DECEMBER 2014 HALF YEAR RESULTS Increased production delivers increase in revenue to A$60.1M Net cash flow from operations A$27.1M maintained despite lower gold price EBITDA A$24.3M, Net profit after tax A$4M Debt reduced to A$12M Doray Minerals Limited (ASX: DRM, Doray, the Company) today announced its financial results for the six-month period ending 31 December 2014. Production for the 6 months ending 31 December 2014 totalled 39,228 ounces, a slight increase over the previous six months. Gold sold increased by approximately 9% and resulted in a 6% increase in revenue to A$60.1 million. A reduction in depreciation and amortisation charges and monthly improvements in grade, costs and margin resulted in maintenance of cash flow from operations at approximately A$27 million despite a lower gold price environment. Table 1. Summary of half-year results for period ending 31 December 2014 Units 6 months to 31 Dec 2014 6 Months to 30 Jun 2014 6 months to 31 Dec 2013 Revenue from gold sales A$M 60.1 56.7 53.9 Gross profit A$M 8.5 9.3 21.8 Net profit/(loss) before tax A$M 5.1 (26.4) 1 18.0 Tax (expense)/benefit A$M (1.1) 8.2 (5.4) Net profit/(loss) after tax A$M 4.0 (18.2) 12.5 Earnings/(loss) per share cents 2.9 (11.6) 8.8 Net cash flow from operations A$M 27.1 27.3 30.5 Doray Managing Director Allan Kelly said the results exceeded expectations in what the Company foreshadowed to the market as a leaner period of cash flow for the Project. “Coming in to the first half of the 2015 financial year, we forecast lower grades and higher costs at Andy Well as we transitioned from treating stockpiled higher grade open pit material to being purely dependant on underground ore,” Mr Kelly said. “I’m pleased to say that we had considerable success in reducing unplanned dilution underground and saw significant monthly improvement in our head grade, costs and profit margins resulting in better than expected results for the half year.” 1 Includes A$32 million impairment ASX Announcement 11 March 2015

Upload: others

Post on 02-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

 

 

DECEMBER 2014 HALF YEAR RESULTS

Increased production delivers increase in revenue to A$60.1M Net cash flow from operations A$27.1M maintained despite lower gold price EBITDA A$24.3M, Net profit after tax A$4M Debt reduced to A$12M

Doray Minerals Limited (ASX: DRM, Doray, the Company) today announced its financial results for the six-month period ending 31 December 2014. Production for the 6 months ending 31 December 2014 totalled 39,228 ounces, a slight increase over the previous six months. Gold sold increased by approximately 9% and resulted in a 6% increase in revenue to A$60.1 million. A reduction in depreciation and amortisation charges and monthly improvements in grade, costs and margin resulted in maintenance of cash flow from operations at approximately A$27 million despite a lower gold price environment. Table 1. Summary of half-year results for period ending 31 December 2014

Units 6 months to 31 Dec 2014

6 Months to 30 Jun 2014

6 months to 31 Dec 2013

Revenue from gold sales A$M 60.1 56.7 53.9

Gross profit A$M 8.5 9.3 21.8

Net profit/(loss) before tax A$M 5.1 (26.4)1 18.0

Tax (expense)/benefit A$M (1.1) 8.2 (5.4)

Net profit/(loss) after tax A$M 4.0 (18.2) 12.5

Earnings/(loss) per share cents 2.9 (11.6) 8.8

Net cash flow from operations A$M 27.1 27.3 30.5

Doray Managing Director Allan Kelly said the results exceeded expectations in what the Company foreshadowed to the market as a leaner period of cash flow for the Project. “Coming in to the first half of the 2015 financial year, we forecast lower grades and higher costs at Andy Well as we transitioned from treating stockpiled higher grade open pit material to being purely dependant on underground ore,” Mr Kelly said. “I’m pleased to say that we had considerable success in reducing unplanned dilution underground and saw significant monthly improvement in our head grade, costs and profit margins resulting in better than expected results for the half year.”

                                                       1 Includes A$32 million impairment 

ASX Announcement

11 March 2015

Page 2: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

 

ASX:DRM  

Doray Minerals Ltd, 11 March 2015

The Company expects increased production and cash flow in the second half of the year as a result of the high-grade stage 2 open pit, which was recently increased by 67%. As a result, the Company recently upgraded its production guidance to 85,000-90,000 ounces (previously 77,000-85,000 ounces) at a cash operating cost of A$600-700/oz (previously A$700-800/oz). “We will also see the benefits from a significantly improved gold price since October 2014 and a reduction the diesel price” Mr Kelly said. Doray will conduct a Half Yearly Results teleconference on Wednesday 11 March at 0830 WST (1130 EST). Dial in details are below: Teleconference details: Dial-in number from an Australian landline: 1800 246 489

Dial-in number from an Australian mobile phone: 03 9011 8100

International dial-in numbers:

Canada: 1 877 304 3572

Canada-Toronto: 1 647 426 9199

Hong Kong: 3 051 2709

Switzerland: 0 800 836 593

UK: 0 8 00 279 4157

For any difficulties with international calls please dial: +61 3 9011 7100. Enter the PIN: 444 779#

You will hear music until the moderator (call leader) joins the meeting. Please dial in a few minutes before the conference starts.

During the meeting:

When participants join or leave the meeting two beeps will be heard. If you are calling from a noisy location mute/unmute yourself by pressing *6 on your phone. For assistance during the meeting, press *0 (star zero).

A recording of the conference call will be available. If you would like a copy please let us know and we will send you the link.

-ENDS-

Page 3: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

 

ASX:DRM  

Doray Minerals Ltd, 11 March 2015

For further information, please contact: Allan Kelly Margie Livingston Managing Director Associate Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 [email protected] [email protected]

About Doray Minerals Limited Doray Minerals Limited (ASX: DRM) is a Western Australian high-grade gold producer, developer and explorer. The Company began mining at its Andy Well Gold Project in the northern Murchison region of Western Australia in August 2013 and recently announced a recommended Takeover Offer for ASX-listed Mutiny Gold Ltd. Doray has a strategic portfolio of gold exploration properties within Western Australia and South Australia and each presents multiple discovery opportunities. The Company's Board and management team has expertise in discovery, development and production.

Page 4: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

     

ACN: 138 978 631      

 CONSOLIDATED INTERIM FINANCIAL REPORT 

 FOR THE HALF‐YEAR ENDED 

 31 DECEMBER 2014 

                      

Note: The information contained herein should be read in conjunction with the most recent annual report.  

Page 5: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

INTERIM FINANCIAL REPORT For the half year ended 31 December 2014   INDEX   Corporate Directory  1  Directors’ Report  2  Condensed Consolidated Statement of Profit or Loss and Other Comprehensive Income  8  Condensed Consolidated Statement of Financial Position  9  Condensed Consolidated Statement of Changes in Equity  10  Condensed Consolidated Statement of Cash Flows  11  Notes to the Financial Statements  12  Directors’ Declaration  20  Auditor’s Independence Declaration  21  Auditor’s Review Report  22  

Page 6: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

1

CORPORATE DIRECTORY 

DIRECTORS:  Peter Alexander  Non‐Executive Chairman  Allan Kelly   Managing Director  Jay Stephenson  Non‐Executive Director  Leigh Junk  Non‐Executive Director  Peter Lester  Non‐Executive Director  Allan Brown  Non‐Executive Director   COMPANY SECRETARY:  Iain Garrett  PRINCIPAL AND REGISTERED OFFICE  Level 3, 41‐43 Ord Street WEST PERTH WA 6005  Telephone         (08) 9226 0600 Facsimile            (08) 9226 0633  Website     www.dorayminerals.com.au 

    AUDITORS:  Nexia Perth Audit Services Pty Ltd Level 3 88 William Street GPO Box 2570 PERTH WA 6001  Telephone  (08) 9463 2463 Facsimile  (08) 9463 2499  

   SHARE REGISTRY:  Computershare Investor Services Pty Ltd Level 2, Reserve Bank Building 45 St George’s Terrace PERTH WA 6000  Telephone   1300 557 010 Facsimile          (08) 9323 2033  

HOME EXCHANGE:  ASX Limited  Exchange Plaza 2 The Esplanade PERTH WA 6000  ASX Code:  DRM  

Page 7: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

2

DIRECTORS’ REPORT  Your directors present their  financial report of Doray Minerals Limited  (“Doray” or “the Group”)  for the half year ended 31st December 2014. In order to comply with the provisions of the Corporations Act 2001, the directors present their report as follows:  1. DIRECTORS  The following persons were directors of Doray Minerals Limited during the period and up to the date of this report:  Mr Peter Alexander  Non‐Executive Chairman Mr Allan Kelly    Managing Director Mr Jay Stephenson   Non‐Executive Director Mr Leigh Junk    Non‐Executive Director  Mr Peter Lester    Non‐Executive Director (appointed 1 September 2014) Mr Allan Brown    Non‐Executive Director (appointed 26 February 2015)  2. FINANCIAL RESULT  The profit of the Group for the period after tax amounted to $3,969,000 (half year ended 31 December 2013 profit: $12,536,000).  3. OVERVIEW  Doray  Minerals  Limited  (ASX:  DRM,  “Doray”)  is  an  Australian‐based  high‐grade  gold  producer  and exploration company.   The Company operates the Andy Well Gold Project, located approximately 45km north of Meekatharra, in the northern Murchison region of Western Australia and is the first new gold operation in the Murchison in over 10 years. Doray commenced mining and site works in November 2012 with first gold production in August 2013, approximately 3.5 years after the initial discovery of the high‐grade Wilber Lode gold deposit by Doray in March 2010.   Doray  recently announced a Board Recommended Takeover Offer  for Mutiny Gold  Limited  (ASX: MYG, “Mutiny”). The combination of the two companies will form a leading mid‐tier, high‐grade West Australian gold  company  with  an  attractive  and  complementary  portfolio  of  production,  development  and exploration assets  4. ANDY WELL GOLD PROJECT 

 Activity during the half year focused on the processing of ore exclusively from the high‐grade Wilber Lode underground  gold mine.  The  Group  progressed  with  underground  development  and  stoping  to  both northern and southern panels of the Wilber Lode, as well as preparing for mining of the Stage 2 Open Pit cut‐back scheduled for the second half of the 2015 financial year.  Doray  achieved  two  significant  milestones  during  the  period  ‐  producing  its  100,000th  ounce  since commencement of production in August 2013 and passing 365 days without a Lost Time Injury (LTI) – with no mining or production  related LTI since  the commencement of construction  in November 2012.   This excellent  safety performance demonstrates Doray’s commitment  to placing  the  safety of  its employees and contractors foremost.  Doray has successfully  implemented alternative mining methods to minimise stoping dilution and to suit 

Page 8: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

3

the local ground conditions.  These methods include sub‐level benching with in‐situ and/or cemented rock fill (“CRF”) sill pillars and/or progressive backfill using the “Avoca” mining method. As a result, mine grade, head grade and gold production improved throughout the half year with a resulting improvement in costs and profit margin.  Table 1. Summary of mine physicals for December 2014 Half Year.   

Units  Sept 14 Qtr  Dec 14 Qtr  2015 FYTD 

Underground Ore Mined  t  77,735  80,459  158,194 

Underground Ore Grade  g/t  7.41  8.21  7.82 

Contained gold  oz  18,531  21,245  39,776 

 A total of 148,352 wet tonnes were milled during the half year at a rate of 33.9 tonnes/hr with total gold recoveries of 98% and a reconciled mill head grade of 8.40g/t. Total gold recovered was 39,257 ounces with a 27 ounce increase in Gold‐in‐circuit (GIC), resulting in total gold production of 39,228 ounces.  Cash  operating  cost  (C1)  for  the  half  year was  A$698/oz, whilst  the  All‐In  Sustaining  Cost  (AISC) was A$1,238/oz compared with an average price received for the same period of A$1,477/oz.   Table 2. Summary of Production for December 2014 Half Year.  

  Units  Sept 14 Qtr  Dec 14 Qtr  2015 FYTD 

Ore processed  tonnes  73,835  74,517  148,352 

Head grade  g/t  7.82  8.98  8.40 

Recovery  %  98.1  97.9  98.0 

Gold recovered  oz  18,203  21,054  39,257 

GIC change  oz  ‐62  89  27 

Gold produced  oz  18,265  20,963  39,228 

Cash Operating Costs  A$M  14.1  13.3  27.4 

Cash Operating Cost (C1)1  A$/oz  773  633  698 

Royalties  A$M  1.2  0.9  2.1 

C1 plus royalties  A$/oz  840  675  752 

Depreciation/Amortisation  A$M  9.2  10.1  19.2 

C2 Cost  A$/oz  1,276  1,115  1,190 

Total Production Costs  A$M  24.9  24.4  49.3 

Total Cost (C3)2  A$/oz  1,366  1,166  1,260 

All‐in Sustaining Cost (AISC)3  A$/oz  1,384  1,1104  1,238 

Gold sold  oz  18,962  21,584  40,545 

Revenue from gold sales  A$M  28.6  31.3  60.0 

Average price received  A$/oz  1,508  1,450  1,477 

Average margin  A$/oz  124  340  239 

1 Includes mining, processing, site  admin and refining costs less silver credits 2 Includes depreciation and amortisation of mining development, royalties, net bank charges and attributable corporate costs 3 As per World Gold Council guidelines 4 Includes a A$14/oz charge related to the issue of employee options in December 2013. 

Page 9: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

4

During  the period,  the Company provided an update of  its production and  cost guidance  for  the 2015 financial year following a significant increase in the size of the high‐grade Wilber Stage 2 open pit mining inventory and improved operating results since August 2014.   Following the completion of grade control drilling, the Company announced a 67% increase to the size of the high‐grade Stage 2 open pit at Andy Well,  to approximately 23,500 ounces @ 16.1g/t Au  (see ASX release dated 7 January 2015) compared with that previously quoted in the July 2012 BFS (approximately 14,000 ounces @ 15.3g/t). Gold production from Andy Well is now expected to be in the range of 85,000 to 90,000 ounces for the 2015 financial year (previously 77,000 to 85,000 ounces). Full year cash operating costs (C1) are expected to be in the range of A$600‐700/oz (previously A$700‐800/oz)..  In September 2014, the Company announced an updated Resource and Reserve Statement for the Andy Well Project as at 30 June 2014 (refer to ASX release dated 25 September 2014), increasing the Resource Inventory at Andy Well by 75,000 ounces,  replacing  the depletion of mining over  the past 12 months. Additionally,  the high‐grade  Judy Lode Resource was converted  into an  initial Ore Reserve and replaced the first year of underground production from the Wilber Lode. Subsequent to the end of reporting period the additional high‐grade Stage 2 open pit ounces (9,500 ounces @ 17.4g/t) were added to the Andy Well Ore Reserve inventory (see ASX release dated 7 January 2015).  Realignment of a portion of  the Great Northern Highway commenced  in November with mining of  the Stage 2 open pit scheduled to commence in January 2015 and be completed by July 2015.  5. Exploration and New Business  Doray has an exploration tenement portfolio covering a total of approximately 4,000km2 in both Western Australia  (WA)  and  South  Australia  (SA).  In  the  northern Murchison  Region  of WA,  Doray  is  actively exploring  for gold mineralisation which has  the potential  to provide additional near‐term development opportunities  for  the Andy Well Gold Project. The Company continues  to explore  for  large, stand‐alone development opportunities over its entire exploration portfolio in WA and SA.  Exploration at Andy Well was centred primarily on identifying and defining parallel gold bearing structures to  the Wilber  Lode,  through  targets  identified  in  the  footwall  corridor. Work was  completed primarily focussed on extending the Wilber and Judy Lodes at depth, follow‐up drilling of the Suzie Zone.   Recent  drilling  results  from  within  the  nearby  Suzie  Zone  also  indicated  the  potential  for  additional shallow high‐grade material which  could be exploited  as part of  the  Stage 2 open pit mining exercise, further proof of the upside potential of the Andy Well project.  Also at Andy Well,  step‐out diamond drilling has  intersected mineralised quartz  lode at depths beyond 600m below surface at both the Wilber and  Judy Lodes. These deep  intersections are significant  in  that they confirm that the Wilber and Judy Lode structures and, by inference, the other structures present at Andy Well,  continue  at  significant  depths  below  current  drilling  and  hence  provide  clear  potential  for extensions to the mine life at Andy Well.  Doray  had  early  exploration  success  at  the  Horse  Well  JV  Project,  where  the  presence  of  a  major mineralised structure at “Dusk til Dawn” was confirmed. RC drilling intersected high‐grade gold with 65m @ 2.6 g/t Au from 50m, including 13m @ 8.2g/t Au from 50m.  During  the period, Doray also  signed a  strategic Farm‐in Agreement with  Iluka Resources  Ltd  (Iluka)  to explore  its 21,000km2 Central and Western Gawler Craton  tenement portfolio  in South Australia. Doray will have the right to earn up to 80% of any ‘gold resources’ discovered within the project area with Iluka retaining rights to discoveries of other commodities made by the Company, unless it elects not to do so. 

Page 10: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

5

6. TAKEOVER OFFER FOR MUTINY GOLD 

On 28th October 2014, the Company announced it had reached agreement with the Board of Mutiny Gold Ltd  (ASX: MYG,  “Mutiny”)  to merge  the  two  companies  via  a  unanimously  recommended  off‐market Takeover Offer for Mutiny by Doray.  The  combination of  the  two  companies will  create  a  leading, mid‐tier high‐grade West Australian  gold producer and explorer with an existing production asset at Andy Well and a development‐ready asset at the high‐grade Deflector gold‐copper‐silver project in the southern Murchison.  Mutiny  shareholders  were  offered  one  Doray  Share  for  every  9.5  Mutiny  shares,  giving  Mutiny shareholders a premium to recent trading price and between 30% and 33% of the merged entity. Mutiny shareholders also retain exposure to the development of the Deflector project whilst gaining exposure to Doray’s existing assets, including the high‐grade Andy Well Gold Project.   Following  development  of  the  Deflector  Gold  Project,  Doray’s  annualised  production  is  expected  to double to approximately 160,000 ounces per annum (gold equivalent).  Doray believes, given the similarities in nature and scale between the proposed Deflector operations and those  at  Andy Well,  that  it  has  the  skills,  recent  experience  and  track  record  to  secure  the  required funding and bring the Deflector project into production as expeditiously as possible.  As at 31 December 2014,  the Company had  received acceptances  for 70.1% of  the Shares on  issue and 78%  of  the  listed  Options.  Subsequent  to  the  end  of  the  period,  Doray  continued  to  increase  the acceptance  level of Shares and  listed Options and declared the Offers unconditional on 15 January 2015 and compulsory acquisition was announced on 4 February 2015 once 90% relevant interest in Mutiny had been achieved.     

Competent Person Statement  The  information  in  this announcement  regarding Doray’s Exploration Results, Mineral Resources or Ore Reserves has been extracted from Doray ASX announcements dated 6 August 2014, 10 September 2014, 25 September 2014, 13 November 2014, 10 December 2014, 18 December 2014 and 7 January 2015 and is available  on  the  Doray  website  at  www.dorayminerals.com.au  or  through  the  ASX  website  at www.asx.com.au (using ticker code “DRM”). Doray confirms that it is not aware of any new information or data  that materially affects  the  information  included  in  the original market announcement and  that all material assumptions and technical parameters underpinning the estimates in that market announcement continue to apply and have not materially changed. Doray confirms that the form and context in which the Competent Person’s  findings are presented have not been materially modified  from the original market announcement. 

 

Page 11: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

6

 Figure 1. Murchison  region geology showing  location of Deflector  in  relation  to existing Doray projects, including the Andy Well Gold Project. 

Page 12: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

7

7. CORPORATE  On 1 September 2014, the Group appointed Mr Peter Lester to the Board as a Non‐Executive Director.  8. SIGNIFICANT EVENTS AFTER THE REPORTING DATE  

On 29 January 2015, the Company announced that it had agreed to a refinancing and restructure of its project finance facility with the Commonwealth Bank of Australia to Westpac Banking Corporation to  enable  improved  access  to  cash  flow  from  its  high‐grade  Andy Well  Gold  Project  in Western Australia  for  exploration  and  business  development  activities. As  part  of  the  refinancing  and restructure, Westpac will pay out the $17 million outstanding balance of the existing project finance facility and provide an additional $6 million  to assist with costs  relating  to  the  takeover of Mutiny Gold Ltd and expenses relating to commencement of the high‐grade Stage 2 open pit.  

On 4 February 2015,  the Company declared  the Takeover Offer  for Mutiny unconditional  following the achievement of over 90% relevant interest in Mutiny.   

 

On 25 February 2015,  the Company announced a maiden high‐grade Resource  for  the Suzie Zone, within the Company’s Andy Well Gold Project in the northern Murchison region of Western Australia. The Suzie Zone is located parallel to the operating Wilber Lode underground mine and the Judy Lode, which is scheduled for underground mining in the near‐term.  

 

On  26  February  2015,  the  Company  appointed Mr  Allan  Brown  to  the  Board  as  a Non‐Executive Director. 

 There are no other significant events after the reporting date.  9. AUDITORS’ INDEPENDENCE DECLARATION  The auditors’  independence declaration as required under section 307C of the Corporations Act 2001  is set out on page 21.    This report  is signed  in accordance with a resolution of  the Board of Directors with pursuant  to section 306.3 of the Corporations Act 2001.  10. ROUNDING OFF OF AMOUNTS  The company is a company of the kind referred to in ASIC Class Order 98/100 and in accordance with that Class Order amounts in the directors’ report and the financial statements are rounded off to the nearest thousand dollars, unless otherwise indicated.   For and on behalf of the Board 

____________________________ PETER ALEXANDER CHAIRMAN Perth, Western Australia Dated this 10th day of March 2015 

Page 13: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

8

CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME For the half year ended 31 December 2014 

 

       CONSOLIDATED 

     31 December 

2014 31 December 

2013

 Note 

  

$’000 

$’000

Revenue from operations      60,072  53,940

Mining and processing costs      (29,947)  (17,548)

Depreciation and amortisation      (19,235)  (12,684)

Royalty expense      (2,113)  (1,945)

Exploration and evaluation expenditure write off      (236)  ‐

Gross profit      8,541  21,763

       

Corporate and other expenses      (2,986)  (2,350)

Results from operating activities      5,555  19,413

       

Financial income       332  205

Financial expense      (831)  (1,647)

Net financing (expense)/ income      (499)  (1,442)

       

Profit before income tax      5,056  17,971

Income tax expense      (1,087)  (5,435)

Net profit for the period      3,969  12,536

 Other comprehensive income 

     

Items that may subsequently be reclassified to profit or loss 

     

Effective portion of changes in fair value of cash flow hedges 

   (2,601)  (2,515)

Total items that may subsequently be reclassified to profit or loss 

   (2,601)  (2,515)

Other comprehensive income for the half year, net of income tax 

   (2,601)  (2,515)

Total comprehensive profit for the period      1,368  10,021

       

Profit per share attributable to ordinary equity holders 

    Cents  Cents

‐basic and diluted  3    2.4  8.8

         

 The above statement should be read in conjunction with the accompanying notes. 

Page 14: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

9

CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION As at 31 December 2014  

                                   CONSOLIDATED     31 December  30 June    2014  2014  Note  $’000  $’000ASSETS  

     

Current Assets       Cash and cash equivalents 8 14,616  15,656Trade and other receivables  124  921Inventories  4,212  6,070Financial asset – gold hedge  4 1,013  4,728Prepayments  477  41

Total Current Assets    20,442  27,416

     Non‐Current Assets     Property, plant and equipment  5 55,457  56,824Exploration assets  6 15,148  10,697Mine development asset  7 14,163  13,879Deferred tax assets  5,832  5,953

Total Non‐Current Assets    90,600  87,353

     TOTAL ASSETS    111,042  114,769

     LIABILITIES  

   

Current Liabilities     Trade and other payables  16,481  20,160Provisions  856  1,298Borrowings  12,949  14,664

Total Current Liabilities    30,286  36,122

Non‐Current Liabilities     Provisions  1,240  1,222Borrowings  586  698

Total Non‐Current Liabilities    1,826  1,920

 

TOTAL LIABILITIES 

   

32,112  38,042

 NET ASSETS 

 78,930  76,727

 EQUITY 

   

Issued capital  91,000  90,412Reserves  4,456  6,810Accumulated losses  (16,526)  (20,495)     TOTAL EQUITY    78,930  76,727

 The above statement of financial position should be read in conjunction with the accompanying notes. 

Page 15: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

10

CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY For the half year ended 31 December 2014 

 

CONSOLIDATED    Issued 

capital

$’000 

Reserves

$’000

Accumulated profit/(losses)  

$’000 

Total

$’000

         

Balance at 1 July 2014  90,412 6,810 (20,495)  76,727

Profit attributable to members of the Group  ‐ ‐ 3,969  3,969

Other comprehensive income   ‐ (2,601) ‐  (2,601)

Total   90,412 4,209 (16,526)  78,095

   

Transactions with owners, directly in equity   

Options exercised during the period  736 ‐ ‐  736

Share based payments   ‐ 247 ‐  247

Share issue costs  (148) ‐ ‐  (148)

At 31 December 2014  91,000 4,456 (16,526)  78,930

 

    Issued 

capital

$’000 

Reserves

$’000

Accumulated losses  

$’000 

Total

$’000

         

Balance at 1 July 2013  73,947 10,838 (14,847)  69,938

Profit attributable to members of the Group  ‐ ‐ 12,536  12,536

Other comprehensive income   ‐ (2,515) ‐  (2,515)

Total   73,947 8,323 (2,311)  79,959

   

Transactions with owners, directly in equity   

Options exercised during the period  5 ‐ ‐  5

Share based payments   ‐ 145 ‐  145

At 31 December 2013  73,952 8,468 (2,311)  80,109

  The above statement should be read in conjunction with the accompanying notes. 

Page 16: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

11

CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS For the half year ended 31 December 2014 

    

CONSOLIDATED 

   31 December 

2014 31 December

2013

   $’000 

 $’000

Cash flows from operating activities   

Receipts from gold and other metal sales   60,076  53,940

Payments to suppliers and employees (incl royalties)   (32,394)  (22,496)

Net interest (paid)/received  (499)  (942)

Net cash from operating activities  27,183  30,502

   

Cash flows from investing activities   

Purchase of property, plant and equipment  (4,165)  (1,009)

Payments for exploration and evaluation expenditure   (4,687)  (2,695)

Payments for mine development assets  (13,987)  (18,625)

Purchase of minority JV partner interest  (4,000)  (4,000)

Net cash used in investing activities  (26,839)  (26,329)

   

Cash flows from financing activities   

Repayment of borrowings  (2,120)  (6,144)

Proceeds from the issue of options  736  5

Net cash provided from financing activities  (1,384)  (6,139)

   

Net (decrease)/increase in cash and cash equivalents  (1,040)  (1,966)

Cash and cash equivalents at 1 July   15,656  25,700

Cash and cash equivalents at the end of the period  14,616  23,734

  The above statement should be read in conjunction with the accompanying notes.   

Page 17: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

12

NOTES TO THE FINANCIAL STATEMENTS For the half‐year ended 31 December 2014  Note 1   (a) BASIS OF PREPARATION  The  half‐year  financial  report  is  a  general  purpose  financial  report  prepared  in  accordance  with  the requirements  of  the  Corporations  Act  2001  and  Australian  Accounting  Standard  AASB  134:  Interim Financial  Reporting.  Compliance  with  Australian  Accounting  Standards  ensures  that  the  financial statements and notes also comply with International Financial Reporting Standards.  This  half‐year  financial  report  is  intended  to  provide  users with  an  update  on  the  latest  consolidated annual financial statements of Doray Minerals Limited and its subsidiaries (“the Group”). As such, it does not  contain  information  that  represents  relatively  insignificant  changes  occurring  during  the  half‐year within the Group. It  is therefore recommended that this financial report be read  in conjunction with the annual financial report for the year ended 30 June 2014 and any public announcements made by Doray Minerals Limited during the half‐year in accordance with the continuous  disclosure requirements arising under the Corporations Act 2001.  The  same accounting policies and methods of  computation, apart  from  those noted below, have been followed in this interim financial report as were applied in the most recent annual financial statements.  Amortisation The Group  amortised mine  properties  in  production  on  a  units  of  production  basis  over  economically recoverable  reserves  and  resources until  30  June  2014.  From  1  July  2014  this was  changed  to ounces produced from tonnes produced.   Financial Position The  half‐year  financial  report  has  been  prepared  on  a  going  concern  basis,  which  contemplates  the continuity of normal business activity and the realisation of assets and the settlement of  liabilities  in the normal course of business.  The Group has realised a profit of $3,969,000 (31 December 2013: profit of $12,536,000) for the half‐year ended 31 December 2014.  As at 31 December 2014  the Group has net current  liabilities of $9,844,000  (30  June 2014: net current liabilities  of  $8,706,000)  which  includes  cash  and  cash  equivalents  of  $14,616,000,  trade  and  other receivables  of  $124,000,  inventories  of  $4,212,000,  a  gold  hedge  financial  asset  of  $1,013,000,  trade payables of $16,481,000, current provisions of $856,000 and borrowings of $12,949,000. The payment of trade  payables,  borrowings  and  forecast  operational  and  capital  expenditure  arising  from  the mining operations  at  the  Andy Well  Gold  Project  are  expected  to  be met  from  existing  cash  resources  and operational cash flows. Any shortfalls experienced in the near term will be covered by the restructuring of debt or through a capital raising. Based on the reasons above, the directors believe it is appropriate that the financial report be prepared on a going concern basis.  Rounding off of amounts The company is a company of the kind referred to in ASIC Class Order 98/100 and in accordance with that Class Order amounts in the directors’ report and the financial statements are rounded off to the nearest thousand dollars, unless otherwise indicated. 

Page 18: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

13

NOTES TO THE FINANCIAL STATEMENTS For the half‐year ended 31 December 2014  Note 1 (continued)  Application of new accounting standards  The Group has adopted all of the new and revised Standards and Interpretations issued by the Australian Accounting Standards Board (the AASB) that are relevant to their operations and effective for the current half‐year.   New and  revised Standards and amendments  thereof and  Interpretations effective  for  the current half‐year that are relevant to the Group include:   

AASB 1031 ‘Materiality’ (2013) 

AASB 2013‐5 ‘Amendments to Australian Accounting Standards – Investment     Entities’ 

AASB 2012‐3  ‘Amendments to Australian Accounting Standards – Offsetting Financial Assets and Financial Liabilities’ 

AASB 2013‐3 ‘Amendments to AASB 136 – Recoverable Amount Disclosures for Non‐   Financial Assets’  

AASB 2014‐1 ‘Amendments to Australian Accounting Standards’  

Part A: ‘Annual Improvements 2010‐2012 and 2011‐2013 Cycles’  

Part C: ‘Materiality’  Impact of the application of AASB 1031 ‘Materiality’ (2013)   The  revised  AASB  1031  is  an  interim  standard  that  cross‐references  to  other  Standards  and  the Framework  for  the Preparation  and Presentation of  Financial  Statements  (issued December 2013)  that contain  guidance  on materiality.  The  AASB  is  progressively  removing  references  to  AASB  1031  in  all Standards  and  Interpretations,  and  once  all  these  references  have  been  removed,  AASB  1031 will  be withdrawn.  The  adoption  of AASB  1031  does  not  have  any material  impact  on  the  disclosures  or  the amounts recognised in the Group's condensed consolidated financial statements.  Impact  of  the  application  of  AASB  2013‐5  ‘Amendments  to  Australian  Accounting  Standards  – Investment Entities’   The Group  has  applied  the  amendments  to AASB  10, AASB  12  and AASB  127  for  the  first  time  in  the current year. The amendments to AASB 10 define an investment entity and require a reporting entity that meets the definition of an investment entity not to consolidate its subsidiaries but instead to measure its subsidiaries at fair value through profit or loss in its consolidated and separate financial statements.  To qualify as an investment entity, a reporting entity is required to:   

obtain funds from one or more investors for the purpose of providing them with investment   management services; 

commit to its investor(s) that its business purpose is to invest funds solely for returns from  capital appreciation, investment income, or both; and 

measure and evaluate performance of substantially all of its investments on a fair value  basis. 

 Consequential  amendments  have  been made  to  AASB  12  and  AASB  127  to  introduce  new  disclosure requirements for investment entities.   

Page 19: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

14

NOTES TO THE FINANCIAL STATEMENTS For the half‐year ended 31 December 2014  Note 1 (continued)  As  the Company  is not an  investment entity  (assessed based on  the criteria  set out  in AASB 10 as at 1 January 2014), the application of the amendments does not have any material impact on the disclosures or the amounts recognised in the Group's condensed consolidated financial statements.  Impact of the application of AASB 2012‐3 ‘Amendments to Australian Accounting Standards – Offsetting Financial Assets and Financial Liabilities’  The  Group  has  applied  the  amendments  to  AASB  132  for  the  first  time  in  the  current  year.  The amendments to AASB 132 clarify the requirements relating to the offset of financial assets and financial liabilities. Specifically, the amendments clarify the meaning of ‘currently has a legally enforceable right of set‐off’ and ‘simultaneous realisation and settlement’.  The  amendments  have  been  applied  retrospectively.  The  Group  has  assessed  whether  certain  of  its financial assets and financial  liabilities qualify for offset based on the criteria set out  in the amendments and  concluded  that  the  application  of  the  amendments  does  not  have  any  material  impact  on  the amounts recognised in the Group's condensed consolidated financial statements.   Impact of the application of AASB 2013‐3 ‘Amendments to AASB 136 – Recoverable Amount Disclosures for Non‐Financial Assets’   The  Group  has  applied  the  amendments  to  AASB  136  for  the  first  time  in  the  current  year.  The amendments  to  AASB  136  remove  the  requirement  to  disclose  the  recoverable  amount  of  a  cash‐generating unit  (CGU)  to which goodwill or other  intangible assets with  indefinite useful  lives had been allocated when there has been no impairment or reversal of impairment of the related CGU. Furthermore, the  amendments  introduce  additional  disclosure  requirements  applicable  to  when  the  recoverable amount of an asset or a CGU is measured at fair value less costs of disposal. These new disclosures include the  fair  value  hierarchy,  key  assumptions  and  valuation  techniques  used  which  are  in  line  with  the disclosure required by AASB 13 ‘Fair Value Measurements’.   The application of these amendments does not have any material impact on the disclosures in the Group's condensed consolidated financial statements.   Impact of  the application of AASB 2013‐9  ‘Amendments  to Australian Accounting Standards’– Part B: ‘Materiality’   This  amending  standard makes  amendments  to  particular  Australian  Accounting  Standards  to  delete references to AASB 1031, at the same time it makes various editorial corrections to Australian Accounting Standards  as  well.  The  adoption  of  amending  standard  does  not  have  any  material  impact  on  the disclosures or the amounts recognised in the Group's condensed consolidated financial statements.   

Page 20: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

15

NOTES TO THE FINANCIAL STATEMENTS For the half‐year ended 31 December 2014  Note 1 (continued)  Impact of the application of AASB 2014‐1 ‘Amendments to Australian Accounting Standards’   Part A: ‘Annual Improvements 2010‐2012 and 2011‐2013 Cycle’   The Annual Improvements 2010‐2012 Cycle include a number of amendments to various AASBs, which are summarised below.   The amendments to AASB 2 (i) change the definitions of ‘vesting condition’ and ‘market condition’; and (ii) add definitions for ‘performance condition’ and ‘service condition’ which were previously included within the definition of  ‘vesting condition’. The amendments  to AASB 2 are effective  for share‐based payment transactions for which the grant date is on or after 1 July 2014.   The amendments to AASB 3 clarify that contingent consideration that is classified as an asset or a liability should  be  measured  at  fair  value  at  each  reporting  date,  irrespective  of  whether  the  contingent consideration is a financial instrument within the scope of AASB 9 or AASB 139 or a non‐financial asset or liability.  Changes  in  fair  value  (other  than measurement  period  adjustments)  should  be  recognised  in profit  and  loss.  The  amendments  to  AASB  3  are  effective  for  business  combinations  for  which  the acquisition date is on or after 1 July 2014.  The  amendments  to AASB 8  (i)  require  an  entity  to disclose  the  judgements made by management  in applying the aggregation criteria to operating segments, including a description of the operating segments aggregated and  the economic  indicators assessed  in determining whether  the operating segments have ‘similar  economic  characteristics’;  and  (ii)  clarify  that  a  reconciliation  of  the  total  of  the  reportable segments’  assets  to  the  entity’s  assets  should  only  be  provided  if  the  segment  assets  are  regularly provided to the chief operating decision‐maker.   The  amendments  to  the  basis  for  conclusions  of  AASB  13  clarify  that  the  issue  of  AASB  13  and consequential amendments  to AASB 139 and AASB 9 did not  remove  the ability  to measure short‐term receivables and payables with no stated interest rate at their invoice amounts without discounting, if the effect  of  discounting  is  immaterial.  As  the  amendments  do  not  contain  any  effective  date,  they  are considered to be immediately effective.   The  amendments  to  AASB  116  and  AASB  138  remove  perceived  inconsistencies  in  the  accounting  for accumulated depreciation/amortisation when an  item of property, plant and equipment or an  intangible asset  is revalued. The amended standards clarify that the gross carrying amount  is adjusted  in a manner consistent  with  the  revaluation  of  the  carrying  amount  of  the  asset  and  that  accumulated depreciation/amortisation  is the difference between the gross carrying amount and the carrying amount after taking into account accumulated impairment losses.  The amendments  to AASB 124  clarify  that a management entity providing  key management personnel services to a reporting entity is a related party of the reporting entity. Consequently, the reporting entity should disclose as related party transactions the amounts incurred for the service paid or payable to the management entity for the provision of key management personnel services. However, disclosure of the components of such compensation is not required.   The  ‘Annual  Improvements 2011‐2013 Cycle’  include a number of amendments to various AASBs, which are summarised below.    

Page 21: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

16

NOTES TO THE FINANCIAL STATEMENTS For the half‐year ended 31 December 2014  Note 1 (continued)  The amendments to AASB 3 clarify that the standard does not apply to the accounting for the formation of all types of joint arrangement in the financial statements of the joint arrangement itself.   The amendments to AASB 13 clarify that the scope of the portfolio exception for measuring the fair value of a group of financial assets and financial liabilities on a net basis includes all contracts that are within the scope of, and accounted for in accordance with, AASB 139 or AASB 9, even if those contracts do not meet the definitions of financial assets or financial liabilities within AASB 132.   The  amendments  to  AASB  140  clarify  that  AASB  140  and  AASB  3  are  not  mutually  exclusive  and application of both  standards may be  required. Consequently,  an entity  acquiring  investment property must determine whether:   (a) the property meets the definition of investment property in terms of AASB 140; and  (b) the transaction meets the definition of a business combination under AASB 3.   Part C – ‘Materiality’   This amending standard makes amendments to particular Australian Accounting Standards to delete their references to AASB 1031, which historically has been referenced in each Australian Accounting Standard.   The adoption of amending standard does not have any material impact on the disclosures or the amounts recognised in the Group's condensed consolidated financial statements.  Note  that  AASB  14  ‘Regulatory  Deferral  Accounts’  and  AASB  2014‐1  ‘Amendments  to  Australian Accounting Standards – Part D: ’Consequential Amendments arising from AASB 14’ is not applicable to the Group as the Group is not a first‐time adopter of Australian Accounting Standards.    Note 2  OPERATING SEGMENT  The  accounting  policies  used  by  the  Company  in  reporting  segments  are  in  accordance  with  the measurement principles of Australian Accounting Standards.  The financial  information presented to the directors are organised to show financial  information for the Group and are not further disaggregated. Hence management consider the Group as a whole to be one operating segment.   Note 3  EARNINGS PER SHARE  

December 2014 

December2013

 Basic and diluted profit per share (cents)  2.4  8.8Profit attributable to members of Doray Minerals Limited ($’000)  $3,969  $12,536Weighted average number of shares in issue  165,458,409  141,867,867  

Page 22: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

17

NOTES TO THE FINANCIAL STATEMENTS For the half‐year ended 31 December 2014  Note 4  FINANCIAL ASSET – GOLD HEDGE   

December 2014 $’000 

June2014$,000

     Derivative financial instrument  1,013  4,728 

 In  January  2013,  Doray  undertook  a  gold  hedging  programme  comprising  the  forward  sale  of  45,000 ounces  at  an  average  price  of A$1,620  per  ounce  over  the  first  14 months  of  production,  comprising approximately 50% of total production from the Andy Well Gold Project over this period.   The Group undertook further hedging in March 2014 comprising the forward sale of an additional 39,651 ounces at an average price of A$1,505.50 per ounce over the period October 2014 to September 2015. In December 2014 another 6,000 ounces at A$1,420.80 per ounce was hedged over the period January 2015 to March 2015.  Fair Value of Financial Assets The methods and valuation  techniques used  for  the purpose of measuring  fair value of  the  company’s financial assets are unchanged compared to the previous reporting period.  The levels of the hierarchy are as follows:  

Level 1: quoted prices (unadjusted) in active markets for identical assets or liabilities Level 2: inputs other than quoted prices included within Level 1 that are observable for the asset or liability, either directly (i.e. as prices) or indirectly (i.e. derived from prices) Level 3: inputs for the asset or liability that are not based on observable market data (unobservable inputs). 

31 December 2014     

  Level 1 

$’000 

Level 2 

$’000 

Level 3 

$’000 

Total 

$’000 

Derivative Financial Asset  ‐  1,013  ‐  1,103 

Total  ‐  1,013  ‐  1,013 

 Valuation  Techniques  and  Key  Inputs:  Future  cash  flows  are  estimated  based  on  forward  gold  prices (from observable forward gold prices at the end of the reporting period) and the contract gold price, and discounted at a rate that reflects the credit risk of the various counterparties.    Note 5  PROPERTY PLANT AND EQUIPMENT  Property, Plant and Equipment  $’000Balance at the beginning of the period  56,824Additions  4,165Depreciation  (5,532)Disposals  ‐

Balance at the end of the period  55,457

 

Page 23: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

18

NOTES TO THE FINANCIAL STATEMENTS For the half‐year ended 31 December 2014  Note 6  EXPLORATION AND EVALUATION ASSETS 

Exploration and Evaluation Assets  $’000Balance at the beginning of the period  10,697Exploration of tenements   4,687 Exploration expenditure written off  (236)

Balance at the end of the period  15,148 

 The  ultimate  recoupment  of  deferred  exploration  and  evaluation  expenditure  carried  forward  is dependent  upon  the  successful  development  and  exploitation,  or  alternatively,  sale  of  the  respective areas of interest at an amount greater than or equal to the carrying value.  A regular review is undertaken of each area of interest within exploration and evaluation to determine the appropriateness of continuing to carry forward costs  in relation to that area of  interest. Exploration and evaluation assets are assessed for write down  if facts and circumstances suggest that the carrying value exceeds the recoverable amount which resulted in a write off of $236,000 on exploration and evaluation assets for the period ended 31 December 2014 (2013: $192,000).  Note 7  MINE DEVELOPMENT ASSETS  Mine Development Assets  $’000Balance at the beginning of the period  13,879Additions  13,987Amortisation  (13,703)

Balance at the end of the period  14,163

 Note 8  CASH AND CASH EQUIVALENTS  Under the term of the bank loan agreement, the Group is required to maintain cash on deposit in a Debt Service  Reserve  Account  which  amounted  to  $5,000,000  at  31  December  2014.  The  cash  cannot  be withdrawn  or  used  by  the  Group  for  liquidity  purposes whilst  the  borrowing  is  outstanding.  For  the periodic  repayments of  the borrowings,  the Group and  the  lender  intend  to net  settle. As a  result,  the Group’s  borrowings  have  been  presented  net  of  the  cash  on  deposit,  as  the  requirements  under Australian Accounting Standards to offset have been met.    Note 9  CAPITAL EXPENDITURE COMMITMENTS    2014 

$’000 2013$’000

Plant and equipment  290  ‐

 Accommodation village expansion 

 220  ‐

 

Page 24: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

19

NOTES TO THE FINANCIAL STATEMENTS For the half‐year ended 31 December 2014  Note 10  EVENTS SUBSEQUENT TO REPORTING DATE  

On 29 January 2015, the Company announced that it had agreed to a refinancing and restructure of its project finance facility with the Commonwealth Bank of Australia to Westpac Banking Corporation to  enable  improved  access  to  cash  flow  from  its  high‐grade  Andy Well  Gold  Project  in Western Australia  for  exploration  and  business  development  activities. As  part  of  the  refinancing  and restructure, Westpac will pay out the $17 million outstanding balance of the existing project finance facility and provide an additional $6 million  to assist with costs  relating  to  the  takeover of Mutiny Gold Ltd and expenses relating to commencement of the high‐grade Stage 2 open pit.  

On 4 February 2015,  the Company declared  the Takeover Offer  for Mutiny unconditional  following the achievement of over 90% relevant interest in Mutiny.   

 

On 25 February 2015,  the Company announced a maiden high‐grade Resource  for  the Suzie Zone, within the Company’s Andy Well Gold Project in the northern Murchison region of Western Australia. The Suzie Zone is located parallel to the operating Wilber Lode underground mine and the Judy Lode, which is scheduled for underground mining in the near‐term.  

 

On  26  February  2015,  the  Company  appointed Mr  Allan  Brown  to  the  Board  as  a Non‐Executive Director. 

 There are no other significant events after the reporting date.  

Page 25: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Doray Minerals Limited  Interim Financial Report 2014 ACN: 138 978 631 

20

NOTES TO THE FINANCIAL STATEMENTS For the half‐year ended 31 December 2014  DIRECTORS’ DECLARATION  The Directors of the Group declare that:  1.  The financial statements and notes set out on pages 8 to 19: 

 (a) comply with Accounting Standard AASB 134: Interim Financial Reporting and the Corporations Act 

2001, and  (b) give  a  true  and  fair  view  of  the Group’s  financial  position  as  at  31 December  2014  and  of  its 

performance for the half year ended on that date.  2. In the Directors’ opinion, there are reasonable grounds to believe that the Group will be able to pay 

its debts as and when they become due and payable.  This declaration is made in accordance with a resolution of the Directors and is signed for and on behalf of the Directors by: 

_________________________ PETER ALEXANDER CHAIRMAN Perth, Western Australia Dated this 10th day of March 2015  

Page 26: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Auditor’s independence declaration under section 307C of the Corporations Act 2001 To the directors of Doray Minerals Limited I declare that, to the best of my knowledge and belief, in relation to the review for the half year ended 31 December 2014, there have been:

(i) no contraventions of the auditor’s independence requirements as set out in the Corporations Act 2001 in relation to the review; and

(ii) no contraventions of any applicable code of professional conduct in relation to the review.

Nexia Perth Audit Services

Amar Nathwani Director Perth 10 March 2015

Page 27: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Independent Auditor’s Review Report to the members of Doray Minerals Limited Report on the Half-Year Financial Report We have reviewed the accompanying half-year financial report of Doray Minerals Limited and its controlled entities (the “Group”), which comprises the condensed consolidated statement of financial position as at 31 December 2014, the condensed consolidated statement of profit or loss and other comprehensive income, condensed consolidated statement of changes in equity and condensed consolidated statement of cash flows for the half-year ended on that date, other selected explanatory notes and the directors’ declaration of the Group comprising the Company and the entities it controlled at the half-year end or from time to time during the half-year. Directors’ Responsibility for the Half-Year Financial Report The directors of the Group are responsible for the preparation of the half-year financial report that gives a true and fair view in accordance with Australian Accounting Standards and the Corporations Act 2001. This responsibility includes: establishing and maintaining internal controls relevant to the preparation and fair presentation of the half-year financial report that is free from material misstatement, whether due to fraud or error; selecting and applying appropriate accounting policies; and making accounting estimates that are reasonable in the circumstances. Auditor’s Responsibility Our responsibility is to express a conclusion on the half-year financial report based on our review. We conducted our review in accordance with Auditing Standard on Review Engagements ASRE 2410 Review of a Financial Report Performed by the Independent Auditor of the Entity, in order to state whether, on the basis of the procedures described, we have become aware of any matter that makes us believe that the financial report is not in accordance with the Corporations Act 2001 including: giving a true and fair view of the Group’s financial position as at 31 December 2014 and its performance for the half-year ended on that date; and complying with Accounting Standard AASB 134 Interim Financial Reporting and the Corporations Regulations 2001. As the auditor of Doray Minerals Limited, ASRE 2410 requires that we comply with the ethical requirements relevant to the audit of the annual financial report. A review of a half-year financial report consists of making enquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and other review procedures. A review is substantially less in scope than an audit conducted in accordance with Australian Auditing Standards and consequently does not enable us to obtain assurance that we would become aware of all significant matters that might be identified in an audit. Accordingly, we do not express an audit opinion. Independence In conducting our audit, we have complied with the independence requirements of the Corporations Act 2001. We confirm that the independence declaration required by the Corporations Act 2001, which has been given to the directors of Doray Minerals Limited, would be in the same terms if given to the directors as at the time of this auditor’s report.

Page 28: DRM Half Yearly Report and Accounts · 2015. 3. 10. · Doray Minerals Limited AMN Corporate +61 (08) 9226 0600 +61 (0)438 661 131 info@dorayminerals.com.au margie@amncorporate.com

Conclusion Based on our review, which is not an audit, we have not become aware of any matter that makes us believe that the half-year financial report of Doray Minerals Limited and its controlled entities is not in accordance with the Corporations Act 2001 including: (a) giving a true and fair view of the Group’s financial position as at 31 December 2014 and

of its performance for the half-year ended on that date; and (b) complying with Accounting Standard AASB 134 Interim Financial Reporting and

Corporations Regulations 2001.

Nexia Perth Audit Services Pty Ltd

Amar Nathwani Director Perth 10 March 2015