dzac may 2015. injury updates 2/24/2015-custodian –right wrist and thumb- recordable injury...
TRANSCRIPT
Injury Updates
• 2/24/2015-Custodian –Right wrist and thumb- Recordable Injury
• 3/30/2015-Rigger-Neck/Shoulder-Recordable Injury
• 4/1/2015-Electrician-Left arm elbow to wrist-First Aid
DZAC Action Items
DZAC Action Items
Issue Solution Location Reported
Date CATS # Status RIWorn signage on electrical pads Site wide 11-Feb-15 Tom Caronna
Access to pumps with tools is difficultD Galvez placed a work order to do a feasibility study-Janice will enter into cats following the study
Hill above Wilson slide October 8th In Progress Stan Tuholski
Dock at B 33 Overloaded with cages little room for deliveries
The cages are placed per regulatory requirements-Issues has been added to the list of items to be discussed as a lessons learned during project reviewinconsideration for future projects. B 33 October 8th Completed Stan Tuholski
Remodeling review needs to include assurance of access for maintenance
Asssess review has been incorporated into the project development process October 8th Resolved Stan Tuholski
B 90 one individual often gets 100 lb servers delivered-up stairs
Janice spoke to Sucan Synarski-Determining if the heavy servers can be delivered directly to B 50-which is where they end up going once they are worked on them or backup plan to find a secure place to have them delivered on a lower floor B 90-site wide October 8th Resolved Janice Sexson
Hill 17 drainage ditch overfill with loose soil
A geotechnical engineer reviewed this hillside this past August and did not express concern about the potential for large rocks falling down the hill. He walked the site with a vendor for soil netting
B 43 October 8th Resolved Janice Sexson