eco-puncture: master plan
DESCRIPTION
Analysis of the Harlem River waterfront reveals fragmented patches of ecological habitat, brownfield contamination, degraded water quality due to storm and CSO discharge and unnatural river edges. Our plan aims to improve the overall ecological health of the river through a series of "eco-puncture" interventions aimed at restoring ecological connectivity along the river and addressing contamination and built up edges from industrialization.TRANSCRIPT
-
Constructed wetland area
Railroad promenade
Eco-Islands
CSO treatment wetland
Pier 5 Remediation zone Stormwater Wetland (mapped park)
Highway runoff catchment area Parking lot stormwater adaptation
ECOLOGY OVERVIEW
Green bulkhead reconstruction
HIGH BRIDGE PARK AREA
YANKEE STADIUM
149 STREET BRIDGE
ROBERTO CLEMENTE STATE PARK
Parkland Restoration
Small vegetated patchesTowers in the parkLarge vegetated patchesActive Parks
Proposed marsh/wetlandProposed Rail corridorRhizo Oyster IslandsEcological urban fingersFishing areasHighway runoff catchment
Small vegetated patchesTowers in the parkLarge vegetated patchesActive Parks
Sewer outfall (major)Sewer outfall (minor)Active brownfield(NYS Brownfield Program)Hazardous Waste Remediation SiteSpill sites within Bronwfield Opportunity Area
SHORT TERM Pilot eco-island Piloturbanfinger Pilot railroad area Parkland restoration Parkinglotadaptation Pier 5 - Phase I
MEDIUM TERM 4 eco-islands Busdepotstormwaterwetland Green bulkhead restoration Pier 5 - Phase II 1urbanfinger
LONG TERM CSOTreatmentWetland Railroadpromenade Pier 5 - Phase III 2urbanfingers
ECO-PUNCTUREAnecologicalplanfortheHarlemRiverWaterfront
Pollution Pubic/PrivateAccessibiliy GreenSpaceIndex
SanbornMapEcological Accupunture
Analysis
EdwardHopperMac mbs Dam Bridge
Public
Private
Accesibility Scale
high
low