e-moi helmut wenzel european monitoring initiative ncree/jrc workshop, tiapei, november 17. – 19....

47
E-MOI Helmut WENZEL Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

Upload: jonathan-blair

Post on 17-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

E-MOI

Helmut WENZELHelmut WENZEL

European Monitoring Initiative

NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

Page 2: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

FP6 2. Call for ProposalsFP6 2. Call for Proposals

Publication December 2003 Deadline Stage 1 2. March 2004 Deadline Stage 2 22. June 2004 Expected Outcome 100 Projects namely 25 IP‘s, funding 250 mio € (av. funding 10m€) 50 STREP‘s, funding 80 mio € (1,6 mio €) 10 CA, SSA, funding 20 mio € (2 mio €) 15 IP‘s for SME, funding 80 mio € (5,4 mio €)

Page 3: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Technical Contents 1Technical Contents 1

3.4.4.1 Human friendly, safe and efficient construction

IP’s Focus on new and breakthrough process re-engineering

approaches to provide novel, efficient and sustainable solutions for the built environment including infrastructure and transport utilities

Safety against unexpected events and damage Truly integrated research activities, including pre-normative

research, user oriented design, maintenance to demolition Full integration of stakeholders

Page 4: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Technical Contents 2Technical Contents 2

3.4.3.3 Optimising the life cycle of industrial systems, products and services

Support to the development of new knowledge based and sustainable processes and eco-innovation

Jointly with area 3.4.3.1 IP’s dedicated to SME’s Support the traditionally less RTD intensive sectors in the

development of more sustainable and safer processes A win-win solution for business and environment

Page 5: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Technical Contents 3Technical Contents 3

3.4.3.3 Optimising the life cycle of industrial systems, products and services

New life cycle optimised, safety and environmental technologies for industrial production

STREP’s Development of breakthrough approaches for reducing initial

investment and resource consumption, improving the whole life service operational costs

Support by key industrial stakeholders required

Page 6: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Technical Contents 4Technical Contents 4

3.4.3.2 System research and hazard control

Hazard reduction in production plant and storage sites IP‘s The objective is to support life cycle safety of industrial

production systems through new breakthrough approaches Safety aspects for prevention of accidents Strong industrial participation Synergy with national, regional and European Programs Integration of the candidate countries Involvement of all stakeholders

Page 7: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Technical Contents 5Technical Contents 5

3.4.3.1 Development of new processes and flexible, intelligent manufacturing systems

Support to the development of new knowledge-based added-value products and services in traditionally less RTD intensive industries

IP‘s dedicated to SME‘s The objective is to promote the shift of the industrial sectors

which are traditionally less RTD intensive to high-added- value sectors by 2010

Incorporation of emerging technologies driving new organisation paradigms in all phases of the complete/ extended value chain to allow knowledge based services

Page 8: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Enable outstanding StructuresEnable outstanding Structures

Page 9: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Aesthetics is a Problem sometimesAesthetics is a Problem sometimes

Page 10: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Condition of the Bridge ???Condition of the Bridge ???

Page 11: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Construction Quality MonitoringConstruction Quality Monitoring

Page 12: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Taiwan High Speed Railway / FaultTaiwan High Speed Railway / Fault

HSRFault

Elastic N ear Fault (Local C am pbell)

E lastic D istant from Fault

R educed R a=2.00 D istant from Fault

1.40

1.20

1.00

0.80

0.60

0.40

0.20

0.000.0 0.5 1.0 1.5 2.0 2.5

Period T (sec)

Res

po

nse

Acc

eler

atio

n (

g)

COMPARISON OF APPLICABLE TYPE / EARTHQUAKE SPECTRA

Page 13: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Anti Seismic Device on a BridgeAnti Seismic Device on a Bridge

Page 14: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Improve Mega ProjectsImprove Mega Projects

Page 15: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

What the Owners want to know :What the Owners want to know :

Aschach

Steinhäusel

Aistbrücke

P23a

S 101

Golling

Mittersill

Wartberg

Regau Ost

Rederbrücke

Oberberg

Pongau PORR Br.

Schwechat

Winden

Regau

LZ13

Innstraße 2

Innstraße 1

Taurach

Innstraße 5

Neutal

Innstraße 3

Innstraße 4

Schmiedgr.

Floridsdf. 2

Floridsdf. 1

C

0,84

0,77

A

0,19 0,19

0,33

0,15

0,33

0,230,25

0,07

0,29

0,34

0,21

0,24

0,29

0,23

B

0,35

0,350,40

Alte Donau

0,69

0,55

0,62

0,56

0,51

0,48

0,60,61

0,80

Gurkbrücke

0,47

0,29

B

Fleet StrategiesThere is Danger

Action required

Good Condition

Page 16: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Map of Map of monitored monitored Post Tensioned BridgesPost Tensioned Bridges

Page 17: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Natural Frequency – Main SpanNatural Frequency – Main Span

Frequency - Main Span

0,00

1,00

2,00

3,00

4,00

5,00

6,00

7,00

8,00

9,00

10,00

0,00 50,00 100,00 150,00 200,00 250,00 300,00 350,00

Main Span

Nat

ura

l Fre

qu

ency

Neural Network Applications

Page 18: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

FP6 2. Call for ProposalsFP6 2. Call for Proposals

Key dates Publication December 2003 Deadline Stage 1 2. March 2004 Deadline Stage 2 22. June 2004

We intend to submit 1 IP, funding request 15 mio € 2 STREP‘s, funding request 2 mio € each 1 SSA, funding 2 mio € 1 IP for SME’s, funding 8 mio €

Page 19: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Proposal Proposal EMASSEMASS

European Monitoring and Assessment Support System

3.4.4.1 Human friendly, safe and efficient construction

IP 30 Partners, 40 mio € budget, 15 mio €

funding

Page 20: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Tra

nsp

orta

tion

Ind

ust

ry,

Em

bed

ded

Se

nso

rs,

LIC

YM

OS

Brid

ge

Ass

ess

me

nt, D

ata

ba

seE

nvi

ron

me

nta

l Co

ndi

tions

Exp lo ita tion Shell

NAS Integration Shell

EUREKANational Program s

andRelated Initiatives

C R A FTPro jects

C O S TActions

In ternationa l C ollaboration

Ass

essm

en

t of H

igh

-ris

e

Bu

ildin

gs,

Win

d Lo

ads

Sm

art S

tru

ctu

res,

TE

SS

Re

-eva

luat

ion

of B

uild

ing

s,N

atu

ral H

aza

rds

Inte

grat

ed M

on

itorin

g o

f W

ind

En

ergy

Pla

nts

V6 V5 V3 V1 V2 V4

Laboratory Tests &D em onstra tion

R isk Assessm ent, L ife C ycle E ngineering

Standard ization, European D ata R eader & Form at

E-DEC IS Expert System s

Sensor Developm ent

D am age D etection,System Identification

H 6

H 5

H 4

H 3

H 2

H 1

Database and Document

Exchange Platform

IS iS , C anada

M r. M ufti

A IT, Tha iland

M r. N ukulcha i

M anagem ent ShellSteering Tools

N S F, U S A R IE S D P, Japan N C R E E , C h ina

M rs. Pauschke M r. O htan i M r. Loh

W P 1 W P 2 W P 3 W P 4 W P X

OBJ 1

OBJ 2

OBJ 3

OBJ X

OBJ 1

OBJ 2

OBJ 3

OBJ X

OBJ 1

OBJ 2

OBJ 3OBJ X

OBJ 1

OBJ 2

OBJ 3

OBJ X

OBJ 1

OBJ 2

OBJ 3

OBJ X

W P 1 W P 2 W P 3 W P 4 W P X

OBJ 1

OBJ 2

OBJ 3

OBJ X

OBJ 1

OBJ 2

OBJ 3

OBJ X

OBJ 1

OBJ 2

OBJ 3OBJ X

OBJ 1

OBJ 2

OBJ 3

OBJ X

OBJ 1

OBJ 2

OBJ 3

OBJ X

Levels of Objectives in E-MOI Levels of Objectives in E-MOI

E M O I

Page 21: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Avoid drastic ExperiencesAvoid drastic Experiences

Page 22: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Messina Straits Bridge, 3,3km spanMessina Straits Bridge, 3,3km span

Page 23: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Quality Control during ConstructionQuality Control during Construction

Page 24: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

System Error after ConstructionSystem Error after Construction

0

10

20

30

40

50

60

0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0

Hz

1998

1997

1,68 Hz

2,77 Hz

3,20 Hz3,66 Hz

2,02 Hz

3,88 Hz

Page 25: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Benchmark Tests with AutopsyBenchmark Tests with Autopsy

Page 26: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Extreme Loading ConditionsExtreme Loading Conditions

Page 27: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Not only focused on BridgesNot only focused on Bridges

Page 28: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Protecting ourProtecting our Cultural Heritage Cultural Heritage

Page 29: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Monitoring LandslidesMonitoring Landslides

30

Page 30: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Avoiding wrong Decisions Avoiding wrong Decisions

proximity to the fault strong ground

shaking surface fault rupture amplification

Page 31: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Monitoring of Machinery Monitoring of Machinery

Page 32: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Fabrication of 400MW TurbineFabrication of 400MW Turbine

Page 33: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Recognise Damages in TimeRecognise Damages in Time

Page 34: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Monitoring of Rolling Stock FleetMonitoring of Rolling Stock Fleet

Page 35: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Remote sensingRemote sensing

• data acquisition of wide area• weather independent• continuous observations • data sources back to early 1970’s• ground resolution up to 1 - 30m

• compatibility to ENVISAT

Page 36: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Remote sensing with InSARRemote sensing with InSAR

IMGI Uni Innsbruck

SAR- Interferogramm with amplitude overlay

Velocity field of landslide

Page 37: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Kinematics of IcelandKinematics of Iceland

Annual periodicity of spreading motion in Iceland

Periodical seismicity of the South Icelandic Seismic Zone in times of seismic unrest

Page 38: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Thinking globallyThinking globally

Page 39: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Harmonisation : Green Eye WriterHarmonisation : Green Eye Writer

File Description Comment

Author

DataDate, Time

Page 40: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Meta Data Protocol : Green Eye WriterMeta Data Protocol : Green Eye Writer

No bulls No bulls without without StandardsStandards

Page 41: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Proposal Proposal SALMAPSSALMAPS

Safety Assessment and Lifetime Management of Piping Systems

3.4.3.3 Optimising the life cycle of industrial systems, products and services

STREP 10 Partner, 5 mio € budget, funding 2 mio €

Page 42: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Pipelines in Nuclear Power PlantsPipelines in Nuclear Power Plants

1.570

4.980

2 ->

1.500

2.593

3 ->

2.480

2.300

2.300

2.300

2.300

2.333

2.333

2.333

1.500

10

20 30 40

750

730 60 70

80 90 100

110

120

130

140 150

160

170 180

190

200 210 400

405 407 410

520

500

510 530 540

550

560

570 580

590 740 610

620

630

640

650

660

670

680

700

710

720

760

WBI WBI Woelfel Beratende Ingenieure Max-Planck-Str. 15 D-97204 Hoechberg/Wuerzburg

ROHR2Commiss. Raw Gas Pipe Line - Birlik Date 28.06.01 16:13:22

Project Lastfall Eigenlast

Drawing S t a t i c s y s t e m

-------- Legend : Line -> (direction)

Int spring

Point mass

Anchorpoint

w-support

p-support

Z

1 : 13 5 Pipes and supporting structure: 3 -D Pipes

Page 43: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Proposal Proposal DECISDECIS

Decision Support and Alert System for the built Environment, Structures and Components

3.4.3.3 Optimising the life cycle of industrial systems, products and services

IP dedicated to SME’s

Page 44: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Knowledge based SystemsKnowledge based Systems

Page 45: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

Demand : „Health Monitoring“Demand : „Health Monitoring“

Page 46: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

We should always be able to helpWe should always be able to help

Page 47: E-MOI Helmut WENZEL European Monitoring Initiative NCREE/JRC Workshop, Tiapei, November 17. – 19. 2003

NCREE/JRC WS Taiwan 2003

International Relations essential

Only a global effort will bring the next big step forward