Page 1: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

East of England C&D Waste Arisings

Maggie BlackwellResource Efficiency

Page 2: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Project Aims

The objectives of this pilot project were :• To demonstrate the potential to collect C&D data for waste

planning from tools such as SMARTWaste Plan• To determine the limitations of the data available• To determine where there are data gaps and• To produce recommendations for improved data and

recommendations for waste minimisation.

Page 3: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Additional aims

The information available has been used to produce:

• An estimate of C&D waste arisings for the East of England broken down into waste type. Information about the amount of waste reused or recycled (on or off site) and sent to landfill.

• Information about the quantities and types of waste collected and managed in each county/unitary authority.

• A forecast of waste arisings on an annual basis to 2031.• Recommendations for reducing C&D waste sent to landfill.

Page 4: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Production of performance indicators

Data from completed projects on the SMARTStart and SMARTWaste Plan tools has been used to produce the following performance indicators:

• Volume/tonnes waste produced per 100m2 floor area• Volume/tonnes waste produced per £100K project value• Volume/tonnes waste produced by waste product type per 100m2 floor

area• Volume/tonnes waste produced by waste product type per £100K

project value

Page 5: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Project types

Performance indicators have been produced for new build construction projects and for refurbishment projects for the following project classifications:

Residential Flats, houses, military accomodation

Public Buildings Museums, fire/police stations, gov. admin

Leisure Hotels, swimming pools, sports halls, theatre

Industrial Buildings Scientific labs, heavy industry, farm buildings

Healthcare Health centres, hospitals

Education Primary schools, universities, high schools

Commercial Offices Institutional, suites, call centres

Commercial Retail Supermarket, department store, warehouse

Civil Engineering Bridges, roads, utilities, airport

Page 6: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

New build construction performance indicators

No. projects

Tonnes waste per 100m2 floor area

No. projects

Tonnes waste per £100K project value

Average Median Average Median

Residential 162 20.7 13.9 159 20.4 14.5

Commercial Office

36 24.9 17.4 35 24.6 13.2

Commercial Retail

41 20.7 14.8 45 11.9 9.3

Education 29 43.6 23.2 37 35.3 17.7

Healthcare 19 21.9 12.3 17 10.2 7.4

Page 7: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Other Performance Indicators

• Refurbishment projects - a set of performance indicators similar to those for new build projects has been produced for refurbishment projects

• Demolition projects - not enough data was available from SMARTWaste about completed demolition projects to produce reliable performance indicators

• Excavation work - SMARTWaste Plan has the option of entering the work package for waste arisings (e.g. demolition, excavation or construction). However, not enough information is currently available to produce performance indicators for excavation waste.

Page 8: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Other sources of waste data used

• Construction Statistics Annual and National Statistics website – data about construction output from these sources has been used in estimation of waste arisings.

• National Federation of Demolition Contractors (NFDC) – data from the NFDC has been used to assist with estimating demolition waste arisings.

• Communities and Local Government Survey of Arisings and Use of Alternatives to Primary Aggregates in England, 2005 – this has been used to assist with estimating excavation waste arisings.

Page 9: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Estimate of new build construction waste arisings for East of England, 2008

Process Data used Estimated waste arising, Tonnes

New build residential construction

Performance indicator from SMARTWaste Plan and SMARTStart = 20.4 Tonnes/£100K

Construction Statistics Annual data on residential new build construction output (£1,851 Million for 2008)

377,604

Other new build construction

Performance indicator from SMARTWaste Plan and SMARTStart = 22.4 Tonnes/£100K

Construction Statistics Annual data on other new build construction output (£3,623 Million for 2008)

811,552

Page 10: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Estimate of refurbishment waste arisings for East of England, 2008

Process Data used Estimated waste arising, Tonnes

Residential refurbishment

Performance indicator from SMARTWaste Plan and SMARTStart = 30.7 Tonnes/£100K

Construction Statistics Annual data on residential repair and maintenance construction output (£3,314 Million for 2008)

1,017,398

Other refurbishment

Performance indicator from SMARTWaste Plan and SMARTStart = 13.0 Tonnes/£100K

Construction Statistics Annual data on other repair and maintenance construction output (£3,142 Million for 2008)

408,460

Page 11: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Estimate of demolition waste arisings for East of England, 2008

Process Data used Estimated waste arising, Tonnes

Demolition work NFDC data on demolition waste arisings (36,124,258 Tonnes for Great Britain)

Construction Statistics Annual information on regional breakdown of demolition work (East of England 12.7% of Great Britain total)

4,587,781

Page 12: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Estimate of excavation waste arisings for East of England, 2008

Process Data used Estimated waste arising, Tonnes

Excavation waste

Communities and Local Government Survey of Arisings and Use of Alternative to Primary Aggregates in England, 2005

3,121,304

Page 13: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Estimate of total C&D waste arisings for East of England, 2008

Process Waste arising, Tonnes

New build construction 1,189,156

Refurbishment 1,425,858

Demolition 4,587,781

Excavation 3,121,304

Total 10,324,100

N.B. No estimate of waste arising from exempt activities has been made

Page 14: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Estimate of total C&D waste arisings for East of England, 2008

East of England total waste arisings (Tonnes)

377,604

811,552

1,017,398

408,460

3,479,877

3,121,304

Residential new build

Other new build

Residentialrefurbishment

Other refurbishmentwork

Demolition

Excavation

Page 15: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Estimate of waste arising by waste type for East of England, 2008

• Performance indicators for individual waste products have also been produced from completed projects on SMARTStart and SMARTWaste Plan

• These performance indicators have been applied to construction output to provide an estimate of waste arising by product from new build construction and refurbishment

Waste type

Estimated arisings, East of England, 2008 (Tonnes)

Asphalt and tar 49,809

Bricks 279,664

Concrete 447,736

Gypsum 81,912

Inert 671,601

Insulation 35,157

Metals 62,536

Packaging 78,825

Timber 183,263

Page 16: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Waste management options

Completed SMARTWaste Plan projects were analysed to determine the waste management methods used overall and for different waste products.

Waste management option

All projects except civil engineering

Civil Engineering projects

Reuse off site 14.1% 66.3%

Recycle off site 20.1% 0.0%

Recovery off site 38.6% 0.0%

Disposal Off site 12.2% 31.6%

Reuse on site 1.5% 0.0%

Recycle on site 7.3% 0.0%

Recovery on site 4.9% 0.0%

Disposal on site 1.2% 0.0%

Total 100.0% 97.9%

Page 17: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Waste management options by waste type

• Detailed analysis of the data from completed projects on SMARTWaste Plan was carried out to determine the waste management methods for each waste type.

• An estimate of amounts of waste reused, recycled, recovered or disposed on and off site from new build and refurbishment has been made for East of England, 2008.

E.g. timber waste arisings for the East of England, 2008 were estimated to be 183,263 tonnes and it has been estimated that 34% of timber is recovered off-site. This gives an estimate of timber recovered off-site in the East of England of 62,685 tonnes.

• A summary for the main waste products is shown

Page 18: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Estimate of waste arising from new build construction managed in East of England, 2008

Estimate of amount of waste managed in East of England, 2008

0

50,000

100,000

150,000

200,000

250,000

Dispos

al of

fsite

Recov

ery o

ffsite

Recyc

le offs

ite

Reuse

offs

ite

Dispos

al on

site

Recov

ery o

nsite

Recyc

le ons

ite

Reuse

ons

ite

Waste management option

Ton

nes

was

te

Asphalt and tar

Bricks

Concrete

Gypsum

Packaging

Timber

Inert

Page 19: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Estimate of waste arising from new build construction managed in East of England, 2008

• Results show that the majority of waste (84%) is managed off site and that the majority of bricks, inert and concrete wastes are reused or recycled

• Data from the RATS Interrogator about the origins of waste received at waste management sites has not been considered in this project

Page 20: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Trends in waste arisings

• Performance indicators have been used to estimate waste arisings from 1996-2008 based on construction output.

• There has been a steady increase from 1996 to 2007.

• In 2008, there was a slight decrease in line with the economic downturn.

• Information from the NFDC also shows a slight decrease from 2007.

Page 21: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Trend in construction output/waste arisings

Trend in construction output/waste arisings

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

Year

Est

imat

ed w

aste

aris

ings

(T

onne

s)

All new housing

Other new work

Housing repairandmaintenanceOther repairandmaintenance

Page 22: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Forecasts of C&D waste arisings, East of England

• Performance indicators produced from SMARTWaste Plan can be used to forecast waste arisings if information on project value or floor area is available

• Data is available on predicted residential new build construction from the Regional Spatial Strategy– Based on this information, it is estimated that waste arisings from

residential new build in East of England will remain steady at approximately 484,000 Tonnes/annum from 2010 to 2031.

• More data on other planned construction activity such as education, healthcare and road-building projects is needed to forecast waste arisings.

Page 23: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Conclusions

• Data from the SMARTWaste system can be used to produce performance indicators

• The performance indicators for new build and refurbishment projects can be used to estimate waste arisings

• For demolition and excavation, alternative sources of information have been used to estimate waste arisings

• Waste arisings from exempt activities have not been included.

Page 24: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Conclusions

• More information on construction output for specific project types such as education and commercial projects is needed to assist with estimating and forecasting waste arisings.

• More information is needed at a district level as this is currently limited to residential new build.

Page 25: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Recommendations for waste minimisation

• SMARTWaste Plan collects information on waste minimisation actions used together with the users views on how effective these actions have been.

• This information has been analysed to determine the waste minimisation actions most commonly used and these include:– Site levels designed to minimise excavation

– Waste concrete re-used as fill on site

– Pre-fabrication e.g. timber frame off-site

– Plasterboard – improved storage to minimise damage, waste sent to manufacturer for recycling and changing specification to minimise cutting

Page 26: East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency

Recommendations for improving data available

• SMARTWaste Plan should be amended to:– Include information on exempt activities– Require information on work package of waste e.g. demolition,

excavation, new build to be entered– Make the tool more applicable to civil engineering projects

• It is recommended that local authorities request a Site Waste Management Plan and that a tool such as SMARTWaste be used. This will allow more data to be collected which can be aggregated and analysed to inform waste policy