Cellar deck Production deck The process Drilling and Production Platform Drilling deck Wellheads (27) Cleanup Test Production Production water treating (47) Production separator (30) Crude oil heater (31) Crude oil cooler (43) Gas to Low Pressure flare Electrostatic treater (45) Crude oil pipeline pump (44) Export pipeline (1) Gas to fuel Lift gas to wells Lift gas compression (20) — 3 stages — To gas injection well To water injection wells Injection gas compressor (33) Inlet dehydration filter separator (46) Injection gas compressor suction scrubber Lift gas scrubber Outlet dehydration filter separator (46) Heat medium return Cooling medium return Cooling medium supply Cooling medium return Cooling medium return Cooling medium supply Cooling medium supply Heat medium supply Glycol regen- erator (48) Glycol contactor (46) Overboard Deaerator (23) Media filter (37) Cooling water cooler (38) Cooling water surge drum (38) Cooling water pumps (38) Water injection charge pump (36) Water injection pump (21) From cooling water users To cooling water users Seawater pumps (40) Seawater Gas Oil Water injection Water Produced fluid 11 19 9 10 8 6 5 5 7 4 3 2 1 18 17 16 15 14 13 12 20 21 22 23 25 30 26 28 32 29 24 24 31 33 27 34 36 37 35 38 40 42 26 41 45 43 44 47 49 51 50 48 39 46 LEGEND DRILLING DECK & MAIN RIG 1. Export pipeline 2. Mud mat 3. Skirt pile sleeve 4. Skirt pile 5. Anode 6. Conductors 7. Export riser 8. Jacket leg 9. Barge bumper 10. Boat landing 11. Riser guard 12. Motor control center and switchgear control building 13. Escape capsule 14. Living quarters 15. Helicopter pad 16. Bulk storage 17. Mud pump package 18. Derrick 19. Flare boom 20. Lift gas compression PRODUCTION DECK 21. Water injection pump 22. Generator 23. Deaerator 24. Waste heat recovery unit 25. Firewall 26. Diesel storage 27. Wellheads 28. Chemical injection skid 29. Production manifold 30. Production separator 31. Crude oil heater 32. Test and cleanup separator 33. Injection gas compressor CELLAR DECK 34. Potable water storage 35. Emergency generator 36. Water injection charge pump 37. Media filter 38. Cooling water cooler Cooling water surge drum Cooling water pumps 39. Air compressor 40. Seawater pumps 41. Gas lift and water injection manifold 42. Firewater pump 43. Crude oil cooler 44. Crude oil pipeline pump 45. Electrostatic treater 46. Inlet dehydration filter separator Glycol contactor Outlet dehydration filter separator 47. Production water treating 48. Glycol regenerator 49. Slug catcher 50. Plated deck 51. Flare scrubber DISCLAIMER The information and illustrations in this poster are intended for educational pur- poses only. PennWell Corp. does not accept liability for decisions based upon the use of this information, nor does it guaranteeits correctness, completeness, or fitness for a particular use. Reproduction of the contents of this poster, in any manner whatsoever, is prohibited without the consent of PennWell Corp. © 2001 PennWell Corp. Drilling and Production Platform Oil & Gas Journal 1700 West Loop South, Suite 1000 Houston, TX 77027 Project publishing support and coordination from Oil & Gas Journal: Dean Gaddy, Senior Editor Guntis Moritis, Production Editor Alana Herron, Art Director Wes Rowell, Artistic Illustration Mustang Engineering 16001 Park Ten Place, Brown Building Houston, TX 77084 Engineering design and graphics provided courtesy of Mustang Engineering: Anna Henry, Technical Illustrator Technical Advisors: John Ellis, Mike Holmes, Chuck Cook, Kurt Albaugh, Mike Prior Dena Lee, Coordination Support Back issues of the Mar. 30, 2001 Oil & Gas Journal issue, which include the Platform poster, may be obtained from PennWell: To order call: 800-752-9764 or submit request to P.O. Box 21288, Tulsa, OK 74121, or fax 918-831-9555

Upload: trancong

Post on 06-Mar-2018

229 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Drilling and Production · PDF fileCellar deck Production deck The process Drilling and Production Platform Drilling deck $$! * $ &,( *+ ) ' , +"'& )' , +"'&. + )+) +"& )' , +"'& *

Cellar deck

Production deck

The process

Drilling and Production Platform

Drilling deck

Wellheads(27)

Cle

anu

p

Test

Pro

du

ctio

n

Productionwater treating

(47)

Productionseparator

(30)

Crude oilheater

(31)

Crude oilcooler(43)

Gas to LowPressure

flare

Electrostatictreater

(45)

Crude oilpipeline pump

(44)

Exportpipeline

(1)

Gas tofuel

Lift gasto wells

Lift gas compression (20)— 3 stages —

To gasinjection well

To waterinjection wells

Injection gascompressor

(33)

Inlet dehydrationfilter separator

(46)

Injection gascompressor

suction scrubber

Lift gasscrubber

Outlet dehydrationfilter separator

(46)

Heat mediumreturn

Coolingmediumreturn

Coolingmediumsupply

Coolingmedium

return

Coolingmedium

return

Coolingmediumsupply

Coolingmediumsupply

Heatmedium

supply

Glycolregen-erator(48)

Glycolcontactor

(46)

Overboard

Deaerator(23)

Media filter(37)

Cooling watercooler(38)

Cooling watersurge drum

(38)

Cooling water pumps(38)

Water injectioncharge pump

(36)

Water injectionpump(21)

From coolingwater users

To coolingwater users

Seawaterpumps

(40)

Seawater

GasOilWater injectionWaterProduced fluid

11

19

9

10

8

65

5

7

4

3

2

1

18

17

16

15

14

13

12

20

21

22

23

25

30

2628

32

29

24

24

3133

27

34

36

37

35

38

40

42

26

41

45

4344

47

49

51

50

48

39

46

LEGENDDRILLING DECK & MAIN RIG1. Export pipeline2. Mud mat3. Skirt pile sleeve4. Skirt pile5. Anode6. Conductors7. Export riser8. Jacket leg9. Barge bumper10. Boat landing11. Riser guard12. Motor control center and switchgear control building13. Escape capsule14. Living quarters15. Helicopter pad16. Bulk storage17. Mud pump package18. Derrick19. Flare boom20. Lift gas compression

PRODUCTION DECK21. Water injection pump22. Generator23. Deaerator24. Waste heat recovery unit25. Firewall26. Diesel storage27. Wellheads28. Chemical injection skid29. Production manifold30. Production separator31. Crude oil heater32. Test and cleanup separator33. Injection gas compressor

CELLAR DECK34. Potable water storage35. Emergency generator36. Water injection charge pump37. Media filter38. Cooling water cooler

Cooling water surge drumCooling water pumps

39. Air compressor40. Seawater pumps41. Gas lift and water injection manifold42. Firewater pump43. Crude oil cooler44. Crude oil pipeline pump45. Electrostatic treater46. Inlet dehydration filter separator

Glycol contactorOutlet dehydration filter separator

47. Production water treating48. Glycol regenerator49. Slug catcher50. Plated deck51. Flare scrubber

DISCLAIMERThe information and illustrations in this poster are intended for educational pur-poses only. PennWell Corp. does not accept liability for decisions based upon the use of this information, nor does it guaranteeits correctness, completeness, or fitness for a particular use.

Reproduction of the contents of this poster, in any manner whatsoever, is prohibited without the consent of PennWell Corp. © 2001 PennWell Corp.

Drilling and Production Platform

Oil & Gas Journal1700 West Loop South, Suite 1000

Houston, TX 77027

Project publishing support and coordination from Oil & Gas Journal:Dean Gaddy, Senior EditorGuntis Moritis, Production EditorAlana Herron, Art DirectorWes Rowell, Artistic Illustration

Mustang Engineering16001 Park Ten Place, Brown Building

Houston, TX 77084

Engineering design and graphics provided courtesy of Mustang Engineering:Anna Henry, Technical IllustratorTechnical Advisors: John Ellis, Mike Holmes, Chuck Cook, Kurt Albaugh, Mike PriorDena Lee, Coordination Support

Back issues of the Mar. 30, 2001 Oil & Gas Journal issue, which include the Platform poster, may be obtained from PennWell:To order call: 800-752-9764 or submit request to P.O. Box 21288, Tulsa, OK 74121, or fax 918-831-9555