Agreement and the total cost of the training each year, including funds used from the Skills for All funding.  MP David Pisoni

Application

I request access to the number of times employees have arrived late and been able to commence their shift as per clause 17.2 of the Rail Commissioner Tram Operations Enterprise Agreement 2011, including the reason for lateness and the number of times each employee has been late MP David Pisoni

ApplicationI request access to the number of Tram Operations employees whose shift has been delayed or terminated due to failing a drug or alcohol test MP David Pisoni

Application

I request access to the Asbestos register for all State Government Transport Infrastructure 

Scope clarified by applicant to search for a master list of all Asbestos registers for State Government Transport Infrastructure  MP David Pisoni

Application

I request access to the Asbestos register for all State Government Schools

Transferred to DECD 16/02/2016 ‐ Reopened by DPTI on 04/03/2016.  MP David Pisoni

ApplicationI request access to all memos, correspondence, reports and recommendations regarding Asbestos associated with the Noarlunga line and related infrastructure since June 2015 until present MP David Pisoni

ApplicationI request access to the number of departmental staff and their last known job title transferred to the State Government Rehabilitation and Redeployment Unit, including their time of stay before return or redeployment each year since 2008.  MP David Pisoni

ApplicationI request access to a list of current speed restricted rail track sections and the reasons for the speed restrictions on the metropolitan rail network   MP David Pisoni

Application I request access to the schedule of sleeper replacement programs since beginning 2008 until current MP David Pisoni

Application I request access to the number of train carriages and locomotives in the train fleet currently and the date of their commission MP David PisoniApplication I request access to the Asbestos register for all Housing SA or State Government social housing buildings MP David Pisoni

ApplicationI enclose a request for access for reports or recommendations of rail station upgrades, including total costs, on the metropolitan rail line network since beginning 2008 until current.  MP David Pisoni

Application I request access to the latest safety audit of the metropolitan rail line network  MP David PisoniApplication I request access to the Asbestos register for the Festival Theatre Centre MP David PisoniApplication I enclose a request for access for the itinerary/calendar for Mr Michael Deegan on 18 and 24 September 2015. MP David Pisoni

ApplicationI enclose a request for the number of compensation payments made to Adelaide Metro passengers for injuries occurring on Adelaide Metro Public Transport and the total value of compensation awarded each year from 2010 until present.  MP David Pisoni

Application I enclose a request for access for the itinerary/calendar for Mr Michael Deegan on 9, 12 and 21 May 2015. MP David PisoniApplication I enclose a request for access for the itinerary/calendar for Mr Michael Deegan on 7, 8, 15 and 16 July 2015. MP David PisoniApplication I enclose a request for access for the itinerary/calendar for Mr Michael Deegan on 4, 17 and 18 November 2015. MP David PisoniApplication I enclose a request for access for the itinerary/calendar for Mr Michael Deegan on 11, 16, 17 and 23 December 2015. MP David PisoniApplication I enclose a request for access for the number of CCTV cameras currently fitted to Adelaide Metro Buses.  MP David PisoniApplication I enclose a request for access for the itinerary/calendar for Mr Michael Deegan on 14, 16 and 17 October 2015. MP David Pisoni

ApplicationI enclose a request for access for the number of arrests for vandalism or assaults as a result of CCTV footage obtained by CCTV cameras fitted on Adelaide Metro buses from beginning 2012 until present  MP David Pisoni

Application I enclose a request for access for the itinerary/calendar for Mr Michael Deegan on 12, 17, 25, 29 and 30 June 2015 MP David Pisoni

Page 18: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

Please provide all documents relating to the below request: A list of all unused office space as at 1 Jan 2016 leased by State Government, detailing how long they’ve been unoccupied. For unused office space leased please provide their address, gross leasing costs, and for owned buildings please provide their address and a list of building values.  MP Stephan Knoll

ApplicationAll documentation including correspondence, memos and briefing notes referring to taxi plate numbers and tenders since 1 July 2014 until present.  MP David Pisoni

ApplicationAll documentation including correspondence, memos and briefing notes referring to a review with key words of ‘taxi’ and/or ‘hire car’ and/or ‘Uber’ and/or ‘Share Economy’ and/or ‘Point to Point industry’ from 1 July 2014 until present.  MP David Pisoni

ApplicationA copy of the data logs (travel time updates) for the estimated travel time signs on South Road, Marion Road, Tapleys Hill Road, North East Road and Lower North East Road, for the past six months.  MP Peter Treloar

ApplicationDocuments that show the ‘Details Project Plan’ (or similar) for the Festival Centre Precinct as described by Minister Mulligan in Question Time on 11th February 2016. MP Stephan Knoll

ApplicationAll reports of incidences of delays, cancellations of service, reports of system breakdowns, including air conditioning repairs and replacements, on the Tonsley Train Line in 2014 and 2015. MP David Pisoni

ApplicationAll reports of incidences of delays, cancellations of service, reports of system breakdowns, including air conditioning repairs and replacements, on the Outer Harbour Train Line in 2014 and 2015. MP David Pisoni

ApplicationAll reports of incidences of delays, cancellations of service, reports of system breakdowns, including air conditioning repairs and replacements, on the Osbourne Train Line in 2014 and 2015. MP David Pisoni

ApplicationAll reports of incidences of delays, cancellations of service, reports of system breakdowns, including air conditioning repairs and replacements, on the Seaford Train Line in 2014 and 2015.  MP David Pisoni

ApplicationAll reports of incidences of delays, cancellations of service, reports of system breakdowns, including air conditioning repairs and replacements, on the Grange Train Line in 2014 and 2015. MP David Pisoni

ApplicationAll reports of incidences of delays, cancellations of service, reports of system breakdowns, including air conditioning repairs and replacements, on the Gawler/Gawler Central/Salisbury Train Line in 2014 and 2015 MP David Pisoni

ApplicationAll reports of incidences of delays, cancellations of service, reports of system breakdowns, including air conditioning repairs and replacements, on the Belair Train Line in 2014 and 2015. MP David Pisoni

ApplicationThe number and value of salary sacrifice arrangements for public servants for the purpose of motor vehicles (including the total number of motor vehicles) in 2014‐15 Financial Year MP David Pisoni

Application

The total number of car parking spaces purchased, rented or leased by the State Government for employee use in the City of Adelaide including ministerial staff (in a separate list if possible), and the total value and the total Fringe Benefit Tax paid for 2015‐15 Financial Year. MP David Pisoni

ApplicationProvide copies of invoices showing costs of upgrading offices for Ministers Vlahos, Bettison, Maher and Bignall at 1 King William Street, Adelaide. Please segregate the costs by Minister.  MP Stephan Knoll

Application All documents that identify the average and maximum speeds of buses using the O’Bahn during the 2014/2015 Financial Year  MP David Pisoni

ApplicationI request a copy of the agenda and full minutes (excluding the communiqué summary) from all meetings of the Premier’s State Local Government Forum held in 2015. MP Steven Griffiths

Internal Review

Any documents including, but not limited to, letters, emails, memos, logs, ministerial directives or notes that refer to any fault or failure or other related incidences at level crossings along the Belair railway line in the past twenty‐four months. Any documents that refer to repairs or maintenance work on level crossings along the Belair railway line in the past twenty‐four months. MP Sam Duluk 

Application

All documents showing leasing arrangements for the following stations: Aldinga, Christies Beach, Elizabeth, Glenelg, Golden Grove, Grenfell Street, Henley Beach, Hindley Street, Holden Hill, McLaren Vale, Netley, Norwood, Parks, Port Adelaide, Salisbury, Sturt and Wakefield Street. Please show the rent pw, square meterage and when the lease started and is to finish. MP Stephan Knoll

Page 19: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

All and any invoices for capital works budget and/or actual from Jan 1 2010 till March 1 2016 at any of the following stations: Aldinga, Christies Beach, Elizabeth, Glenelg, Golden Grove, Grenfell Street, Henley Beach, Hindley Street, Holden Hill, McLaren Vale, Netley, Norwood, Parks, Port Adelaide, Salisbury, Sturt and Wakefield Street.  MP Stephan Knoll

Application

All comments made to the Rate My Ride Survey which appears on the Adelaide Metro Website by respondents in November and December 2015

MP David Pisoni

ApplicationPlease provide collated results for all respondents in 2015 to each question posed by the Rate My Ride Survey which appears on the Adelaide Metro Website MP David Pisoni

Application

I request details of the 'Planning and Development Fund', including: The total amount paid into the Fund in 2014/15; A list of all projects supported by grants ($10.5 million through the Places for People and Open Space) in 2014/15; A list of all projects supported by the Planning and Development Fund to SA Government projects, including Vibrant City and Riverbank Precinct initiatives ($4.116 million). MP Steven Griffiths

Application

I request details of the 'Local Government Stimulus Program', including: All documents/agreements outlining the partnership between the Local Government Association and councils to bring forward "shovel‐ready" projects in local council areas to support job creation in local communities; The total level of funding that has been delivered through the program, including any funds from the $65 million Public Housing Stimulus Package, A list of all funding recipients, including details of each projects and the funding level granted (the LGA previously announced that there were 104 specific projects in 65 council areas); Timeframes for the delivery of the 'Local Government Stimulus Program' i.e. have all funds been delivered and projects completed; and a copy of the program guidelines outlining funding conditions.  MP Steven Griffiths

ApplicationCopies of the lists of defects as identified by AOSMA that were provided to Property Control Group (PCG) in March 2015, April 2015 and May 2015 as noted in the ‘Report on the Adelaide Oval…for 1 July 2015 – 31 December 2015’. MP Stephan Knoll

Application‘Copies of the spreadsheets containing information on identified project defects as noted in the ‘Report on the Adelaide Oval…for 1 July 2015 – 31 December 2015’. ’ MP Stephan Knoll

Application Copies of agendas, minutes and out of session notes for the Property Control Group (PCG) meetings 1 Jan 2015 and 31 January 2016 MP Stephan Knoll

Application

 Street 1. Documents, reports, correspondence and budgets regarding the remodelling/renovations of floors 10 and 12 of King William Street between June 2014 and March 2016 ‐ including the costs associated with the construction of wet areas including but not limited to bathrooms/toilets/powder rooms/washrooms2. Documents, reports, correspondence and budgets regarding repairs associated with damage/flooding/water damage on floors 10 and 12 of 1 King William Street between June 2015 and March 2016.3. Documents, reports, correspondence and budgets regarding the repairs of other offices at 1 King William Street associated with the flooding/water damage from floors 10/12 of 1 King William Street between June 2015 and March 2016. MP Dennis Hood

ApplicationCopies of documents identifying incidents of inappropriate and unauthorised access to information in the TRUMPS, over the last five years.  MP Peter Treloar

Application the total number of drug/alcohol tests undertaken by Tram Operations employees from 2010 until current MP David PisoniApplication total number of diesel trains in commission currently MP David PisoniApplication total number of diesel trains in commission in 2008 MP David PisoniApplication number of decommissioned or withdrawn diesel train carriages each year since 2008 until present MP David Pisoni

Page 20: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

Any document that makes reference in financial terms to railway assets held by the Government of South Australia from 2002 until the present. 

Scope Clarification Sent 22/03/2016 ‐ 

Scope clarified to : “Any document that takes inventory of assets that comprise railway infrastructure, i.e. property, plant and equipment, owned by the Government of South Australia in the financial year of 2002/03 and also the financial year of 2014/15.” MP Sam Duluk 

Application

Any document that makes reference to financial transactions of the Rail Transport Facilitation Fund from 2002 until present. 

Scope Clarification Sent 22/03/2016 ‐ Received

Annual financial statements that make reference to the Rail Transport Facilitation Fund from the financial years 2002/2003 until 2014/2015 MP Sam Duluk 

Application

Any document that makes reference to the sale or lease of railway assets held by the Government of South Australia from 2002 until the present. 

MP Sam Duluk 

ApplicationAccidents statistics for 2014 and 2015 for pedestrians hit by a motor vehicle, or motor cycle or bicycle at the intersection of Jetty Road and Colley Terrace, Glenelg MP Duncan McFetridge

Application Copies of the cost estimates for the two options proposed for a new safety ramp treatment considered by the Department MP Stephan Knoll

ApplicationCopies of the schedule and any applicable notes of the 22 options/proposals considered entitled "South Eastern Freeway ‐ 22 Options Weekly Status update" for between the 7th November 2014 and February 2016 MP Stephan Knoll

ApplicationA copy of the report from GHD Australia to the Minister for Transport and Infrastructure or the department dated between 2009‐2012 that makes reference to grade separation  MP Sam Duluk 

External ReviewPlease provide any document that details plans, including costings that has been devised or proposed to the Department of Planning Transport and Infrastructure to make alterations to the Blackwood Roundabout since 1 January2012 until the present MP Sam Duluk 

Application

I request documents relating to the role of the Commissioner for Kangaroo Island, specifically:  1.Details the number of  mes the Commissioner has travelled to Kangaroo Island for the period between 11 May 2015 to 7 April 

2016 (details to include the dates and length if each visit).  2.A copy of the guidelines prepared, including dra  guidelines, for the establishment of Local Advisory Boards as per Part 3 of the 

Commissioner for Kangaroo Island Act 2014. 3.A copy of all dra  management plans developed by the Kangaroo Island Futures Authority. 

MP Steven Griffiths

Internal Review

INTERNAL REVIEW A copy of all materials given or supplied to the Minister for Planning in relation to his consideration and decision on the Park Lands Zone Development Plan Amendment (approval of which was Gazetted on 17th September 2015). MP Mark Parnell

ApplicationValuation document relating to Cameron Macleod and/or OPTEON property group concerning Lots 32, 312‐314 Jetty Road, Wallaroo, South Australia, reference 2014/10853/01 MP Robert Brokenshire

ApplicationThe total amount of Australian steel and Australian concrete used in the construction of the new Royal Adelaide Hospital. (Where steel and concrete has been sourced from outside of Australia for this project, please state the origin of this steel and concrete.  MP Tim Whetstone

Page 21: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

ApplicationThe total amount of Australian steel and Australian concrete used in the South Road Superway project (Where steel and concrete has been sourced from outside of Australia for this project, please state the origin of this steel and concrete) MP Tim Whetstone

Application

The total amount of Australian steel and Australian concrete used in State Government infrastructure projects in 2010‐11, 2011‐12, 2012‐13, 2013‐14, 2014‐15 and 2015‐16 to April 2016 (Projects in which steel and concrete outsides of Australia have been used on a project, please state the origin of this steel and concrete MP Tim Whetstone

Application Accident statistics at the King Street Bridge/Adelphi Terrace, Glenelg intersection for the years 2011, 2012, 2013, 2014 and 2015. MP Duncan McFetridge

ApplicationCopies of invoices showing costs of upgrading offices for Assisting Ministers Bettison and Picton within the State Administration Building (200 Victoria Square, Adelaide). Please segregate costs by assisting Minister.  MP Stephan Knoll

ApplicationCopies of the Regulatory Impact Study and Regulatory Impact Statement on the changes to the Planning, Development and Infrastructure Bill 2015. MP Stephan Knoll

Internal Review

INTERNAL REVIEW ‘All documentation relating to the manufacturing and procurement oh high voltage cable for the overhead wiring system of the Seaford Railway Line Electrification Project, specifically:•Procurement documentation, particularly QA/QC requirements stipulating engineering standards for products delivered;•Cable manufacturers ISO 9001 certification or compliance statement;•Cable manufacturer’s mill and mechanical testing certificates; and •Cable manufacturer’s data reports (MDRs)’

MP Stephan Knoll

Application

Correspondence relating to the Gold Pass Australian Railway Medallion. I am specifically seeking the following information: •All transcripts and email correspondence rela ng to the topic of the Gold Medallion. •All correspondence between Michelle Spagnole , Manager Public Transport Ops and Planning and the Clerk of the Legisla ve 

Council, Clerk of House of Assembly relating to the topic of the Gold Medallion between 1st March 2016 and 14 April 2016.MP Tammy Franks MLC

ApplicationStatistics held by the Department on Flagstaff Road, Flagstaff Hill, including, but not limited to, traffic volumes and crashes from January 2010 until present. MP Sam Duluk 

Application

I request access to information regarding Riverbank Authority – Riverbank Precinct as follows: 1.In rela on to the Riverbank Precinct (a precinct authority established under the Urban Renewal Act 1995) please provide copies of 

all correspondence, notices or other documents regarding the establishment, pursuant to section 7H(14), of the Urban Renewal Act 1995, of:

(a)The design review panel; and (b)The community reference panel; and (c)Any other panel which the Riverbank Authority may have established pursuant to sec on 7H(15). 2.Also please provide copies of any requirements issued by the Minister pursuant to sec on 7H(16). 3.Any authorisa on of a person by Council pursuant to sec on 7H(17). MP Isobel Redmond

Page 22: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

I request access to information regarding Riverbank Authority – Riverbank Precinct as follows: 1.A copy of the request received by the Minister from Adelaide City Council or any other person of body reques ng that the area of 

land comprising the Riverbank Precinct (as defined in the Housing and Urban Development (Administrative Arrangements) (Riverbank Authority) Regulations 2014) be made a Precinct under the Urban Renewal Act 1995, in accordance with the provisions of section 7H of the Urban Renewal Act 1995, including the business case which accompanied the request (pursuant to section 7H(2)(b)).

2.A copy of the No ce published in the Gaze e establishing the area of land known as the Riverbank Precinct as a precinct.  3.A copy of any submission made to the Minister by the Adelaide City Council in compliance with sec on 7H(3)(a)(ii). 4.A copy of the consent of the Adelaide Park Lands Authority in compliance with sec on 7H(4). 5.Copies of any correspondence between the Minister and the Development Assessment Commission in accordance with sec on 

7H(8)(b), 7H(10)(11) and (12). 6.A copy of the report by the Development Assessment Commission provided under sec on 7H(13) and a copy of the le er by 

which it was forwarded to the riverbank Authority in accordance with section 7H(13). 

MP Isobel Redmond

ApplicationAll number plates sold through the SA Motor Registration website via Auction, after 1 bid. The number of plates and the type of plated passed in after auction from 2014 ‐ now. How many plates sold by third party with values between2014 ‐ current. MP Vincent Anthony Tarzia

Application

Please provide a copy of the ‘Monthly Report’ identifying defects and associated rectification as noted in the Minutes of the Property Control Group (3.1) on the 29th of January 2015.

Clarified on 5/7/2016 to Project Control Group ‐ Not Property Control Group.  MP Stephan Knoll

Application

Please provide a copy of the ‘Monthly Report’ or similar identifying defects and associated rectification as noted in the Minutes of the Property Control Group (3.1) on the 26th of February 2015, including any appendices. 

Clarified on 5/7/2016 to Project Control Group ‐ Not Property Control Group. MP Stephan Knoll

Application

Please provide a copy of the ‘Monthly Report’ or similar identifying defects and associated rectification as noted in the Minutes of the Property Control Group (3.2) on the 26th of March 2015, including any appendices.

Clarified on 5/7/2016 to Project Control Group ‐ Not Property Control Group. MP Stephan Knoll

Application

Please provide a copy of the ‘Monthly Report’ or similar identifying defects and associated rectification as noted in the Minutes of the Property Control Group (3.2) on the 23rd of April 2015, including any appendices such as but not limited to ‘appendix A’; as noted. 

Clarified on 5/7/2016 to Project Control Group ‐ Not Property Control Group. MP Stephan Knoll

Application

Please provide a copy of the ‘Monthly Report’ or similar identifying defects and associated rectification as noted in the Minutes of the Property Control Group (3.1 & 3.2) on the 28th of May 2015, including any appendices. 

Clarified on 5/7/2016 to Project Control Group ‐ Not Property Control Group.  MP Stephan Knoll

Application

Please provide a copy of the ‘Monthly Report’ or similar identifying defects and associated rectification as noted in the Minutes of the Property Control Group on the 29th of October 2015, including any appendices.

Clarified on 5/7/2016 to Project Control Group ‐ Not Property Control Group. MP Stephan Knoll

Page 23: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

Please provide a copy of the ‘Monthly Report’ or similar identifying defects and associated rectification as noted in the Minutes of the Property Control Group on the 27th of August 2015, including any appendices.

Clarified on 5/7/2016 to Project Control Group ‐ Not Property Control Group.  MP Stephan Knoll

Application

Please provide a copy of the ‘Monthly Report’ or similar identifying defects and associated rectification as noted in the Minutes of the Property Coordination Meeting on the 15th of December 2015, including any appendices.

Clarified on 5/7/2016 to Project Control Group ‐ Not Property Control Group. MP Stephan Knoll

Application

Please provide a copy of the ‘Monthly Report’ or similar identifying defects and associated rectification as noted in the Minutes of the Property Control Group on the 24th of September 2015, including any appendices.

Clarified on 5/7/2016 to Project Control Group ‐ Not Property Control Group. MP Stephan Knoll

ApplicationPlease provide all invoices for steel purchased for the rail revitalisation project for the Seaford and Tonsley rail lines between the years 2010 and 2014 (inclusive). Please include documents that show country of Origin.  MP Stephan Knoll

Application All comments, notes and memos pertaining to bus lanes or transit lanes used for taxis, hire cars and ride sharing.  MP David PisoniApplication All submissions to Infrastructure Australia from January 2012 to present. MP David Pisoni

Application

All options prepared for O Bahn traffic routes into and through the Adelaide CBD and surrounding area from 2012 to the present. 

MP David Pisoni

Application

All draft and final proposals for bus lanes in metropolitan Adelaide including accepted and rejected proposals. 

On 20 June 2016 Minister Pisoni's office provided a date range for their request of "2010 to the present" MP David PisoniApplication The business plan for the O Bahn tunnel project MP David Pisoni

ApplicationThe most recent traffic counts at road and rail intersections in metropolitan Adelaide. 

MP David Pisoni

ApplicationAny and all documents regarding the concept plans of the new city High School 

MP John Gardner

Application

I request all documents, including emails, communications with private bus companies, including Willunga Bus Charter and quotations provided, communications between departments, communications internally, along with any other documentation detailing the use of private bus companies to transport passengers who would be affected by the proposal to potentially shut down the Tonsley and Seaford Train Lines whilst a full investigation is carried out into the failure of the electrification on the Tonsley and Seaford Train Lines which occurred in April 2016.

Rationale: It has been speculated that investigations have been performed by the Department of Planning, Transport and Infrastructure into the availability and costs involved in contracting private bus companies to transport passengers who would be affected by the proposal to potentially shut down the Tonsley and Seaford Train Lines whilst a full investigation is carried out into the failure of the electrification on the Tonsley and Seaford Train Lines which occurred in April 2016.

MP Michael Pengilly

ApplicationA copy of any report from GHD to the Minister for Transport and Infrastructure or the Department that makes reference to rail grade separation, particularly to rail lines located in the Adelaide Hills.  MP Sam Duluk 

Application Traffic counts for the last 2 years at federal road and rail intersections in metropolitan Adelaide.  MP David Pisoni

Page 24: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

ApplicationReports produced to date on The Provision of Independent Review Services for the Design and Construction of the North‐South Corridor, Torrens to River Torrens Project (DPTI027753). MP David Pisoni

Application Traffic counts for the last 2 years at local road and rail intersections in metropolitan Adelaide. MP David Pisoni

Application

The breakdown of South Australian (SA) Government subsidy applied to each ‘trip’ for each ‘person’ on a particular mode of public transport (eg. Bus, tram, train). For example, for each tram passenger travelling a one way journey has their fare subsidised by $2.45 by the SA Government.  MP Michael Pengilly

ApplicationThe number of apprentice starts and completions (including their trades) under the Government Apprenticeships Scheme and the number of trainees (to be listed separately) from 2006 to the present.  MP David Pisoni

ApplicationThe number of staff employed on 457 visas in the Department for Planning, Transport, and Infrastructure and their occupations from 2006 to present.  MP David Pisoni

ApplicationA copy of all documents between the State Valuation Office (SVO) and the Department of Treasury and/or the Treasurer’s office, including between the Valuer‐General and the Treasurer from 1 January 2016 to present  MP John Darley

Application

All reports, plans, costing documents, or recommendations produced by or provided to DPTI relating to pedestrian crossing options on Hackney Road as part of the O’Bahn Extension project

On 10 July 2016 Mr Pisonis office gave a timeframe for the request of '1 June 2013 to present'. MP David Pisoni

ApplicationAll reports, plans, costing documents and recommendations produced by or provided to DPTI relating to a pedestrian footbridge over Hackney Road as part of the O’Bahn Extension project. MP David Pisoni

Application

What was the severance package paid to Mr Paul Anderson, Office of Recreation and Sport Executive Director, when he left his position? How long did Mr Anderson have to run on his contract? Please include any ‘Deed of Agreement’ or similar with regards to his termination.  MP Stephan Knoll

Application All delays longer than 15 minutes on the Grange train line and all cancellations on that line from 1 January 2015 to the present.  MP David Pisoni

Application

All delays longer than 15 minutes on the Seacliff train line and all cancellations on that line from 1 January 2015 to the present.

On 20 June 2016 clarified the scope to:

All delays longer than 15 minutes on the Seaford train line and all cancellations on that line from 1 January 2015 to the present.MP David Pisoni

Application All delays longer than 15 minutes on the Tonsley train line and all cancellations on that line from 1 January 2015 to the present. MP David Pisoni

Application

Documents relating to the positioning of reduce speed signs on the entry ramp to the Princes Highway, Crafers West on 4 May 2016.'

On 11 July 2015 Minister Pisonis office clarified the request asking for:

'temporary signage used on the day to indicate that there was a change of speed coming up in the fixed zone on the freeway.' MP David Pisoni

Application All delays longer than 15 minutes on the Gawler train line and all cancellations on that line from 1 January 2015 to the present. MP David Pisoni

ApplicationThe number of vehicles exceeding the speed limit on the Princes Highway, Crafers West on 4 May 2016 and the speed at which each of those vehicles was travelling.  MP David Pisoni

ApplicationAll delays longer than 15 minutes on the Outer Harbour train line and all cancellations on that line from 1 January 2015 to the present. MP David Pisoni

Page 25: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application All statistics related to the SA State Sport Dispute Centre, including descriptions and outcomes since its inception to 2016. MP Tim WhetstoneApplication Copies of any reports related to the economic and social contribution of sport in South Australia from 2013 to 2016. MP Tim Whetstone

ApplicationAll briefings and reports relating to the sports voucher concept within the time frame of 2011‐12, 2012‐13, 2013‐14, 2014‐15 and 2015‐16. MP Tim Whetstone

Application

All reports and briefings on recreation and sport funding (including Active Club) in 2013‐14, 2014‐15 and 2015‐16.

On 22 June 2016 applicant limited the timeframe to the past 12 months. 

On 29 June 2016 the applicant clarified the scope to request;“Reports and briefings on the Office of Recreation and Sport Grant funding programs” MP Tim Whetstone

Application

All correspondence with the Stadium Management Authority, SANFL, AFL (Including the Adelaide Crows Football Club and Port Adelaide Football Club), SACA and Cricket Australia in 2014, 2015 and 2016.

Clarified on 13 July 2016 to:

“All correspondence with the Adelaide Oval Stadium Management Authority, SANFL and AFL relating to events hosted at Adelaide Oval in 2014, 2015 and 2016”

Which on 15 July 2016 was further clarified to: “the statement ‘events hosted at Adelaide Oval’ was requesting sport events hosted at Adelaide Oval. MP Tim Whetstone

Application All briefings and reports on Coopers Stadium in 2014‐15 and 2015‐16. MP Tim Whetstone

Application All agendas and minutes from Commonwealth Games Feasibility Committee meetings in 2012‐13, 2013‐14, 2014‐15 and 2015‐16. MP Tim Whetstone

Internal Review

INTERNAL REVIEW

Valuation document relating to Cameron Macleod and/or OPTEON property group concerning Lots 32, 312‐314 Jetty Road, Wallaroo, South Australia, reference 2014/10853/01 MP Robert Brokenshire

Application

…details of objections lodged to capital and site valuations for the 2014/2015 and 2015/2016 financial years which resulted in a reduction greater that 20%.I request the following information: •Original valua on •Date of review •Suburb of subject property •Reduced valua on MP John Darley

Application

I request all documentation regarding the costing of the O’Bahn project from 1 January 2013 to 28 June 2016 including, but not limited to, a breakdown of all costs, details on how the cost benefit ratio was calculated and alternative projects costed and considered to improve the reliability and speed of the O’Bahn MP Rachel Sanderson MP

Application

I request all documents and correspondence between 1 January 2011 and 28 June 2016 in relation to any road safety reports, traffic surveys and resulting recommendations; discussion of future plans; and projected or quoted costings of future plans regarding the intersection of Hackney Road and Park Terrace Gilberton. MP Rachel Sanderson MP

ApplicationI request all documents in relation to any road safety reports, traffic surveys and discussion of future plans for the Regency and Prospect Roads intersection, Prospect MP Rachel Sanderson MP

Page 26: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

ApplicationAll documents created and received regarding the Executive Steering Committee that oversaw negotiations regarding the Festival Plaza redevelopment (previously known as the AFC Car Park Request for Proposals project) for the period 2011 to present. MP Vickie Chapman

Application All minutes, agendas and speaking notes from the SA Women in Sport Taskforce since its inception. MP Tim Whetstone

Application

I seek access to the following information for each of the three following time frames ‐ August 2014, August 2015 and May 2016 (in spreadsheet form if possible)1. Total public BUS system patronage in South Australia for each of the time frames.2. Total public TRAIN system patronage in South Australia for each of the time frames.3. Total public TRAM system patronage in South Australia for each of the time frames.4. Public transport BUS patronage broken down by day and route within each of the time frames.5. Public transport TRAIN patronage broken down by day and route within each of the time frames.6. Public transport TRAM patronage broken down by day and route within each of the time frames.7. If possible ‐ for each of the breakdowns a further breakdown of initial boarding numbers and transfer numbers.

MP Robert Brokenshire

Application

 All documents relating to the cost of fitting out the new Kaurna electorate  office at Seaford Meadows SC 760 Grand Boulevard, Seaford Meadows SA    5169. Please include any costs of breaking the previous lease for the Kaurna    electorate office, any make good costs incurred from the previous lease and the cost of the new lease including outgoings. MP Stephan Knoll

Application

All of the documents relating to the cost of fitting out the new Lee electorate office at Level 1, 62 Semaphore Rd, Semaphore  SA  5015.  Please include any costs of breaking the previous lease for the Lee electorate office, any make good costs incurred from the previous lease at Shop 4, 173‐177 Tapleys Hill Rd, Seaton,  SA  5023 and the cost of the new lease including outgoings. MP Stephan Knoll

Application

All the documents providing advice or identifying the costs of relocating or refurbishing Minister Close's office in 2015 and 2016.  Please include any costs for breaking the previous lease, any make good costs incurred from the previous lease and the cost of the new lease including outgoings. MP Stephan Knoll

ApplicationAll documents relating to the 'business case' and other supporting documents to produce such, for the $3billion AdeLink extension as announced by the Federal Labor party during the Federal Campaign of 2016.  From 1 January till 2nd July 2016. MP Stephan Knoll

ApplicationAll documents containing data in relation to boom gate faults at the Morphettville tram crossing for the period 1 July 2014 until 30 June 2016. MP Duncan McFetridge

Application

I request that you provide to me a copy of all correspondence from DPTI staff, including the CEO to Light Regional Council and staff in relation to the Roseworthy township expansion.

Time frame given by applicants office on 28/07/2016 of "November 2013 to present" MP John Darley

ApplicationI request that you provide me a copy of all DPTI documentation regarding the Roseworthy township expansion including correspondence, emails and internal file notes, between DPTI staff, including the CEO, from November 2013 to present.  MP John Darley

Application All briefing and reports relating to stadium audits in South Australia in 2014, 2015 and 2016. MP Tim Whetstone

Application

A list of successful and unsuccessful funding applications through the Office for Recreation and Sport, including the applicant, description of what the applicant applied for, the amount and what was awarded and each electorate the applicant is from. Date Range 2014/15 and 2015/16. MP Tim Whetstone

Internal ReviewINTERNAL REVIEW ‐ Reports produced to date on The Provision of Independent Review Services for the Design and Construction of the North‐South Corridor, Torrens to River Torrens Project (DPTI027753). MP David Pisoni

Page 27: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

Information regarding Community Grants for Safer, Greener and More Active Travel as follows;1. Size (i.e. full time equivalent) and cost (ie budget) of the Section managed by the Manager, Safer Travel and Behaviour Change.2. The scope of the work it is intended to carry out3. What is the size of a 'small scale project'?4. Who makes the decision on applications?5. Is there a statutory basis (i.e. Act or Regulation) under which this operates? MP Isobel Redmond

Application

Please provide;1.  Average time taken, and range of times, to drive from Fixed Electronic "time to city" signs on Montacute Road to the city.2. Average time taken, and range of times, to drive from Fixed Electronic "time to city" signs on Payneham Road to the city.

Data available for 2016 MP Vincent Anthony Tarzia

Application All correspondence between the Office of the CE of DPTI and the Premier's Office regarding the trade union royal commission.  MP Stephan Knoll

ApplicationAll correspondence between the office of the CE of DPTI and the Transport Minister's Office regarding the trade union royal commission MP Stephan Knoll

ApplicationPlease provide;"All 'project status reports' or completion reports' or similar for the AddInsight project from 1 January 2016 till 15 July 2016" MP Stephan Knoll

ApplicationPlease provide all reports of each structural inspection of the Millswood subway from 2006 to the present day.

MP David PisoniInternal Review INTERNAL REVIEW ‐ The business plan for the O Bahn tunnel project. MP David Pisoni

Internal Review

INTERNAL REVIEW ‐ All options prepared for O Bahn traffic routes into and through the Adelaide CBD and surrounding area from 2012 to the present. 

MP David Pisoni

Internal Review

INTERNAL REVIEWAll draft and final proposals for bus lanes in metropolitan Adelaide including accepted and rejected proposals. 

On 20 June 2016 Minister Pisoni's office provided a date range for their request of "2010 to the present" MP David Pisoni

Internal Review

INTERNAL REVIEW All reports, plans, costing documents, or recommendations produced by or provided to DPTI relating to pedestrian crossing options on Hackney Road as part of the O’Bahn Extension project

On 10 July 2016 Mr Pisonis office gave a timeframe for the request of '1 June 2013 to present'. MP David Pisoni

Internal ReviewINTERNAL REVIEW All delays longer than 15 minutes on the Tonsley train line and all cancellations on that line from 1 January 2015 to the present. MP David Pisoni

Page 28: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Internal Review

INTERNAL REVIEWAll delays longer than 15 minutes on the Seacliff train line and all cancellations on that line from 1 January 2015 to the present.

On 20 June 2016 clarified the scope to:

All delays longer than 15 minutes on the Seaford train line and all cancellations on that line from 1 January 2015 to the present.MP David Pisoni

Internal ReviewINTERNAL REVIEWAll delays longer than 15 minutes on the Gawler train line and all cancellations on that line from 1 January 2015 to the present. MP David Pisoni

Internal Review

INTERNAL REVIEWAll delays longer than 15 minutes on the Outer Harbour train line and all cancellations on that line from 1 January 2015 to the present. MP David Pisoni

Internal ReviewINTERNAL REVIEWAll delays longer than 15 minutes on the Grange train line and all cancellations on that line from 1 January 2015 to the present.  MP David Pisoni

ApplicationA copy of the terms of reference given to the Valuer in relation to the valuation document relating to Cameron Macleod and/or OPTEON property group concerning Lots 32, 312‐314 Jetty Road, Wallaroo, South Australia reference no: 2014/10853/01 MP Robert Brokenshire

Application

Please provide the number, agency and ASO level of all GIS (Geographical Information Systems) Officers or similar employed by the agency as at 1 July 2016.

MP Stephan Knoll

Application

All documents related to repaired, replaced and malfunctioning security cameras including any fines issued in response to camera compliance in taxis in South Australia.

Note to Division:  MP has clarified scope ‐ timeframe from 2013 to present MP David Pisoni

Application

All documents, contracts or agreements related to the specifications, supplier(s) and tender processes for the supply of security cameras in taxis in South Australia. 

Note to Division:  MP has clarified scope ‐  timeframe from 2013 to present MP David Pisoni

Application

All documents related to the cost of taxi security cameras and any complaints received regarding the quality, reliability and cost of security cameras in taxis in South Australia. 

Note to Division:  MP has clarified scope ‐ timeframe from 2013 to present MP David Pisoni

Application

All documents related to the picture quality requirements for security cameras in taxis, including the minimum quality requirement for stored images and pixel per square inch minimum requirements. 

Note to Division:  MP has clarified scope ‐ timeframe from 2013 to present MP David Pisoni

Application

All documents showing the number of online motor registration renewals since the introductions of online registration, by each year, since the introduction of online registration. 

MP David Pisoni

ApplicationAll documents showing the total number of motor registration renewals from 2010 to the present for both commercial and non‐commercial vehicles. MP David Pisoni

Page 29: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

All documents related to the hours worked per week on trams by Passenger Service Assistants since 2014.

Scope clarified on the 31st October 2016 to:

"the average number of hours spent on trams by Passenger Service Assistants including the total number of passenger service assistants." MP David Pisoni

External Review

EXTERNAL REVIEW

Valuation document relating to Cameron Macleod and/or OPTEON property group concerning Lots 32, 312‐314 Jetty Road, Wallaroo, South Australia, reference 2014/10853/01 MP Robert Brokenshire

Application

Timeframe: financial year 2015/161. The number of learners permit applications made for each time frame broken down by; a. People applying aged under 18; and b. People applying aged between 18 and 20.2. The number of learner's permits issued to people in the time frames broken down by the number issued to a. people under the age of 18; and b. The number issued to people aged between 18 and 20.3. The number of accidents in the time frames in South Australia involving the driver of a motorcycle broken down by a. the number where the driver was aged under 18 years of age; and b. the number where the driver was aged between 18 and 20; and c. whether the accident resulted in the driver's death/fatality, serious injury or minor injury.  MP Robert Brokenshire

Application

All documents related to all buses in use in the Adelaide metropolitan system whose body was built before 1991. 

Division Please Note: Clarification of Scope (23/08/16)"All buses whose bodies are aged more than 25 years old that are still in operation in the metro system" MP David Pisoni

Application All documents related to the last use of DPTI articulated bus #904978 Man SG280 on any Adelaide Metropolitan route or for charter.  MP David Pisoni

Application All documents related to the last use of DPTI articulated bus #904954 Man SG280 on any Adelaide metropolitan route or for charter  MP David Pisoni

ApplicationThe employment contract of Mr Michael Deegan, Chief Executive of the Department of Planning, Transport and Infrastructure and all documents related to any other payments made to him including bonus or incentive payments since his employment commenced.  MP David Pisoni

ApplicationAll documents related to the number of registered vessels (to include motorised, sail, and Jetski boats) by postcode, suburb or similar identifier.  MP David Pisoni

Application All invoices to AECOM with regard to the planning study for works on the South Road, Darlington.  MP David Pisoni

Application

All planning studies and invoices and receipts (including inter‐government transfers and/or invoices) relating to the $70 million of Federal funding awarded through the National Building Program to fund planning studies on Adelaide’s North‐South Corridor for 14 February 2011.

Clarification from applicant on 31 October to amend FOI request to:

A list of authors, titles, dates and invoices of all planning studies relating to the $70 million of Federal funding awarded through the National Building Program to fund planning studies on Adelaide’s North‐South Corridor from 14 February 2011.” MP David Pisoni

Page 30: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

All documents related to the location and number of Marine Safety Officers in South Australia from 2010 to the present. 

MP David Pisoni

Application

All documents related to the total expenditure on boat ramps, all other marine infrastructure, safety publications and compliance officers each year since 2010

MP David Pisoni

ApplicationAll documents related to all projects funded from the Facilities Fund(Marine) for each year since 2010. MP David Pisoni

External Review EXTERNAL REVIEW ‐ The business plan for the O Bahn tunnel project. MP David Pisoni

ApplicationCopies of all documents including invoices since 1 January 2015 relating to a payment of any expense associated with the renovation of the 16th Floor of the State Admin Building. MP Rob Lucas

Application All documents relating to SA's International Sports Diplomacy Strategy  MP Tim Whetstone

ApplicationAll documents including all submissions to the Minister related to security camera compliance in taxis, including all procedures undertaken to check this compliance and all breaches of compliance since 2009 MP David Pisoni

ApplicationAll information provided to the Minister from accredited persons from the register of security camera systems fitted in taxis from 2009 as required by Section 74 (3) viii of the Passenger Transport regulations 2009 MP David Pisoni

Application

I request all documents relating to land zoned Rural Living within the new Environment and Food Protection Areas (relevant to the Planning Development and Infrastructure Act), specifically:The names and addresses of all landowners within the 35 Rural Living areas (Minister Rau and Chris Kwong have previously committed to providing these details as it was relayed letters have been sent to all landowners); andA copy of all correspondence sent to the landowners and the relevant local government authority (Council) regarding the new Environment and Food Protection Areas and the two year sunset clause to be introduced. 

MP Steven GriffithsApplication All list of suppliers of security camera systems for taxis including suppliers removed from that list since 2009. MP David Pisoni

ApplicationAll statements provided to the Minister by all accredited suppliers of security cameras for taxis, certifying system compliance since 2009. MP David Pisoni

Application

All lists of accredited suppliers (persons who hold accreditation under regulation 74 of the Passenger Transport Regulations 2009) of security camera systems for taxis including accredited suppliers removed from that list since 2009.

MP David Pisoni

ApplicationAll documents submitted to the Minister related to the software used in connection with any security camera system fitted (or to be fitted) to taxis by an accredited supplier, including all documents related to checks on this equipment from 2009. MP David Pisoni

ApplicationAll documents related to all Greenway and cycle path projects including all plans for proposed and completed projects, all work currently in progress and the total money spent or committed to be spent on these projects from 2010 to the present MP David Pisoni

Application

All documents related to all projects funded by the $100 million road safety contribution by the Motor Accident Commission to the 2013‐14 State Budget including each project name, location, cost and completion date.

On 24 October 2016 the applicant provided a refinement of the scope to;

"...a list of relevant projects." MP David Pisoni

Application

All fines levied under Sections 75, 76 and 77 of the Passenger Transport Regulations 2009 listed by amount of fine and offence since 2009.

MP David Pisoni

Page 31: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

A list of all capital works projects in the Government’s capital works program (updated following the 2016‐17 Budget). For each project, the list should include the project name, proposed annual Government expenditure over each future year and the estimated total cost (including contingencies). The list should include those projects either being undertaken in 2016‐17 or to be undertaken in future years. MP David Ridgway

ApplicationI request access to copies of minutes taken during meetings of the Procurement Governance Committee of the Department of Planning, Transport and Infrastructure for the period 1 July 2015 to 30 June 2016. MP David Ridgway

Internal ReviewINTERNAL REVIEW All correspondence between the Office of the CE of DPTI and the Premier's Office regarding the trade union royal commission.  MP Stephan Knoll

Internal Review

INTERNAL REVIEWAll correspondence between the office of the CE of DPTI and the Transport Minister's Office regarding the trade union royal commission MP Stephan Knoll

ApplicationI request access to copies of all specified procurement information submitted to the State Procurement Board as per the State Procurement Board’s Board Procurement Reporting Policy for the period 1 July 2015 to 30 June 2016. MP David Ridgway

Application

I request access to all documents that discuss, analyse, explain, interpret or otherwise concern traffic modelling and traffic counts involving the Oaklands Crossing Intersection. 

MP Corey Wingard

Application

I request access to any documents that detail, refer to, or describe plans for a rail overpass, rail underpass, changes to traffic signals or that consider a modification to the Oaklands railway crossing in any form. 

MP Corey Wingard

Application

I request access to the Rail Revitalisation Signalling and Communications Project ‐ Adelaide ETCS Headway Validation Report dated 11/05/2015 and authored by CH2MHILL and any other documents that refer to this report in any way. 

MP Corey Wingard

Application

I request access to the August 2011 document 'Oaklands Park Capacity Improvements ‐ Traffic Analysis Report' by the Department of Transport, Energy and Infrastructure. 

MP Corey WingardApplication I request access to the August 2015 document 'Oaklands Park Review ‐ Concept Planning Report' authored by DPTI.  MP Corey Wingard

ApplicationI request access to the February 2012 document 'Oaklands Park Grade Separation Planning study ‐ Concept Planning Report' authored by Sinclair Knight Merz.  MP Corey Wingard

Application I request access to the document entitled 'Oaklands Grade Separation Project ‐ Business Case' authored by DPTI on 01/04/2013. MP Corey Wingard

Application

All correspondence including analysis, advice or requests from sport and recreation clubs/organisations in South Australia for support in relation to increasing costs of electricity, water and Emergency Services Levy bills in 2014, 2015 and 2016. 20/09/2016 11:25 Applicant offered to re‐scope to:‐ All correspondence from sport and recreation clubs/organisations in SA relating to electricity, water and emergency services levy in 2014, 2015 and 2016 (to date). 22/09/2016 12:16 Applicant changed scope again to:‐All correspondence within the department and from sport and recreation clubs/organisations in SA relating to electricity, water and emergency services levy in 2014, 2015 and 2016 (to date) MP Tim Whetstone

ApplicationAll correspondence identifying costs to sport and recreation clubs/organisations in South Australia for electricity and water bills in 2014, 2015 and 2016. MP Tim Whetstone

ApplicationA copy of all minutes and agendas from the Office for Recreation and Sport‐led utilities working group in 2013‐14, 2014‐15, 2015‐16 and 2016‐17. MP Tim Whetstone

Page 32: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

A copy of the SASI HP Financials spreadsheet for 2008‐09, 2009‐10, 2010‐11 and 2014‐15 (this includes actual spending on directorate, sports science, sports programs management, each high performance sports program, the sports program total and the SASI total). (Please also provide definitions of the abbreviated titles in the spreadsheets.)

MP Tim Whetstone

ApplicationA list of successful and unsuccessful application to the boating facilities fund with a description of each, and a total amount of funding requested and the total amount granted for each project in 2013‐14, 2014‐15, 2015‐16 and 2016‐17. MP Tim Whetstone

Application

Documents submitted between January 1, 2015 to date of this application:1. Which represent ideas, put internally to the CEO's office and/or to other senior management, to improve any aspect of SA's road, rail, tram or bus systems2. Requests from the CEO submissions/ideas for the improvement of any aspect of SA's road, rail, tram or bus systems.Documents should include but not be limited to e‐mail (including on the SAGEMS system), letters, briefings and reports.  MP Robert Brokenshire

External Review

All draft and final proposals for bus lanes in metropolitan Adelaide including accepted and rejected proposals. 

On 20 June 2016  Minister Pisoni's office provided a date range for their request of "2010 to the present" MP David Pisoni

External Review

All reports, plans, costing documents, or recommendations produced by or provided to DPTI relating to pedestrian crossing options on Hackney Road as part of the O’Bahn Extension project

On 10 July 2016 Mr Pisonis office gave a timeframe for the request of '1 June 2013 to present'. MP David Pisoni

External Review All delays longer than 15 minutes on the Grange train line and all cancellations on that line from 1 January 2015 to the present.  MP David Pisoni

External ReviewAll delays longer than 15 minutes on the Outer Harbour train line and all cancellations on that line from 1 January 2015 to the present. MP David Pisoni

External Review All delays longer than 15 minutes on the Gawler train line and all cancellations on that line from 1 January 2015 to the present. MP David Pisoni

External Review

All delays longer than 15 minutes on the Seacliff train line and all cancellations on that line from 1 January 2015 to the present.

On 20 June 2016 clarified the scope to:

All delays longer than 15 minutes on the Seaford train line and all cancellations on that line from 1 January 2015 to the present.MP David Pisoni

External Review All delays longer than 15 minutes on the Tonsley train line and all cancellations on that line from 1 January 2015 to the present. MP David Pisoni

External Review All options prepared for O Bahn traffic routes into and through the Adelaide CBD and surrounding area from 2012 to the present.  MP David Pisoni

Internal Review

What was the severance package paid to Mr Paul Anderson, Office of Recreation and Sport Executive Director, when he left his position? How long did Mr Anderson have to run on his contract? Please include any ‘Deed of Agreement’ or similar with regards to his termination.  MP Stephan Knoll

Application Copies of the Lease Agreements for the Lee Electorate Office for financial year ending 2014, 2015 and 2016. MP Stephan KnollApplication Copies of the Lease Agreements for the Kaurna Electorate Office for financial year ending 2014, 2015 and 2016. MP Stephan KnollInternal Review Copies of any reports related to the economic and social contribution of sport in South Australia from 2013 to 2016. MP Tim Whetstone

Internal Review All statistics related to the SA State Sport Dispute Centre, including descriptions and outcomes since its inception to 2016. MP Tim Whetstone

Page 33: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Internal Review

All reports and briefings on recreation and sport funding (including Active Club) in 2013‐14, 2014‐15 and 2015‐16.

On 22 June 2016 applicant limited the timeframe to the past 12 months. 

On 29 June 2016 the applicant clarified the scope to request; “Reports and briefings on the Office of Recreation and Sport Grant funding programs”

MP Tim WhetstoneInternal Review All briefings and reports on Coopers Stadium in 2014‐15 and 2015‐16. MP Tim Whetstone

Internal ReviewAll briefings and reports relating to the sports voucher concept within the time frame of 2011‐12, 2012‐13, 2013‐14, 2014‐15 and 2015‐16. MP Tim Whetstone

Internal Review

All correspondence with the Stadium Management Authority, SANFL, AFL (Including the Adelaide Crows Football Club and Port Adelaide Football Club), SACA and Cricket Australia in 2014, 2015 and 2016.

Clarified on 13 July 2016 to “All correspondence with the Adelaide Oval Stadium Management Authority, SANFL and AFL relating to events hosted at Adelaide Oval in 2014, 2015 and 2016”

On 15 July 2016 the applicant clarified that the statement “events hosted at Adelaide Oval” was requesting sport events hosted at Adelaide Oval. 

MP Tim WhetstoneInternal Review All briefing and reports relating to stadium audits in South Australia in 2014, 2015 and 2016. MP Tim Whetstone

Internal Review

All documents related to repaired, replaced and malfunctioning security cameras including any fines issued in response to camera compliance in taxis in South Australia.

Note to Division:  MP has clarified scope ‐ timeframe from 2013 to present MP David PisoniApplication All documents related to the number of engineering internships for each year from 2006 to the present MP David Pisoni

Application

All soil testing results on the Outer Harbour rail line taken as part of the Torrens Road to River Torrens Project including all soil testing results associated with grade separation, all information with regard to contaminants found and all recommendations concerning remediation of contaminants from 2012 to the present MP David Pisoni

Internal Review

All documents related to the picture quality requirements for security cameras in taxis, including the minimum quality requirement for stored images and pixel per square inch minimum requirements. 

Note to Division:  MP has clarified scope ‐ timeframe from 2013 to present MP David Pisoni

Internal Review

All documents showing the number of online motor registration renewals since the introductions of online registration, by each year, since the introduction of online registration. 

MP David Pisoni

Internal ReviewAll documents showing the total number of motor registration renewals from 2010 to the present for both commercial and non‐commercial vehicles. MP David Pisoni

External Review

All comments, notes and memos pertaining to bus lanes or transit lanes used for taxis, hire cars and ride sharing. 

MP David Pisoni

Internal ReviewI request access to the February 2012 document 'Oaklands Park Grade Separation Planning study ‐ Concept Planning Report' authored by Sinclair Knight Merz.  MP Corey Wingard

Page 34: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Internal ReviewI request access to the August 2011 document 'Oaklands Park Capacity Improvements ‐ Traffic Analysis Report' by the Department of Transport, Energy and Infrastructure.  MP Corey Wingard

Internal Review I request access to the document entitled 'Oaklands Grade Separation Project ‐ Business Case' authored by DPTI on 01/04/2013. MP Corey WingardInternal Review I request access to the August 2015 document 'Oaklands Park Review ‐ Concept Planning Report' authored by DPTI.  MP Corey Wingard

ApplicationAll documents (including those related to the reimbursement of flight, accommodation and minor expenses) related to the cost of the employment of consultants.  MP David Pisoni

ApplicationAll documents (including minutes, memos, records of conversations) related to meetings between the Rail Commissioner (and/or his representative) and EMA Consulting.  MP David Pisoni

ApplicationAll documents (including minutes, memos, records of conversations) related to meetings between the Rail Commissioner (and/or his representative) and consultants.  MP David Pisoni

ApplicationAll documents (including reports, memos, tenders documents, meeting notes and contracts) related to the employment of  EMA Consulting.  MP David Pisoni

Application

Documents related to the number and total value of invoices identified as having been paid in error or deemed to be fraudulent from 2010 to the present. 

MP David Pisoni

Application The latest condition reports for each of Unley Road, Goodwood Road, Glen Osmond Road, Cross Road and Greenhill Road.  MP David Pisoni

ApplicationAll documents (including reports, memos, tender documents, meeting notes and contracts) related to the appointment of consultants. MP David Pisoni

ApplicationAll feedback responses to Michael Deegan, Rail Commissioner in response to his posts at http://adelaidemetro.com.au/About‐us/Rail‐Commissioner from March 2015 to the present.  MP David Pisoni

Application I request the balance of the ‘Planning and Development Fund’ as at 30 June 2016 and 30 September 2016. MP Steven Griffiths

Application

I request details relevant to the Port Adelaide Development Assessment Committee (PADAC), specifically:Since the Committee was established via Regulations on 9 April 2015, how many development applications have been determined by the PADAC; andThe number of meetings attended and the level of remuneration received by each of the nine PADAC members since 9 April 2015 (S Blencowe, C Branford, S Crafter, P Dungey, H Dyer, R Excell, S Fogarty, D Mutton and D O’Loughlin) relevant to their work on the PADAC. 

MP Steven Griffiths

Application

1. Copies of briefing notes prepared for/ received by the Chief executive of DPTI concerning the power outage across South Australia. 2. Copies of briefing notes and briefing reports from the Chief Executive of DPTI for Government Ministers concerning the SA Power outage/blackout. MP Robert Brokenshire

ApplicationDocuments outlining projects, spending, infrastructure or future planning that include the terms “marginal electorates” or “marginal seats”. Timeframe: January 1 2015 to date of this application (26/10/2016) MP Robert Brokenshire

ApplicationA list of all projects funded by the “$2 million over four years to reinvigorate the role of the neighbourhood Watch Program” (2014‐2015 Budget Speech). MP David Pisoni

Application

All documents related to work completed since Cabinet note MFI 05/09 PN on public transport services from the Adelaide CBD to Adelaide Airport. 

Sent to ‐ Planning Transport Policy, Infrastructure Delivery and Public Transport Ops.  MP David PisoniApplication The cost of public transport fare evasion in SA each year since 2010. MP David PisoniApplication All documents that include the terms ‘toll road’ or ‘user charge’ from March 2014 to present. MP David Pisoni

Application The latest data available related to asset maintenance, depreciation and accelerating rundown of the existing transport network.  MP David PisoniApplication All minutes from the Road Safety Ministerial Council from March 2002 to the latest. MP David Pisoni

Page 35: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

Documents related to the development of freight transport infrastructure from 2003.Rescope from David Pisoni to:‐Documents related to the development of Rail freight transport infrastructure from 2003. and Documents related to the development of Road freight transport infrastructure from 2010.

MP David Pisoni

Application

All plans for the O'Bahn Tunnel ProjectRescoped by David Pisoni to :‐Current tunnel plans and concept plans showing the position of the tunnel, the entry and exit points "PlanView" type drawings showing start of tunnel, where it goes and the end of the tunnel. NO DETAIL does not want to know cut & fill, road design or any other details, wants over view type of drawings.

MP David Pisoni

Application

I request access to all correspondence between the Department of Planning, Transport and Infrastructure and the Department of Correctional Services regarding an unsolicited proposal for the planning and development of a new prison in South Australia for the period of 1 January 2015 to present. 

MP David Ridgway

Application

I request access to all documents relating to an unsolicited proposal for the planning and development of a new prison in South Australia for the period of 1 January 2015 to present.

MP David Ridgway

Application

I seek access to the following information for each of the time frames – August 1, 2015 to August 8, 2015 and; August 1, 2016 to August 8, 2016 (in spreadsheet form if possible)

1.Total public BUS system patronage in South Australia, route by route and day‐by‐day for each of the  me frames. MP Robert Brokenshire

Application

A list of all identified alienated land (as referred to in Cabinet Document of 18/04/2005 titled 'Accommodating State Transport Infrastructure Projects in the Adelaide City Parklands Bill 2005') that has been identified and a separate list of all identified alienated land returned for park lands use." MP David Pisoni

Internal ReviewI enclose a request for access for reports or recommendations of rail station upgrades, including total costs, on the metropolitan rail line network since beginning 2008 until current.  MP David Pisoni

Internal Review

I request access to the Asbestos register for all State Government Transport Infrastructure 

Scope clarified by applicant to search for a master list of all Asbestos registers for State Government Transport Infrastructure  MP David Pisoni

Internal ReviewI enclose a request for access for the number of bus crashes reported annually involving Adelaide Metro (or equivalent) buses from 2006 until present.  MP David Pisoni

Internal Review I enclose a request for access for the asbestos register for all State Government Hospitals MP David PisoniInternal Review I enclose a request for access for the asbestos register for the State Administration Building MP David Pisoni

Internal ReviewI request access to all memos, correspondence, reports and recommendations regarding Asbestos associated with the Noarlunga line and related infrastructure since June 2015 until present MP David Pisoni

Internal Review I request access to the schedule of sleeper replacement programs since beginning 2008 until current MP David Pisoni

Internal ReviewAll documentation including correspondence, memos and briefing notes referring to a review with key words of ‘taxi’ and/or ‘hire car’ and/or ‘Uber’ and/or ‘Share Economy’ and/or ‘Point to Point industry’ from 1 July 2014 until present.  MP David Pisoni

Internal ReviewAll documents related to all projects funded from the Facilities Fund(Marine) for each year since 2010. MP David Pisoni

Page 36: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Internal Review

A list of all capital works projects in the Government’s capital works program (updated following the 2016‐17 Budget). For each project, the list should include the project name, proposed annual Government expenditure over each future year and the estimated total cost (including contingencies). The list should include those projects either being undertaken in 2016‐17 or to be undertaken in future years. MP David Pisoni

Internal ReviewAll documents related to the number of registered vessels (to include motorised, sail, and Jetski boats) by postcode, suburb or similar identifier.  MP David Pisoni

Internal Review

Copies of all documents, including reports, briefings, presentations and advice relating to the Torrens Junction grade separation. Including all proposed solutions or variations thereof.

Scope clarified on 25 February 2016 to:

Copies of any consulting reports and briefings relating to the Torrens Junction grade separation on all projects over the last five years MP David Ridgway

Internal ReviewAll documents related to the location and number of Marine Safety Officers in South Australia from 2010 to the present. 

MP David Pisoni

Application

Documents related to the numbers of fare evaders on public transport in SA and the income foregone from fare evasion from 2014 to the present. 

rescoped 21/11/2016:‐  the total number of fare evaders detected and/or estimated to be detected by year since 2014 MP David Pisoni

Application

Documents or data relating to fare evasion and policing fare evasion (including the number of full time equivalent staff responsible for monitoring/policing fare evasion) on trams in SA from 2014 to the present. 

rescoped 21/11/2016:‐  . I require evidence of the monitoring/policing of fare evasion on trams in SA from 2014 to the present. MP David Pisoni

Application

All documents relating to fare evasion on public transport in SA from 2014 to the present. Rescoped 21/11/2016:‐  documents (from 2014 to the present) relating to fare evasion that the Minister for Planning, Transport and Infrastructure would require to tackle fare evasion MP David Pisoni

Internal Review

All documents related to the total expenditure on boat ramps, all other marine infrastructure, safety publications and compliance officers each year since 2010

MP David PisoniInternal Review All invoices to AECOM with regard to the planning study for works on the South Road, Darlington.  MP David Pisoni

Internal ReviewAll documents related to all Greenway and cycle path projects including all plans for proposed and completed projects, all work currently in progress and the total money spent or committed to be spent on these projects from 2010 to the present MP David Pisoni

Internal Review

All documents related to all projects funded by the $100 million road safety contribution by the Motor Accident Commission to the 2013‐14 State Budget including each project name, location, cost and completion date.

On 24 October 2016 the applicant provided a refinement of the scope to;

"...a list of relevant projects." MP David Pisoni

Internal ReviewAll lists of accredited suppliers (persons who hold accreditation under regulation 74 of the Passenger Transport Regulations 2009) of security camera systems for taxis including accredited suppliers removed from that list since 2009. MP David Pisoni

Application

The number and cost of traffic infringement fines per week paid by the identified drivers of government vehicles and the number and cost of traffic infringement fines paid by the Government Department which leases the car from Fleet SA, from the beginning of 2011 to present.  MP David Pisoni

Page 37: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

ApplicationThe number of government vehicles involved in accidents per week and the cost to pay for damage to government cars per week from the beginning of 2011 to present.  MP David Pisoni

Internal ReviewAll reports of incidences of delays, cancellations of service, reports of system breakdowns, including air conditioning repairs and replacements, on the Seaford Train Line in 2014 and 2015.  MP David Pisoni

ApplicationThe Acquisition Plan (Contract #16C239) for the AdelLINK project and King William Street extension from April 2016, between the Department of Planning, Transport, and Infrastructure and InfraPlan (Aust) Pty Ltd MP Vickie Chapman

ApplicationAll documents relating to increases or projected increases in costs of delivery transport services due to rising electricity prices from 2014 to present.  MP David Pisoni

Internal Review

I request access to the Asbestos register for all State Government Schools

Transferred to DECD 16/02/2016 ‐ Reopened by DPTI on 04/03/2016.  MP David Pisoni

ApplicationAll correspondence between DPTI and Walker Corporation regarding the Festival Plaza redevelopment (including car park project) for the period 2012 to May 2014. MP Vickie Chapman

Application

I request details relevant to the Commissioner for Kangaroo Island, specifically;The budget over forward estimates for the Commissioner for Kangaroo Island; andDetails of funding/budget for Advisory Boards established under the Commissioner; andDetails of the contract of employment of Commissioner Wendy Campana, including the expiration date.

MP Steven Griffiths

Application

Details relevant to Planning and Development Fund, specifically;Details of all funding applications over the past three years, i.e 13/14, 14/15 and 15/16 financial years;Details of the unsuccessful applicants over the three year period; andDetails of  the application process, specifically the decision making process ‐ how the Department reviews and makes a determination on each application for funding and who signs off on each application decision.

On 24 November, this was clarified to "a list of all funding applications, successful and unsuccessful" for points 1 and 2, point 3 remains the same. MP Steven Griffiths

Application The number of people suspended with pay and suspended without pay for the financial years 2013/14, 2014/15 and 2015/16. MP Stephan Knoll

ApplicationDetails of all 'referred customer disputes' sent to Dimension Data; as required by the 'Purchasing Agreement for Messaging and Business Communication Services', clause 51.7. For the period of 1 July 2015  till 1 November 2016. MP Stephan Knoll

ApplicationDetails of any 'Default Notices' sent to or received from the agency as required by the 'Purchasing Agreement for Messaging and Business Communication Services'; Schedule 3 Clause 36.1. For the period of 1 July 2015 till 1 November 2016. MP Stephan Knoll

Internal Review

All documents, contracts or agreements related to the specifications, supplier(s) and tender processes for the supply of security cameras in taxis in South Australia. 

Note to Division:  MP has clarified scope ‐  timeframe from 2013 to present MP David Pisoni

External Review

All documents, contracts or agreements related to the specifications, supplier(s) and tender processes for the supply of security cameras in taxis in South Australia. 

Note to Division:  MP has clarified scope ‐  timeframe from 2013 to present MP David Pisoni

ApplicationDetails of any log book kept of Incidents and Problems of the ‘Purchasing Agreement for Messaging and Business Communication Services’; Schedule 5, clause 45.4.2. For the period of 1 July 2015 till 1 November 2016. MP Stephan Knoll

ApplicationCopies of all ‘Dispute Notices’ as per the ‘Purchasing Agreement for Messaging and Business Communication Services’; Schedule 3, clause 40.2. For the period of 1 July 2015 till 1 November 2016. MP Stephan Knoll

Application All invoices and reports of the cost of graffiti removal on Adelaide Metro trains from 2014 until the present. MP David Pisoni

Page 38: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application The number of arrest and prosecutions of graffiti offenders caught graffiting Adelaide Metro trains from 2014 until present. MP David Pisoni

ApplicationAll asbestos removal work undertaken since January 2014 to the present and all planned asbestos removal work scheduled to be completed to the end of 2018. MP David Pisoni

ApplicationReports on the number of instances of graffiti on trains from 2014 until present, including any photographs taken of Adelaide Metro trains that have graffiti. MP David Pisoni

ApplicationThe total money spent and action taken to catch offenders or reduce instances of graffiti on Adelaide Metro trains from 2014 until present. MP David Pisoni

Application

I request details relevant to the Community Wastewater Management Scheme (CWMS) Funding Agreement between the Minister for Local Government and the Local Government Association of South Australia, specifically :  A copy of the progress report and final report of the CWMS Review Group;  Details of the level of funds provided to the LGA for distribution through the CWMS program for the period between 01 July 2008 and 30 June 2016;Details of the "independent assessment" undertaken on the Mallala CWMS including a report detailing any defects/faults required to be repaired prior to handover to the Adelaide Plains Council|, and the cost in commissioning the independent assessment. MP Steven Griffiths

Application All meeting agendas and minutes for the Black Spot Consultation Committee for 2015 and 2016. MP David PisoniApplication All funding proposals identified in 2016 by the Black Spot Consultative Committee as suitable for funding. MP David PisoniApplication Documents identifying the current ALCAM ratings for Adelaide level crossings. MP David PisoniApplication All correspondence received by the Black Spot Consultative Committee from 1 January 2016 to present. MP David PisoniApplication A list of all current Agents for DPTI Metrocards/Metrotickets MP David PisoniApplication A copy of all application forms required by DPTI Metrocard Ticketing Unit for businesses wishing to become Agents. MP David PisoniApplication A list of all businesses rejected by DPTI Metrocard Ticketing Unit as Agents and the reasons for rejection of application. MP David PisoniApplication Total number of applicants to become Agents for DPTI Metrotickets each year since 2012 MP David PisoniApplication Number of FTEs in DPTI Metrocard Ticketing Unit MP David PisoniApplication Total number of applicants to become Agents for DPTI Metrocards each year since 2012. MP David PisoniApplication Number of Agents for DPTI selling tickets in 2010. MP David Pisoni

Application

I request details relevant to The Draft 30 Year Plan for Greater Adelaide, specifically;The total number of submissions received on The Draft 30 Year Plan for Greater Adelaide;A copy of each of the submissions (only required if the submissions are not made publically available online);Details of who is undertaking work in analysing the submissions i.e. "the submission analysis phase";The timeline for the release of the final document ‐ the updated 30 Year Plan for Greater Adelaide. MP Steven Griffiths

ApplicationCopies of all correspondence between the Member for Colton, Paul Caica MP, and the Department of Planning, Transport and Infrastructure regarding Seaview Road, including the Seaview and Grange Road intersection. MP Vickie Chapman

Application The latest condition reports for each of North East Road, Prospect Road, Fitzroy Terrace, Robe Terrace and Hackney Road. MP David Pisoni

Application

The latest condition reports for each of Stuart Highway, Cook Road  (Nullarbor), Ooldea Road (Nullarbor), Tieyon Road (Tieyon) and Mount Dare Road (Eringa).

MP David Pisoni

ApplicationThe latest condition reports for each of Lambina Road, Mintabie Road, Wintinna Road, Arckaringa Road, William Creek Road and Mount Clarence Road. MP David Pisoni

ApplicationThe latest condition reports for each of Gawler Bypass Road, Adelaide Road, Twelfth Street Ryde Court, Overway Bridge Road and Sturt Highway. MP David Pisoni

Application The latest condition reports for each of Anzac Highway, Marion Road, Richmond Road, South Road, and Cross Road. MP David PisoniApplication The latest condition reports for each of Golden Grove Road, Hancock Road, Kersbrook Road and Humbug Scrub Road. MP David Pisoni

ApplicationThe latest condition reports for each of Flinders Drive (Cape Jervis), Inman Valley Road, Williss Drive, Main Street (Yankalilla), Hindmarsh Tiers Road, Pages Flat Road and Reservoir Road (Myponga). MP David Pisoni

Page 39: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

ApplicationThe latest condition reports for each of Oodnadatta Road, Kempe Road (Coober Pedy), Todmorden Road (Todmorden), Evelyn Downs Road (Evelyn Downs) and Painted Desert Road. MP David Pisoni

ApplicationThe latest condition reports for each of Playford Highway, Kohinoor Road, Telegraph Road (Kangaroo Island), Hog Bay Road, American River Road, Middle Terrace (Kangaroo Island), Howard Drive, North Terrace (Kangaroo Island) and Thomas WIlson Street. MP David Pisoni

ApplicationThe latest condition reports for each of Redbanks Road, Murray Street, Lyndoch Road, Barossa Valley Way and Trotting Track Road Gawler. MP David Pisoni

ApplicationThe latest condition reports for each of McIntyre Road, Grenfell Road, Bridge Road, Smith Road, Park Terrace (Salisbury) and Kings Road. MP David Pisoni

ApplicationThe latest condition reports for each of Anne Beadell Highway, Borefield Road, Stuart Creek Road, Ingomar Road (Benbournie), McDouall Peak Road and the Twins Road (McDouall Peak). MP David Pisoni

ApplicationThe latest condition reports for each of North Well Road (Wilgena), Mount Vivian Road, Gawler Rangers Road, Lake Everard Road, Kondoolka Road, Andamooka Station Road and Bosworth Road (Bosworth). MP David Pisoni

ApplicationThe latest condition reports for each of Victor Harbor Road, Brookman Road, Main Road (McLaren Vale), Aldinga Road, Kangarilla Road, Commercial Road (Moana) and Tatachilla Road. MP David Pisoni

Application The latest condition reports for each of Tapleys Hill Road, Henley Beach Road, Holbrooks Road, Rowells Road and Seaview Road. MP David Pisoni

ApplicationThe latest condition reports for each of Birdseye Highway, Ash Road (Middleback Range), Carriewerloo Road, Myall Creek Road, Wartaka Road and Yudnapinna Road. MP David Pisoni

Application The latest condition reports for each of Seacombe Road, Main South Road, Southern Expressway, Black Road and Panatalinga Road. MP David Pisoni

Application The latest condition reports for each of Lonsdale Road, Ocean Boulevard, Majors Road, Chandlers Hill Road and Kenihans Road. MP David Pisoni

ApplicationThe latest condition reports for each of Billa Kalina Road, Commonwealth Hill Road (Bulgunnia), Hawks Nest Bore Road, Tarcoola Road, Bon Bon Road (Bon Bon) and Gosses Road. MP David Pisoni

ApplicationThe latest condition reports for each of Dequetteville Terrace, Park Terrace, Nottage Terrace, Stephen Terrace and Northcote Terrace. MP David Pisoni

ApplicationThe latest condition reports for each of Lincoln Highway, Iron Baron Road, Middelback Road (Iron Baron), Cleve Road and Arno Bay Road. MP David Pisoni

ApplicationThe latest condition reports for each of The Outback Highway, Moralana Road (Flinders Rangers), Flinders Rangers Way, RM Williams Way and Horrocks Highway. MP David Pisoni

Application The latest condition reports for each of Daws Road, Springbank Road, Fiveash Drive, Ayliffes Road and Oaklands Road MP David Pisoni

ApplicationThe latest condition reports for each of Warren Road, Cricks Mill Road, Smart Road, Reservoir Road  (Modbury), Awoonga Road and Grand Junction Road. MP David Pisoni

ApplicationThe latest condition reports for each of Radio Tower Road (Carriewerloo), Warrakimbo Road, Lake Torrens Homestead Road, Wallerberdina Road (Barndioota), Motpena Road and Nilpena Road (Nilpena). MP David Pisoni

Application The latest condition reports for each of Grange Road, Findon Road, Trimmer Parade and Frederick Road. MP David PisoniApplication The latest condition reports for each of Brighton Road, Diagonal Road, Morphett Road, Sturt Road and Prunus Street. MP David Pisoni

Application The latest condition reports for each of Gorge Road, Tippet Road, Torrens Valley Road, South Para Road and Lower North East Road. MP David PisoniApplication The latest condition reports for each of Main North Road, Yorktown Road, Blacktop Road and The Golden Way. MP David PisoniApplication The latest condition reports for each of Sudholz Road, Fosters Road, Blacks Road, Darley Road and Muller Road. MP David Pisoni

ApplicationThe latest condition reports for each of Hampstead Road, Poole Avenue, O.G Road, Ascot Avenue, Taunton Road and Lower Torrens Road. MP David Pisoni

ApplicationThe latest condition reports for each of Buckleboo Road, Mail Run Road (Thurlga), Uno Road (UNO), Kolendo Road, Eyre Highway and Iron Knob Road. MP David Pisoni

Page 40: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

ApplicationThe latest condition reports for each of Mahanewo Road, Yalymboo Road, Pernatty Road (Kootaberra), S Gap Road, South Gap, Kootaberra Road and Andamooka Road. MP David Pisoni

ApplicationThe latest condition reports for each of Olympic Dam Highway, Olympic Way, Hiltaba Road, Yardea Road, Barns Road (Pygery) and Nonning Road. MP David Pisoni

ApplicationThe latest condition reports for each of Port Road, West Lakes Boulevard, Clark Terrace, Old Port Road, Military Road and Bower Road. MP David Pisoni

Application The names of each of the office holders as per the attached organisational chart as at 14 November 2016. MP David Pisoni

ApplicationThe latest road condition reports for each of Victor Harbor Road, Brookman Road, Main Road (McLaren Vale), Aldinga Road,, Kangarilla Road, Commercial Road (Moana) and Tatachilla Road. MP David Pisoni

Application

Angle Vale Road, Northern Expressway, Two Wells Road, Jack Cooper Drive and Brereton Road.

1 December 2016, DPTI FOI Unit clarified this request to; The latest condition reports for each of Angle Vale Road, Northern Expressway, Two Wells Road, Jack Cooper Drive and Brereton Road.

MP David Pisoni

ApplicationAll correspondence with State Governments in NSW, QLD, WA and VIC that refers to the collection of a levy of rideshare, taxi and hire car trips from January 2016 to latest available. MP David Pisoni

Application

The number of FTE transit police and prescribed officers (as per the Passenger Transport Act 1994) for the 2013/2014, 2014/2015, 2015/2016 financial years. 

MP John Darley

Application

Please provide a copy of the contract issued by the Department of Planning, Transport and Infrastructure to Kirby Marine for 'The Supply and Delivery of Three Petrol Vessels with Trailers (DPTI039249)' with Execution Date 18 November 2016. As listed on the Tenders SA website.  MP Vincent Anthony Tarzia

ApplicationCopies of all correspondence between the Member for Colton, Paul Caica MP, and the Minister for Transport regarding Seaview Road, including the Seaview and Grange Road intersection. MP Vickie Chapman

Internal ReviewAll documents related to work completed since Cabinet note MFI 05/09 PN on public transport services from the Adelaide CBD to Adelaide Airport.  MP David Pisoni

ApplicationI request that you provide to me a copy of all debt registers, as outlined in the Treasurer's Instruction 5, held by the Department of Planning, Transport and Infrastructure. Identifying information is not required. MP John Darley

External Review

Documents related to the number and total value of invoices identified as having been paid in error or deemed to be fraudulent from 2010 to the present. 

MP David Pisoni

Internal Review

Documents related to the number and total value of invoices identified as having been paid in error or deemed to be fraudulent from 2010 to the present. 

MP David PisoniInternal Review The cost of public transport fare evasion in SA each year since 2010. MP David Pisoni

ApplicationEnclosed is a request for copies of all lease documents associated with office accommodation at  60 Flinders Street, Adelaide (Santos Building). MP Peter Treloar

Internal ReviewAll documents including all submissions to the Minister related to security camera compliance in taxis, including all procedures undertaken to check this compliance and all breaches of compliance since 2009 MP David Pisoni

Internal Review

All soil testing results on the Outer Harbour rail line taken as part of the Torrens Road to River Torrens Project including all soil testing results associated with grade separation, all information with regard to contaminants found and all recommendations concerning remediation of contaminants from 2012 to the present MP David Pisoni

Internal ReviewAll documents (including reports, memos, tenders documents, meeting notes and contracts) related to the employment of EMA Consulting.  MP David Pisoni

Internal ReviewAll documents (including minutes, memos, records of conversations) related to meetings between the Rail Commissioner (and/or his representative) and consultants.  MP David Pisoni

Page 41: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Internal ReviewAll documents (including reports, memos, tender documents, meeting notes and contracts) related to the appointment of consultants. MP David Pisoni

Internal ReviewAll documents (including those related to the reimbursement of flight, accommodation and minor expenses) related to the cost of the employment of consultants.  MP David Pisoni

Internal ReviewAll documents (including minutes, memos, records of conversations) related to meetings between the rail Commissioner (and/or his representative) and EMA Consulting.  MP David Pisoni

External Review All documents that include the terms ‘toll road’ or ‘user charge’ from March 2014 to present. MP David PisoniInternal Review All documents that include the terms ‘toll road’ or ‘user charge’ from March 2014 to present. MP David Pisoni

Internal Review

Documents related to the development of freight transport infrastructure from 2003.Rescope from David Pisoni to:‐Documents related to the development of Rail freight transport infrastructure from 2003. and Documents related to the development of Road freight transport infrastructure from 2010.

MP David Pisoni

Internal Review The latest data available related to asset maintenance, depreciation and accelerating rundown of the existing transport network.  MP David Pisoni

Internal Review

All planning studies and invoices and receipts (including inter‐government transfers and/or invoices) relating to the $70 million of Federal funding awarded through the National Building Program to fund planning studies on Adelaide’s North‐South Corridor for 14 February 2011.

Clarification from applicant on 31 October to amend FOI request to:

A list of authors, titles, dates and invoices of all planning studies relating to the $70 million of Federal funding awarded through the National Building Program to fund planning studies on Adelaide’s North‐South Corridor from 14 February 2011.” MP David Pisoni

Internal Review

A list of all identified alienated land (as referred to in Cabinet Document of 18/04/2005 titled 'Accommodating State Transport Infrastructure Projects in the Adelaide City Parklands Bill 2005') that has been identified and a separate list of all identified alienated land returned for park lands use." MP David Pisoni

Application

Documents or communication between the Department of Planning, Transport and Infrastructure or the Minister for Transport on changes to reporting requirements for bus contractors to notify the Department of Planning, Transport and Infrastructure of any bus collisions each year from 2011 to present.  MP David Pisoni

Internal Review

The number and cost of traffic infringement fines per week paid by the identified drivers of government vehicles and the number and cost of traffic infringement fines paid by the Government Department which leases the car from Fleet SA, from the beginning of 2011 to present.  MP David Pisoni

ApplicationDocuments that substantiate the jobs growth claim established through the passing of the Motor Vehicles (Trials of Automotive Technologies) Amendment Bill in the Department of Planning, Transport and Infrastructure Annual Report 2015/2016. MP David Pisoni

Internal ReviewThe number of government vehicles involved in accidents per week and the cost to pay for damage to government cars per week from the beginning of 2011 to present.  MP David Pisoni

ApplicationThe details of the doubtful debtors to the Department of Planning, Transport, and Infrastructure including a breakdown doubtful debts owed by individuals or bodies and the periods the debts have been in arrears. MP David Pisoni

Internal ReviewAll documents relating to increases or projected increases in costs of delivery transport services due to rising electricity prices from 2014 to present.  MP David Pisoni

ApplicationAn itemised list featuring corresponding values of Buses, Tram and Train Rolling Stock listed under Plant and Equipment Assets belonging to the Department of Planning, Transport and Infrastructure within the 2015/2016 financial year. MP David Pisoni

Page 42: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

An itemised list featuring corresponding values of Busway Track and Structures, Metro Rail Structure (including bridges) and Metro Rail and Tram Lines Track listed under Network Assets belonging to the Department of Planning, Transport and Infrastructure within the 2015/2016 financial year. MP David Pisoni

ApplicationThe total cost of separation packages from Department of Planning, Transport and Infrastructure employees over the 2015‐2016 financial year.  MP David Pisoni

ApplicationThe cost of repairs to Adelaide Metro buses as result of collisions each year from the period of 1 January 2011 till the latest available and the subsequent hours these damaged Adelaide Metro buses spent off the road during the same period each year.  MP David Pisoni

ApplicationThe number of litigation processes the Department of Planning, Transport and Infrastructure has been engaged in and/or settled since January 2012 excluding workers compensation.  MP David Pisoni

Application

The summaries for all complaints received by the Department of Planning, Transport and Infrastructure over the 2015‐2016 financial year and details to the action and/or responses to each received complaint. Re‐scoped 04/01/2017 to:‐The number and type of complaints from passengers relating to public transport, broken down by bus, rail, and tram over the period. Perhaps you could now extend it to the end of the 2016 calendar year if that data is now available. MP David Pisoni

Application All documents, contracts or agreements related to the supply of Trams for the Adelaide Metro Tram network since 1 January 2015. MP David Pisoni

Application

Documents or communication between the Department of Planning, Transport and Infrastructure or the Minister for Transport on changes to reporting requirements for bus contractors to notify the Department of Planning, Transport and Infrastructure of any bus collisions each year from 2011 to present. MP David Pisoni

Internal ReviewDocuments outlining projects, spending, infrastructure or future planning that include the terms “marginal electorates” or “marginal seats”. Timeframe: January 1 2015 to date of this application (26/10/2016) MP Robert Brokenshire

External Review

All documents related to the location and number of Marine Safety Officers in South Australia from 2010 to the present. 

On 11 October 2016 the applicant clarified the request to 

A summary of the location and number of Marine Safety Officers in South Australia from 2010 to the present.  MP David Pisoni

External Review

All documents related to the total expenditure on boat ramps, all other marine infrastructure, safety publications and compliance officers each year since 2010

MP David PisoniExternal Review All invoices to AECOM with regard to the planning study for works on the South Road, Darlington.  MP David Pisoni

External Review

All documents related to all Greenway and cycle path projects including all plans for proposed and completed projects, all work currently in progress and the total money spent or committed to be spent on these projects from 2010 to the present

Rescoped by Mr Pisoni MP ‐ 

A summary of: •where the Greenways projects are/proposed to be •how much money has been spent on Greenways projects to date •Whether the project is mee ng the proposed  melines.

MP David Pisoni

Application All documents relating to CCTV breakdown or non‐operational CCTV cameras on Adelaide Metro trains. From Jan 2014 to present. MP David Pisoni

ApplicationAll documents relating to the number of private security personnel employed by Adelaide Metro/DPTI for duties on trams, trains and buses. From Jan 214 to present. MP David Pisoni

Page 43: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application All documents relating to CCTV breakdown or non‐operational CCTV cameras on Adelaide Metro trams. From Jan 2014 to present. MP David Pisoni

ApplicationAll documents related to reports by passenger train drivers on incidents involving physical violence, verbal abuse/aggression, property damage, robbery, vandalism or graffiti to Adelaide Metro/DPTI. From Jan 2014 to present. MP David Pisoni

ApplicationAll documents related to reports by tram drivers on incidents involving physical violence, verbal abuse/aggression, property damage, robbery, vandalism or graffiti to Adelaide Metro/DPTI. From Jan 2014 to present. MP David Pisoni

ApplicationAll documents related to reports by bus drivers on incidents involving physical violence, verbal abuse/aggression, property damage, robbery, vandalism or graffiti to Adelaide Metro/DPTI. From Jan 2014 to present. MP David Pisoni

Application

All documents related to reports from Adelaide Metro or DPTI to SAPOL Public Transport Safety Officers as a result of reports by passenger train drivers on incidents involving physical violence, verbal abuse/aggression, property damage, robbery, vandalism or graffiti to Adelaide Metro/DPTI. From Jan 2014 to present. MP David Pisoni

Application

All documents related to reports from Adelaide Metro or DPTI to SAPOL Public Transport Safety Officers as a result of reports by tram drivers on incidents involving physical violence, verbal abuse/aggression, property damage, robbery, vandalism or graffiti to Adelaide Metro/DPTI. From Jan 2014 to present. MP David Pisoni

Application

All documents relating to procedures or instructions from Adelaide Metro/DPTI for passenger train drivers for dealing with physical violence, verbal abuse/aggression, property damage, robbery, vandalism or graffiti seen by them on the train’s CCTV monitors. From Jan 2014 to present. MP David Pisoni

ApplicationAll documents relating to the cost of private security personnel employed by Adelaide Metro/DPTI for duties on trams, trains and buses. From Jan 2014 to present. MP David Pisoni

Application

All documents relating to complaints or reports from passengers on trains, trams and buses regarding incidents involving physical violence, verbal abuse/aggression, property damage, robbery, vandalism or graffiti to Adelaide Metro/DPTI. From Jan 2014 to present. MP David Pisoni

ApplicationAll documents relating to the guidelines and interaction with offenders for private security personnel employed by Adelaide Metro/DPTI for duties on trams, trains and buses. From Jan 2014 to present. MP David Pisoni

Application

I request that you provide to me information regarding the number of valuations made by the State Valuation Office in the 2014/2015 and 2015/2016  financial years for:

1.Acquisi on purposes 2.Rental determina ons 3.Other

And which agencies or departments requested the valuation.MP John Darley

Application

I request that you provide to me information regarding: 1.The number of objec ons lodged for the 2015/2016 financial year 2.The number of  objec ons lodged for the 2015/2016 financial  year which were s ll outstanding as of 1 December 2016 3.The number of other objec ons s ll outstanding on 1 December 2016 4.Average  me taken to finalise an objec on 5.The number of objec ons finalised for the 2015/2016 financial year which were reduced 6.The number of objec ons finalised for the 2015/2016 financial year which were disallowed

MP John DarleyApplication Recommendations made by the Road Safety Advisory Group to the Road Safety Infrastructure Fund (RSI).  MP David PisoniApplication The Agenda and Minutes for the Road Safety Advisory Group since its establishment.  MP David Pisoni

Internal Review

1. Copies of briefing notes prepared for/ received by the Chief executive of DPTI concerning the power outage across South Australia. 2. Copies of briefing notes and briefing reports from the Chief Executive of DPTI for Government Ministers concerning the SA Power outage/blackout.

MP Robert Brokenshire

Page 44: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Internal Review

Documents submitted between January 1, 2015 to date of this application:1. Which represent ideas, put internally to the CEO's office and/or to other senior management, to improve any aspect of SA's road, rail, tram or bus systems2. Requests from the CEO submissions/ideas for the improvement of any aspect of SA's road, rail, tram or bus systems.Documents should include but not be limited to e‐mail (including on the SAGEMS system), letters, briefings and reports. 

MP Robert BrokenshireInternal Review All minutes from the Road Safety Ministerial Council from March 2002 to the latest. MP David Pisoni

Internal ReviewAll asbestos removal work undertaken since January 2014 to the present and all planned asbestos removal work scheduled to be completed to the end of 2018. MP David Pisoni

Internal Review

I request details relevant to the Commissioner for Kangaroo Island, specifically;The budget over forward estimates for the Commissioner for Kangaroo Island; andDetails of funding/budget for Advisory Boards established under the Commissioner; andDetails of the contract of employment of Commissioner Wendy Campana, including the expiration date.

MP Steven Griffiths

Internal ReviewThe total money spent and action taken to catch offenders or reduce instances of graffiti on Adelaide Metro trains from 2014 until present. MP David Pisoni

Internal Review All invoices and reports of the cost of graffiti removal on Adelaide Metro trains from 2014 until the present. MP David Pisoni

Internal Review The number of arrest and prosecutions of graffiti offenders caught graffiting Adelaide Metro trains from 2014 until present. MP David Pisoni

Internal ReviewReports on the number of instances of graffiti on trains from 2014 until present, including any photographs taken of Adelaide Metro trains that have graffiti. MP David Pisoni

Internal Review

I request all documents relating to land zoned Rural Living within the new Environment and Food Protection Areas (relevant to the Planning Development and Infrastructure Act), specifically:The names and addresses of all landowners within the 35 Rural Living areas (Minister Rau and Chris Kwong have previously committed to providing these details as it was relayed letters have been sent to all landowners); andA copy of all correspondence sent to the landowners and the relevant local government authority (Council) regarding the new Environment and Food Protection Areas and the two year sunset clause to be introduced. 

MP Steven Griffiths

Internal Review

I request details relevant to the Port Adelaide Development Assessment Committee (PADAC), specifically:Since the Committee was established via Regulations on 9 April 2015, how many development applications have been determined by the PADAC; andThe number of meetings attended and the level of remuneration received by each of the nine PADAC members since 9 April 2015 (S Blencowe, C Branford, S Crafter, P Dungey, H Dyer, R Excell, S Fogarty, D Mutton and D O’Loughlin) relevant to their work on the PADAC. 

MP Steven Griffiths

Internal Review

I request details relevent to The Draft 30 Year Plan for Greater Adelaide, specifically;The total number of submissions received on The Draft 30 Year Plan for Greater Adelaide;A copy of each of the submissions (only required if the submissions are not made publically available online);Details of who is undertaking work in analysing the submissions i.e. "the submission analysis phase";The timeline for the release of the final document ‐ the updated 30 Year Plan for Greater Adelaide. MP Steven Griffiths

Page 45: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Internal Review

Details relevant to Planning and Development Fund, specifically;Details of all funding applications over the past three years, i.e 13/14, 14/15 and 15/16 financial years;Details of the unsuccessful applicants over the three year period; andDetails of  the application process, specifically the decision making process ‐ how the Department reviews and makes a determination on each application for funding and who signs off on each application decision.

On 24 November, this was clarified to "a list of all funding applications, successful and unsuccessful" for points 1 and 2, point 3 remains the same. MP Steven Griffiths

Internal Review

I request details relevant to the Community Wastewater Management Scheme (CWMS) Funding Agreement between the Minister for Local Government and the Local Government Association of South Australia, specífically :  A copy of the progress report and final report of the CWMS Review Group;  Details of the level of funds provided to the LGA for distribution through the CWMS program for the period between 01 July 2008 and 30 June 2016;Details of the "independent assessment" undertaken on the Mallala CWMS including a report detailing any defects/faults required to be repaired prior to handover to the Adelaide Plains Councì|, and the cost in commissioning the independent assessment. MP Steven Griffiths

ApplicationFrom 1 January 2015, a list of any free Hospitality, entertainment or gifts received by the CEO or any Executive of the Department from companies or individuals MP Rob Lucas

Application From 01/01/2015 copies of all correspondence between the Auditor General and the Chief Executive of the Department. MP Rob Lucas

ApplicationCopies of all documents relating to a) the payment of any entertainment and meal expenses and b) details of all credit card transactions for the Chief Executive or Chief Executives from 1/01/2015 to 31/12/2016 MP Rob Lucas

Application Since I January 2015, a list of the age of all public servants who were offered a TVSP and whether they accepted the TVSP MP Rob Lucas

ApplicationSince January 2015 all documents including emails and notes of telephone conversations relating to any termination payments for staff employed under a ministerial contract MP Rob Lucas

ApplicationFrom I January 2015 copies of all correspondence between the Auditor General and the Minister and between the Auditor General and the Chief Executive Officer of any department or agency reporting to the Minister MP Rob Lucas

ApplicationI) The additional cost to the department of the introduction of part‐day public holidays on Christmas Eve and New Year's Eve 2) Any document that explains how that cost has been estimated. MP Rob Lucas

Application

“(1) Copies of all correspondence (including emails) between the Minister for Planning and Transport andDPTI regarding extensions to the tramline. Search period: January 2016 and December 23, 2016.(2) All documents including reports evidencing estimated completion dates for the extension of thetramline to the Festival Search period: January 2016 and December 23, 2016.(3) All documents evidencing estimated budgets for the extension of the tramline project including budgetforecast and any reasons why budget forecasts may have been changed. Search period: January 2016and December 23, 2016.”

MP Robert Brokenshire

Application

In relation to sites referred to statistically in the Across Government Asbestos Risk ReductionReports laid on the table in Parliament in 2015 and 2016, a list of all of the sites that have beenmarked for (a) Remove or (b) Remove as Soon as Practicable; as of the time‐frame of the Report astabled.ANDInformation on any removal work that has been undertaken on those sites as at the date of thisApplication

MP Robert Brokenshire

Page 46: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

Time frame: The 2016 Calendar yearDocuments – including emails and reports showing:1. The number of burst water mains causing a traffic hazard in SA during the time frameincluding name of road and suburb.2. Estimated cost in traffic time delays during the time frame.3. Estimated cost in lost productivity during the time frame.

MP Robert Brokenshire

Application

All documentation, studies, reports and emails (including those on the sAGEM system) prepared and/or discussing plans, costings and consultations oncerning, A. the South Eastern Freeway/Princes Highway between Stirling and the Cross Road/Portrush Road/Glen Osmond Road Intersection area (sometimes referred to as the Toll Gate) and B. the Stirling and Crafers intersections. Time Frame for search: January 2014 to Date of Application (23/12/2016). 

On 16 March 2017 the appicant re‐scoped this application to remove emails from the request so please supply information for; 

All documentation, studies, and reports prepared and/or discussing plans, costings and consultations oncerning, A. the South Eastern Freeway/Princes Highway between Stirling and the Cross Road/Portrush Road/Glen Osmond Road Intersection area (sometimes referred to as the Toll Gate) and B. the Stirling and Crafers intersections. Time Frame for search: January 2014 to Date of Application (23/12/2016).

 

MP Robert BrokenshireApplication New RAH chilled water reticulation failure report by HYLC (consortium) for DPTI 2016. MP David Pisoni

ApplicationA list of and the total dollar value of invoices (including description of work done) from consultants engaged by DPTI from 1st March 2014 until end December 2016. MP David Pisoni

Application Reports of lifts and/or escalators out of order (including the length of time) at Adelaide Metro rail stations for 2015 and 2016. MP David Pisoni

ApplicationThe number of claims made or payments made by DPTI in compensation for damage to property caused by road condition or DPTI property since Jan 2014 (each year) to the latest available MP David Pisoni

Application The report titled: 16C209 Cleaning and Maintenance of Public Toilets (Exeloo Automated Public Toilets) ‐ Reference # DPTI039647 MP David Pisoni

Application

The most recent traffic counts at the DPTI maintained arterial road and rail intersections of Brighton Road (Hove), Frederick Road (Grange East), South Road and Cross Road (Clarence Park), Carey Gully Road (Bridgewater), Old Princes Highway (Nairne) and Woodside Road (Nairne) for the last 2 years.  MP David Pisoni

ApplicationThe most recent traffic counts at DPTI maintained arterial road and tram intersections of Marion Road (Plympton) and Cross Road (Plympton Park) for the last 2 years.  MP David Pisoni

ApplicationThe most recent traffic counts at the local road and rail intersections of Leader Street (Forestville), East Avenue (Millswood), Raglan Avenue (Edwardstown) and Jervois Road (Marino) for the last 2 years.  MP David Pisoni

Application

All quotes, invoices and correspondence relating to the purchase of trams from July 1 2016 to current (13 January 2017). 

MP David Pisoni

Application

Dates and headings/titles of all correspondence to MINTRA in Madrid Spain since July 1 2016 to current (13 January 2017). 

MP David Pisoni

Page 47: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

All details/invoices/reimbursements of travel and accommodation costs for consultants or any company or organisation during 2016.

MP David PisoniApplication The latest condition reports for individual boat ramps in coastal South Australia. MP David Pisoni

Application

All documents, including briefings, incoming correspondence, outgoing correspondence and emails created or received since 2010 which refer to Candy Road at O'Halloran Hill/Happy Valley.

MP David Speirs

ApplicationAny document that refers to the implications of the Government's decision to stop the department from being a self‐insurer for workers compensation. MP Rob Lucas

ApplicationSince 1 July 2015 copy of each 'Savings Opportunity Report' forwarded to the agency from the Strategic Procurement Division of DPC. MP Rob Lucas

ApplicationThe number of staff (FTE) in the department whose role is particularly involved with communications, publicity, media, promotion, public relations or similar role. MP Rob Lucas

Application All minutes, agendas from meetings and all correspondence of the South Australian Sport Integrity Network since its inception. MP Tim Whetstone

Internal ReviewDocuments that substantiate the jobs growth claim established through the passing of the Motor Vehicles (Trials of Automotive Technologies) Amendment Bill in the Department of Planning, Transport and Infrastructure Annual Report 2015/2016. MP David Pisoni

Application The latest condition reports for all DPTl railway bridges, tram bridges, road bridges and bicycle bridges in metropolitan Adelaide MP David PisoniApplication The latest condition reports for all DPTl railway bridges, and road bridges in regional South Australia. MP David Pisoni

ApplicationA list of all DPTl railway bridges, train bridges, road bridges grid bicycle bridges in South Australia that have received maintenance work since Jan 2009 MP David Pisoni

Application

Any documents including, but not limited to, memos, notes, ministerial directives, departmental reports, letters and emails, held by the Department describing faults with the signalling network, and/or maintenance work, along the Belair railway line between January 2015 and January 2017

Rescope 22/02/2017Any documents including, but not limited to, memos, notes, ministerial directives, departmental reports, letters and emails, held by the Department describing signalling errors or maintenance work in respect to boom gates failures, along the Belair line at Glenalta station, Blackwood station, and Coromandel station, between January 2015 and January 2017. MP Sam Duluk 

ApplicationA list of all locations where CCTV cameras have been, or are being, installed by the department between 1 July 2013 and 30 June 2016 MP David Ridgway

Internal Review

Documents related to the numbers of fare evaders on public transport in SA and the income foregone from fare evasion from 2014 to the present. rescoped 21/11/2016:‐  the total number of fare evaders detected and/or estimated to be detected by year since 2014 MP David Pisoni

Internal Review

Documents or data relating to fare evasion and policing fare evasion (including the number of full time equivalent staff responsible for monitoring/policing fare evasion) on trams in SA from 2014 to the present. 

rescoped 21/11/2016:‐  . I require evidence of the monitoring/policing of fare evasion on trams in SA from 2014 to the present. MP David Pisoni

Internal ReviewThe details of the doubtful debtors to the Department of Planning, Transport, and Infrastructure including a breakdown doubtful debts owed by individuals or bodies and the periods the debts have been in arrears. MP David Pisoni

Page 48: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Internal Review

All documentation, studies, reports and emails (including those on the sAGEM system) prepared and/or discussing plans, costings and consultations conerning, A. the South Eastern Freeway/Princes Highway between Stirling and the Cross Road/Portrush Road/Glen Osmond Road Intersection area (sometimes referred to as the Toll Gate) and B. the Stirling and Crafers intersections. Time Frame for search: January 2014 to Date of Application (23/12/2016). On 16 March 2017 the applicant re‐scoped this application to remove emails from the request so please supply information for;  All documentation, studies, and reports prepared and/or discussing plans, costings and consultations concerning, A. the South Eastern Freeway/Princes Highway between Stirling and the Cross Road/Portrush Road/Glen Osmond Road Intersection area (sometimes referred to as the Toll Gate) and B. the Stirling and Crafers intersections. Time Frame for search: January 2014 to Date of Application (23/12/2016).Re‐scoped 25/05/2017 to:‐Reports and Studies

MP Robert Brokenshire

Internal ReviewAll documents related to reports by tram drivers on incidents involving physical violence, verbal abuse/aggression, property damage, robbery, vandalism or graffiti to Adelaide Metro/DPTI. From Jan 2014 to present. MP David Pisoni

Internal ReviewAll documents related to reports by passenger train drivers on incidents involving physical violence, verbal abuse/aggression, property damage, robbery, vandalism or graffiti to Adelaide Metro/DPTI. From Jan 2014 to present. MP David Pisoni

Internal Review The latest condition reports  for each of Gorge Road, Tippet Road, Torrens Valley Road, South Para Road and Lower North East Road. MP David PisoniInternal Review Documents identifying the current ALCAM ratings for Adelaide level crossings. MP David PisoniInternal Review The names of each of the office holders as per the attached organisational chart as at 14 November 2016. MP David Pisoni

Internal ReviewAll correspondence with State Governments in NSW, QLD, WA and VIC that refers to the collection of a levy of rideshare, taxi and hire car trips from January 2016 to latest available. MP David Pisoni

Internal Review A copy of all application forms required by DPTI Metrocard Ticketing Unit for businesses wishing to become Agents. MP David PisoniInternal Review A list of all businesses rejected by DPTI Metrocard Ticketing Unit as Agents and the reasons for rejection of application. MP David PisoniInternal Review Number of FTEs in DPTI Metrocard Ticketing Unit MP David PisoniInternal Review Total number of applicants to become Agents for DPTI Metrocards each year since 2012. MP David Pisoni

Internal Review All documents relating to CCTV breakdown or non‐operational CCTV cameras on Adelaide Metro trains. From Jan 2014 to present. MP David Pisoni

Internal ReviewAll documents relating to the number of private security personnel employed by Adelaide Metro/DPTI for duties on trams, trains and buses. From Jan 214 to present. MP David Pisoni

Internal Review All documents relating to CCTV breakdown or non‐operational CCTV cameras on Adelaide Metro trams. From Jan 2014 to present. MP David Pisoni

Internal Review

All documents related to reports from Adelaide Metro or DPTI to SAPOL Public Transport Safety Officers as a result of reports by passenger train drivers on incidents involving physical violence, verbal abuse/aggression, property damage, robbery, vandalism or graffiti to Adelaide Metro/DPTI. From Jan 2014 to present. MP David Pisoni

Internal Review

All documents related to reports from Adelaide Metro or DPTI to SAPOL Public Transport Safety Officers as a result of reports by tram drivers on incidents involving physical violence, verbal abuse/aggression, property damage, robbery, vandalism or graffiti to Adelaide Metro/DPTI. From Jan 2014 to present. MP David Pisoni

Internal Review

All documents relating to procedures or instructions from Adelaide Metro/DPTI for passenger train drivers for dealing with physical violence, verbal abuse/aggression, property damage, robbery, vandalism or graffiti seen by them on the train’s CCTV monitors. From Jan 2014 to present. MP David Pisoni

Internal ReviewAll documents relating to the cost of private security personnel employed by Adelaide Metro/DPTI for duties on trams, trains and buses. From Jan 2014 to present. MP David Pisoni

Internal Review

All documents relating to complaints or reports from passengers on trains, trams and buses regarding incidents involving physical violence, verbal abuse/aggression, property damage, robbery, vandalism or graffiti to Adelaide Metro/DPTI. From Jan 2014 to present. MP David Pisoni

Page 49: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Internal ReviewAll documents relating to the guidelines and interaction with offenders for private security personnel employed by Adelaide Metro/DPTI for duties on trams, trains and buses. From Jan 2014 to present. MP David Pisoni

Application All invoices paid and/or received for Bridge inspections from 2009 until present. MP David Pisoni

ApplicationAll documents related to the source(s) of the steel used in the bridge structure installed over South Road, Croydon as part of the Torrens to Torrens Project.  MP David Pisoni

Application

1 ‐ Please provide a copy of all correspondence between the Department and the Campbelltown City Council regarding parking at the Paradise Interchange from 2014 to present. 

2 ‐ Please provide a copy of correspondence from the meeting between the Minister and the Campbelltown City Council Mayor and the Chief Executive Officer as referenced on Page 1 of the East Torrens Messenger, 18 January 2016.

3 ‐ Please provide a copy of any drafted or proposed costings, plans or other information put together by the Department in deliberating the possible development of the parking infrastructure at the Paradise Interchange to date. 

MP Vincent Anthony Tarzia

ApplicationAny document that identifies the start and completion dates of the design (including any amendments or addendums) of the tram and bikeway bridge over South Road at Glandore/Black Forest.  MP David Pisoni

Application All documents which detail the current inspection guidelines for DPTI bridges, tram and tram lines.  MP David Pisoni

Application The number of and type of engineers directly employed by DPTI (and its predecessors) each year from 2002 until present.  MP David Pisoni

Application

Any correspondence from Lend Lease (and the DPTI's response) that refers to contract variations for the northern connector project since the contract was awarded. 

On 13 February 2017 the applicant clarified the request to;

“a list of contract variations for northern connector project since the contract was awarded.” MP David Pisoni

Application The total value of contract variations requested by Lend Lease for the northern connector project since the contract was awarded.  MP David Pisoni

Application

All documents, purchase orders, approvals and invoices for the design of the tram and bikeway bridge over South Road at Glandore/Black Forest. 

MP David PisoniApplication The number of assaults on Transit Police on Adelaide Metro transport services each year from 2014 to the present.  MP David Pisoni

Application The type of assaults on Wilson Security staff contracted for Adelaide Metro transport services each year from 2014 to the present  MP David Pisoni

ApplicationQuotes or prices requested by DPTI for the 3 trams to be purchased as part of the North Tce/King William Road Extension of the tram line. MP David Pisoni

ApplicationAny documents regarding the contracting of train and tram services by Adelaide Metro or DPTI (for new or existing services) since March 2014 until present MP David Pisoni

ApplicationThe number of physical and/or verbal assaults of members of the public on Adelaide Metro transport services each year from 2014 to the present.  MP David Pisoni

ApplicationThe agenda and minutes of the Monday morning meetings scheduled in relation to the Rail Operations Enterprise Agreement from 4 April 2016 until present. MP David Pisoni

Application The type of assaults on Transit Police on Adelaide Metro transport services each year from 2014 to the present.  MP David Pisoni

ApplicationThe number of assaults on Wilson Security staff contracted for Adelaide Metro transport services each year from 2014 to the present.  MP David Pisoni

Page 50: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

ApplicationDetails of order and/or delivery schedules for the 3 trams to be purchased as part of the North Tce/King William Road extension of the tram line.  MP David Pisoni

ApplicationI request that you provide to me a copy of all instructions issued by the Valuer‐General to their staff regarding the implementation of the 5 year revaluation program as outlined in the 2016/2017 State Budget.  MP John Darley

ApplicationDocuments which show the total spend on maintenance at the SA Aquatic and Leisure Centre and a breakdown of that maintenance (including a breakdown of costs required to keep the facility to an international standard) in 2013‐14, 2014‐15, 2015‐16 and 2016‐17. MP Tim Whetstone

ApplicationAll documents, including the final report, related to a consultancy by Mott MacDonald Aust Pty Ltd in 2012‐13 (described as 'develop a business case for South Australia Sports Institute redevelopment). MP Tim Whetstone

Application All minutes, agendas, notes and associated documents from the SA Women in Sport Taskforce in 2016‐17. MP Tim Whetstone

Application

All successful and unsuccessful applications to the VACSWIM program in 2016‐17.

Re‐scoped by the applicant on 16 February 2017 to; 

“A list of all successful and unsuccessful applications to deliver the vacswim program in 2016‐17”. MP Tim Whetstone

ApplicationAll minutes, agendas and documents related to the expert panel advising on the research report on the economic and social value of sport and recreation to South Australia in 2013‐14, 2014‐15, 2015‐16 and 2016‐17. MP Tim Whetstone

Application All valuations of recreation, sport and stadia infrastructure held by the department since June 2012. MP Tim Whetstone

Application

A list of successful and unsuccessful funding applications through the Office for Recreation and Sport, including the applicant, description of what the applicant applied for, the amount and what was awarded and each electorate the application is from.  Date range is 2016/17. MP Tim Whetstone

ApplicationAll recommendations provided by the SA Boating Facility Advisory Committee to the Minister during 2013‐14, 2014‐15, 2015‐16 and 2016‐17. MP Tim Whetstone

ApplicationAn economic impact statement on Adelaide hosting the Commonwealth Games as referred to by Minister Bignell in Estimates, 22 July 2014. MP Tim Whetstone

Application

All documents referring to variations and completion dates between the department and the architect and/or contractors. 

Rescoped on 13/02/2017 to; 

to “all documents, referring to variations and completion dates for all infrastructure projects (from 2014 to present), between the department and the architect and/or contractors.”

MP David Pisoni

ApplicationThe latest inspections report for the South Road Tram and Bikeway Bridge including any purchase or work orders or invoices relating to/or as a result of the inspection. MP David Pisoni

ApplicationThe number of valuations made by the State Valuation Office in 2014/2015 and 2015/2016 financial years which were undertaken for any purpose other than for general valuations as outlined in s11 of the Valuation of Land Act. MP John Darley

Application

I seek access to the following information for the dedicated public bus line servicing the Adelaide Airport known as JetLine for the period November 2014 to the date of this application 15th February 2017:1. Total patronage for the Adelaide Metro JetLine bus known as JetExpress ‐ J1X from Nov 2014 to current date.2. Total patronage for the Adelaide Metro JetLine bus ‐ J1 from Nov 2014 to current date.3. Total patronage for the Adelaide Metro JetLine bus J1a from Nov 2014 to current date. MP Robert Brokenshire

Application

I request access to all the details of any email, circular, letter, or any other correspondence dated between 1/10/2016 ‐ 31/01/2017, in relation to the requests by Hardy's & Wilson Quarries to change the operating hours for quarry operations. This includes any correspondence between external persons and agencies (eg. Kangaroo Island Council, Department of State Development and the operators of the quarries). MP Michael Pengilly

Page 51: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application Copy of the 'Asset Valuation Report': all volumes as at 1 July 2015 and 1 July 2016. MP Stephan KnollApplication ‘Copies of any ‘Current Building Vacancy Reports’ produced or received in 2015 and 2016.’ MP Stephan Knoll

Application

‘Correspondence to, and received from ‘Infrastructure Australia’ from 1 July 2016 and 31st December 2016.’

MP Stephan Knoll

ApplicationPlease provide the lease agreement and all documents relating to the lease of Certificate of title number CT5700/985, which details the registered proprietor as the Minister for Transport and Infrastructure’. MP Adrian Pederick

Application

All invoices paid out of the Community Road Safety Fund.  

Advice of rescope from applicant received on 14 March 2017:"All income and expenditure from the Community Road Safety Fundfrom 1 July 2012, for the (separate)  financial years of 2012/13, 2013/14, 2014/15 and 2015/16.' MP Stephan Knoll

Application‘All documents from 01/01/2015 – 20/02/2017 including costing documents in relation to the development of the Women’s Memorial Playing Fields including reports from Suter Planners’. MP Sam Duluk 

Application

‘Copies of the applications for grants from the ‘Residents Win’ program.

RESCOPE RECEIVED FROM APPLICANT 06/03/2017:

"Can you please provide for financial years 2014/15 and 2015/16 a summary of the funded, and unsuccessful applications for the 'Residents Win' program please."

MP Stephan Knoll

Application A copy of the signed lease agreement between the owners of the SA Water House site at Victoria Square, Adelaide and the lessee MP Vickie Chapman

External Review

I request details relevant to the Commissioner for Kangaroo Island, specifically;The budget over forward estimates for the Commissioner for Kangaroo Island; andDetails of funding/budget for Advisory Boards established under the Commissioner; andDetails of the contract of employment of Commissioner Wendy Campana, including the expiration date.

MP Steven Griffiths

ApplicationDocuments that confirm the cost of the Analysis of the economic value of Renewal SA by KPMG contract reference RSA2016/02112A889338. MP David Pisoni

ApplicationAnalysis of the economic value of Renewal SA by KPMG contract reference RSA2016/02112A889338 including any draft or interim reports MP David Pisoni

Application

All inspection, repair and maintenance reports (draft or final) for the South Road Superway from 1 July 2014 until current.

MP David Pisoni

Application

“All documents that record the number and type of incidents reported by passenger train drivers on incidents involving physical violence, verbal abuse/aggression, property damage, robbery, vandalism or graffiti to Adelaide Metro/DPTI.  From Jan 2014 to present.” MP David Pisoni

Application

“All documents relating to the trail and implementation of free WiFi on Adelaide Metro buses from January 2012 to present.”

MP David Pisoni

Page 52: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application“Reports of any investigations into staff harassment, bullying or gender discrimination in the workplace across the DPTI (including Adelaide Metro) from 2014 until the latest available.  Also, any invoices as a result of any such investigations.” MP David Pisoni

Application“All tenders, agreements, work orders and invoices for engineering, inspection and/or repair services for the South Road Superway from 1 July 2014 until current.” MP David Pisoni

Application Copies of all lease documents associated with office accommodation at 50 Flinders Street, Adelaide. MP Peter Treloar

External ReviewI enclose a request for access for reports or recommendations of rail station upgrades, including total costs, on the metropolitan rail line network since beginning 2008 until current.  MP David Pisoni

Application

Please provide a list of all external legal expenditures, and dollar amount, incurred by the Department as defined by expenditures outside of the Government’s own legal personnel and going to private law firms.  Please provide information by year from 2014 to present. MP Vincent Anthony Tarzia

ApplicationThe most recent traffic counts at the DPTI maintained road intersections of Federick Road and Grange Road (Grange) and Federick Road and Trimmer Parade (Grange). MP David Pisoni

ApplicationThe most recent traffic counts at the DPTI maintained road intersections of Brighton Road and Oaklands Road (Somerton Park) and Brighton Road and Sturt Road (Brighton). MP David Pisoni

ApplicationThe most recent traffic counts at the DPTI maintained road and rail intersections of Brighton Road (Hove), Frederick Road (Grange East) and South Road and Cross Road (Clarence Park). MP David Pisoni

ApplicationThe most recent traffic counts at the DPTI maintained arterial road and tram intersections of Marion Road (Plympton) and Cross Road (Plympton Park). MP David Pisoni

ApplicationThe most recent traffic counts at the DPTI maintained road and rail intersections of Carey Gully Road (Bridgewater), Old Princes Highway (Nairne) and Woodside Road (Nairne). MP David Pisoni

ApplicationThe most recent traffic counts at the DPTI maintained road intersections of Anzac Highway and Marion Road (Plympton) and Marion Road and Cross Road (Plympton Park). MP David Pisoni

Application The most recent traffic counts at the road intersection of Anzac Highway, Stonehouse Avenue and Cross Road (Plympton). MP David PisoniApplication All Documents for the 12 months ended 28 February 2017 relating to 186 Upper Sturt Road MP Sam Duluk 

Application

Copies of all correspondence, including but not limited to letters, emails, attachments to email, memoranda, minutes, briefing notes and hand written notes citing Telethon since 01 September 2015.

Clarified By Terry Stevens office 10/03/3017 this means the telethon charity also be known as “Telethon South Australia” or “Telethon Inc.” MP Terry Stevens

Application

Any documents including, but not limited to, memos, notes, ministerial directives, departmental reports, letters and emails, held by the Department in relation to the purchase of Australian Rail Track Corporation Ltd (ARTC) land adjacent to the Eden Hills Railway Station, and the extension of car parking facilities at Eden Hills Railway Station, from 1 January 2014 until 9 March 2017. MP Sam Duluk 

ApplicationPlease provide a list of all external legal expenditures, and dollar amount, incurred by the Council as defined by expenditures outside of the Government’s own legal personnel and going to private law firms.  Please provide information by year from 2014 to present. MP Vincent Anthony Tarzia

External Review

All planning studies and invoices and receipts (including inter‐government transfers and/or invoices) relating to the $70 million of Federal funding awarded through the National Building Program to fund planning studies on Adelaide’s North‐South Corridor for 14 February 2011.

Clarification from applicant on 31 October to amend FOI request to:

A list of authors, titles, dates and invoices of all planning studies relating to the $70 million of Federal funding awarded through the National Building Program to fund planning studies on Adelaide’s North‐South Corridor from 14 February 2011.” MP David Pisoni

Page 53: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

External ReviewAll documents including all submissions to the Minister related to security camera compliance in taxis, including all procedures undertaken to check this compliance and all breeches of compliance since 2009 MP David Pisoni

External Review

All soil testing results on the Outer Harbour rail line taken as part of the Torrens Road to River Torrens Project including all soil testing results associated with grade separation, all information with regard to contaminants found and all recommendations concerning remediation of contaminants from 2012 to the present MP David Pisoni

External ReviewAll documents (including minutes, memos, records of conversations) related to meetings between the Rail Commissioner (and/or his representative) and consultants.  MP David Pisoni

External Review The latest data available related to asset maintenance, depreciation and accelerating rundown of the existing transport network.  MP David Pisoni

External Review

The number and cost of traffic infringement fines per week paid by the identified drivers of government vehicles and the number and cost of traffic infringement fines paid by the Government Department which leases the car from Fleet SA, from the beginning of 2011 to present.  MP David Pisoni

External ReviewAll documents relating to increases or projected increases in costs of delivery transport services due to rising electricity prices from 2014 to present.  MP David Pisoni

External ReviewReports on the number of instances of graffiti on trains from 2014 until present, including any photographs taken of Adelaide Metro trains that have graffiti. MP David Pisoni

External ReviewI request access to all memos, correspondence, reports and recommendations regarding Asbestos associated with the Noarlunga line and related infrastructure since June 2015 until present MP David Pisoni

External Review The number of arrest and prosecutions of graffiti offenders caught graffiting Adelaide Metro trains from 2014 until present. MP David Pisoni

External ReviewThe total money spent and action taken to catch offenders or reduce instances of graffiti on Adelaide Metro trains from 2014 until present. MP David Pisoni

External Review

Documents related to the development of freight transport infrastructure from 2003.Rescope from Mr David Pisoni on 09/12/2016 to narrow the request to:‐Documents related to the development of Rail freight transport infrastructure from 2003. and Documents related to the development of Road freight transport infrastructure from 2010.

FINAL RESCOPE‐ from Mr David Pisoni on 24/03/2017 to narrow the request to:‐

‘Documents relating to the development of freight infrastructure for freight coming from the north and the east of the city’. Applicant indicated he was particularly interested in documents relating to the Goodwood junction and South Eastern Freeway north of Stirling, including alternative routes for the transport of freight on the freeway.

MP David Pisoni

External ReviewAll documents related to work completed since Cabinet note MFI 05/09 PN on public transport services from the Adelaide CBD to Adelaide Airport.  MP David Pisoni

External Review The cost of public transport fare evasion in SA each year since 2010. MP David Pisoni

External Review

A list of all identified alienated land (as referred to in Cabinet Document of 18/04/2005 titled 'Accommodating State Transport Infrastructure Projects in the Adelaide City Parklands Bill 2005') that has been identified and a separate list of all identified alienated land returned for park lands use." MP David Pisoni

ApplicationAny documents including, but not limited to, memos, notes, ministerial directives, department reports, letters and emails, held by the Department relating to the procurement process for Messaging and Business Communication Services. MP Sam Duluk 

Application

A list of the regional and urban roads that received funding as part of the $110 million allocated to road infrastructure in the 2015/16 State Budget, including the total amount allocated to each road/project. 

MP Sam Duluk 

Page 54: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

Any documents including, but not limited to, memos, notes, ministerial directives, department reports, letters and emails, held by the Department relating to traffic and exit roads at Blackwood Park (Craigburn Farm), including Blackwood Park Blvd and Craigburn Road.  MP Sam Duluk 

Application

A list of all unused office space as at 1 Jan 2017 leased by the State Government, detailing how long they’ve been unoccupied. For unused office space leased please provide their address, gross leasing costs, and for owned buildings please provide their address and a list of building values.  MP Sam Duluk 

Application

All documents and correspondence regarding the Unley Development Plan since the 1st of January 2015 until the latest available. 

RESCOPE RECEIVED 24/03/2016:All correspondence between the Department of Planning, Transport and Infrastructure and the Unley Council regarding the Unley (City) Development Plan since the 1st of January 2015 until the latest available.

MP David PisoniApplication All department documents/reports regarding the design of the South Road Tram Bridge from 2008 until 2010 MP David Pisoni

ApplicationCopies of the final report, and any drafts, on the "CBD courts facility planning study", including the business case and letter of instruction or instructing documents requesting this be undertaken. MP Vickie Chapman

ApplicationThe number of Park n Ride spaces currently available in metropolitan Adelaide. 

MP Sam Duluk 

ApplicationThe number and location of new Park 'n Ride sites that are 'shovel ready' or work is being carried out to make the site  'shovel ready'. MP Sam Duluk 

Internal ReviewCopies of all documents relating to a) the payment of any entertainment and meal expenses and b) details of all credit card transactions for the Chief Executive or Chief Executives from 1/01/2015 to 31/12/2016 MP Rob Lucas

ApplicationDocuments (invoices, receipts, credit card statements etc…) which indicate the number of instances when the department has used an UBER service and the cost to the department per month from the 1st of July 2016 to the latest available. MP David Pisoni

Application Variation No. 4 ‐ Additional Heavy Rail Analysis, as referred to in the AECOM invoice No. 21038079. MP David Pisoni

Internal ReviewThe number of litigation processes the Department of Planning, Transport and Infrastructure has been engaged in and/or settled since January 2012 excluding workers compensation.  MP David Pisoni

ApplicationThe broad concepts and alternative concepts; Public Transport Interchange (Transport Sustainability) & Park'n'Ride (Transport Sustainability), as referred to in the AECOM invoice No. 21040477. MP David Pisoni

Internal Review All documents, contracts or agreements related to the supply of Trams for the Adelaide Metro Tram network since 1 January 2015. MP David Pisoni

Internal Review

The summaries for all complaints received by the Department of Planning, Transport and Infrastructure over the 2015‐2016 financial year and details to the action and/or responses to each received complaint. Re‐scoped 04/01/2017 to:‐The number and type of complaints from passengers relating to public transport, broken down by bus, rail, and tram over the period. Perhaps you could now extend it to the end of the 2016 calendar year if that data is now available. MP David Pisoni

Application The latest air quality tests/reports for the platforms at the Adelaide Railway Station. MP David Pisoni

ApplicationAny document that refers to the implications of the Government's decision to stop government departments from being self‐insurers for workers compensation. MP Rob Lucas

Application Reports, advice or briefings received by the department or the Minister from SNC Lavalin Rail and Transit in 2015 or 2016. MP David Pisoni

Page 55: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

The number of Claims against the Department of Planning, Transport and Infrastructure which the department has been engaged in, defended and/or settled since January 2012 excluding workers compensation.

Rescope by applicant 21/04/17:The number of civil claims for damages against the Department of Planning, Transport and Infrastructure which the department has been engaged in, defended and/or settled since January 2014.

Rescope by the applicant 07/06/2017:The number of civil claims for damages against the Department of Planning, Transport and Infrastructure which the department has been engaged in, defended and/or settled since 1 July 2015.

MP David Pisoni

Internal Review The total value of contract variations requested by Lend Lease for the northern connector project since the contract was awarded.  MP David Pisoni

Application

I request access to:‐‐All internal correspondence, memorandum and other communications in relation to Development Application No. DA 473/E031/15, the Stirling Petrol Station Development‐All internal correspondence, memorandum and other communications between Department Officers and the Adelaide Hills Council in relation to Development Application No. DA 473/E031/15, the Stirling Petrol Station Development‐All internal correspondence, memorandum and other communications between DPTI and the developer in relation to Development Application No. DA 473/E031/15, the Stirling Petrol Station Development‐All internal correspondence, memorandum and other communications between the Development Assessment Commission and DPTI in relation to Development Application No. DA 473/E031/15, the Stirling Petrol Station Development.

MP Troy Bell

Application Any correspondence or other documents relating to the new city high school (also known as the Adelaide Botanic High School).  MP John GardnerApplication The total amount committed to upgrade cables on the Belair rail line in the 2015/16 and 2016/17. MP Sam Duluk 

Internal ReviewAll documents from 01/01/2015 – 20/02/2017 including costing documents in relation to the development of the Women’s Memorial Playing Fields including reports from Suter Planners.  MP Sam Duluk 

Application

All briefing notes, meeting notes, diary entries and written correspondence between the Minister and/or his office and Stan Chapley or representatives of the Norwood Foodland IGA from June 2016 to the latest available.Approval to transfer to MO.

MP David Pisoni

Application

Any request, by the Minister, of the availability of Unsold Space for the application of Advertising Material on department property and the outcome of those requests from March 2014 until latest available. Approval to transfer to MO. 

MP David PisoniApplication Copy of all work/reports prepared by SNC Lavalin Rail and Transit relating to invoices # PS17532 and # PS17696 MP David Pisoni

ApplicationI request access to all financial statements, accounts and reports relating to the Planning and Development Fund for the period 01 July 2015 ‐ 30 June 2016, and 01 July 2016 to present. (28/04/2017) MP David Ridgway

Application

I request access to three quarterly service standard reports namely the:

1. Public Transport Services Summary for January to March 2017;2. Public Transport Services Summary for October to December 2016; and3. Public Transport Services Summary for July to September 2016. MP Corey Wingard

Page 56: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

I request access to documents, letters, emails and other correspondence sent to the Commonwealth Department of Infrastructure and Urban Development from the South Australian Department of Planning, Transport and Infrastructure since October 2016.

On 02 June 2017 the scope was clarified to; 

I request access to documents, letters, emails and other correspondence sent to the Commonwealth Department of Infrastructure and Urban Development from the South Australian Department of Planning, Transport and Infrastructure that include the term ‘Oaklands Crossing’ since October 2016. MP Corey Wingard

Application

I request access to documents, letters, emails and any other correspondence sent to the Office of the Federal Minister for Urban Infrastructure from the South Australian Department of Planning, Transport and Infrastructure since October 2016.

On 2 June 2017 the scope was amended to; 

I request access to documents, letters, emails and any other correspondence sent to the Office of the Federal Minister for Urban Infrastructure from the South Australian Department of Planning, Transport and Infrastructure that includes the term ‘Oaklands Crossing’ since October 2016. MP Corey Wingard

Application

I request access to planning documents that involve, discuss or refer to the Oaklands Crossing, including any potential changes to the crossing. This includes, but is not limited to, engineering documents held by DPTI, plans authored by the department, costing documents and any other documentation that contains, includes or refers to plans for the Oaklands Crossing.

On 12 May 2017 the applicant revised the request to;

I request access to the project proposal report on the Oaklands Crossing held by the Department of Planning, Transport and Infrastructure and any other supporting documentation including costing documents or engineering plans associated with this project report. MP Corey Wingard

Internal Review

Any documents including, but not limited to, memos, notes, ministerial directives, departmental reports, letters and emails, held by the Department describing faults with the signalling network, and/or maintenance work, along the Belair railway line between January 2015 and January 2017

Rescope 22/02/2017Any documents including, but not limited to, memos, notes, ministerial directives, departmental reports, letters and emails, held by the Department describing signalling errors or maintenance work in respect to boom gates failures, along the Belair line at Glenalta station, Blackwood station, and Coromandel station, between January 2015 and January 2017. MP Sam Duluk 

Internal Review Correspondence to, and received from ‘Infrastructure Australia’ from 1 July 2016 and 31st December 2016. MP Stephan KnollInternal Review Copy of the 'Asset Valuation Report': all volumes as at 1 July 2015 and 1 July 2016. MP Stephan KnollInternal Review ‘Copies of any ‘Current Building Vacancy Reports’ produced or received in 2015 and 2016.’ MP Stephan Knoll

Internal Review

‘Copies of the applications for grants from the ‘Residents Win’ program.

RESCOPE RECEIVED FROM APPLICANT 06/03/2017:

"Can you please provide for financial years 2014/15 and 2015/16 a summary of the funded, and unsuccessful applications for the 'Residents Win' program please." MP Stephan Knoll

Page 57: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

I request access to all documents relating to:1. the number of people that have applied for an athletic scholarship each year since 2008, including which recreation or sport those scholarships referred to; and 2. the number and names of every athletic scholarship and/or service that has been provided or granted each year since 2008. MP Corey Wingard

ApplicationI request access to the number of applications received for the Wendy Ey Memorial Scholarship Program each year for the past five years. I also request details of all applicants, including those that were unsuccessful over the past five years.  MP Corey Wingard

Application

I request access to all documents relating to the Recreation and Sport Youth Traineeship Incentive Program ("the Program") including (but not limited to) all documents relating to:‐ The Program being discontinued by the Office for Recreation and Sport in 2014‐2015;‐the names and number of applicants who participated in the Program each year; and‐the names and number of applicants who applied for the Program each year. MP Corey Wingard

Application

I request access to:1. The Office for Recreation and Sports Grants Review conducted in 2011; and2. All documents relating to any grants reviews conducted by the Office for Recreation and Sport since December 2011, including (but not limited to) any internal reviews conducted that take into consideration the views of people in the sporting and recreation community.  MP Corey Wingard

Internal Review

Time frame: The 2016 Calendar yearDocuments – including emails and reports showing:1. The number of burst water mains causing a traffic hazard in SA during the time frameincluding name of road and suburb.2. Estimated cost in traffic time delays during the time frame.3. Estimated cost in lost productivity during the time frame.

MP Robert Brokenshire

Application

Any and all correspondence to and from the Department of Planning, Transport and Infrastructure, and Infrastructure Australia, relating to the Adelaide Freight Movement Study.

On 29/05/2017 the applicant clarified the request to; 

The request relates to the GHD ‘Adelaide Rail Freight Movements Study’ completed in June 2010 for the Department of Infrastructure, Transport, Regional Development & Local Government. 

MP Sam Duluk 

Application

I seek access to the following information for the time frame January 2015 to date of this request:1. Copies of all complaints made regarding public buses (including complaints about drivers) lodged via phone, email and those lodged electronically through the DPTI ‘compliments and complaints’ webpage for the time frame (with the name and details of the complainant removed for privacy).2. Copies of complaints made regarding public trains (including complaints about drivers) lodged via phone, email and those lodged electronically through the DPTI ‘compliments and complaints’ webpage for the time frame (with the name and details of the complainant removed for privacy). MP Robert Brokenshire

Application

All documentation relating to the assessment by the Office of the Coordinator General of the Hungry Jacks development situated at 533 Brighton Road, Brighton. This should include the application for approval of the development, emails, briefing minutes, and assessment matrices. MP David Speirs

Page 58: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

q p p g g g p jfinancial years:Freight Access Road ProjectsImproving Critical Road infrastructureIntersection Crashes ProgramStrategic Route ReviewsSmall Projects

I also request the same information (as described above) for the following annual projects over the same period:Asset ImprovementAsset Management

Re‐scope requiredRe‐scope confirmed 28/6/17"I request copies of all financial plans, budgets and forecasts relating to the following projects for the 2015‐16 and 2016‐17 financial years:Improving Critical Road infrastructureIntersection Crashes ProgramStrategic Route ReviewsSmall Projects"

To be certain, we are not asking for all correspondence and related documents, but the financial plans, budgets and forecasts specifically. 

The department has previously provided a breakdown of the capital works program as a single budget detailing multiple project; if this is not the same for the above project, that would be helpful to know so we can amend our request as appropriate. 

MP David Ridgway

Application

The total number of car parking spaces rented by the Department in 2013/14, 2014/15, 2015/16, 2016The total number of [public servants in the Department that are provided with a car parking space paid for by the DepartmentThe total annual fringe benefit paid by the Department for rented car parking spaces in 2013/14, 2017/15, 2015/16, 2016/17The location of the car park spaces rented by the Department by Council area

MP Sam Duluk 

ApplicationAll documents and correspondence relating to specifications, purchase and replacement of tram tracks for the Jetty Road section of the Glenelg tram line from March 2014 to present. MP David Pisoni

Internal Review

An itemised list featuring corresponding values of Busway Track and Structures, Metro Rail Structure (including bridges) and Metro Rail and Tram Lines Track listed under Network Assets belonging to the Department of Planning, Transport and Infrastructure within the 2015/2016 financial year. MP David Pisoni

Internal ReviewAn itemised list featuring corresponding values of Buses, Tram and Train Rolling Stock listed under Plant and Equipment Assets belonging to the Department of Planning, Transport and Infrastructure within the 2015/2016 financial year. MP David Pisoni

Internal Review

A list of the regional and urban roads that received funding as part of the $110 million allocated to road infrastructure in the 2015/16 State Budget, including the total amount allocated to each road/project. 

MP Sam Duluk 

Page 59: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Internal Review

Any documents including, but not limited to, memos, notes, ministerial directives, department reports, letters and emails, held by the Department relating to traffic and exit roads at Blackwood Park (Craigburn Farm), including Blackwood Park Blvd and Craigburn Road.  MP Sam Duluk 

Internal Review

Any documents including, but not limited to, memos, notes, ministerial directives, departmental reports, letters and emails, held by the Department in relation to the purchase of Australian Rail Track Corporation Ltd (ARTC) land adjacent to the Eden Hills Railway Station, and the extension of car parking facilities at Eden Hills Railway Station, from 1 January 2014 until 9 March 2017. MP Sam Duluk 

Internal Review All Documents for the 12 months ended 28 February 2017 relating to 186 Upper Sturt Road MP Sam Duluk 

Internal ReviewThe number and location of new Park 'n Ride sites that are 'shovel ready' or work is being carried out to make the site  'shovel ready'. MP Sam Duluk 

Application Number of telephone consultants (FTE) employed specifically for taking inquiries via the 1300 311 108 Adelaide Metro info line.  MP David Pisoni

ApplicationThe number of telephone consultants on duty specifically for taking inquiries via the 1300 311 108 Adelaide Metro info line on Wednesday the 19th April from 9am – 10am.  MP David Pisoni

Internal Review

A list of all unused office space as at 1 Jan 2017 leased by the State Government, detailing how long they’ve been unoccupied. For unused office space leased please provide their address, gross leasing costs, and for owned buildings please provide their address and a list of building values.  MP Sam Duluk 

ApplicationAll documents providing advice or identifying costs of relocating or refurbishing DPTI offices in 2016 and 2017.  Please include any costs of breaking the previous lease and the cost of the new lease including outgoings.   MP Sam Duluk 

Application

I request access to all and any documents relating to:1. scheduled and unscheduled maintenance conducted at the Oaklands Railway Crossing at the intersection of Morphett and Diagonal Road ("Oaklands Railway Crossing") in the last 12 months;2. the speed of which the trains are travelling at through the Oaklands Railway Crossing in the last 12 months;3. recorded traffic clearance times through the Oaklands Railway Crossing and the Hove Railway Crossing on Brighton Road, Hove in the last 12 months;4. the volt supply to the boom gates at both Oaklands Railway Crossing and Hove Railway Crossing; and5. any safety checks done at the Oaklands Railway Crossing in the last 12 months.  MP Corey Wingard

Application

1. All documents relating to when, how many and how much private investors have contributed towards the ongoing operational costs of the SA North Terrace Sports Museum;2. All documents relating to how much Sport SA has raised towards the SA North Terrace Sports Museum;3. A copy of the 10 years lease the State Government have taken out on a vacant building in front of the Intercontinental hotel to open the SA North Terrace Sports Museum;4. All documents relating to how much is required from both Sport SA and private investors for the SA North Terrace Sports Museum to be operational;5. All documents relating to the planning and design work created for the SA North Terrace Sports Museum;6. All documents relating to any contributions made towards the SA North Terrace Sports Museum from the Federal Government. MP Corey Wingard

Application

Any documents providing advice on, or identifying costs of (or associated with) Market Research undertaken by the Department between 1 January 2017 and 25 May 2017, in relation to the 'Keep SA Moving' Campaign 2017. Please remove any reference to third parties so as to avoid lengthy delay in performing consultation pursuant to Sections 25‐28 of the Act.  MP Sam Duluk 

Application

Any document held, including but not limited to, memos, notes, briefing papers, ministerial directives, departmental reports, letters and emails, that provide advice on, or detail the length and cost of the 'Keep SA Moving Campaign 2017'. Please remove any reference to third parties so as to avoid lengthy delay in performing consultation pursuant to Sections 25‐28 of the Act.  MP Sam Duluk 

Page 60: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

Any document held, including but not limited to, memos, notes, briefing papers, ministerial directives, departmental reports, letters and emails, that provide advice on, or detail costs relating to funding for the 2017 Railway Crossing Safety Strategy (or part there‐of). Please remove any reference to third parties so as to avoid lengthy delay in performing consultation pursuant to Sections 25‐28 of the Act.  MP Sam Duluk 

Application

Any document held, including but not limited to, memos, notes, briefing papers, ministerial directives, departmental reports, letters and emails, concerning Main Road, Blackwood, for the period 1 January 2016 until 26 May 2017. Please remove any reference to third parties so as to avoid lengthy delay in performing consultation pursuant to Sections 25‐28 of the Act.  MP Sam Duluk 

Application Any contracts and or memorandum of understanding etc. between DPTI and the taxi council or any of its members. MP David Pisoni

ApplicationAll documents relating to property owners who will potentially be affected by land acquisitions on yet to be completed sections of the North South road corridor being informed or contacted by DPTI. MP David Pisoni

Internal ReviewCopies of the final report, and any drafts, on the "CBD courts facility planning study", including the business case and letter of instruction or instructing documents requesting this be undertaken. MP Vickie Chapman

Application All documents and crash statistics regarding the Dalkeith and Main North Road intersection from 2002 onwards. MP Stephan Knoll

Application

All correspondence relating to the Amy Gillett bikeway.Re‐scoped on 29/6/17 to include all letters, emails, budgets and memos, inthe time period 2013 to present.Re‐scoped on 10/07/2017 to include emails only.

MP John Gardner

Internal ReviewThe total amount committed to upgrade cables on the Belair rail line in the 2015/16 and 2016/17.

MP Sam Duluk 

Internal Review

I request access to all documents relating to:1. the number of people that have applied for an athletic scholarship each year since 2008, including which recreation or sport those scholarships referred to; and 2. the number and names of every athletic scholarship and/or service that has been provided or granted each year since 2008.

MP Corey Wingard

Internal Review

I request access to:1. The Office for Recreation and Sports Grants Review conducted in 2011; and2. All documents relating to any grants reviews conducted by the Office for Recreation and Sport since December 2011, including (but not limited to) any internal reviews conducted that take into consideration the views of people in the sporting and recreation community.

MP Corey Wingard

Internal Review

I request access to the number of applications received for the Wendy Ey Memorial Scholarship Program each year for the past five years. I also request details of all applicants, including those that were unsuccessful over the past five years. 

MP Corey Wingard

Internal Review

I request access to all documents relating to the Recreation and Sport Youth Traineeship Incentive Program (""the Program"") including (but not limited to) all documents relating to:‐ The Program being discontinued by the Office for Recreation and Sport in 2014‐2015;‐the names and number of applicants who participated in the Program each year; and‐the names and number of applicants who applied for the Program each year.

MP Corey Wingard

Page 61: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Internal Review

I request access to three quarterly service standard reports namely the:

1. Public Transport Services Summary for January to March 2017;2. Public Transport Services Summary for October to December 2016; and3. Public Transport Services Summary for July to September 2016.

MP Corey Wingard

Application

Please provide all documents relating to the below request:Concept designs relating to the access the Dernancourt Shopping Centretogether with any documents relating to costings;Any correspondence to and from DPTl or Minister Mullighan with Tea TreeGully council, owners of Dernancourt Shopping Centre or Members ofParliament in relation to the Dernancourt Shopping Centre.

27 June 2017  ‐ applicant provided a time‐frame of 'from 2014 to present' MP John Gardner

Internal Review

I seek access to the following information for the time frame January 2015 to date of this request:1. Copies of all complaints made regarding public buses (including complaints about drivers) lodged via phone, email and those lodged electronically through the DPTI ‘compliments and complaints’ webpage for the time frame (with the name and details of the complainant removed for privacy).2. Copies of complaints made regarding public trains (including complaints about drivers) lodged via phone, email and those lodged electronically through the DPTI ‘compliments and complaints’ webpage for the time frame (with the name and details of the complainant removed for privacy).

Scope refined on 21 July 2017; 

Reduce the scope to just buses and the last 12 months.  MP Robert Brokenshire

Application

Any documents including, but not limited to, memos, notes, briefing papers, ministerial directives, departmental reports, letters and emails, that detail project and/or implementation costs for the 'Road Management Plan, Edition 2, Main Road (RN6452) & Shepherds Hill Road (RN6467) ‐ February 2015, Transport Services Division (Document #6923461)'. Please remove any reference to third parties so as to avoid lengthy delay in performing consultation pursuant to Sections 25‐28 of the Freedom of Information Act.  MP Sam Duluk 

ApplicationAny documents including, but not limited to, memos, notes, ministerial directives, department reports, letters and emails, held by the Department relating to a Park and Ride facility in Bellevue Heights for the period 1 January 2016 to 30 June 2017. MP Sam Duluk 

Internal Review

Any and all correspondence to and from the Department of Planning, Transport and Infrastructure, and Infrastructure Australia, relating to the Adelaide Freight Movement Study.

On 29/05/2017 the applicant clarified the request to; 

The request relates to the GHD ‘Adelaide Rail Freight Movements Study’ completed in June 2010 for the Department of Infrastructure, Transport, Regional Development & Local Government. 

MP Sam Duluk 

Page 62: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

I request details relevant to DPTI’s work in removing trees deemed to be hazardous on roads within the Pinery bushfire areas, including: •When the arborist assessment within the area was undertaken. •The names of the eight roads in which trees were assessed. •The loca on of the 17 trees marked to be removed (a ques on has been posed about the low number). •If work to remove the 17 “structurally unsound” trees have commenced, or been completed.  •If major pruning of 52 trees has commenced or been completed. 

MP Steven Griffiths

ApplicationAll details of Strategic Route Reviews of Main South Road where recommendations (including for duplication) have been made for the section from Seaford to Old Coach Road at Aldinga and from Aldinga to Sellicks Beach, from March 2014 to present.  MP David Pisoni

Application

Any correspondence between the department and Commercial and General and/or COMO Apartments (Malvern) PTY. LTD. (ACN: 606 030 111) or any representatives of those companies regarding 301‐305 Unley Road, Malvern SA 5061, from 1st of January 2015 till the latest available. 

MP David Pisoni

ApplicationCorrespondence regarding independent safety certification of fire processes at the New Royal Adelaide Hospital site since 1 Jan 2017 to current. MP David Pisoni

ApplicationCorrespondence regarding the independent certification of residual current devices (safety switches) at the New Royal Adelaide Hospital site since 1 Jan 2017 to current. MP David Pisoni

Application

1.The total cost of the department's budget spend on advertising/media campaigns for each financial year from July 1, 2013 to June 30, 2017. 2. Information relating to each individual campaign including:a) Name of campaign;b) Copies of media brief provided to the Master Media Agency;c) Copy of media strategyd) Copy of media plane) Where advertisments ran, length of run and budget for the run. Please include copies of invoices, or where considered commercially confident, summary of invoiced cost for radio, print, television, billboards, YouTube, online, stationery, graphic design, in‐house printing etc.f)Please include a summary of how much money has been allocated for the campaign for the 2017/18 financial year. 

Please advise if too onerous and we can discuss re‐scope. 

Re‐scope to "The number and cost of commercial media campaigns for the last two years" MP Robert Brokenshire

Application All documents relating to the Marree Man(or Stuart Giant) since 01 July 2012 MP Dan Van Holst Pellekaan

ApplicationCopy of the lease agreement of the Hambledon Road Campbelltown site owned by the State Government, which was formerly a Kindergarten MP Vincent Anthony Tarzia

Page 63: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

I request copies of all financial plans, budgets, forecasts or reports, and any reports, plans, briefings or presentations or similar documents relating to DPTI Annual Programs in regional areas, as referenced on page 124 of Budget Paper 3 of the 2017‐18 State Budget.

Rescope recevied 16/08/17:"a list of possible projects that may be included in the DPTI Annual Programs and corresponding reports and studies."

Rescope received 19/09/17:“a list of possible projects that may be included in the DPTI Annual Program and corresponding financial details, as referenced on page 124 of Budget Paper 3 of the 2017‐18 State Budget.” MP David Ridgway

Application

Time period ‐ 2014,  2015, 2016, and 2017 reporting years to date. Copies of Road maintenance logs, reports, summaries and budgets showing:1. Roads in South Australia listed for repair/maintenance in the time periods outlined (including name of road/street/avenue etc and suburb/town); anda.The date the department initially logged/became aware of the need for the repair/maintenance; andb. Whether work is still waiting to be done , is underway, has been patched/reinforced through minor works until further work can be carried out or whether the work has been completed; andc. For those with completed roadworks or roadworks underway ‐ the date roadworks began and were finalised.d. For roads awaiting repair/maintenance ‐ a description of the works needed, the estimated cost of those works and the estimated time the works are expected to take2. The estimated cost of the backlog of roadworks currently on the departments ledgers

MP Robert Brokenshire

Application

Any documents including, but not limited to, memos, notes, ministerial directives, departmental reports, letters and emails, held by the Department relating to planning work and/or concept development and design, for the treatment of Main Road/Downer Ave as recommended in the ‘Road Management Plan, Edition2, Main Road (RN6452) & Shepherds Hill Road (RN6467) – February 2015, Transport Services Division (Document #6923461).Please remove any reference to third parties so as to avoid lengthy delay in performing consultation pursuant to sections 25‐28 of the Act MP Sam Duluk 

Application

Any documents including, but not limited to, memos, notes, ministerial directives, departmental reports, letters and emails, held by the Department relating to planning work and/or concept development and design, for the treatment of Blackwood Roundabout as recommended in the ‘Road Management Plan, Edition2, Main Road (RN6452) & Shepherds Hill Road (RN6467) – February 2015, Transport Services Division (Document #6923461). MP Sam Duluk 

Application

Any documents including, but not limited to, memos, notes, ministerial directives, departmental reports, letters and emails, held by the Department relating to planning work and/or concept development and design, for the treatment of Main Road: Monalta Drive to Laffers Road as recommended in the ‘Road Management Plan, Edition2, Main Road (RN6452) & Shepherds Hill Road (RN6467) – February 2015, Transport Services Division (Document #6923461).

Please remove any reference to third parties so as to avoid lengthy delay in performing consultations pursuant to Section 25‐28 of the Act MP Sam Duluk 

Application

Any documents including, but not limited to, memos, notes, ministerial directives, departmental reports, letters and emails, held by the Department relating to planning work and/or concept development and design, for the treatment of Shepherds Hill Road / Brighton Parade / Waite Street as recommended in the ‘Road Management Plan, Edition 2, Main Road (RN6452) & Shepherds Hill Road (RN6467) – February 2015, Transport Services Division (Document #6923461 MP Sam Duluk 

Page 64: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

Any documents including, but not limited to, memos, notes, ministerial directives, departmental reports, letters and emails, held by the Department relating to planning work and/or concept development and design, for the treatment of Main Road / Russell Street as recommended in the ‘Road Management Plan, Edition 2, Main Road (RN6452) & Shepherds Hill Road (RN6467) – February 2015, Transport Services Division (Document #6923461) MP Sam Duluk 

Application

Any documents including, but not limited to. Memos, notes, ministerial directives, departmental reports, letters and emails, held by the department relating to planning work and/or concept development and design, for the treatment of Shepherds Hill Road / Sherbourne Road / Melton Street as recommended in the ‘Road Management Plan, Edition 2, Main Road (RN6452) & Shepherds Hill Road (RN6467) – February 2015,Ttransport Services Division (Document # 6923461) MP Sam Duluk 

ApplicationCopies of all project reports, plans, submissions, design or feasibility studies, business cases or similar documents relating to project's delivered under the women's sport facility fund. MP David Ridgway

Application

Copies of all planning, design, feasibility or similar studies into potential or planned grade separations within metropolitan Adelaide. 

Rescoped on 16/08/17 by MP's office to include the timeframe '1 July 2014 to 16 August 2017' MP David Ridgway

Application

I request access to information relating to corporate service charges, corporate overhead costs, and any other interactions thereof, allocated to each program and sub program administered by the agency, as well as in aggregate, for the 2016‐17 and 2017‐18 periods, as well as the forward estimates, This extends to the disaggregated disclosures of the statement of comprehensive income

MP David Ridgway

Application

I request copies of all Blackspot funding submissions that were prepared or submitted in 2015‐16, 2016‐17 and 2017‐18.

Date of application received 18/07/17. Please only include documents up to and including this date.

Rescope received 19/09/17:“I request a list of all Blackspot funding submissions that were submitted in 2015‐16, 2016‐17 and 2017‐18, which includes details of the estimated financial cost of each proposal.” MP David Ridgway

Application

Expenditure on State Owned and Maintained Roads within the Goyder ElectorateI request details from the Department of Planning, Transport and Infrastructure relating to maintenance or new State owned roads within the Goyder Electorate for the financial years 2014/15, 2015/16 and 2016/17 for: •Iden fied loca on of planned maintenance or new infrastructure, •Funding alloca on and  me alloca on to the maintenance project or new infrastructure, •Actual cost at the comple on of the maintenance project or new infrastructure

MP Steven Griffiths

Application

I request all reports on the condition of Golden Grove Road, from Grenfell Road to One Tree Hill Road, prepared by those who conducted the inspections during the periods 01/06/15 and 01/07/16 to date

MP Jennifer Rankine

Page 65: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Internal Review

I request access to all and any documents relating to:1. scheduled and unscheduled maintenance conducted at the Oaklands Railway Crossing at the intersection of Morphett and Diagonal Road ("Oaklands Railway Crossing") in the last 12 months;2. the speed of which the trains are travelling at through the Oaklands Railway Crossing in the last 12 months;3. recorded traffic clearance times through the Oaklands Railway Crossing and the Hove Railway Crossing on Brighton Road, Hove in the last 12 months;4. the volt supply to the boom gates at both Oaklands Railway Crossing and Hove Railway Crossing; and5. any safety checks done at the Oaklands Railway Crossing in the last 12 months.

MP Corey Wingard

Internal Review

1. All documents relating to when, how many and how much private investors have contributed towards the ongoing operational costs of the SA North Terrace Sports Museum;2. All documents relating to how much Sport SA has raised towards the SA North Terrace Sports Museum;3. A copy of the 10 years lease the State Government have taken out on a vacant building in front of the Intercontinental hotel to open the SA North Terrace Sports Museum;4. All documents relating to how much is required from both Sport SA and private investors for the SA North Terrace Sports Museum to be operational;5. All documents relating to the planning and design work created for the SA North Terrace Sports Museum;6. All documents relating to any contributions made towards the SA North Terrace Sports Museum from the Federal Government. MP Corey Wingard

Internal Review

I request access to documents, letters, emails and other correspondence sent to the Commonwealth Department of Infrastructure and Urban Development from the South Australian Department of Planning, Transport and Infrastructure since October 2016.

On 02 June 2017 the scope was clarified to; 

I request access to documents, letters, emails and other correspondence sent to the Commonwealth Department of Infrastructure and Urban Development from the South Australian Department of Planning, Transport and Infrastructure that include the term ‘Oaklands Crossing’ since October 2016. MP Corey Wingard

ApplicationCopies of all plans, investigations, studies, reports and similar documents relating to planned or prospective ‘Park and Ride’ facilities prepared by or for the department since 1 January 2013 MP David Ridgway

Application

Any document held, including but not limited to, memos, notes, briefing papers, ministerial directives, department reports, letters and emails, which provide advice on, or detail costs to engage security guards at the Angus Road (Hawthorn) level crossing, in July 2017. MP Sam Duluk 

ApplicationAny document held but not limited to, memos, notes, briefing papers, ministerial directives, department reports, letters and emails, which provide advice on, or detail costs to engage security guards at level crossing in South Australia, in the FY 16/17 MP Sam Duluk 

ApplicationFinal designs, drawings and maps created by the department for the re‐alignment of Goodwood, Springbank and Daws Road between 2001‐2002. MP David Pisoni

Application

Any documents showing the name identifying the type of aluminium composite panel manufactured by Yuanda Australia Pty Ltd and installed on the external walls of the new Royal Adelaide Hospital. Any documents showing that this particular brand of panel complies with current Australian building codes MP Duncan McFetridge

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect to Copper Coast Highway, Yorke Highway and the intersection thereof, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect to Port Wakefield Road 1 January 2012 MP David Ridgway

Page 66: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect to Dalkeith Road Main North Road and the intersection thereof, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect to Semaphore Road, prepared since 1 January 2012 MP David Ridgway

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect to Glynburn Road, prepared since 1 January 2012

MP David Ridgway

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect to Rowley Terrace prepared since 1 January 2012

MP David Ridgway

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect to Southern Ports Highway prepared since 1 January 2012

MP David Ridgway

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect to Horrocks Highway prepared since 1 January 2012

MP David Ridgway

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect to Coromandel Parade, Sheppards Hill Road, and the intersection thereof, prepared since 1 January 2012

MP David Ridgway

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect to Happy Vale Drive, Chandler’s Hill Road, and the intersection thereof, prepared since 1 January 2012

MP David Ridgway

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect to South Eastern Freeway, prepared since 1 January 2012

MP David Ridgway

Application

 I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect to The Parade, prepared since 1 January 2012

MP David Ridgway

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect to Main South Road, Tatachilla Road, and the intersection thereof, prepared since 1 January 2012

MP David Ridgway

Page 67: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect to Anzac Highway, prepared since 1 January 2012

MP David Ridgway

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect to Main Road, Blackwood, prepared since 1 January 2012

MP David Ridgway

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect to Bains Road, States Road, and the intersection thereof, prepared since 1 January 2012

MP David Ridgway

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Copper Coast Highway, prepared since 1 January 2012

MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Bull Creek Road, and the intersection thereof prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Prospect Road, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Doctors Road , prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Balcombe Ave, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Greenhill Road prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Spencer Highway prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Cross Road, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Hog Bay Road, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Torrens Road, Crozier Road, and the intersection thereof,, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Curtis Road, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Main North Road, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Payneham Road, prepared since 1 January 2012 MP David Ridgway

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Diagonal Road, Morphett Road, and the intersection thereof, prepared since 1 January 2012 MP David Ridgway

Page 68: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Owen Road, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Panalatinga Road, prepared since 1 January 2012 MP David Ridgway

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Bayview Road, McIntyre Road, and the intersection thereof, prepared since 1 January 2012 MP David Ridgway

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Old Princess Highway, Woodside Road, and the intersection thereof, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Dukes Highway, prepared since 1 January 2012 MP David Ridgway

Application 2017/17182/01I request copies of any plans, studies, designs, cos ngs, inves ga ons or similar documents prepared by or for, or 

otherwise in the possession of, the department with respect Brighton Road, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Richmond Road, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Sir Donald Bradman Drive, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Portrush Road, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Magill Road, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Charles Sturt Ave, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Cheltenham Parade, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Belair Road, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Highway 1 or sections thereof, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Barrier Highway, prepared since 1 January 2012 MP David Ridgway

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Playford Highway, Tinsmith Road, and the intersection thereof, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Goodwood Road, prepared since 1 January 2012 MP David Ridgway

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect North East Road, South Para Road, and the intersection thereof, prepared since 1 January 2012 MP David Ridgway

Application

I request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect to Hancock Road, Golden Grove Road, and the intersection thereof, prepared since 1 January 2012 MP David Ridgway

ApplicationI request copies of any plans, studies, designs, costings, investigations or similar documents prepared by or for, or otherwise in the possession of, the department with respect Glen Osmond Road, prepared since 1 January 2012 MP David Ridgway

Page 69: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

The number of staff members seconded from your department to work in a South Australian Government Minister's office during the time frame including:

a)The Minister's Office to which the staff member was seconded b)the start date and end date of the secondment (please note ongoing if assignment has no official end date) c)The rank/posi on  tle of the staff member and whether the secondment changed the rank/posi on and if so a descrip on of the 

change (eg only. AS05 seconded and placed as AS06)Time Frame: January 2015 to current date

MP Robert Brokenshire

Internal Review

I request details relevant to DPTI’s work in removing trees deemed to be hazardous on roads within the Pinery bushfire areas, including: •When the arborist assessment within the area was undertaken. •The names of the eight roads in which trees were assessed. •The loca on of the 17 trees marked to be removed (a ques on has been posed about the low number). •If work to remove the 17 “structurally unsound” trees have commenced, or been completed.  •If major pruning of 52 trees has commenced or been completed.  MP Steven Griffiths

External ReviewCopies of all documents relating to a) the payment of any entertainment and meal expenses and b) details of all credit card transactions for the Chief Executive or Chief Executives from 1/01/2015 to 31/12/2016 MP Rob Lucas

ApplicationCategory of public notice originally given to the proposed development for the site of 306 Glen Osmond Road, Myrtle Bank and subsequent revisions to the public notification category MP David Pisoni

ApplicationI request all reports on the condition of Golden Grove Road, from Grenfell Road to One Tree Hill Road, prepared by those who conducted the inspections during the periods 01/06/15 and 01/07/16 to date MP Jennifer Rankine

Application

I request access to all the details of any email, circular, letter, phone call, discussion notes or any other correspondence between you, or any members of your staff, with all Directors, Board Members and any other staff of Kangaroo Island Plantation Trees in relation to the proposed wharf at Smiths Bay and the names of all roads to be upgraded following the allocation of funding from SA government to Kangaroo Island Council  for upgrading of unsealed roads on Kangaroo Island up to 30 June 2020.The Directors and staff of KIPT include Mr Paul McKenzie, Mr John Sergeant, Mr Greg BoultonMs Shauna Black, Mr Graham Holdaway, Ms Victoria Allison, Mr Peter Lockett and Mr Stephen Connell.The material requested is inclusive of the dates 1 December 2016 and 15 August 2017.

MP Michael Pengilly

Application

I request access to document(s) concerning: properties which have been compulsory acquired by DPTI from 1 January 2016 – 30 June 2017. Specifically, for each property acquired, I request information regarding: ‐ The final compensable amount ‐ The cost DPTI incurred for external valuations ‐ The cost DPTI incurred for legal fees ‐ The amount reimbursed to disposed owners for valuations and legal advice/representation

MP John DarleyApplication A copy of the lease for Ayers House held by Mr Richard Clarke, managing director of Ayers House Weddings and Events. MP David Speirs

Application

I request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Brighton Road

Re‐scope to "I request a list of studies (or similar documents) into the potential, planned or actual upgrade of Brighton Road which detail the cost of said upgrades, prepared since 1 January 2013" MP David Ridgway

Page 70: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application I request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Charles Sturt Avenue MP David Ridgway

Application I request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Balcombe Avenue MP David Ridgway

Application

I request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Cheltenham Parade

Re‐scope 01/11/2017 to 

I request a copy of any study (or similar document) into the potential, planned or actual upgrade of Cheltenham Parade which details the cost of said upgrade, prepared since 1 January 2013 MP David Ridgway

Application I request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Semaphore Road MP David Ridgway

Application

“Any documents including, but not limited to memos, notes, ministerial directives, departmental reports, letters and emails, held by the Department relating to work, maintenance and or concept development and design, for the treatment of the Waite Road and Cross Road Intersection in Netherby MP Sam Duluk 

Internal Review

Time period – 2014, 2015, 2016, and 2017 reporting years to date. Copies of Road maintenance logs, reports, summaries and budgets showing:

1.Roads in South Australia listed for repair/maintenance in the  me periods outlined (including name of road/street/avenue etc and suburb/town); and

a.The date the department ini ally logged/became aware of the need for the repair/maintenance; and b.Whether work is s ll wai ng to be done , is underway, has been patched/reinforced through minor works un l further work can 

be carried out or whether the work has been completed; and c.For those with completed roadworks or roadworks underway ‐ the date roadworks began and were finalised. d.For roads awai ng repair/maintenance ‐ a descrip on of the works needed, the es mated cost of those works and the es mated 

time the works are expected to take.2. The estimated cost of the backlog of roadworks currently on the department's ledgers.’

MP Robert Brokenshire

Application

I request copies of all documents that indicate the dates of all inspections undertaken by Department of Planning, Transport and Infrastructure personnel on Golden Grove Road, between Grenfell Road to Crouch Road, Golden Grove during the periods 01/06/15 to 30/6/16 and 01/07/16 to date. MP Jennifer Rankine

Application

I request copies of all documents that indicate the dates of all inspections undertaken by Department of Planning, Transport and Infrastructure personnel on Golden Grove Road, between Grenfell Road to Crouch Road, Golden Grove during the periods 01/06/15 to 30/6/16 and 01/07/16 to date. MP Jennifer Rankine

Application

All letters, emails, notes on telephone calls and any other correspondence mentioning Golden Grove Road from Paula Luethen‐ Soper (also known as Paula Luethen), Luigi Messisca, Richard Harvey, David Pisoni MP, Member for Unley, and Hon John Dawkins MLC and the responses by the Department to Paula Luethen‐Soper (also known as Paula Luethen) Luigi Messisca, Richard Harvey, David Pisoni MP, Member for Unley, and Hon John Dawkins MLC as a result of their queries about Golden Grove Road during the periods 01/01/14 and 15/09/17 to date. MP Jennifer Rankine

Internal Review

All reports on the condition of Golden Grove Road, from Grenfell Road toOne Tree Hill Road, prepared by those who conducted the inspections during the periods 01/06/15 to 30/6/15 and 01/07/16 to date". MP Jennifer Rankine

Page 71: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Internal Review

1. The total cost of the department’s budget spend on advertising/ media campaigns for each financial yearfrom July 1, 2013 to June 30, 2017 and;2. Information relating to each individual campaign including:a) Name of campaign;b) Copies of media brief provided to the Master Media Agency;c) Copy of media strategyd) Copy of media plane) Where advertisement ran, length of run and budget for the run. Please include copies of invoices, or where considered commercially confident, summary of invoiced cost for radio, print, television, billboards,YouTube, online, stationery, graphic design, in‐house print etcf) Please include a summary of how much money has been allocated for the campaign for the 2017/18 financial year.Re scope to “The number and cost of commercial media campaigns for the last two years”.

MP Robert Brokenshire

ApplicationCopies of all documents that indicate the dates Golden Grove Road has been inspected since December 2016. Copies of all reports prepared following the inspections and details of any works undertaken for the same time period. MP Jennifer Rankine

Application

For each year in the time frame – records regarding traffic volumes across the Swanport Bridge on Highway 1 between Murray Bridge and Tailem Bend. Time Frame: January 2013 to current date (22/09/2017)

MP Robert Brokenshire

Application

The number of accidents and fatalities which have taken place on the Swanport Bridge on Highway 1 between Murray Bridge and Tailem Bend in past five years including accidents within 2km either side of the bridge. Time Frame: January 2013 to current date (22/09/2017)

MP Robert Brokenshire

Application

Copies of reports, studies and proposals regarding the Swanport Bridge on Highway 1, between Murray Bridge and Tailem Bend. Time Frame: January 2014 to current date (22/09/2017)

MP Robert Brokenshire

Application

I request access to all the details of any email, circular, letter, phone call, discussion notes or any other correspondence between the Commissioner for Kangaroo Island, The Mayor, or any members of Council staff, with all Directors, Board members and any other staff of Kangaroo Island Plantation Trees in relation to the proposed wharf at Smiths Bay and the names of all roads to be upgraded following the allocation of fundingfrom SA government to Kangaroo Island Council for upgrading of unsealed roads on Kangaroo Island up to 30 June 2020.The Directors and staff of KIPT include Mr Paul McKenzie, Mr John Sergeant, Mr Greg Boulton, Ms Shauna Black, Mr Graham Holdaway, Ms Victoria Allison, Mr Peter Lockett and Mr Stephen Connell.The material requested is inclusive of the 15 August 2017 and 22 September 2017.

MP Michael Pengilly

Application

I request access to all documents relating to the budget and actual spend of social media promotion by the Department of Planning, Transport and Infrastructure for the 2014/15, 2015/16, 2016/17 and 2017/18 periods.

MP David Ridgway

Page 72: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

I request access to all correspondence (emails, briefing notes etc) between representatives of the Department of Premier and Cabinet and media/communications staff within the Department of Planning, Transport and Infrastructure regarding social media promotion for the period of 1 January 2014 till present.

MP David Ridgway

ApplicationWhat are the cost estimates relating to project management fees, consultancy fees, and other non‐building related costs, across the 139 STEMWorks projects in DECD schools? MP John Gardner

External Review

1. The total cost of the department’s budget spend on advertising/ media campaigns for each financial year from July 1, 2013 to June 30, 2017 and;2. Information relating to each individual campaign including:a) Name of campaign;b) Copies of media brief provided to the Master Media Agency;c) Copy of media strategyd) Copy of media plane) Where advertisement ran, length of run and budget for the run. Please include copies of invoices, or where considered commercially confident, summary of invoiced cost for radio, print, television, billboards,YouTube, online, stationery, graphic design, in‐house print etcf) Please include a summary of how much money has been allocated for the campaign for the 2017/18 financial year.

Re sscope to “The number and cost of commercial media campaigns for the last two years”.

MP Robert Brokenshire

Page 73: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

External Review

Time period ‐ 2014,  2015, 2016, and 2017 reporting years to date. Copies of Road maintenance logs, reports, summaries and budgets showing:1. Roads in South Australia listed for repair/maintenance in the timeperiods outlined (including name of road/street/avenue etc and suburb/town); anda.The date the department initially logged/became aware of the need for the repair/maintenance; andb. Whether work is still waiting to be done , is underway, has been patched/reinforced through minor works until further work can be carriedout or whether the work has been completed; andc. For those with completed roadworks or roadworks underway ‐ the date roadworks began and were finalised.d. For roads awaiting repair/maintenance ‐ a description of the works needed, the estimated cost of those works and the estimated time the works are expected to take2. The estimated cost of the backlog of roadworks currently on the department ledgers.

Re‐scoped with applicant at settlement conference on 20/11/17 ‐ Time period ‐ 2014,  2015, 2016, and 2017 reporting years to date. Copies of Road maintenance logs, reports, summaries and budgets showing:d. For roads awaiting repair/maintenance ‐ a description of the works needed, the estimated cost of those works and the estimated time the works are expected to take2. The estimated cost of the backlog of roadworks currently on the department ledgers.

MP Robert Brokenshire

ApplicationI request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Happy Valley Drive, Chandler's, Hill Road, and the intersection thereof.  MP David Ridgway

ApplicationI request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Main South Road, and intersections thereof. MP David Ridgway

ApplicationI request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Main South Road, Tatchilla Road and intersections thereof. MP David Ridgway

ApplicationI request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Sir Donald Bradman Drive. MP David Ridgway

ApplicationI request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Main Road, Blackwood. MP David Ridgway

Application I request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Doctors Road. MP David Ridgway

Application I request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Goodwood Road. MP David Ridgway

ApplicationI request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Coromandel Parade, Sheppards Hill Road, and intersections thereof. MP David Ridgway

Application I request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Cross Road. MP David Ridgway

ApplicationI request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Bains Road, States Road, and intersections thereof. MP David Ridgway

Application I request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Panalatinga Road. MP David Ridgway

Page 74: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

ApplicationI request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Diagonal Road, Morphett Road, and intersections thereof. MP David Ridgway

Application I request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Anzac highway. MP David Ridgway

Application I request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Richmond Road. MP David Ridgway

ApplicationI request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Bayview Road, McIntyre Road, and intersections thereof. MP David Ridgway

Application I request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Spencer Highway. MP David Ridgway

Application I request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Main North Road. MP David Ridgway

ApplicationI request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Dalkeith Road, Main North Road, and intersections thereof. MP David Ridgway

ApplicationI request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Playford Highway, Tinsmith Road, and intersections thereof. MP David Ridgway

ApplicationI request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Copper Coast Highway, Yorke Highway, and intersections thereof. MP David Ridgway

ApplicationI request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of North East Road, South Para Road, and intersections thereof. MP David Ridgway

Application I request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Prospect Road. MP David Ridgway

ApplicationI request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Torrens road, Crozier Road, and intersections thereof. MP David Ridgway

Application I request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Port Wakefield Road. MP David Ridgway

Application I request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Curtis Road. MP David Ridgway

Application I request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Dukes Highway. MP David RidgwayApplication I request a copy of any investigation, including estimated costs, into the potential or actual upgrade of Glynburn Road. MP David Ridgway

Application I request a copy of any investigation, including estimated costs, into the potential or actual upgrade of Horrocks Highway. MP David RidgwayApplication I request a copy of any investigation, including estimated costs, into the potential or actual upgrade of Barrier Highway. MP David Ridgway

Application I request a copy of any investigation, including estimated costs, into the potential or actual upgrade of South Eastern Freeway. MP David Ridgway

Application I request a copy of any investigation, including estimated costs, into the potential or actual upgrade of Southern Ports Highway. MP David RidgwayApplication I request a copy of any investigation, including estimated costs, into the potential or actual upgrade of Owen Road. MP David Ridgway

ApplicationI request a copy of any investigation, including estimated costs, into the potential or actual upgrade of Hancock Road, Golden Grove road, and the intersection thereof. MP David Ridgway

ApplicationA copy of the contract awarded to York Civil for the upgrade of the Marion Road and Sturt Road intersection in 2015. MP Rob Lucas

ApplicationDocuments that show which schools have solar panels installed. Pleaseinclude details such as the date(s) installed (month and year) and size of the solar panels (wattage), per installation. MP Stephan Knoll

ApplicationAny documents that show audits and reports on bridges on the Sturt Highway in South Australia from January 1 2014 to 16 October 2017. MP Tim Whetstone

Page 75: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

ApplicationAll data relating to traffic counts and volumes along the Sturt Highway at Waikerie in the 80km/ph zone in 2012, 2013, 2014, 2015, 2016 and 2017 to date. MP Tim Whetstone

Application

I request access to information relating to the budgeted and estimated figures to be spent by the department on its Annual Programs in regional areas, as referred to on page 124 of the 17‐18 State Budget Statement, for the current forward estimates period. MP David Ridgway

External Review

All documentation, studies, reports and emails (including those on the sAGEM system) prepared and/or discussing plans, costings and consultations conerning, A. the South Eastern Freeway/Princes Highway between Stirling and the Cross Road/Portrush Road/Glen Osmond Road Intersection area (sometimes referred to as the Toll Gate) and B. the Stirling and Crafers intersections. Time Frame for search: January 2014 to Date of Application (23/12/2016). On 16 March 2017 the applicant re‐scoped this application to remove emails from the request so please supply information for;  All documentation, studies, and reports prepared and/or discussing plans, costings and consultations concerning, A. the South Eastern Freeway/Princes Highway between Stirling and the Cross Road/Portrush Road/Glen Osmond Road Intersection area (sometimes referred to as the Toll Gate) and B. the Stirling and Crafers intersections. Time Frame for search: January 2014 to Date of Application (23/12/2016). Re‐scoped 25/05/2017 to:‐ Reports and Studies MP Robert Brokenshire

Internal Review

The number of staff members seconded from your department to work in a South Australian Government Minister's office during the time frame including:

a)The Minister's Office to which the staff member was seconded b)the start date and end date of the secondment (please note ongoing if assignment has no official end date) c)The rank/posi on  tle of the staff member and whether the secondment changed the rank/posi on and if so a descrip on of the 

change (eg only. AS05 seconded and placed as AS06) Time Frame: January 2015 to current date

MP Robert Brokenshire

Application

I request a copy of any investigation, including estimated costs, into the potential, planned or actual upgrade of Bayview road, McIntyre Road, and the intersection thereof MP David Ridgway

Internal Review

I request copies of all documents that indicate the dates of all inspections undertaken by Department of Planning, Transport and Infrastructure personnel on Golden Grove Road, between Grenfell Road to Crouch Road, Golden Grove during the periods 01/06/15 to 30/6/16 and 01/07/16 to date. MP Jennifer Rankine

Application

For each: bus, tram and train for the time frame August 1, 2017 to August 15, 2017.a) The initial boarding patronage for each form of public transport by routefor each day during the time frame.b) The total patronage for each form of public transport by route for each day during the time frame.c) The number of transfers for each form of public transport by route for each day during the time frame. MP Robert Brokenshire

Application

For the time frames: 2005 to 2006 and 2016 to 2017: The total patronage for all bus  services in the following regional areas (by  route).a) Port Lincolnb) Whyallac) Port Augustad) Port Piriee) Murray Bridgef) Mount Gambier MP Robert Brokenshire

Application1. Copy of the Adelaide Metro Service Planning Guidelines2. Copy of Adelaide Metro signage and timetable style guide MP Robert Brokenshire

Page 76: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

The number of Standby Cabs that are licensed to work within the Adelaide Metropolitan area.

Has been re‐scoped to ‐ The number of Standby Cabs that are currently licensed to work within the Adelaide Metropolitan area.The number of Standby Cabs that have been licensed to work within theAdelaide Metropolitan area over the past 3 months.

MP Geoff Brock 

Application

1. Copies of briefings, reports and correspondence between the Minister for Local Government and SA Councils regarding Australia Day.

2. Copies of briefings, reports and correspondence between the Minister for Local Government and SA Councils regarding citizenship ceremonies. MP Robert Brokenshire

Application

"All memos and correspondence to and from the Department regarding 306 Glen Osmond Road, Fullarton.”

Re‐scoped to ‐“All memos and correspondence to and from the Department regarding Development Assessment number DA 090/E004/17 in relation to 306 Glen Osmond Road, Fullarton.” MP David Pisoni

Application

“All documentation regarding the costing and the actual cost of the O’Bahn project from 28 June 2016 to 17 November 2017 including but not limited to a breakdown of all costs, details on how the cost benefit ratio was calculated and alternative projects costed and considered to improve the reliability and speed of the O’Bahn.” MP Rachel Sanderson MP

Internal Review

I request access to planning documents that involve, discuss or refer to the Oaklands Crossing, including any potential changes to the crossing. This includes, but is not limited to, engineering documents held by DPTI, plans authored by the department, costing documents and any other documentation that contains, includes or refers to plans for the Oaklands Crossing.

On 12 May 2017 the applicant revised the request to;

I request access to the project proposal report on the Oaklands Crossing held by the Department of Planning, Transport and Infrastructure and any other supporting documentation including costing documents or engineering plans associated with this project report.

MP Corey Wingard

External Review

“A six month period (relevant to the six months immediately preceding the access application, namely 11 May 2017).

Complaints about public buses and complaints lodged through the ‘compliments and complaints’ website. Only those complaints within the ‘service changes and service quality’ and ‘other’ categories (that is, excluding complaints about ‘punctuality’; ‘fares and ticketing’ and ‘passenger comfort’) and;Complete figures about the complaints but rows relevant to complaints about matters other than driver competency and public safety may be redacted from the document(s).”

MP Robert Brokenshire

Page 77: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Application

1. All discussion notes, telephone conversation records, emails, letters and other correspondence between the following entities – Kangaroo Island Council including the Office of the CEO, The Commissioner for Kangaroo Island and her office, the Office of the Premier of South Australia, the Minister for Tourism and his office, The Department of Tourism and the South Australian Tourism Commission pertaining to the invitation list for the flight, celebrations and dinner following the flight by Qantas from Adelaideto Kangaroo Island on 4 December 2017.

2. All discussion notes, telephone conversation records, emails, letters and other correspondence between the above entities with relation to payments made by each of the above entities to cover the cost of the invited guests on the flight by Qantas to Kangaroo Island and celebrations including the dinner following the flight on 4 December 2017.

Re‐scoped on 17/01/2018 to ‐ 

1.All discussion notes, telephone conversa on records, emails, le ers and other correspondence between the following en es – Kangaroo Island Council including the Office of the CEO, The Commissioner for Kangaroo Island and her office, the Office of the Premier of South Australia, the Minister for Tourism and his office, The Department of Tourism and the South Australian Tourism Commission pertaining to the invitation list for the flight and celebrations following the flight by Qantas from Adelaide to Kangaroo Island on 4 December 2017.

2.All discussion notes, telephone conversa ons records, emails, le ers, and other correspondence between the above en es with relation to payments made by each of the above entities to cover the cost of the invited guests on the flight by Qantas to Kangaroo Island and celebrations following the flight on 4 December 2017.

3.A copy of the list of invited guests and all documents regarding the cost of the Business Networking Dinner held on Kangaroo Island on 4 December 2017.

MP Michael Pengilly

Internal ReviewCopies of reports, studies and proposals regarding the Swanport Bridge on Highway 1, between Murray Bridge and Tailem Bend. Time Frame: January 2014 to current date (22/09/2017). MP Robert Brokenshire

Internal Review

For the time frames: 2005 to 2006 and 2016 to 2017: The total patronage for all bus  services in the following regional areas (by  route).a) Port Lincolnb) Whyallac) Port Augustad) Port Piriee) Murray Bridgef) Mount Gambier

MP Robert Brokenshire

Internal Review

For each: bus, tram and train for the time frame August 1, 2017 to August 15, 2017.a) The initial boarding patronage for each form of public transport by routefor each day during the time frame.b) The total patronage for each form of public transport by route for each day during the time frame.c) The number of transfers for each form of public transport by route for each day during the time frame.

MP Robert Brokenshire

Page 78: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Internal Review

1. Copy of the Adelaide Metro Service Planning Guidelines2. Copy of Adelaide Metro signage and timetable style guide

MP Robert Brokenshire

ApplicationAll invoices relating to the closure of the Pine Avenue pedestrian crossing at Kingston Park including, but not limited to, invoices relating to capital works, waste management, consultants, engineers, public consultation, advertising and site remediation. MP David Speirs

ApplicationCopies of all documents and correspondence (including briefing papers, emails, minutes of meetings (and attachments thereto) regarding the provision of funding to Equestrian SA for the period 1 April 2014 to 10 January 2018. MP David Ridgway

Internal Review

All letters, emails, notes on telephone calls and any other correspondence mentioning Golden Grove Road from Paula Luethen‐ Soper (also known as Paula Luethen), Luigi Messisca, Richard Harvey, David Pisoni MP, Member for Unley, and Hon John Dawkins MLC and the responses by the Department to Paula Luethen‐Soper (also known as Paula Luethen) Luigi Messisca, Richard Harvey, David Pisoni MP, Member for Unley, and Hon John Dawkins MLC as a result of their queries about Golden Grove Road during the periods 01/01/14 and 15/09/17 to date. MP Jennifer Rankine

ApplicationDocuments provided all documents relating to a phone survey conducted in February 2017 seeking public feedback on public transort in South Australia. MP Dan Van Holst Pellekaan

Application

I seek access to the following management plans associated with the proposed ALINTA  power station at Reeves Plains (development number 312N005/17):•Construction Environmental Management Plan (CEMP) and the related sub‐ plans: Construction Noise and Vibrations Management Plan and Soil Erosion and Drainage Management Plan (SEDMP), as outlined in section 3 of the conditions of approval•Operational Environmental Management Plan (OEMP), as outlined in section 4 of the conditions of approval•Waste Management Plan (WMP) as outlined in section 11 of the conditions of approval•Traffic Management Plan, as outlined in section 13 of the conditions of approval•Stormwater Management Plan, as outlined in section 21 of the conditions of approval•Emergency Response Plan, as outlined in section 23 of the conditions of approval•Landscaping Plan as outlined in section 24 of the conditions of approval MP Rex Patrick

Page 79: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Type Name Request

Appl Robert Brokenshire MLCAny summary, collation, opinion produced or otherwise correspondence held by the Chief Executiveor any Deputy Chief Executive about the Regional Mining and Infrastructure Plan

Int Rev Robert Brokenshire MLC

With regard to the South Road Superway project:(1) Copies of the communication between the (a) Chief Executive and/or Deputy Chief Executive/s and (b1)the project managers or (b2) the Minister’s office regarding any changes in the final completion datebetween 1 September 2013 and the date of this Request (including current estimated completion date);AND(2) Invoices, budgets, plans or other over-arching details of any planned expenditure or promotion of theopening of the Superway – and evidence of costs incurred thereto as to changes in dates for the opening(also including the proposed dates, over time, for the opening);(3) Details of the contract provisions and any efforts to enact contract provisions by the Department orGovernment for the project running over-time.

Appl Robert Brokenshire MLC

With regard to the South Road Superway project:(1) Copies of the communication between the (a) Chief Executive and/or Deputy Chief Executive/s and (b1)the project managers or (b2) the Minister’s office regarding any changes in the final completion datebetween 1 September 2013 and the date of this Request (including current estimated completion date);AND(2) Invoices, budgets, plans or other over-arching details of any planned expenditure or promotion of theopening of the Superway – and evidence of costs incurred thereto as to changes in dates for the opening(also including the proposed dates, over time, for the opening);(3) Details of the contract provisions and any efforts to enact contract provisions by the Department orGovernment for the project running over-time.

Appl Robert Brokenshire MLC

All Conceptual or other Maps and other documentation arising from considerations to modify thecurrent Urban Growth Boundary anywhere on the northern side of Main North Road including butnot limited to the Angle Vale, Concordia, Virginia, Two Wells, Buckland Park and / or Gawler Riverareas ANDany proposals developed contributed to or held by the agency that recommends revision of theUrban Growth BoundaryTIME FRAME: during the 2012, 2013 or 2014 calendar years (to date)

Appl Steven Marshall MP All documents mentioning R Martin, P Malinauskus & Labor Candidates

Appl Tammy Franks MLC

“Information about:a) The termination of the lease with Adelaide City Council for the current City Skate Park site adjacent to the Adelaide Railyards;b) Any funding commitments from the State Government for a relocation of the skate facility as part of a broader activity hub;c) The development of a community engagement strategy to inform the development of a Master Plan for a new skate facility in the City as part of a broader activity hub.”

File 2018/15258/01 – Document 003

Page 80: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Appl Robert Brokenshire MLC

“PART A: For each calendar year in the Time Frame:

(1) The number of persons in each year who had their driver’s licence disqualified, broken down between P plater and Open Licence holders; (2) The number of drivers who lost at least 1 demerit point that year, and the total number of demerit points lost by adrivers that year; (3) The top 20 postcodes (including placenames) of the places of residence of the largest number of drivers’ licence holders (P plate or otherwise) who were disqualified during that year (eg Adelaide 5000 82 drivers, North Adelaide 5006 42 drivers etc); (4) The top 20 postcodes (including placenames) of the places of residence of the largest number of drivers’ licence holders (P plate or otherwise) who incurred at least 1 Demerit Point during that year (eg Adelaide 5000 1,940 incurred 1 or more demerit points; North Adelaide 5006 1,000 incurred 1 or more demerit points etc).

TIME FRAME: 2010, 2011, 2012 and 2013 calendar years; AND

PART B: If possible, a list of the postcodes (with place-names) where, from 1 January 2010 to 31 December 2013), no person with a drivers licence registered place of residence at that postcode received a disqualification or 1 or more demerit points – providing only the top 10 locations sorted by the number of persons registered with drivers’ licences place of residence at that postcode (eg table of 10 postcodes & place names, 1. Mypolonga 42 registrants 0 demerit points or disqualifications, 2. Tarlee 32 registrants, 0 demerit points of disqualifications etc).”

Appl Robert Lucas MLC Documents relating to cashing out leave entitlements (Ministerial contract)Appl Robert Lucas MLC Copy of the Minister's DirectoryAppl Robert Lucas MLC Documents relating to Min T & I Travel expenses

Appl Robert Lucas MLC“Since 1 Jan 2013, all docs including emails and notes of telephone conversations relating to any termination payments for staff employed under a ministerial contract.”

Appl Robert Lucas MLC“Copies of all documents including emails which indicate the total costs including production and distribution for the booklet ‘Adelaide Oval redevelopment: Ashes Edition.”

Appl John Gardner MP Casualty Vehicle Accidents - Lower NE Rd - since January 2005Appl Michael Pengilly MP KIFA report re Kingscote AirportAppl Robert Brokenshire MLC Character Preservation Acts (McLaren Vale and Barossa Valley)Appl Steven Griffiths MP Documents related to development no 544/V001/13

Appl Robert Brokenshire MLC

“Copies of all letters or e-mails of complaint sent to the Chief Executive by members of the public (i.e. not including staff of the SA , interstate or Commonwealth public service unless the person was using a public service email address but writing in a private capacity), where the Department decided to respond with an Apology in writing (including where the apology was included in a letter about other matters to the person), and in each case copies of that letter including that Apology.

(To be clear, where the Department decided not to provide an apology, or dealt with the matter another way – for instance compensation – those cases are not within the scope of this Request. The focus is on Member of the Public Complaints that resulted, in whole or in part, in an Apology during the Time Frame)

TIME FRAME: 1 September 2013 to the date of this Request”

Page 81: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Appl Robert Brokenshire MLC

(1) Details of the extent to which the Respondent to this Application uses the services of “The Milk Box” (an arm of the Box Corporate) for the provision of fresh milk to staff;

(2) Details, if not “The Milk Box” as to which company provides fresh milk to the Respondent under contract (ie excluding milk that staff might acquire from a local supermarket / delicatessen)

(3) In either case of (1) or (2) above, evidence that the Respondent has sought to satisfy himself as to the state or locality origin of the fresh milk provided by that provider.

TIME FRAME: 2012/13 and 2013/14 reporting years (to date).

Appl Vickie Chapman MP

“All documents held by the department concerning the site visit to the South Road Superway by the Premier and members of the Australian Labor Party on 13 March 2014, including but not limited to, documents requesting access to the northbound lanes prior to official opening.”

Appl Vickie Chapman MP All correspondence from Min for Transport 15/2/14 to 1/4/14Int Rev Vickie Chapman MP All incoming minister briefs/similar docs provided to Minister MullighanAppl Vickie Chapman MP All incoming minister briefs/similar docs provided to Minister MullighanAppl Vickie Chapman MP Patronage on Adelaide Metro Services on 29/3/14

Appl Vickie Chapman MP“All agreements entered into by the State Government and providers Adelaide Metro services regarding increased payments during 2014.”

Appl John Darley MLC“Any reports the Department of Planning, Transport and Infrastructure has commissioned or has received about the Kangaroo Island Ferry from 1 January 2012 to present.”

Appl Vickie Chapman MP“All correspondence received by the Office of the Minister for Transport and Infrastructure from representatives of Adelaide Capital Partners for the period 2009 to present.”

Appl Steven Marshall MP all correspondence between Minister Bignell and govt departments between 15/2/14 - 23/3/14 inclusiveExt Rev Vickie Chapman MP All recommendations made by the Road Safety Initiatives Advisory GroupAppl Vickie Chapman MP All recommendations made by the Road Safety Initiatives Advisory Group

Appl Vickie Chapman MPAll correspondence and documents sent to the Federal Government concerning the 'Productivity Commission Inquiry into Infrastructure Costs'

Appl David Pisoni MP

“All documents (including briefings) prepared on:- The Liberal Party’s plan for a second campus of Adelaide High School; - Labor’s plan for a second city high school;- school zone modelling for Adelaide and Brighton high school; and – consultations with leaders and community members at Seaview High School regarding Labor’s election promises for the school in 2013/2014.”

Appl Vickie Chapman MPAll written advice provided to the Minister for Transport and infrastructure (Hon Tom Koutsantonis) and his staff, regarding the requirement to close the Seaford Rail line during 2014

Appl Vickie Chapman MPAll written advice provided to the Minister for Transport and infrastructure (Hon Stephen Mullighan) and his staff, regarding the requirement to close the Seaford Rail line during 2014

Appl David Speirs MP All documents related to bike lanes on Brighton RoadAppl David Speirs MP Warning Bells - Level crossings Seacliff & BrightonAppl Steven Marshall MP Black Spot list 2013-14Appl Steven Marshall MP Black Spot locations 2014/15

Page 82: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Appl David Pisoni MP

All incidents reports and all documents pertaining to civil claims made regarding incidents occurring at the tram line crossing of:- Beckmann Street and Winifred Avenue, Glandore;- Marion Road, Plympton; and- Cross Road, Plympton In the previous 12 months. (REVISED SCOPE)

Appl David Pisoni MP

“All documents(including emails, reports and records of complaints) regarding the volume of the crossing bells at the tram line crossings of:- Beckman Street and Winifred Avenue Glandore;- Marion Road Plympton- Cross Road Plympton;From beginning 2013 until present.”

Appl Robert Lucas MLC Copies of all briefing documents prepared by the agency for a possible incoming Liberal Government

Appl Steven Griffiths MP

Documentation detailing the number of property valuation appeals lodged with the State Valuation Office for residential properties and commercial and industrial properties within the Clare/Kadina area in 2012/13.

I also seek the number of property owners who appealed against the valuation of their property who had their valuation reduced.

Additionally, I seek the details of how many property owners lodged an appeal to the Valuer-General in 2012/13 and what the outcome was for each appeal within the Clare/Kadina area

Appl Steven Griffiths MP

Documentation dealing with the number of property valuation appeals lodged with the State Valuation Office for residential properties and commercial and industrial properties in 2012/13.

I also seek the number of property owners who appealed against the valuation of their property who had their valuation reduced.

Additionally, I seek the details of how many property owners lodged an appeal to the Valuer-General in 2012/13 and what the outcome was for each appeal.

Appl Robert Lucas MLC Copies of all briefing documents prepared by the Agency prior to the March 2014 election for the Labor Party being re-elected to Government

Appl David Speirs MP All documents relating to the Brighton Rugby Union Football Club from 1 January 2014 to present day

Appl Stephan Knoll MPAll deeds (including drafts) entered into between the State Government and the developers of ‘Springwood’ relating to the development of infrastructure to support development at Gawler East

Page 83: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Appl Robert Brokenshire MLC

‘Any material prepared by, received by or discussed by the Department, even in e-mail correspondence (including Sagems system), mentioning or about the • ‘new Government’,• ‘Liberal Government’ or• Other discussions or preparationsrelating to the contingency that a Liberal Government may have been elected on 15 March 2014 (for instance, costings or plans on timeframes for implementation of key Liberal election policies).’

Appl Robert Brokenshire MLC

Grants ORS approved or received by the following organisations:(1) McLaren Vale Netball Club;(2) McLaren Vale Football Club; or(3) Old Noarlunga Football Club

Appl Dan Van Holst Pellekaan MPall documents relating to the Rural Speed Limit Review - 2013, including reports, draft reports, emails, correspondence, minutes of meeting and memos since 1 July 2013. Please exclude all submissions to this review

Appl Dennis Hood MLC

For all persons whom the Department paid targeted voluntary separation packages, where that person was over the age of 60 years: (a) Their length of service: (b) The amount paid to them;(c) Their annual salary level at the time they took the package and (d) Their actual age; Names and other identifying information may be removed. TIME FRAME: 15 March 2013 to the date of this request (29 May 2014)

Appl Vickie Chapman MP Correspondence received by FOI staff from a Ministerial officer

Appl Vickie Chapman MPDocuments that identify the number of people who boarded and alighted trains at the Wayville Train Station for the week 8-14 June 2014

Appl Vickie Chapman MPDocuments that identify the calculation of the benefit-cost ratio for the O-bahn city access/tunnel project as announced in February 2014.

Appl Duncan McFetridge MP

The total number of fatalities and the number of reported accidents that have occurred on Henley Beach Road between South Road and Marion Road, broken down by side streets, for each year from 1 January 2010 to the date of service of this request.

Int Rev Duncan McFetridge MP Copies of all documents relating to the establishment of the Adelaide Shores Football Centre at West Beach.Appl Duncan McFetridge MP Copies of all documents relating to the establishment of the Adelaide Shores Football Centre at West Beach.

Appl Steven Griffiths MP

...access to any reports/documentation/information compiled since December 2011 when the speed limit was reduced from 110kmh to 100kmh on rural roads within 100 kilometres of Adelaide and on the Yorke Peninsula outlining the following statistics:

1. The number of fines issued to motorists for exceeding the speed limit on the affected road network (i.e. roads with a reduced speed limit of 100kmh)2. The total amount of revenue raised from speeding motorists on the 100 kmh road network since December 20113. The number of crashes and casualties on the affected road network since the speed limit was reduced in December 2011

Appl David Speirs MP“All documents created between 2010 and present day relating to the pedestrian crossing on Brighton Road outside Seacliff Primary School, Seacliff.”

Page 84: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Int Rev Michelle Lensink MLCAll documents between David Harvey and DEWNR and/or Chris Rawlinson and DEWNR during 2013 (in relation to Adelaide Metro Aerial Orthophoto)

Appl Michelle Lensink MLCAll documents between David Harvey and DEWNR and/or Chris Rawlinson and DEWNR during 2013 (in relation to Adelaide Metro Aerial Orthophoto)

Appl Robert Lucas MLC Correspondence from 2013 between the Auditor-General and Chief Executive of the Department or Agency

Appl Robert Lucas MLCFor the period 1 January 2013 to 31 December 2013, a list of any free hospitality, entertainment or gifts received by the CEO or any Executive of the Department from companies or individuals

Appl Robert Lucas MLC Correspondence from 1 January 2014 - 30 June 2014 between the Auditor-General and Chief Executive

Appl Robert Lucas MLCFor the period 1 January 2014 to 30 June 2014, a list of any free hospitality, entertainment or gifts received by the CEO or any Executive of the Department from companies or individuals

Appl Robert Brokenshire MLC

1) Documents provided to Commissioner or to those that directly report to commissioner regarding fixed cameras at Crafers West and Leabrook Gardens; 2) Revenue income during the period of November 2013 to June 30 2014; 3) Figures on number of fines issued, paid and outstanding; 4) Estimated revenue from the cameras in the 2013/2014 Financial year

Appl Stephan Knoll MP

I request a list of all unused office space currently leased by the State Government, detailing how long they've been unoccupied. For unused office space leased please provide gross leasing costs and for owned buildings please provide a list of building values.

Appl Stephan Knoll MPAll documents, including all costs of consultancies relating to scoping and preparatory work for the original $61 millioproposal for the upgrade of the O-Bahn

Appl Stephan Knoll MPI request all documents, including all costs of consultancies, relating to scoping and preparatory work for the $520 million proposal for trams in the Western Suburbs

Int Rev Stephan Knoll MP I request building owner details as at 1 July 2014 for all current SA Electorate officesAppl Stephan Knoll MP I request building owner details as at 1 July 2014 for all current SA Electorate offices

Appl Michelle Lensink MLCAccess to any emails, reports, memorandums, discussion papers or any other document between David Harvey andDEWNR and/or Chris Rawlinson and DEWNR during 2014 in relation to Adelaide Metro Orthophoto

Appl Dan Van Holst Pellekaan MP

Please provide a copy of the agreement between the South Australian Government and Genesee & Wyoming Australia (GWA) Lease Agreement (or Agreements), along with the current agreement for the non-metropolitan railways, corridors and infrastructure, including the Barossa and Mid North Lines.'

Appl Corey Wingard MP

“The reports that identified the level of patronage on Adelaide Metro services on Saturday, 5th July 2014 and Friday 11th July 2014, specifically, how many passengers used Adelaide Metro services to attend the two AFL matches at the Adelaide Oval.”

Appl Corey Wingard MP

All documents identifying the most recent ranking of traffic intersections in the Adelaide metropolitan and suburban areas for safety purposes and/or upgrade, and documents identifying the most recent intersection upgrade proposals submitted for funding

Page 85: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Appl Steven Griffiths MP

“…a copy of the final reports outlining the findings from the April 2013 review of boards and committees undertaken by the Minister for Planning i.e. Building Advisory Committee, Building Safety Committee, Building Rules AssessmenCommission, Capital City Committee, Development Assessment Commission, Development Policy Advisory Committee, Local Heritage Advisory Committee, West Beach Trust and the Inner Metropolitan Development Assessment Committee, including information compiled as part of a self-assessment process by each of the boards and committees reporting to the Minister to address the following issues:

- Recommended options for boards and committees and supporting rationale that responds to key considerations in the self-assessment template;- Implementation approach and timeframe;- Legislative change required to effect reform;- Alternative community engagement and consultation mechanisms;- The savings to be achieved though a reduction in the cost of boards and committees, and;- The Board sitting fees for 2011/12

Appl David Speirs MPAll documents created between 2002 and 2014 which outline the department's (or predecessor departments') policies for public servants interacting with Members of Parliament

Appl Mark Parnell MLC

“...a copy of the service audit reports detailing numbers of complaints, customer feedback and resolutions on SA metropolitan bus, tram and train services for each year ending June 30 2014, for the last five years.”

Appl Corey Wingard MP All SPADS reports for trains - how many signals passed in danger and red lights were run for the last 12 months.

Appl Steven Griffiths MPA copy of the final reports outlining the findings from the April 2013 review of boards and committees undertaken by the Minister for Local Government. Transferred to DPTI from DPC -DPTI00117712

Appl Michael Pengilly MP Documents concerning the establishment of a stall at Adelaide Central Markets by KIFA

Appl Michael Pengilly MPFunding arrangements between KIFA and Adelaide Central Market Authority re new stall at the Adelaide Central Market

Ext Rev Michael Pengilly MP“Copies of any and all letters, emails, notes, records and memoranda relating to the formulation of the final invitation list to the Kangaroo Island Branding Launch involving KIFA staff and KIFA Board Members.”

Int Rev Michael Pengilly MP“Copies of any and all letters, emails, notes, records and memoranda relating to the formulation of the final invitation list to the Kangaroo Island Branding Launch involving KIFA staff and KIFA Board Members.”

Appl Michael Pengilly MP“Copies of any and all letters, emails, notes, records and memoranda relating to the formulation of the final invitation list to the Kangaroo Island Branding Launch involving KIFA staff and KIFA Board Members.”

Appl Michael Pengilly MP“A breakdown of the total amount of financial support the Kangaroo Island Futures Authority has committed to the establishment of the new stall at the Adelaide Central Market.”

Appl Robert Lucas MLCCopies of all document including emails and notes of telephone conversations that refer to the appointment of persons to a selection panel for the position of CE of DPTI in 2014.

Appl Robert Lucas MLC

Copies of all documents including emails that list the names of all persons on the selection panel for the position of Chief Executive DPTI

Appl Mark Parnell MLCCopy of any documents relating to the business case and/or cost: benefit analysis for the proposed upgrade of SoutRoad and the North-South Corridor project as a whole.

Page 86: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Appl Vickie Chapman MPAll entries into the DPTI gift register (or similar system used to record gifts provided to DPTI employees by other entities) for the 2013-14 year.

Appl Vickie Chapman MPAll documents sent to the Federal Government in respect of the Strzelecki Track upgrade ( as announced by Hon Tom Koutsantonis on 26 February 2014).

Appl Steven Griffiths MPAny reports, including draft engineer reports, on the costings of the Laura to Gladstone Road upgrade as per the agreement with Minister Geoff Brock

Appl Steven Griffiths MPAny reports, including draft engineer reports, on the costings of the Bute to Kulpara Road upgrade as per the agreement with Minister Geoff Brock

Appl Vickie Chapman MP“All documents held by DPTI that identify the purpose of the capital works program “Rail Revitalisation – Offset Provision” and documents concerning the acquittal process for this program.”

Appl Vickie Chapman MP“The modelling referred to by Minister Piccolo on 4 September 2014 that identifies current and projected patronage at the Wayville Station.”

Appl Vickie Chapman MPEmails sent and received by Rod Hook, Andy Milazzo, Lino Di Lernia, Mark Elford, John Hanlon, Manuel Delgado and Paul Gelston from 12/02/2014-14/02/2014 regarding the O-bahn extension.

Appl Dennis Hood MLC

“All documentation, studies, reports and emails (including those on the SAGEM system) prepared and/or discussing plans, costings and consultation concerning a third arrestor bed on the section of the South Eastern Freeway/ Princes Highway between Crafers or Stirling and the Cross Road/ Portrush Road/ Glen Osmond Road Intersection area (sometimes referred to as the Toll Gate). Time Frame for search: January 2010 to September 2014.”

Int Rev Dennis Hood MLC

“All documentation, studies, reports and emails (including those on the SAGEM system) prepared and/or discussing plans, costings and consultation concerning a third arrestor bed on the section of the South Eastern Freeway/ Princes Highway between Crafers or Stirling and the Cross Road/ Portrush Road/ Glen Osmond Road Intersection area (sometimes referred to as the Toll Gate). Time Frame for search: January 2010 to September 2014.”

Ext Rev Dennis Hood MLC

“All documentation, studies, reports and emails (including those on the SAGEM system) prepared and/or discussing plans, costings and consultation concerning a third arrestor bed on the section of the South Eastern Freeway/ Princes Highway between Crafers or Stirling and the Cross Road/ Portrush Road/ Glen Osmond Road Intersection area (sometimes referred to as the Toll Gate). Time Frame for search: January 2010 to September 2014.”

Appl Corey Wingard MP Copies of the total number of completed 'quick' and 'full survey' for period of 1 June 2013 - 1 June 2014 (inclusive)

Appl Corey Wingard MPCopies of any and all documents relating to DPTI's Metro transport forecasting model used to gain an understanding of likely patronage impacts by 2018

Appl Corey Wingard MPCopies of submitted answers relating to the entire short and long customer satisfaction survey as listed on the Adelaide Metro Website for the period of 1 June 2013 - 1 June 2014 (inclusive)

Appl Corey Wingard MPDetails of music festivals, exhibitions included in the modelling estimates for 22 years as referred to by Tony Piccolo MP

Appl Corey Wingard MPA list of the number of speed and red light camera photos taken from 2009- August 2014 and the cost for a motorist of obtaining a photo.

Appl Corey Wingard MP

Copies of the submitted answers revealing the level of satisfaction of South Australian Transport users on a scale of 1 - 10 for the period of 1 June 2013 - 1 June 2014 (inclusive) in relation to - how likely would you be to recommend Adelaide Metro public transport services to someone else?

Appl Corey Wingard MPA list of the highest speed and locations of motorcyclist(s) riding in 25, 40, 50, 60, 80, 100 and 110 speed zones ovethe last 5 years

Page 87: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Appl Corey Wingard MPA list of the total number of speeding and red light camera offences that have been successfully and unsuccessfully (because of failure to identify the motorcyclist) prosecuted against motorcyclists in the last five years

Appl Corey Wingard MPCopies of the submitted answers revealing the level of satisfaction of South Australian Transport users on a scale of 1 - 10 fir the period of 1 June 2013 - 1 June 2014 (inclusive) in relation to various categories.

Int Rev Tim Whetstone MP

All docs outlining the Active club program grant types, amount requested and amount approved for 2013-14. All documents outlining the number of Active Club Program applications received and approved and a breakdown of requests and approvals to the fund for each sport for 2013-14

Appl Tim Whetstone MP

All docs outlining the Active club program grant types, amount requested and amount approved for 2013-14. All documents outlining the number of Active Club Program applications received and approved and a breakdown of requests and approvals to the fund for each sport for 2013-14

Int Rev Tim Whetstone MPThe desktop audit of sporting facilities in South Australia undertaken by the State Government in preparation for the Commonwealth Games to be held in South Australia in 2026

Appl Tim Whetstone MPThe desktop audit of sporting facilities in South Australia undertaken by the State Government in preparation for the Commonwealth Games to be held in South Australia in 2026

Appl Tim Whetstone MPAll documents identifying the number of fines issued for driving a motor vehicle unregistered and the total amount of overdue reminder letters sent out in 2010-11, 2011-12, 2013-13 and 2013-14

Appl Tim Whetstone MP

“All documents which detail or outline the number of heavy vehicle inspections to lift defects undertaken in the Riverland during 2010-11, 2011-12, 2012-13 and 2013-14.”

Appl Corey Wingard MPCopies of the exact number of incident reports issued to fare evaders on all buses, trains and trams for the period of 1 June 2011 - 1 June 2012 (inclusive)

Appl Corey Wingard MPCopies of the exact number of incident reports issued to fare evaders on all buses, trains and trams for the period of 1 June 2012 - 1 June 2013 (inclusive)

Appl Corey Wingard MPCopies of the exact number of incident reports issued to fare evaders on all buses, trains and trams for the period of 1 June 2013 - 1 June 2014 (inclusive)

Appl Corey Wingard MPCopies of the exact number of incident reports issued to fare evaders on all buses, trains and trams for the period of 1 June 2010 - 1 June 2011 (inclusive)

Appl Stephan Knoll MPI request all current copies of contracts between the Department and the owners of the buildings listed in the attached schedule.

Appl Steven Marshall MP

“...all 2014-15 black spot nominations including the location and details of the black spot, eligibility (including reasons), the cost of fixing the black spot, the amount of state black spot funds allocated, and the amount of other funds allocated.”

Appl Steven Griffiths MP Copy of the final submission of the West Beach Trust as part of a self assessment process by the board

Appl Tim Whetstone MPAll documents outlining the state government's spending on high performance sports program and the list of high performance sports program and funding for each program in 2011-12, 2013-14 and 2014-15.

Int Rev Tim Whetstone MPAll documents outlining the state government's spending on high performance sports program and the list of high performance sports program and funding for each program in 2011-12, 2013-14 and 2014-15.

Appl Tim Whetstone MPAll receipts, costs, reimbursements and itineraries for travel by Recreation and Sport Minister Leon Bignell and those accompanying him during the 2013-14 financial year.

Int Rev Tim Whetstone MPAll receipts and costs associated with the hiring and use of the State Government's corporate suite at Hindmarsh Stadium in 2010-11, 2011-12 and 2012-13.

Appl Tim Whetstone MPAll receipts and costs associated with the hiring and use of the State Government's corporate suite at Hindmarsh Stadium in 2010-11, 2011-12 and 2012-13.

Appl Tim Whetstone MPAll documents outlining the total maintenance costs spent and total estimated maintenance costs of swimming pools in South Australia 2012-13, 2013-14, and 2014-15.

Page 88: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Appl Tim Whetstone MPAll receipts, costs, reimbursements and itineraries for travel by Recreation and Sport Minister Leon Bignell and those accompanying him during the 2014-15 financial year.

Appl Tim Whetstone MPThe State Government's business case regarding the relocation of the South Australian Sports Institute's training ansport science facilities to a new centre for sporting excellence.

Appl Tim Whetstone MPAll receipts, costs, reimbursements and itineraries for travel by Recreation and Sport Minister Leon Bignell and those accompanying him during the 2012-13 financial year.

Appl Tim Whetstone MP The full documentation for the Community Sports Hub Report undertaken by the Office for Recreation and Sport.

Appl David Ridgway MLCCopies of all documents summarising and/or comparing the expansion and redevelopment of the Adelaide Convention Centre budget forecasts with actual expenditure, for the period 1 July 2013 to 13 October 2014.

Appl David Speirs MP

‘All documents created during 2013 and 2014 relating to the Young Street Pedestrian Crossing (Seaford Line) detailing the review of the crossing’s safety and closure which the Department for Planning, Transport and Infrastructure has publicly stated it has undertaken.

Accompanying notes: DPTI officials and ministerial correspondence states that a review of the closure of the Young Street Crossing was undertaken in the months following its closure. I would like access to this review and all supporting and accompanying documents.’

Appl Steven Griffiths MP Reports/Documents outlining all State Govt contracts above the value of $10000

Appl Steven Griffiths MPA copy of reports in relation to the Planning and Development Fund, specifically reports detailing expenditure from the Fund for all projects for the 2012/13 and 2013/14 financial years.

Appl Mark Parnell MLC "...For a copy of the patronage figures on public transport services for the last five financial years."

Appl Mark Parnell MLCA summary of complaints received, ordered into themes/topics (eg staff, infrastructure, punctuality etc) and separated by bus, tram and train services for each year ending June 30, for the last five years

Appl Steven Griffiths MP A copy of the agenda and minutes of the Premier's State Local Government Forum held in 2014

Appl Steven Griffiths MPAll corres received and sent from the Office for State/Local Government Relations to the LGA of SA since 15 March 2014 in relation to the ESL and the impact on local government budgets

Appl Dan Van Holst Pellekaan MP1 January 2013 to present, documents detailing the reasons for custom coaches being unsuccessful in their tender submissions for govt contracts to supply and build buses

Int Rev Michelle Lensink MLCAll emails, reports, memorandums discussion papers or any other document which refers to the Port Stanvac Jetty from December 2013 to the present day.

Appl Michelle Lensink MLCAll emails, reports, memorandums discussion papers or any other document which refers to the Port Stanvac Jetty from December 2013 to the present day.

Ext Rev Michelle Lensink MLCAll emails, reports, memorandums discussion papers or any other document which refers to the Port Stanvac Jetty from December 2013 to the present day.

Appl Stephan Knoll MP

“Summary of results showing month of testing, how many were tested, and how many returned positive tests, and how many were suspended for a positive test of public transport drivers including but not limited to Bus, Tram and Train drivers and operators since 2012 till present.”

Appl Stephan Knoll MP How many buses are DDA compliant

Appl Vickie Chapman MPThe Accounts kept in relation to the Planning and Development Fund (as required by S.82(a) of the Development Ac1993, for the 2013-14 year

Page 89: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Appl Stephan Knoll MPMandatory reporting data in relation to occupation health and safety including but not limited to numbers of critical incident reports, accident reports

Appl Stephan Knoll MP

I request the drafts of the ‘Traffic Intervention Plan’, ‘Traffic Interventions Schedule’ and the ‘Detailed Works Plan’ in relation to road infrastructure design and delivery deed between LendLease, Minister for Transport and Infrastructure and Town of Gawler, Barossa Council and Commissioner of Highways

Appl Vickie Chapman MPThe Accounts kept in relation to the Planning and Development Fund (as required by S.82(a) of the Development Ac1993, for the 2012-13 year

Appl Stephan Knoll MP Summary list of the age of the public transport fleet including but not limited to buses, trains, and trams.

Appl Stephan Knoll MPAny and all results of surveys conducted on public transport, completed by the public (either answering questions personally, or by interview) since 2012 till present

Int Rev Corey Wingard MP

1) A 10 minute sample of the vision from the passenger cameras on the double decker bus for the following times: 15 November 2014 at 5pm; 19 November 2014 at 9am; 1 December 2014 at 8pm. 2) The number of passengers on the double decker bus at the above dates and times. 3) The number of passengers each day who used a metro card to travel on the double decker bus to and from the airport since the first date of operation to today (1 December 2014). 4) The percentage of total double decker bus passengers who purchased tickets to travel on the bus as opposed to using metro card.

Appl Corey Wingard MP

1) A 10 minute sample of the vision from the passenger cameras on the double decker bus for the following times: 15 November 2014 at 5pm; 19 November 2014 at 9am; 1 December 2014 at 8pm. 2) The number of passengers on the double decker bus at the above dates and times. 3) The number of passengers each day who used a metro card to travel on the double decker bus to and from the airport since the first date of operation to today (1 December 2014). 4) The percentage of total double decker bus passengers who purchased tickets to travel on the bus as opposed to using metro card.

Appl Corey Wingard MP

1) The date and location at which the first point-to-point speed camera was made active in South Australia. 2) The date and location at which all other point-to-point cameras since the cameras were first made active in South Australia. 3). The total number drivers caught speeding by the point-to-point cameras since the cameras were first made active in South Australia. 4). The total number of successful prosecutions of drivers caught speeding by the point-to-point cameras since the cameras were first made active in South Australia. 5) The total number of successful prosecutions of drivers who appealed their fine after being caught speeding by the point-to-point cameras since the cameras were first made active in South Australia.

Appl Corey Wingard MP

The following information about hiring lockers in public transport centres and train stations: 1. the number of lockers across the state; 2. the number of lockers in operation across the state; 3. The number hired per day on average OR(if that information is not available) The number hired out on the following dates 10 September 2014, 31 October 2014, 21 November 2014; 4. the revenue raised for hiring lockers for each financial year from 30 June 2008; 5. the annual maintenance cost and budget to keep the lockers from 30July 2008.

Appl Corey Wingard MP

A) Copies of the punctuality reports for each train line from April 2013 to October 2014. B) Details of each occasion where the A-City Class 4000 Electric Trains been pulled from service in South Australia, with complete details as to the reason. C) Details of all correspondence, documents and briefs to the Minister advising of the sustainability of thA-City Class 4000 electric Trains, and any other considered train models.

Int Rev Corey Wingard MP

A) Copies of the punctuality reports for each train line from April 2013 to October 2014. B) Details of each occasion where the A-City Class 4000 Electric Trains been pulled from service in South Australia, with complete details as to the reason. C) Details of all correspondence, documents and briefs to the Minister advising of the sustainability of the___14 A-City Class 4000 electric Trains, and any other considered train models.

Appl Corey Wingard MPA List of the 20 most delayed bus routes within the last six months (May 2014 - October 2014), measured by numbeof individual services running late along the service on average.

Page 90: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Appl Corey Wingard MP

Copies of all CCTV footage of the following to instances relating to Tram Driver, Mr Mark Evans: assault of Mr Evans on Tram 108 at 17:39 on Sunday 17th February 2013, occurring at stop 12 'on the up'; the complaint of 'road rage' against Mr Evans while on Tram 106 @ 11:30 on Monday 14 July 2014 at Gordon St/Partridge St - Jetty Rd Glenelg intersection, when Tram was heading towards the City.

Int Rev Corey Wingard MP

Copies of all CCTV footage of the following to instances relating to Tram Driver, Mr Mark Evans: assault of Mr Evans on Tram 108 at 17:39 on Sunday 17th February 2013, occurring at stop 12 'on the up'; the complaint of 'road rage' against Mr Evans while on Tram 106 @ 11:30 on Monday 14 July 2014 at Gordon St/Partridge St - Jetty Rd Glenelg intersection, when Tram was heading towards the City.

Appl Corey Wingard MP

All details and/or all copies of correspondence, reports, and documents pertaining to: penalties and fines issued to bus contractors; and shortfalls in delivering contractually obligated services by the bus contractors for every financia year subsequent to July 1 2011.

Int Rev Corey Wingard MP

All details and/or all copies of correspondence, reports, and documents pertaining to: penalties and fines issued to bus contractors; and shortfalls in delivering contractually obligated services by the bus contractors for every financia year subsequent to July 1 2011.

Appl Corey Wingard MPHow many individual bus services have run late (by the end of their route) in the last six months (May 2014-October 2014).

Appl Corey Wingard MP

the following information about six carriage sets of electric trains in South Australia: the number of times an electric train has run in service as six carriage sets since they began operation in Adelaide to today (1December 2014); the stations at which these six carriage set trains stopped; the train stations across all lines that are not long enough to accommodate six carriage electric train sets.

Appl Corey Wingard MP

A list of bus routes that transport: between 20 and 11; between 10 and 6; and 5 or less passengers average per journey outside of peak times but between the hours of 6am and 11pm, within the last 12 months (October 2013-October 2014).

Appl Corey Wingard MPA list of patronage numbers for all bus services operating on the 640 Marino route on the following dates:10 September 2014, 31 October 2014, 21 November 2014.

Appl Corey Wingard MP

The number of times an electric train has been late leaving for its scheduled journey.The number of intermediate timing points there are for trains services along each line, and their location.The number of occasions an electric train has missed its intermediate timing point in the last six months (May 2014 – October 2014).The number of occasions an electric train has missed arrived late at its destination in the last six Months (May 2014 October 2014).

Int Rev Corey Wingard MP

The number of times an electric train has been late leaving for its scheduled journey.The number of intermediate timing points there are for trains services along each line, and their location.The number of occasions an electric train has missed its intermediate timing point in the last six months (May 2014 – October 2014).The number of occasions an electric train has missed arrived late at its destination in the last six Months (May 2014 October 2014).

Appl Corey Wingard MPA copy of all documents or final reports on any and all independent overviews/reviews of Adelaide electrification dated between June 2010 and July 2014.

Appl Corey Wingard MP

A) The number of times the new electric trains have broken down since coming into operation. B)Itemised information about each breakdown and service request for each train from the date it commenced service to today (1 December 2014). C) The number of times broken down electric trains or train maintenance issues have delayed public transport services in the last six months (may 2014 to October 2014); and the reason for each delay. D). The number of electric trains that have been towed to the Dry Creek Depot.

Page 91: DPTI - Department of Planning, Transport and ... · Port Adelaide created from 2013 to present Tim Whetstone MP ... All correspondences, plans, and documents detailing or referencing

Appl Mark Parnell MLC

Requesting documents regarding 1. The sale by the Government of Martindale Hall2. Any Conditions on the sale3. The gifting arrangements of Martindale Hall to the University of Adelaide and4. The gifting arrangements of Martindale Hall to the Government from the University of Adelaide

Appl David Pisoni MP Documents that refer to the sale of Department of Education building in Flinders Street since 30 March 2014Int Rev David Pisoni MP Documents that refer to the sale of Department of Education building in Flinders Street since 30 March 2014Appl David Pisoni MP All documents that refer to sites for a second city high school since 30 March 2014Int Rev David Pisoni MP All documents that refer to sites for a second city high school since 30 March 2014