Golder Associates Inc. 1751 West County Road B, Suite 105 Roseville, Minnesota, USA 55113 T: +1 651 697-9737 +1 651 697-9735 Golder and the G logo are trademarks of Golder Associates Corporation golder.com December 26, 2018 Project No. 0236105019 Canadian Pacific Plaza Attn: Jeremy Coughlin 120 South 6th Street Suite 700 Minneapolis, MN 55402 RE: SHOREHAM YARD – CEDAR SERVICE PUMP & TREAT SYSTEM MCES SPECIAL DISCHARGE PERMIT 2286 SELF-MONITORING REPORT ELECTRONIC SUBMITTAL - NOVEMBER 2018 SAMPLE RESULTS INFORMATION Dear Jeremy, Enclosed is a copy of the Metropolitan Council Environmental Services (MCES) Self-Monitoring Report (SMR) submitted electronically to the MCES on December 27, 2018 for the Cedar Service Pump & Treat System. Discharge to the sanitary sewer did not occur during the reporting period; therefore, sample data is not included in the Self-Monitoring Report. The following document is enclosed: Sampling Results SMR – November, 2018 If you have any questions regarding these submittals, please contact the undersigned at 651-697-9737. Sincerely, Golder Associates Inc. Neha Damle Barb Johnson, P.E. Engineer Associate ND/BJ/ND CC: Claire Mackler, Golder

Upload: others

Post on 03-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Draft CS Cover Letter November 2018 - Canadian Pacific Railway€¦ · Microsoft Word - Draft CS Cover Letter November 2018 Author: NDamle Created Date: 12/26/2018 8:28:37 AM

Golder Associates Inc. 1751 West County Road B, Suite 105 Roseville, Minnesota, USA 55113 T: +1 651 697-9737 +1 651 697-9735

Golder and the G logo are trademarks of Golder Associates Corporation golder.com

December 26, 2018 Project No. 0236105019

Canadian Pacific Plaza

Attn: Jeremy Coughlin

120 South 6th Street

Suite 700

Minneapolis, MN 55402

RE: SHOREHAM YARD – CEDAR SERVICE PUMP & TREAT SYSTEM

MCES SPECIAL DISCHARGE PERMIT 2286

SELF-MONITORING REPORT ELECTRONIC SUBMITTAL -

NOVEMBER 2018 SAMPLE RESULTS INFORMATION

Dear Jeremy,

Enclosed is a copy of the Metropolitan Council Environmental Services (MCES) Self-Monitoring Report (SMR)

submitted electronically to the MCES on December 27, 2018 for the Cedar Service Pump & Treat System.

Discharge to the sanitary sewer did not occur during the reporting period; therefore, sample data is not included in

the Self-Monitoring Report. The following document is enclosed:

Sampling Results SMR – November, 2018

If you have any questions regarding these submittals, please contact the undersigned at 651-697-9737.

Sincerely,

Golder Associates Inc.

Neha Damle Barb Johnson, P.E.

Engineer Associate

ND/BJ/ND

CC: Claire Mackler, Golder

Page 2: Draft CS Cover Letter November 2018 - Canadian Pacific Railway€¦ · Microsoft Word - Draft CS Cover Letter November 2018 Author: NDamle Created Date: 12/26/2018 8:28:37 AM
NDamle
Typewritten Text
Barbara Johnson
NDamle
Typewritten Text
NDamle
Typewritten Text
Associate, Senior Consultant
NDamle
Typewritten Text
651-697-9737