Cooling Tower Water Conservation Educator

My main focus is to introduce and educate interested individuals and companies about Maximum Sustainable Cooling Tower Water Conservation.

Shawn Bray 

• Founded in 1996• Experts in Cooling Tower Water Conservation• 19 Years Professional, Hands‐on Experience with Government and Private Sector• Focus on Performance, Efficiency, and Sustainability• Attaining Goals Through Sound and Proven Practices• Respected Manufacturer of Tested and Proven Water Saving Technologies• Members of  Professional Organizations Geared Towards Water Conservation in 

Large Buildings with Cooling Towers – Building Owners and Managers Association – Sustainability Committee Members, Alliance for Water Efficiency, EPA WaterSense Hotel Challenge, etc…

TERLYN INDUSTRIES

Maximum Sustainable Cooling Tower Water Conservation

• Maximum sustainable water conservation in cooling towers is the ability to conserve the greatest amount of water while maintaining complete system integrity... indefinitely.

Performance & Efficiency

• Must first control scale, minimize corrosion, and eliminate biological fouling, under all operating conditions.

Performance & Efficiency

• Sustainability also requires a comprehensive maintenance program to ensure the equipment is being properly maintained, is in good operating condition, and is performing at its peak design efficiency.

Technology and Performance

• Chemical water treatment programs are the most widely used means of protecting cooling tower systems. Of all the treatment products available for cooling towers, it is the scale inhibitor alone that determines the level of sustainable water conservation.

Conventional Scale Inhibitors

• Conventional scale inhibitors raise the saturation point of the condenser water to some degree, allowing more elements to be held in solution.  Although this reduces the amount of wastewater that must be dumped from the system, the performance is limited.  To control the elements in water and eliminate scale, conventional treatment programs require an average of 30% to 50% wastewater discharge to dilute the system water.

Emerging Scale Inhibitor Technology• The TERLYN CWT3 scale inhibitor is a hydrolytically stable, high strength chemistry that systematically controls cationic ions in water through sequestration, threshold stabilization, and crystal modification.  The extreme ionic potential of this chemistry creates a synergistic attraction, or bond between CWT3 and the scale forming elements in water.

Simplified Explanation• The TERLYN scale inhibitor has an incredibly strong negative charge. When it is introduced into the system water of a cooling tower, the positively charged scale forming elements are attracted to it and a powerful bond is created. Because it is completely water soluble, it holds the elements in solution until they are eventually discharged with the wastewater.

Program system’s sub‐meter both the makeup and bleed‐off water lines using impulse water meters with feedback to the control.  This allows the proper amounts of treatment based on actual system demand and to accurately monitor water consumption and wastewater loss.

A wall mount feed control panel incorporates a programmable microprocessor control system, precision self‐priming peristaltic feed pumps, monitoring probes, check valve injection ports, condenser water flow switch, and isolation valves, to create a clean, easily field‐installable package.

The control system is capable of off‐site remote monitoring and adjustment of a variety of system variables. Real‐time alarm warnings can be transmitted by email or text. The system can also be configured to communicate with building automation systems.

Emerging Technology

Study Sponsored by Denver Water

Key Speaker: Paul R. PuckoriusPuckorius & Associates, Inc.

Water & Waste Water ConsultantsArvada, Colorado

Water Treatment StudyCity & County of Denver

Presented by: Jason Millheim, LEED AP Denver Water

Water Conservation In Cooling TowersStudy Sponsored By Denver Water – March 2009

Water Treatment StudyFour Roof‐Top Units (RTU)

Each RTU is an independent system that serves a quadrant of the building

• Install same controls in each unit

• Results came down to water treatment only

• Units share equal load

• Units are on same roof‐top

Traditional  Chemical (set point 1,200)

High‐cycles Chemical(set point 2,000)

Improved Chemical (set point 7,000)

Electro Magnetic Pulse (set point 2,000)

Trad

ition

al Che

mical 

High‐cycles Che

mical 

Improved

 Che

mical 

Electro Magne

tic Pulse 

6 Year Total Water Savings

Small Tower (under 1000 ton)w/ Low Demand Load 

www.whitehouse.gov/administration/eop/ceq/sustainability

All government buildings must reduce their water use by

By

Parkshore Plaza Condominiums

During the first 2 years, system water consumption and wastewater discharge was reduced by 54.27%, saving 4,394,220 gallons of potable water for the community.

30 story high‐rise building with 120 luxury condominium units, a variety of retail businesses on the ground floor, and a highly rated fine dining restaurant. 

Project Details:Cooling Towers: 2Total Tonnage: 1200Manufacturer: EvapcoTotal Chillers: 1Heat Exchangers: 2Water/Sewer Cost: $14.12/1K gal. TERLYN ROI: 4 Months

Regatta Beach Club Resort

In the first 2 years, the system water consumption and wastewater discharge was reduced by 50.09%, saving 4,551,267 gallons of potable water for the community.

With over 300 units, Regatta Beach Club Resort is one of the largest beach front condominium communities on Clearwater Beach, FL.

Project Details:Cooling Towers: 2Total Tonnage: 1200Manufacturer: EvapcoTotal Chillers: 0Heat Exchangers: 2Water/Sewer Cost: $17.77/1K gal. TERLYN ROI: 3 Months

Bayfront Tower Condominiums

In the first 6 months, system water consumption and wastewater discharge was reduced by 50%, saving 2,144,100 gallons of potable water for the community.

868,000 square foot waterfront condominium houses 250 residential units and 11 commercial units.

Project Details:Cooling Towers: 3Total Tonnage: 933Manufacturer: MarleyTotal Chillers: 2Heat Pumps: 250Water/Sewer Cost: $8.90/1K gal. TERLYN ROI: 6 Months

Impact of Implementing Maximum Sustainable Cooling Tower Water

Conservation Program 1,000 ton unit$10.00/Kgal