DTS Experiences at Minnesota Power. Tom Chambers 2008 EMS Users Conference Atlanta, GA. Credits to…. Matt Novitzki Programmer Analyst Senior Paul Koskela Engineer Senior Mark Pinney Operations Trainer Rick Liljegren System Operations Manager Vendor Personnel. Today…. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/1.jpg)
DTS Experiences at Minnesota Power
Tom Chambers2008 EMS Users Conference
Atlanta, GA
![Page 2: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/2.jpg)
Credits to…• Matt Novitzki
– Programmer Analyst Senior
• Paul Koskela– Engineer Senior
• Mark Pinney– Operations Trainer
• Rick Liljegren– System Operations Manager
• Vendor Personnel
![Page 3: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/3.jpg)
Today…• About Minnesota Power• Implementation • Experiences• Case Studies• In-house Restoration Drill (detail)• Observations• Questions
![Page 4: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/4.jpg)
Minnesota Power
• Small/Medium size (1700 MW Load)
• Service Territory is Northeast MN
• Duluth, MN
• Large Industrial Loads
• Large flows N to S and W to E
• DC, Phase Shifters, SVC
![Page 5: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/5.jpg)
Implementation
• Spring 2006 – Upgraded to Rel. 8.1+– Hardware Upgrades– Enternet Control (Java webapp based UI)– PNA to TSM– DTS (again)
![Page 6: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/6.jpg)
Pre-Upgrade• TSM In-house Workshop
– 1 week with Vendor Engineer– Set up system to take advantage of TSM features
not in PNA– Resolved Model Problems– Problem Solving– Basic User/Admin Training– TSM Configuration– Produced model for TSM/DTS upgrade
![Page 7: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/7.jpg)
Pre-Upgrade
• DTS Factory Acceptance Tests– System Level Tests– Simulation Initialization Tests– Power System Simulator Tests– Simulation Event Processor Tests– Conditional Event Tests– Data Acquisition and Control Tests
![Page 8: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/8.jpg)
Post-Upgrade
• Reran FAT In-house (SAT)
• Generated, Installed Fixes and Tested many Problem Reports
![Page 9: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/9.jpg)
Post-Upgrade• DTS In-house Workshop
– 1 week with Vendor Engineer– Basic User/Admin Training– DTS Configuration– Problem Discovery and Resolution– Sample Scenario Building
• DTS In-house Instructor Training• DTS In-house User Training
![Page 10: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/10.jpg)
Post-Upgrade
• Converted our System One Line Displays to have Apps and Power System Simulator Views.
• Matt and Paul Attended the Vendor Power System Applications Users Seminar in Fort Collins, CO
![Page 11: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/11.jpg)
Post-Upgrade
• Internal Model Verification– Vendor Visualization Method
• db2gml.sh and db2gml_bus.sh scripts• yED
– Results compared verses One-Line diagrams and model notes
![Page 12: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/12.jpg)
![Page 13: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/13.jpg)
Experiences
![Page 14: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/14.jpg)
Operator Training Held• MISO Restoration Drill
– Two Sessions in Fall 2006– Day 1: Scenarios (basic training)– Day 2: Blackstart (from Hydro)
• MP Restoration Drill– Three Sessions in Spring 2007– Day 1: Scenarios (Case Studies)– Day 2: Blackstart (from Hydro)
![Page 15: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/15.jpg)
Operator Training Held• MISO Restoration Drill
– Three Sessions in Fall 2007– Day 1: Scenarios (more advanced: DC single pole
operation, SVS – runback scheme)– Day 2: Blackstart (two island scenario)
• No Drill in Spring 2008• MP Restoration Drill (Planned)
– Three Sessions in Fall 2008– Day 1: Scenarios– Day 2: Blackstart (Sept. 18th 2007 separation)
![Page 16: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/16.jpg)
MP Model…• ~250 Internal Busses• ~1000 External Busses
• Features– DC Line– Seasonal Limits– Special Protection and Runback Schemes– Automatic Contingency List
![Page 17: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/17.jpg)
DTS Staff…
• System Operations Trainers(2)
• System Performance Engineer
• ITS EMS Support Programmer/Analyst
• None are full time DTS!
![Page 18: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/18.jpg)
Problems up front…
• System crashed during Simulation Preparation
• Controlling a non-modeled point crashed DTS
• Reloading snapshots failed
• Could not restart a simulation from a Simulation Data Collection Snapshot
![Page 19: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/19.jpg)
Tips…• Get DTS Experience before first FAT• DTS is only as good as the Model• Create a DTS Station/Points
– Points can be used for execution of blocks of predefined events immediately through conditional events
– Points can be used as flags and/or pseudo timers with conditional events
![Page 20: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/20.jpg)
Tips…• Be creative
– Sequential Control– Custom Applications
• Do not reinvent the wheel– Scenarios vs. Power System Functionality
• Script the Scenarios (Library of Scenarios)– Setup, execution and expected results
• Trainer implemented vs scheduled Scenarios
![Page 21: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/21.jpg)
During the past year…• Internal Model Improvements• Updates to External Model• Problem Resolutions• Promoted use of DTS and TSM• Release 10 Upgrade with DTS
enhancements• Added 345KV Tie Line with Phase Shifter• Used DTS to validate External Model and
simulate new 345KV line before in-service
![Page 22: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/22.jpg)
Next up…• Refine Boundary Model with Telemetry• Continue Problem Resolution• Continue Promoting use of DTS and TSM• System wide dynamic display• Additional Frequency mappings into DTS• Fall 2008 Vendor Apps Users Group• Phasor Measurements?
![Page 23: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/23.jpg)
Case Study
Day 1: Restoration Drill
![Page 24: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/24.jpg)
![Page 25: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/25.jpg)
Case Study: Restoration Drill
• TSM 101– Basic TSM Training
• Execution and TSM Display Review
– Provides a means to view system conditions of the snapshot used for the scenarios
![Page 26: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/26.jpg)
Case Study: Restoration Drill
• Scenario 1: Bad Measurement– TSM State Estimator Bad Measurement
Summary
• Scenario 2: Most Severe Contingency– TSM Contingency Analysis: Contingency Case
Report– TSM Study Case– Apps View – What-if Analysis– TSM Summaries (Limit Violations)
![Page 27: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/27.jpg)
Case Study: Restoration Drill
• Scenarios 3-5: Special Alarms– Breaker Low Air Pressure– Breaker Low Gas Pressure
• Breaker Blocked after delay
– RTU Failure
– Review Alarm Book– Discuss Impacts– Call Company Experts
![Page 28: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/28.jpg)
Case Study: Restoration Drill
• Scenario 6: Bus/Transformer Lockout
![Page 29: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/29.jpg)
![Page 30: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/30.jpg)
![Page 31: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/31.jpg)
![Page 32: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/32.jpg)
![Page 33: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/33.jpg)
![Page 34: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/34.jpg)
![Page 35: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/35.jpg)
![Page 36: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/36.jpg)
![Page 37: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/37.jpg)
Case Study: Restoration Drill
• Scenario 7: Loss of Communications– Alarm Book
• Scenario 8: Tie Line Fault– Discuss procedures for restoring a tie line
with another company
![Page 38: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/38.jpg)
Case Study: Restoration Drill
• Scenario 9: Most Severe Contingency – Part II – Event happens– Implement TSM Plan developed earlier– Check for new Most Severe Contingency
![Page 39: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/39.jpg)
Case Study
Day 2: Blackstart
![Page 40: DTS Experiences at Minnesota Power](https://reader036.vdocument.in/reader036/viewer/2022062407/56812ceb550346895d91ae7a/html5/thumbnails/40.jpg)
Observations• DTS has finally matured• DTS Requires Significant Support
– Engineering– Programming– Training
• Powerful Tool– Real life results can be achieved– Accepted by Operators