drawing register (document management) · 50mm chamferededge to concrete lv room transformerroom...

9
Project: Project title: Sheet: Page: PV-0222 Little Snodworth 1 1 Poweri Services Ltd Document type: Date of issue: Tel: 0115 7270929 Design Issue 15/07/2015 3 Email: [email protected] Issued to: Detail: Status: Client Mulbrick Clean Energy Scaffolding N/A Systems Designer Scott Morton Electrical Engineer TBC Architect TBC PV-0222 - 01 Site Layout 15/07/2015 PL PV-0222 - 01 - Site Layout v.4.pdf 4 Done PV-0222 - 02 Site Location Plan 30/06/2015 SM PV-0222 - 02 - Site Location Plan v.1.pdf 1 Done PV-0222 - 03 Section Plan 15/07/2015 PL PV-0222 - 03 - Section Plan v.2.pdf 2 Done PV-0222 - 04 Elevation & Access Plan 30/06/2015 SM PV-0222 - 04 - Elevation & Access Plan v.1.pdf 1 Done PV-0222 - 05 Inverter Sections 30/06/2015 SM PV-0222 - 05 - Inverter Sections v.1.pdf 1 Done PV-0222 - 06 Substation Elevations 30/06/2015 SM PV-0222 - 06 - Substation Elevations v.1.pdf 1 Done PV-0222 - 07 Typical Temporary Construction Compound 30/06/2015 SM PV-0222 - 07 - Typical Temporary Construction Compound v.1.pdf 1 Done DRAWING REGISTER (DOCUMENT MANAGEMENT) Complete Revision: Designer File Name: Drawings No: Document: Date: Stud Farm File Location:

Upload: others

Post on 25-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DRAWING REGISTER (DOCUMENT MANAGEMENT) · 50mm Chamferededge to concrete LV Room TransformerRoom Switchroom Switch Room Meter Room 50mm Chamfered Transformer QUADRO MT 24 kV INVERTER

Project: Project title: Sheet: Page:

PV-0222 Little Snodworth 1 1

Poweri Services Ltd

Document type: Date of issue: Tel: 0115 7270929

Design Issue 15/07/2015 3 Email: [email protected]

Issued to: Detail: Status:

Client Mulbrick Clean Energy

Scaffolding N/A

Systems Designer Scott Morton

Electrical Engineer TBC

Architect TBC

… …

PV-0222 - 01 Site Layout 15/07/2015 PL PV-0222 - 01 - Site Layout v.4.pdf 4 Done

PV-0222 - 02 Site Location Plan 30/06/2015 SM PV-0222 - 02 - Site Location Plan v.1.pdf 1 Done

PV-0222 - 03 Section Plan 15/07/2015 PL PV-0222 - 03 - Section Plan v.2.pdf 2 Done

PV-0222 - 04 Elevation & Access Plan 30/06/2015 SM PV-0222 - 04 - Elevation & Access Plan v.1.pdf 1 Done

PV-0222 - 05 Inverter Sections 30/06/2015 SM PV-0222 - 05 - Inverter Sections v.1.pdf 1 Done

PV-0222 - 06 Substation Elevations 30/06/2015 SM PV-0222 - 06 - Substation Elevations v.1.pdf 1 Done

PV-0222 - 07 Typical Temporary Construction Compound 30/06/2015 SM PV-0222 - 07 - Typical Temporary Construction Compound v.1.pdf 1 Done

DRAWING REGISTER (DOCUMENT MANAGEMENT)

CompleteRevision:Designer File Name:Drawings No: Document: Date:

Stud Farm

File Location:

Page 2: DRAWING REGISTER (DOCUMENT MANAGEMENT) · 50mm Chamferededge to concrete LV Room TransformerRoom Switchroom Switch Room Meter Room 50mm Chamfered Transformer QUADRO MT 24 kV INVERTER
Page 3: DRAWING REGISTER (DOCUMENT MANAGEMENT) · 50mm Chamferededge to concrete LV Room TransformerRoom Switchroom Switch Room Meter Room 50mm Chamfered Transformer QUADRO MT 24 kV INVERTER

50mm Chamfered

edge to concrete

LV Room

TransformerRoom

Switchroom

Switc

h Ro

om

Meter

Roo

m

50mm Chamfered

edge to concrete

LV Room

TransformerRoom

Switchroom

Switc

h Ro

om

Meter

Roo

m

QUADRO MT24 kV

INVERTER

INVERTER

SCAS

STS

D

COMM

-10

TP

QUADRO MT24 kV

INVERTER

INVERTER

SCAS

STS

D

COMM

-10

TP

QUADRO MT24 kV

INVERTER

INVERTER

SCAS

STS

D

COMM

-10

TP

SCAS

STS

D

COMM

-10

TP

INVERTER

INVERTER24 kVQUADRO MT

SCAS

STS

D

COMM

-10

TP

INVERTER

INVERTER24 kVQUADRO MT

SCAS

STS

D

COMM

-10

TP

INVERTER

INVERTER24 kVQUADRO MT

SCAS

STS

D

COMM

-10

TP

INVERTER

INVERTER24 kVQUADRO MT

Date:

Initial Issue:

Revision Number:

15/07/2015

29/05/2015

14Company Name and Address:Mulbrick Clean EnergyTy MenaiParc MenaiBangorGwyneddLL57 4HJ

Drawing: Site Layout Plan

Scale:1:1250@A1

Drawn By:SM / PL

Site Boundary (Red)

Security Fencing (Green)Substation Location

4.9976 MWp Solar Farm17842 Modules in total405.5 X Tables of 48 modulesYingli 280W modules3 X SMA MV Power Station 800SC2 X SMA MV Power Station 720SC1 X SMA MV Power Station 550SCTotal Area 10.659 ha

DC Cable Trench (Purple)

Inverter Stations

Drawing Number:PV-0222-01

Project Name and Address:Mulbrick Clean Energy4.9976 MWp Solar FarmLittle Snodworth

Project:Little Snodworth - Solar Farm

N

HV Cable Trench (Dark Green)

Solar PV Modules (Blue)

CCTV Location

Scale 1:1250 @

metres100755025025 125

A1

Access Gates (Cyan)

Temporary Construction Compound

Access Road (Yellow)

Access Gates (Cyan)

Redirected Footpath Redirected Footpath

Page 4: DRAWING REGISTER (DOCUMENT MANAGEMENT) · 50mm Chamferededge to concrete LV Room TransformerRoom Switchroom Switch Room Meter Room 50mm Chamfered Transformer QUADRO MT 24 kV INVERTER

Date:

Initial Issue:

Revision Number:Company Name and Address:Mulbrick Clean EnergyTy Menai Parc MenaiBangorGwyneddLL57 4HJ

Drawing: Site Location Plan

Drawing Number:PV-222-02

Scale:1:1250@A0

Drawn By:PL

Site Boundary - 106,594 m²

Key

N

Project:Little Snodworth - Solar Farm

1

30/06/2015

30/06/2015

Scale 1:1250 @

metres100755025025 125

A0

4.9976 MWp Solar Farm17842 Modules in total405.5 X Tables of 48 modulesYingli 280W modules3 X SMA MV Power Station 800SC2 X SMA MV Power Station 720SC1 X SMA MV Power Station 550SCTotal Area 10.659 ha

Project Name and Address:Mulbrick Clean Energy4.9976 MWp Solar FarmLittle Snodworth

Page 5: DRAWING REGISTER (DOCUMENT MANAGEMENT) · 50mm Chamferededge to concrete LV Room TransformerRoom Switchroom Switch Room Meter Room 50mm Chamfered Transformer QUADRO MT 24 kV INVERTER

50mm Chamfered

edge to concrete

LV Room

TransformerRoom

Switchroom

Switc

h Ro

om

Meter

Roo

m

50mm Chamfered

edge to concrete

LV Room

TransformerRoom

Switchroom

Switc

h Ro

om

Meter

Roo

m

QUADRO MT24 kV

INVERTER

INVERTER

SCAS

STSD

COMM

-10

TP

QUADRO MT24 kV

INVERTER

INVERTER

SCAS

STSD

COMM

-10

TP

QUADRO MT24 kV

INVERTER

INVERTER

SCAS

STSD

COMM

-10

TP

SCAS

STSD

COMM

-10

TPINVERTER

INVERTER24 kVQUADRO MT

SCAS

STSD

COMM

-10

TPINVERTER

INVERTER24 kVQUADRO MT

SCAS

STSD

COMM

-10

TPINVERTER

INVERTER24 kVQUADRO MT

SCAS

STSD

COMM

-10

TPINVERTER

INVERTER24 kVQUADRO MT

Date:

Initial Issue:

Revision Number:

Drawing: Section Plan

Ref:PV-222-03

Scale:Various

Drawn By:PL

W-

W-

N1-

N1-

E-

E-

S-

S-

Section N1-N1 (1:200)

Section E-E (1:200)

Section S-S (1:200)

Section W-W (1:200)

Typical Fencing Elevation & Gate Detail (1:100)

Site Layout (1:2500)

Scale 1:200 @

metres10504 2015

A1

2000

mm

Site Boundary - 106,594m²

Proposed 2.0m high Deer Fencing (All galvanised and powder coated grey)

Site Access

17842 Solar Panels

Scheme capacity is 17842 x 280 watt modules which equates to power capacity of 4.99576MWp.

Key

Section A-A (1:125)

N

Fencing to have a 100mm gap under bottom egde for small wildlife transit

CCTV Locations

2

30/06/2015

15/07/2015

metres20015010050050 250

Scale 1:2500 @ A1

Minimum 3.0m Access Zone

Site Boundary

2m Deer Fencing

3.0m Minimum Access Zone

2m Deer Fencing

53.96m

2m Deer Fencing

2m Deer Fencing

54.33m54.54m

HV Electrical Cables

6m Electrical Buffer Zone

6m Electrical Buffer Zone

Project:Little Snodworth - Solar Farm

Company Name and Address:Mulbrick Clean EnergyTy MenaiParc MenaiBangorGwyneddLL57 4HJ

N2-

N2-

Site Boundary9700mm

Proposed PV Module Tables

Project Name and Address:Mulbrick Clean Energy4.9976 MWp Solar FarmLittle Snodworth

Scale 1:100 @

metres864202 10

A1 Scale 1:125 @

metres107.552.502.5 12.5

A1

Proposed PV Module Tables

Site Boundary

CCTV Tower

Minimum 3.0m Access Zone

Proposed PV Module Tables

9700mm

Proposed PV Module Tables

Site Boundary

Minimum 3.0m Access Zone

Proposed Access Track

Existing Access Track

Existing Access Track

HV Trench

CCTV Tower

Site Boundary

2m Deer Fencing

Minimum 3.0m Access Zone

12700mm

Existing Road

Footpath re-direct

Page 6: DRAWING REGISTER (DOCUMENT MANAGEMENT) · 50mm Chamferededge to concrete LV Room TransformerRoom Switchroom Switch Room Meter Room 50mm Chamfered Transformer QUADRO MT 24 kV INVERTER

50mm Chamfered

edge to concrete

LV Room

TransformerRoom

Switchroom

Switc

h Ro

om

Meter

Roo

m

50mm Chamfered

edge to concrete

LV Room

TransformerRoom

Switchroom

Switc

h Ro

om

Meter

Roo

m

SCAS

STS

D

COMM

-10

TP

INVERTER

INVERTER24 kVQUADRO MT

50mm Chamfered

edge to concrete

LV Room

TransformerRoom

Switchroom

Switc

h Ro

om

Meter

Roo

m

50mm Chamfered

edge to concrete

LV Room

TransformerRoom

Switchroom

Switc

h Ro

om

Meter

Roo

m

QUADRO MT24 kV

INVERTER

INVERTER

SCAS

STSD

COMM

-10

TP

QUADRO MT24 kV

INVERTER

INVERTER

SCAS

STSD

COMM

-10

TP

QUADRO MT24 kV

INVERTER

INVERTER

SCAS

STSD

COMM

-10

TP

SCAS

STSD

COMM

-10

TPINVERTER

INVERTER24 kVQUADRO MT

SCAS

STSD

COMM

-10

TPINVERTER

INVERTER24 kVQUADRO MT

SCAS

STSD

COMM

-10

TPINVERTER

INVERTER24 kVQUADRO MT

SCAS

STSD

COMM

-10

TPINVERTER

INVERTER24 kVQUADRO MT

Date:

Initial Issue:

Revision Number:

Drawing: Access Plan & PV Elevations

Drawing Number:PV-222-04

Scale:See Annotations

Drawn By:PL

Typical Panel Framing detail, Front View (1:40)

Site Layout (1:2500)

Drawing prepared at A1 scale but when printed at -· A3 size 1:25 scales @ 1:50 1:20 scales @ 1:40 1:2500 scales @ 1:5000 · A1 size Scale @ As Shown

Scale 1:20 @

metres1.00.500.4 2.01.5

A1

Typical Panel Framing detail, Side View (1:40)

Module Dimensions (1:20)

Trina SolarTSM250-PC05A

Site Access Arrangements (1:2500)

1

30/06/2015

30/06/2015

Site access Road (Permanent)

metres20015010050050 250

Scale 1:2500 @ A1

Site

acc

ess R

oad

(Per

man

ent)

Project:Little Snodworth - Solar Farm

Company Name and Address:Mulbrick Clean EnergyTy MenaiParc MenaiBangorGwyneddLL57 4HJ

4.9976 MWp Solar Farm17842 Modules in total405.5 X Tables of 48 modulesYingli 280W modules3 X SMA MV Power Station 800SC2 X SMA MV Power Station 720SC1 X SMA MV Power Station 550SCTotal Area 10.659 ha

Scale 1:40 @

metres2100.8 43

A1 Scale 1:500 @

metres40302010010 50

A1

Site Boundary - 106,594m²

Proposed 2.0m high Deer Fencing (All galvanised and powder coated grey)

Site Access

17842 Solar Panels

Scheme capacity is 17842 x 280 watt modules which equates to power capacity of 4.99576MWp.

Key N

CCTV Locations

Project Name and Address:Mulbrick Clean Energy4.9976 MWp Solar FarmLittle Snodworth

Page 7: DRAWING REGISTER (DOCUMENT MANAGEMENT) · 50mm Chamferededge to concrete LV Room TransformerRoom Switchroom Switch Room Meter Room 50mm Chamfered Transformer QUADRO MT 24 kV INVERTER

QUADRO MT24 kV

INVERTER

INVERTER

SCAS

STS

D

COMM

-10

TP

Date:

Initial Issue:

Revision Number:

30/06/2015

30/06/2015

1

Drawing: Inverter Station Sections

Ref:PV-222-04

Scale:1:25 @ A1

Drawn By:PL

Inverter Station Front Section (1:25)

Inverter Station Plan (1:25)

Inverter Station Back Section (1:25)

Scale 1:25 @

metres2.01.51.00.500.5 2.5

A1

Inverters & Transformers from the SMA Solar Technologies Sunny Central & Transformer Station Range

Project:Little Snodworth - Solar Farm

Company Name and Address:Mulbrick Clean EnergyTy MenaiParc MenaiBangorGwyneddLL57 4HJ

Project Name and Address:Mulbrick Clean Energy4.9976 MWp Solar FarmLittle Snodworth

Page 8: DRAWING REGISTER (DOCUMENT MANAGEMENT) · 50mm Chamferededge to concrete LV Room TransformerRoom Switchroom Switch Room Meter Room 50mm Chamfered Transformer QUADRO MT 24 kV INVERTER

GRP Int. height3330

Proposed GroundLevel

400

21

Top of Concrete450

Existing Ground Level0

Ground to be built up

Fronting Doors

GRPHousing Unit

External Finish (Dark Green)

Concrete Level550

Existing Ground Level0

GRP Housing

Steel Subframe

GRP Int. height3330

Proposed GroundLevel

400

A D

Existing Ground Level0

GRP Housing Unit

Steel Subframe Ground to be Made Up

Side Doors

External Finish (Dark Green)External Finish

(Dark Green)

Concrete Foundation

Floor Plan Layout780

Internal Roof Height3780

New Surface Level400

Fronting Doors

Steel Subframe

Concrete Foundation

Removable PanelAbove Doors

AD

GRP Housing Unit

Steel Subframe

External Finish (Dark Green)

External Finish (Dark Green)

Concrete Level550

Floor Plan Layout780

Internal Roof Height3780

New Surface Level400 Existing Ground Level

0

GRP Housing

Steel Subframe

Concrete Foundation

External Finish (Dark Green)

Date:

Initial Issue:

Revision Number:

26/04/2015

26/04/2015

1Company Name and Address:Mulbrick Clean EnergyTy MenaiParc MenaiBangorGwyneddLL57 4HJ

Drawing: Sub-Station Sections

Scale:1:100 @ A3

Drawn By:PL

Sub-Station West Section (1:100)

Sub-Station South Section (1:100)

Sub-Station North Section (1:100)

Scale 1:100 @

metres01 2 4 51 3

A3

Sub-Station East Section (1:100)

1.2m 1m 3.7m 1m 1.2m

3.65m

3.33

m

3.865m

3.17m

3.88

9m

1.51m

0.7m

1.435m2.25m

2.11

3m0.91m

0.225m

2.13

9m

0.4m

1.2m 1m 2.75m 1m 1.2m

2.75m

2.95m

3.08

m2.

675m

2.2m

2.33

9m

2.93

m

3.07

3m

0.4m

1.2m 1m 2.75m 1m 1.2m

3.272m

0.91m

2.11

m

Ref:PV-222-06

Project:Little Snodworth - Solar Park

Project Name and Address:Mulbrick Clean Energy4.9976 MWp Solar FarmLittle Snodworth

Page 9: DRAWING REGISTER (DOCUMENT MANAGEMENT) · 50mm Chamferededge to concrete LV Room TransformerRoom Switchroom Switch Room Meter Room 50mm Chamfered Transformer QUADRO MT 24 kV INVERTER

Date:

Initial Issue:

Revision Number:

30/06/2015

30/06/2015

1

Drawing: Temporary Construction Compound

Scale:1:250 @ A3

Drawn By:PL

Temporary Construction Compound (1:250)Ref:PV-222-07

Toilets

Toilets

Drying Rooms

Canteen

Canteen

Portaloo

Car Parking - 20 spaces2.4m by 4.8m

Turning Circle10m radius

Temporary Fencing (2.2m high)

6 X StorageContainers

9.3m X 3.1m

Deliveries

Office

Offic

e

Water Bowser

Generators Portaloo

Site Security

Scale 1:250 @

metres201510505 25

A3

N

Company Name and Address:Mulbrick Clean EnergyTy MenaiParc MenaiBangorGwyneddLL57 4HJ

Project:Little Snodworth - Solar Park

Project Name and Address:Mulbrick Clean Energy4.9976 MWp Solar FarmLittle Snodworth