    DRIVING INNOVATION

    IN

    DESIGN & CONSTRUCTION

    Presented by

    Dato A.K Nathan

    Group Chairman/Managing Director

    Eversendai Corporation Bhd

  • 8/11/2019 Driving Innovation in Design & Construction

    2/66

    Innovation is the way forward towards

    future

    Project owners, Architects & Engineers

    must drive innovation

    Foremost, a structure need to be designed

    economically and constructed using the

    right building material with innovativeconstruction methodology

    For Innovation Steel is the ideal option

  • 8/11/2019 Driving Innovation in Design & Construction

    3/66

    Investing in a commercial building project can

    be an enormous commitment of time and

    money. The type of structure you choose will

    have an impact on the construction scheduleand cost. Most commercial building ventures

    require economy, efficiency and quick

    construction for better returns.

    A composite steel building can provide saving

    but it needs to be understood clearly and the

    global saving that can be gained rather thancomparing just the cost of steel and concrete

    and assuming that it is expensive is not correct.

  • 8/11/2019 Driving Innovation in Design & Construction

    4/66

    Structural steel has entered a new era. Today itprovides not only strength to buildings but alsobeauty, durability , design flexibility, adaptability

    and re- cyclability and can be the material ofchoice in building construction if one understandsthe benefit and its advantages

    With todays structural steel framing , grace, artand function can come together in almost

    limitless ways; it offers new solution and

    opportunities, allowing architects to stretch their

    imagination and create some of the mostchallenging structures they have visualised in

    their mind. What was once thought impossible is

    now a reality

  • 8/11/2019 Driving Innovation in Design & Construction

    5/66

    Investing in a commercial building project can bean enormous commitment of time and money. Thetype of structure you choose will have an impact

    on the construction schedule. Most commercialbuilding ventures require economy, efficiency, and

    quick construction for better returns.

    A composite steel building can provide savings

    but it needs to be understood clearly and theglobal saving that can be gained rather than

    comparing just the cost of steel and concrete and

    deciding that it is expensive is not correct.

  • 8/11/2019 Driving Innovation in Design & Construction

    6/66

    First of all the structure needs to be designedeconomically and constructed using newtechnology and materials with innovativeconstruction methods

    Architects artistic freedom is further enhancedby the availability of various types of steelshapes that can be worked with to perform

    As time changes, steel structures are easilyused in the redesigned of old building by addingnew facades to give a new architectural look

    Steel beams may include web openings foraesthetic or functional purposes while stillallowing the beams to carry the required loads.

  • 8/11/2019 Driving Innovation in Design & Construction

    7/66

    Piping and duct work can pass through thebeam openings instead of being housed in a

    separate layer below each floor. This helpsreduce the overall height of a structure,resulting in material and operating costsavings

    Scaling down building heights can be costsaving. Eliminating 200mm or 300mm fromeach floor can cut the cost in the overallbuilding material usage. This is possible only

    in steel framing due to its flexibility andallowing the M& E works to pass through thefloor beams

  • 8/11/2019 Driving Innovation in Design & Construction

    8/66

    Speed at which a building is built is important.

    Earlier occupancy means the building owner can

    sell or rent the space earlier, a factory owner can

    start their production earlier

    Fast construction lowers financial costs and

    overhead expenses for constructionmanagement services

    Structural steel building is lighter and this

    reduces both cost and the time spent onconstruction of foundation works

  • 8/11/2019 Driving Innovation in Design & Construction

    9/66

    Steel framings simple stick design allows

    construction to proceed rapidly from the start ofconstruction

    One of the most convincing reasons for the

    choice of steel against concrete is the speed atwhich such building can be constructed. Thecycle time per floor is between two to threetimes lesser comparing concrete.

    From energy efficiency stand point, minimizingfloor to floor heights also helps curb heatingand cooling costs

  • 8/11/2019 Driving Innovation in Design & Construction

    10/66

    Steels high strength to weight ratio allows it tospan large distances gracefully andeconomically

    Structural steel, since giving lighter framing,allows to use more space in high rise building,thus increasing the utilization area and reducesthe construction cost

  • 8/11/2019 Driving Innovation in Design & Construction

    11/66

    When designing a building in extreme wind andearthquake zones, steel is the material of choicefor seismic design because it is inherentlyductile and flexible. It naturally flexes underextreme loads

    Additionally steel structures have reservestrength , many of the beam-column connectionin a building are designed to support vertical orgravity loads. But the connections also have thecapacity to resist lateral loads caused by windand earthquakes to a certain level

  • 8/11/2019 Driving Innovation in Design & Construction

    12/66

    BENEFITS TO THE NATION

    Steel is recyclable thereby limiting the use of othernatural resources. The trend worldwide is to producemore steel from scrap, bypassing the need to mineand refine iron ore, thus further reducingenvironmental degradation

    Shorter completion times for projects mean thatinfrastructure facilities and public services can bebrought to the people much sooner. This will bring

    more rapid development to more areas of the country

    The use of steel frameworks can bring a higher levelof efficiency in the construction industry in terms ofquality, cleaner environment and less disruption to

    traffic in urban areas

  • 8/11/2019 Driving Innovation in Design & Construction

    13/66

    Fits well for Industrialize Building

    System (IBS)

  • 8/11/2019 Driving Innovation in Design & Construction

    14/66

    Typical Floor Layout using Steel Columns & Beams

    OPTION-1 (Following typical present concrete structure layout)

  • 8/11/2019 Driving Innovation in Design & Construction

    15/66

    Typical Floor Layout using Steel Columns & Beams

    OPTION-2 (Re-design using long span)

  • 8/11/2019 Driving Innovation in Design & Construction

    16/66

    In a composite structure design the

    core wall thickness will about

    100mm more than concrete

    building design for the core wall

    CORE WALL

  • 8/11/2019 Driving Innovation in Design & Construction

    17/66

    Column Size Projection

    COMPOSITE Vs CONCRETE

    0

    300

    600

    900

    1200

    1500

    G to 8 9 to 28 29 to 31 32 to 56 57 to 59 60 to Up

    Floor level

    Colu

    mnSize

    Composite

    Concrete

  • 8/11/2019 Driving Innovation in Design & Construction

    18/66

    saving 375 mm per floor height on certain floors

  • 8/11/2019 Driving Innovation in Design & Construction

    19/66

    Saving 200 mm per floor height on certain floors

  • 8/11/2019 Driving Innovation in Design & Construction

    20/66

    Piping and duct work can be rooted

    through the beam openings

  • 8/11/2019 Driving Innovation in Design & Construction

    21/66

    After a MonthProgress

    Steel Construction Concrete Construction

  • 8/11/2019 Driving Innovation in Design & Construction

    22/66

    After 2 months

    Steel Construction Concrete Construction

  • 8/11/2019 Driving Innovation in Design & Construction

    23/66Steel Construction Concrete Construction

    After 4 Month

  • 8/11/2019 Driving Innovation in Design & Construction

    24/66Steel Construction Concrete Construction

    After 6 Months

  • 8/11/2019 Driving Innovation in Design & Construction

    25/66

    Steel Construction Concrete Construction

    After 8 Months

  • 8/11/2019 Driving Innovation in Design & Construction

    26/66

    Steel Construction Concrete Construction

    After 9 Months

  • 8/11/2019 Driving Innovation in Design & Construction

    27/66

    Steel Construction Concrete Construction

    About 11 Months

  • 8/11/2019 Driving Innovation in Design & Construction

    28/66

    Steel column need not to wait for Concrete encasement

    for 5 floors

  • 8/11/2019 Driving Innovation in Design & Construction

    29/66

    Connections Details

  • 8/11/2019 Driving Innovation in Design & Construction

    30/66

    Typical Steel Column and Beam Connections

  • 8/11/2019 Driving Innovation in Design & Construction

    31/66

    Steel availability has been the subject ofmore than a few conversations lately, with

    the blame placed on the ever-expandingconstruction activity in Asian countrieslike China. However, experts from thesteel industry are eager to dispel the myth

    that there simply isnt enough steel to goaround. Over the past year, theres beena lot of misperception out there in terms ofavailability of material, There is no

    shortage. Structural steel isreadily

    available.

  • 8/11/2019 Driving Innovation in Design & Construction

    32/66

    Need a lead time of 6 to 8 months(depends on project to project) fromthe time of award with finalisedstructural design to begin steel

    erection works

    Need time to finalise connection design

    To liaise with architect and consulting engineers

    Shop Drawings and approval Procurement of Steel Materials

    Fabrication

    Delivery to site

  • 8/11/2019 Driving Innovation in Design & Construction

    33/66

    The Schedule is based on 4 day floor cycle

    Need a lead time of 5 to 6 months from the time

    of award

    Need information & time to finalize connection

    design, steel member size and to develop Model

    Shop Drawings and approval Procurement of Steel Material

    Fabrication, Delivery & Construction

    Surface preparation & protection is very critical

    for steel

  • 8/11/2019 Driving Innovation in Design & Construction

    34/66

    Through the years, Eversendai has garnered an enviable

    reputation in the industry by executing many prestigious

    and complex projects, both locally and internationally.The company has achieved this by adhering to its basic

    corporate principles:-

    Adherence to Safety

    Adherence to Quality

    Strict Adherence to Time Schedule

    Total Customer Satisfaction

    It is due to these dedication and basic principle that

    constantly brings satisfied clients back, time and time again

    EVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    35/66

    HIGH RISE BUILDING

    EVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    36/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    37/66

    C O N S T R U C T I O N M E T H O D O L O G YRSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    38/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    39/66

  • 8/11/2019 Driving Innovation in Design & Construction

    40/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    41/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    42/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    43/66

  • 8/11/2019 Driving Innovation in Design & Construction

    44/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    45/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    46/66

  • 8/11/2019 Driving Innovation in Design & Construction

    47/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    48/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    49/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    50/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    51/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    52/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    53/66

  • 8/11/2019 Driving Innovation in Design & Construction

    54/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    55/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    56/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    57/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    58/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    59/66

    EVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    60/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    61/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    62/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    63/66

  • 8/11/2019 Driving Innovation in Design & Construction

    64/66

    EVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    65/66

    C O N S T R U C T I O N M E T H O D O L O G YVERSEN I

  • 8/11/2019 Driving Innovation in Design & Construction

    66/66