east of england c&d waste arisings maggie blackwell resource efficiency
TRANSCRIPT
East of England C&D Waste Arisings
Maggie BlackwellResource Efficiency
Project Aims
The objectives of this pilot project were :• To demonstrate the potential to collect C&D data for waste
planning from tools such as SMARTWaste Plan• To determine the limitations of the data available• To determine where there are data gaps and• To produce recommendations for improved data and
recommendations for waste minimisation.
Additional aims
The information available has been used to produce:
• An estimate of C&D waste arisings for the East of England broken down into waste type. Information about the amount of waste reused or recycled (on or off site) and sent to landfill.
• Information about the quantities and types of waste collected and managed in each county/unitary authority.
• A forecast of waste arisings on an annual basis to 2031.• Recommendations for reducing C&D waste sent to landfill.
Production of performance indicators
Data from completed projects on the SMARTStart and SMARTWaste Plan tools has been used to produce the following performance indicators:
• Volume/tonnes waste produced per 100m2 floor area• Volume/tonnes waste produced per £100K project value• Volume/tonnes waste produced by waste product type per 100m2 floor
area• Volume/tonnes waste produced by waste product type per £100K
project value
Project types
Performance indicators have been produced for new build construction projects and for refurbishment projects for the following project classifications:
Residential Flats, houses, military accomodation
Public Buildings Museums, fire/police stations, gov. admin
Leisure Hotels, swimming pools, sports halls, theatre
Industrial Buildings Scientific labs, heavy industry, farm buildings
Healthcare Health centres, hospitals
Education Primary schools, universities, high schools
Commercial Offices Institutional, suites, call centres
Commercial Retail Supermarket, department store, warehouse
Civil Engineering Bridges, roads, utilities, airport
New build construction performance indicators
No. projects
Tonnes waste per 100m2 floor area
No. projects
Tonnes waste per £100K project value
Average Median Average Median
Residential 162 20.7 13.9 159 20.4 14.5
Commercial Office
36 24.9 17.4 35 24.6 13.2
Commercial Retail
41 20.7 14.8 45 11.9 9.3
Education 29 43.6 23.2 37 35.3 17.7
Healthcare 19 21.9 12.3 17 10.2 7.4
Other Performance Indicators
• Refurbishment projects - a set of performance indicators similar to those for new build projects has been produced for refurbishment projects
• Demolition projects - not enough data was available from SMARTWaste about completed demolition projects to produce reliable performance indicators
• Excavation work - SMARTWaste Plan has the option of entering the work package for waste arisings (e.g. demolition, excavation or construction). However, not enough information is currently available to produce performance indicators for excavation waste.
Other sources of waste data used
• Construction Statistics Annual and National Statistics website – data about construction output from these sources has been used in estimation of waste arisings.
• National Federation of Demolition Contractors (NFDC) – data from the NFDC has been used to assist with estimating demolition waste arisings.
• Communities and Local Government Survey of Arisings and Use of Alternatives to Primary Aggregates in England, 2005 – this has been used to assist with estimating excavation waste arisings.
Estimate of new build construction waste arisings for East of England, 2008
Process Data used Estimated waste arising, Tonnes
New build residential construction
Performance indicator from SMARTWaste Plan and SMARTStart = 20.4 Tonnes/£100K
Construction Statistics Annual data on residential new build construction output (£1,851 Million for 2008)
377,604
Other new build construction
Performance indicator from SMARTWaste Plan and SMARTStart = 22.4 Tonnes/£100K
Construction Statistics Annual data on other new build construction output (£3,623 Million for 2008)
811,552
Estimate of refurbishment waste arisings for East of England, 2008
Process Data used Estimated waste arising, Tonnes
Residential refurbishment
Performance indicator from SMARTWaste Plan and SMARTStart = 30.7 Tonnes/£100K
Construction Statistics Annual data on residential repair and maintenance construction output (£3,314 Million for 2008)
1,017,398
Other refurbishment
Performance indicator from SMARTWaste Plan and SMARTStart = 13.0 Tonnes/£100K
Construction Statistics Annual data on other repair and maintenance construction output (£3,142 Million for 2008)
408,460
Estimate of demolition waste arisings for East of England, 2008
Process Data used Estimated waste arising, Tonnes
Demolition work NFDC data on demolition waste arisings (36,124,258 Tonnes for Great Britain)
Construction Statistics Annual information on regional breakdown of demolition work (East of England 12.7% of Great Britain total)
4,587,781
Estimate of excavation waste arisings for East of England, 2008
Process Data used Estimated waste arising, Tonnes
Excavation waste
Communities and Local Government Survey of Arisings and Use of Alternative to Primary Aggregates in England, 2005
3,121,304
Estimate of total C&D waste arisings for East of England, 2008
Process Waste arising, Tonnes
New build construction 1,189,156
Refurbishment 1,425,858
Demolition 4,587,781
Excavation 3,121,304
Total 10,324,100
N.B. No estimate of waste arising from exempt activities has been made
Estimate of total C&D waste arisings for East of England, 2008
East of England total waste arisings (Tonnes)
377,604
811,552
1,017,398
408,460
3,479,877
3,121,304
Residential new build
Other new build
Residentialrefurbishment
Other refurbishmentwork
Demolition
Excavation
Estimate of waste arising by waste type for East of England, 2008
• Performance indicators for individual waste products have also been produced from completed projects on SMARTStart and SMARTWaste Plan
• These performance indicators have been applied to construction output to provide an estimate of waste arising by product from new build construction and refurbishment
Waste type
Estimated arisings, East of England, 2008 (Tonnes)
Asphalt and tar 49,809
Bricks 279,664
Concrete 447,736
Gypsum 81,912
Inert 671,601
Insulation 35,157
Metals 62,536
Packaging 78,825
Timber 183,263
Waste management options
Completed SMARTWaste Plan projects were analysed to determine the waste management methods used overall and for different waste products.
Waste management option
All projects except civil engineering
Civil Engineering projects
Reuse off site 14.1% 66.3%
Recycle off site 20.1% 0.0%
Recovery off site 38.6% 0.0%
Disposal Off site 12.2% 31.6%
Reuse on site 1.5% 0.0%
Recycle on site 7.3% 0.0%
Recovery on site 4.9% 0.0%
Disposal on site 1.2% 0.0%
Total 100.0% 97.9%
Waste management options by waste type
• Detailed analysis of the data from completed projects on SMARTWaste Plan was carried out to determine the waste management methods for each waste type.
• An estimate of amounts of waste reused, recycled, recovered or disposed on and off site from new build and refurbishment has been made for East of England, 2008.
E.g. timber waste arisings for the East of England, 2008 were estimated to be 183,263 tonnes and it has been estimated that 34% of timber is recovered off-site. This gives an estimate of timber recovered off-site in the East of England of 62,685 tonnes.
• A summary for the main waste products is shown
Estimate of waste arising from new build construction managed in East of England, 2008
Estimate of amount of waste managed in East of England, 2008
0
50,000
100,000
150,000
200,000
250,000
Dispos
al of
fsite
Recov
ery o
ffsite
Recyc
le offs
ite
Reuse
offs
ite
Dispos
al on
site
Recov
ery o
nsite
Recyc
le ons
ite
Reuse
ons
ite
Waste management option
Ton
nes
was
te
Asphalt and tar
Bricks
Concrete
Gypsum
Packaging
Timber
Inert
Estimate of waste arising from new build construction managed in East of England, 2008
• Results show that the majority of waste (84%) is managed off site and that the majority of bricks, inert and concrete wastes are reused or recycled
• Data from the RATS Interrogator about the origins of waste received at waste management sites has not been considered in this project
Trends in waste arisings
• Performance indicators have been used to estimate waste arisings from 1996-2008 based on construction output.
• There has been a steady increase from 1996 to 2007.
• In 2008, there was a slight decrease in line with the economic downturn.
• Information from the NFDC also shows a slight decrease from 2007.
Trend in construction output/waste arisings
Trend in construction output/waste arisings
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
Year
Est
imat
ed w
aste
aris
ings
(T
onne
s)
All new housing
Other new work
Housing repairandmaintenanceOther repairandmaintenance
Forecasts of C&D waste arisings, East of England
• Performance indicators produced from SMARTWaste Plan can be used to forecast waste arisings if information on project value or floor area is available
• Data is available on predicted residential new build construction from the Regional Spatial Strategy– Based on this information, it is estimated that waste arisings from
residential new build in East of England will remain steady at approximately 484,000 Tonnes/annum from 2010 to 2031.
• More data on other planned construction activity such as education, healthcare and road-building projects is needed to forecast waste arisings.
Conclusions
• Data from the SMARTWaste system can be used to produce performance indicators
• The performance indicators for new build and refurbishment projects can be used to estimate waste arisings
• For demolition and excavation, alternative sources of information have been used to estimate waste arisings
• Waste arisings from exempt activities have not been included.
Conclusions
• More information on construction output for specific project types such as education and commercial projects is needed to assist with estimating and forecasting waste arisings.
• More information is needed at a district level as this is currently limited to residential new build.
Recommendations for waste minimisation
• SMARTWaste Plan collects information on waste minimisation actions used together with the users views on how effective these actions have been.
• This information has been analysed to determine the waste minimisation actions most commonly used and these include:– Site levels designed to minimise excavation
– Waste concrete re-used as fill on site
– Pre-fabrication e.g. timber frame off-site
– Plasterboard – improved storage to minimise damage, waste sent to manufacturer for recycling and changing specification to minimise cutting
Recommendations for improving data available
• SMARTWaste Plan should be amended to:– Include information on exempt activities– Require information on work package of waste e.g. demolition,
excavation, new build to be entered– Make the tool more applicable to civil engineering projects
• It is recommended that local authorities request a Site Waste Management Plan and that a tool such as SMARTWaste be used. This will allow more data to be collected which can be aggregated and analysed to inform waste policy