EAR2 Beam Line Report on the Status C. Weiss 28.11.2013 EAR2 Beam Line - Report on the Status 1

Upload: warren-randall

Post on 06-Jan-2018

219 views

Category:

Documents


4 download

DESCRIPTION

Beam Line - Design Considerations 1.Exchangeable components in order to allow new target installation (2018). 2.Minimum background to the experiment. 3.Maximum neutron fluence to the experiment. 4.Acceptable dose rate in working area close to beam line (0.5  Sv/h in ISR). 5.Maximum flexibility for experiment installation (capture & fission setup). 6.Automatic alignment with neutron beam. 7.Feasibility :-)! EAR2 Beam Line - Report on the Status3

TRANSCRIPT

Page 1: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 1

EAR2 Beam LineReport on the Status

C. Weiss

28.11.2013

Page 2: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 228.11.2013

Beam Dump

EAR-2 Exp. Hall

2nd Collimator

Magnet

Pit Shielding

Target

New Area

Existing Area1st Collimator

Filter Box

Shielding

Service Gallery

ISR Tunnel

h [m]

0

9.8

18.1

24.4

EAR1

Page 3: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 3

Beam Line - Design Considerations

1. Exchangeable components in order to allow new target installation (2018).

2. Minimum background to the experiment.3. Maximum neutron fluence to the experiment.4. Acceptable dose rate in working area close to beam line (0.5

mSv/h in ISR).5. Maximum flexibility for experiment installation (capture &

fission setup).6. Automatic alignment with neutron beam.7. Feasibility :-)!

28.11.2013

Page 4: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 4

VACUUM CHAMBERS

28.11.2013

Page 5: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 528.11.2013

Special vacuum chamber at the beam dump with inserted shielding material

(avoid backscattered neutrons).

Target

Special vacuum chamber at the 2nd collimator, to allow the insertion of the

collimator and to optimize shielding.

Special vacuum chamber to get as close as possible to the target and allow

material irradiations close to target.

SiMon: carbon fibre vacuum chamber(LNS / INFN).

Page 6: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 6

n_TOF Target from the Top

28.11.2013

Opening on top of the spallation target structure EAR2 TOF tube goes through there

Page 7: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 7

Vacuum Chamber 1• 8.9 m total length:

– ‘Triangular’ shape for the first 1.1 m– Cylindrical shape (d = 317.9 mm) from top of target onwards

• Window: 1.5 mm Al, concave shape • 12 mm gap of air btw. target and window

28.11.2013

Page 8: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 8

Production on-going

28.11.2013

Vacuum chamber 1

Page 9: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 928.11.2013

New guidings for irradiation on targetBasket Ø160

Vacuum chamber 1

Page 10: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 10

COLLIMATORS

28.11.2013

Page 11: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 11

Collimators

• Decisions on beam parameters: n_TOF coll. meeting May – capture beam n_TOF tech. meeting in Sept. – fission beam

• 2nd collimator: 2 m Fe + 1 m PE (with B or Li)• 1st collimator: 1 m Fe

28.11.2013

Measurement Collimator & Shape Inner Diameter [mm]

Capture 2nd: conical d2 = 20d1 = 69

1st: cylindrical d0 = 200

Fission 2nd: conical d2 = 85.6d1 = 124.6

Page 12: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 12

1st Collimator

28.11.2013

Shutter replaced with vacuum chamber

Collimator 1:1 m Fe dinner = 200 mm(will be inserted in vacuum chamber 1)

Magnet

Page 13: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 13

PE (+B or Li) core 260 kg

1.5 m

2 m

1 m

Steel core 2 t

Steel vacuum vessel 5 t

28.11.2013

2nd Collimator

Page 14: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 1428.11.2013

2nd CollimatorMultiple-step design

as conical is not machinable!

Page 15: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 15

BEAM LINE SHIELDING

28.11.2013

Page 16: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

→ Additional shielding layer on the floor of EAR2 for background reduction.

→ Steel balls above service gallery.

→ 1.5 m concrete right above service gallery.

→ Fe collar at the level of 1st collimator.

→ Concrete around beam pipe up to service gallery.

h [m

]

0

9.8

18.1

Target

Service Gallery

Page 17: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 17

Service Gallery

Section 1

Section 2

Section 3

Section 4

Shielded Pit

Section 1Section 2

Centering pins

Section 3Section 4

28.11.2013

Target

Page 18: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 18

New Concrete Shieldings

28.11.2013

Page 19: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 19

Steel forms for concrete taps Green light for production

28.11.2013

Concrete Tap Blocks

Page 20: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 20

1.5 m

2 m

1 m

St steel balls 3 t (0.6m³)

Concrete 1.1 t

28.11.2013

Shielding above Service Gallery

Page 21: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 21

SERVICE GALLERY - MAGNET AND FILTER BOX

28.11.2013

Page 22: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 22

Magnet and Filter Box

28.11.2013

Filter Box

Permanent Magnet: 0.2 Tm

ready by end 2013

1st collimator in ‘storage position’

Ducts for steel ball removal

Page 23: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 23

Filter Box

*Proposed by E. Berthoumieux, F. Gunsing and C. Lederer

28.11.2013

Filter EAR1Available

EAR2Proposed

d [mm]

Cd* ✗ 0.5

Ag ✔ 0.5

W* ✔ 0.8

Mo* ✔ 1

Co* ✔ 0.25

Na* ✗ 10

Al* ✔ / ✔ 30 / 80

S* ✗ 80

C ✔ 60

Page 24: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 24

Filter Box

EAR2: 276 mm available length, each filter: 350 x 350 mm2

28.11.2013

Filter EAR1Available

EAR2Proposed

d [mm]

Cd* ✗ ? 0.5

Ag ✔ ✔ 0.5

W* ✔ ✔ 0.8

Mo* ✔ ✔ 1

Co* ✔ ✔ 0.25

Na* ✗ ✔ 10

Al* ✔ / ✔ ✔ / ✗ 30 / 80

S* ✗ ✔ 80

C ✔ ? 60

Page 25: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 25

Filters: Transmission Probabilities

28.11.2013

Page 26: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 26

BEAM DUMP

28.11.2013

Page 27: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 27

Beam Dump

28.11.2013

Design constraints: Background situation in EAR2

(n_TOF) Dose rate outside

(Radioprotection) Maximum weight

(Civil Engineering)

Outer dimensions (to be confirmed by RP):1. Concrete: 3.2 x 3.2 x 2.4 m3

2. Iron: 1.6 x 1.6 x 1.6 m3

Page 28: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 28

Beam Dump Entrance

28.11.2013

Vacuum chamber Ø200

Borated polyethylene

Borated polyethylene

Concrete block

Gap 60mm

Alignment accuracy to be defined!

Al window (300 mm)

Page 29: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 29

EXPERIMENTAL AREA

28.11.2013

Page 30: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 30

Additional Shielding in EAR2

28.11.2013

Additional shielding below beam dump.

Additional shielding above 2nd collimator = false floor (20 cm).

C6D6 detectors in FLUKA.

Page 31: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 31

Capture Setup

28.11.2013

- SiMon and sample exchanger (INFN) included in model.

- Support for sample exchanger to be modified (less material, detector closer to sample).

- Beam-line reductions before and after sample not included yet.

- Small Kapton windows planned before and after sample (like in EAR1).

- Valve below SiMon (vacuum + safety).

- Additional shielding not included yet (false floor + below beam dump).

Page 32: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 32

Capture Setup

28.11.2013

Vacuum Valve

1 m from beam centre to pillars

Page 33: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 33

Capture + Fission Setup

28.11.2013

- Top part of the beam line will have to be dismantled before the crane can be used.

- Vacuum chamber with inserted shielding different for capture and fission => also needs to be removed when changing the collimators.

Page 34: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 34

From Capture to Fission(and reverse!)

28.11.2013

Vac. chamber + shielding in roof

To be dismantled and remounted:

Beam Line + Detectors

2nd Collimator

False Floor = Shielding

1st Collimator in Service Gallery!

4-5 days!

Page 35: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 35

6LI OR 10B

28.11.2013

Page 36: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 36

Investigations

• Use 6Li(n,a)3H instead of 10B(n,a)7Li for 2nd collimator and all shielding material in EAR2.

• Cross-section of 6Li(n,a)3H is 4 times smaller than 10B(n,a)7Li – higher neutron background expected.

• See presentation of Silvia for details about the simulations.

• Available material: 7.5% natLithium-Polyethylene.

• Material properties: machinable like normal PE, no safety issues reported.

• Budget: Approximately 10 000 Euros for 1 m3.

28.11.2013

Page 37: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 37

CONCLUSIONS

28.11.2013

Page 38: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 38

Conclusions

• Production started for various elements:• Vacuum chamber 1• All needed bellows• Magnet (almost ready)

• To be decided:? Filters (proposed: Ag, W, Mo, Co, Na, Al, S)? 10B or 6Li? Monitoring system (capture)? Error margins for beam dump alignment? Safety margins for vacuum chambers inside EAR2

• To Do: • Supports (detectors, sample exchanger, etc.)• Equipment in EAR2 (tools, sources, etc.)

28.11.2013

Page 39: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 39

Master Mind Sylvain Girod

28.11.2013

Page 40: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 40

WHAT HAVE WE FORGOTTEN?Thank you for your attention!

28.11.2013

Page 41: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 41

BACKUP

28.11.2013

Page 42: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 42

1.5 m

2 m

1 m

28.11.2013

Collimator 2Material

Thickness 20 mm

Gap 60 mm

Minimum aperture Ø320 mm

Pit Ø800 mm

175 mm available for chicanes on radius.(Here 3x58mm)

Maximum gap: 2mm

Page 43: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

→ Additional shielding layer at the floor of EAR2 for background reduction

→ Steel balls above service gallery

→ 1 m Concrete right above service gallery

→ Fe + Concrete wall in ISR tunnel

→ Fe collar at the level of 1st collimator

→ Concrete around beam pipe up to service gallery

Page 44: EAR2 Beam Line Report on the Status C. Weiss 28.11.2013EAR2 Beam Line - Report on the Status1

EAR2 Beam Line - Report on the Status 44

1st Collimator: Removal

1. The green shielding is brought above the collimator with a trolley on the rails

2. The collimator is lifted inside the green shielding with a hoist

3. The rails guide the trolley to the storage position

4. The collimator is lowered in the storage pit

28.11.2013

Hoist 0.5t