easyway -ro es 1 traffic info report 2008 v0.3 29jan2009(2)
TRANSCRIPT
ASPI
FINAL REPORT SheetROMANIA 2008European Studies
ES 1
Traffic Information Systems - StudyMain Achievements
Description of the situation before the project implementation:
In Romania there is no centralized information regarding the traffic and roads infrastructure status. Different information exists at different Infrastructure Administrators or Authorities, but there is no system gathering all the relevant information from one area and presenting it to the public.Traffic Police have information regarding all the accidents and incidents on the motorways and national roads and also inside cities. The information is gathered in a Traffic Info Centre and is presented to the public in news bulletins on local radio stations and TV stations.Description of the solution implemented:
OBJECTIVES A. National and International state report on Traffic Information. B. The elaboration of the technical Specification/tender documentation for the study and for the pilot project
A. National and International study on Traffic Information 1) Market Analysis National and European State regarding Traffic Information Actual analysis and definition of the evolution purposes at the National Level InfoTransNet
Information subsystem for freight transport
Technical Road Data Bank TRADB Traffic Road Accidents Data Base
Traffic monitoring subsystem for the national road network
InfoTraffic Road Police Center for information regarding accidents/incidents
Actual state analysis regarding Traffic Information
Potential service providers and products analysis
B. The elaboration of the technical specification/tender documentation for the study and for the pilot project. 1) The study regarding the National Traffic Information System - technical specification 2) Pilot Project - technical specification Location
Structure and Functions
Testing
Possible architecture of the Road Traffic Information Center General Requirements Evaluation pilot system
Recommendations regarding system extend at the national level
3) Cost estimation of the contract 4) Motivation Criteria for tender procedure Proposed system architectureThe system consists of the following parts:
Reliable data network
Server architecture
Dispatcher consoles
Display Key Events EFFETTIVI
DescriptionDate (mm/yyyy)
Offers submission 09/2008
Contract signature no.93/2068510/2008
Submission of report 12/2008
Report Acceptance12/2008
Costs Spent (K)
EURStudy
PlannedTOTALStudySpent TOTAL%
InternalExternalInternalExternal
2008600.000600.00022.92722.9273,82%
ECB monthly accounting rate of the euro for December 2008 EUR/RON: 3,9227Deliverables
Title of deliverableLanguage
DeliverableSummary
MONI-EasyWay_National and International Status ReportRomanian
MONI-EasyWay_Technical SpecificationRomanian
3