Company over view 4
Our Strength 5
Our Projects Business Fields Service 5
Vision Mission & Values 6
Our Clients 7
List of Major Projects Executed and In Process 8-9
Photo Gallery 10-13
Organization Chart 14
QHSE Policy 15
Quality Statement 16
Contact Us 17
![Page 4: ECONOMY GROUP](https://reader031.vdocument.in/reader031/viewer/2022012021/6168a2abd394e9041f715e8d/html5/thumbnails/4.jpg)
4 | PAGE
ECONOMY GROUPFor Building Contracting &Paints
Company Overview
EGC Building Contracting &Paints (EGC) was established in the state of Kuwait in 2003.And registered in the Kuwait Chamber of Commerce No. 137361 to provide contracting and sub-contractingg work for Surface preparation & painting and Scaffolding works as well as general trading work.
EGC is in business to construct and build new infrastructure facilities from conception to delivery and beyond, provide contracting services in an ethical manner with fair profit, whileMaintaining controlled growth in a safe, stable and rewarding environment for its entire staff. The main aim of our Management and its team shall be to become the market leaders, providing efficiency, excellence and reliability. We dedicate ourselves in understanding and fulfilling customer requirements and needs.
![Page 5: ECONOMY GROUP](https://reader031.vdocument.in/reader031/viewer/2022012021/6168a2abd394e9041f715e8d/html5/thumbnails/5.jpg)
5 | PAGE
Our Strength
• We have well trained Blasters & Painters with both KOC & KNPC Approvals.
• A well-equipped Blasting & Painting Yard around 8000 sq meter with KOC Approval and
other all facilities located in Mina Abdullah
• NACE Certified coating inspectors to monitor quality control activities & Inspections
• Closed Blasting Room’s of Around 600 sq meters for the Blasting.
• 52560 safe working hours with no accidents.
• Strict Safety measures for the entire crew.
• 15 Year’s of experience in the field of Blasting and Painting & Scaffolding.
• Successfully completion of 14 Major project’s for KOC, KNPC (&) MEW
Business Fields
• Oil & Gas Field (Onshore)
• Petrochemicals
• Power Plant (Electricity & Water)
• Refineries
• Others Industrial Plants
Services
• Blasting & Industrial Painting
• Cold wrapping
• Thermal Spraying
• Scaffolding
• Air Compressor, Diesel Engine Service & Repair
![Page 6: ECONOMY GROUP](https://reader031.vdocument.in/reader031/viewer/2022012021/6168a2abd394e9041f715e8d/html5/thumbnails/6.jpg)
6 | PAGE
Vision
To become Name of Choice for Qualitymanagement system across all borders.
Mission
• To become a reliable contractor to Oil and Gas, Petrochemical andPower sector companies in Kuwait.
• To achieve and maintain the international standard of quality for itsservices.
• To complete all assignments within schedule and operate at the mostcompetitive terms.
Values• Humility & Willingness to learn• Customer Oriented services• Business with Ethics• Empowerment• Passion for Excellence• Teamwork
![Page 7: ECONOMY GROUP](https://reader031.vdocument.in/reader031/viewer/2022012021/6168a2abd394e9041f715e8d/html5/thumbnails/7.jpg)
7 | PAGE
9 | P a g e
KNPC DAELIM HESICO
KOC KHARAFI NATIONAL MEW
KHARAFI STEEL ALGHANIM INTERNATIONAL
SIEMENS
10 | P a g e
Photo Gallery
Our Workshop
KNPC MEW
Gulf Spic
KHARAFI STEEL
![Page 8: ECONOMY GROUP](https://reader031.vdocument.in/reader031/viewer/2022012021/6168a2abd394e9041f715e8d/html5/thumbnails/8.jpg)
8 | PAGE
LIST OF MAJOR PROJCTS EXECUTED & IN PROGRESS
SI.No. Description Project
DurationClient Ref No Contract
Value KD
1Repair and Maintenance of under ground Pipe line North KOC.
2006-2008Arabia nrtech
K.S.C AK-6528-2008 49,000.000
2 Mina Al Zour Power Plant Project 2007-2008 Alghanim
International 52487-2154 70,840.000
3 Subiya Power Plant Project. 2007-2008Khalid Ali Al Kharafi &
Bros.Co.MEWP-101-2007 50,660.000
4 Steel Structural Painting& for MAA Refinery 2011-2012 DAELIM-
KNPC DK-652-1254 42,440.000
5Steel Structural for Painting and man power supply in Arif Jan Camp For Building Work
2011-2012Al –SEEB
Engineering 27654/2011 36,250.000
6Steel Structural for Blasting & Painting. Kuwait Flour Mill Project.
2012Khalid Ali Al Kharafi & Bros.Co.
P-120/12 51,330.000
7
Steel Structural for Blasting and Painting. vEffluent Water Injection PHASE 1and sea Water Injection PHASE2
2013HEISCO.
KOC. 204/2526 45,000.000
8Steel Structural for Blasting and Painting.North LPG Tank Farm Project.
2013 HEISCO.KNPC. 2017/8164 28,551.000
9
Steel Structural for Blasting and Painting.WARA Pressure Maintenance Project.
2013HEISCO.
KOC 2014/8164 28,551.000
10 Blasting, external & internal painting of diesel and water Tanks for Ministry of electricity& water. Supply, Erection, Operation Maintenance of Gas Turbines Project
2013-2014 AlghanimInternational.
MEW.PO-31953 212,750.000
11Turbine coatingProject: Supply, Erection, Oper-atiMaintenance of Gas Turbines. 2013-2014 Siemens.
MEW.
2013/A-2567/SM 127,658.000
12
Underground wrapping of pipes Project: Supply, Erection, Oper-ation Maintenance of Gas Tur-bines.
2013-2014Alghanim
International.MEW.
3026 185,000.000
![Page 9: ECONOMY GROUP](https://reader031.vdocument.in/reader031/viewer/2022012021/6168a2abd394e9041f715e8d/html5/thumbnails/9.jpg)
9 | PAGE
13
Blasting & Painting for Structural steels.Sabiya (OGCT-2)Power Project 2015-2016
Khalid Ali Al Kharafi
& Bros.Co.MEW.
P-366-01 25.500.000
14
Blasting & Painting for Structural steels.EPC of Flare gas recovery facilities in Unit-49 at MAB Refinery Project
2015-2016
Khalid Ali Al Kharafi
& Bros.Co.KNPC
KAK/SHU/P365/050
/201599000.000
15
Blasting & Painting for Structural steels.KNPC Roadway Bridge Steel Work at MAA Refinery Project
2015-2016
Khalid Ali Al Kharafi
& Bros.Co.KNPC.
P-359-AFCONS 125000.000
16
Blasting & Painting for structural steelsNew Gathering Centre , GC-29 In North Kuwait
2016-2017 HEISO.KOC.
617018/B/002 70,000.000
17
Blasting & Painting for Structural steelsKNPC Clean Fuels Project.
2016-2017
Khalid Ali Al Kharafi
& Bros.Co.KNPC.
P-367/2016 62,328.000
18
Blasting & Painting for Structural steelsKNPC Clean Fuels Project at MAB2
2016-2017
Khalid Ali Al Kharafi
& Bros.Co.KNPC
P-362/P-363 55,000.000
19
Blasting & Painting for Structural Steels. New Gathering Centre,GC-29 North Kuwait
2017-2018 Al KHADD-AH-KOC
AKSF/PO-374/2016 110,000.000
20Blasting & Painting for Pipe Spools. EPC Stand by Service for clean fuel project
2017-2018 Arabi
EnertechK.S.C-KNPC
01/2017 59,200.000
21
Blasting & Painting for Pipe Spools,knpc-sp-1 Structural,Steel,Mechanical and Piping work SMP-2, SMP-3
2017-2018 Gulf SpicKNPC
GS/WO/2012/2017/2013
44,183.000
22Blasting & Painting Structural Steels ,Small Boat Harbours Project
2017-2018
CANAR TRADING & CONTRACT-
ING COMPANY
-KOC)
AP3013 24,500
23Surface preparation & Painting of Pipe spools (Jsurassic Producation Facilitty, JPF2).
2017-2018 Al-Mulla Koc S.O 2900000204 92,425.000
QHSE POLICY
LIST OF MAJOR PROJCTS EXECUTED & IN PROGRESS
SI.No. Description Project
DurationClient Ref No Contract
Value KD
1Repair and Maintenance ofunder ground Pipe line North KOC.
2006-2008Arabia nrtech
K.S.C AK-6528-2008 49,000.000
2 Mina Al Zour Power Plant Project 2007-2008 Alghanim
International 52487-2154 70,840.000
3 Subiya Power Plant Project. 2007-2008Khalid Ali Al Kharafi &
Bros.Co.MEWP-101-2017 50,660.000
4 Steel Structural Painting& for MAA Refinery 2011-2012 DAELIM-
KNPC DK-652-1254 42,440.000
5Steel Structural for Painting and man power supply in Arif Jan Camp For Building Work
2011-2012Al –SEEB
Engineering 27654/2011 36,250.000
6Steel Structural for Blasting & Painting. Kuwait Flour Mill Project.
2012Khalid Ali Al Kharafi & Bros.Co.
P-120/12 51,330.000
7
Steel Structural for Blasting and Painting. vEffluent Water Injection PHASE 1and sea Water Injection PHASE2
2013HEISCO.
KOC. 204/2526 45,000.000
8Steel Structural for Blasting and Painting.North LPG Tank Farm Project.
2013 HEISCO.KNPC. 2017/8164 28,551.000
9
Steel Structural for Blasting and Painting.WARA Pressure Maintenance Project.
2013HEISCO.
KOC 2014/8164 28,551.000
10 Blasting, external & internal painting of diesel and water Tanks for Ministry of electricity& water. Supply, Erection, Operation Maintenance of Gas Turbines Project
2013-2014 AlghanimInternational.
MEW.PO-31953 212,750.000
11Turbine coatingProject: Supply, Erection, Oper-atiMaintenance of Gas Turbines. 2013-2014 Siemens.
MEW.
2013/A-2567/SM 127,658.000
12
Underground wrapping of pipes Project: Supply, Erection, Oper-ation Maintenance of Gas Tur-bines.
2013-2014Alghanim
International.MEW.
3026 185,000.000
![Page 10: ECONOMY GROUP](https://reader031.vdocument.in/reader031/viewer/2022012021/6168a2abd394e9041f715e8d/html5/thumbnails/10.jpg)
10 | PAGE
Photo Gallery
Our Workshop
![Page 11: ECONOMY GROUP](https://reader031.vdocument.in/reader031/viewer/2022012021/6168a2abd394e9041f715e8d/html5/thumbnails/11.jpg)
11 | PAGE
Photo Gallery
(Underground Wrapping)
(Thermal Spray)
![Page 12: ECONOMY GROUP](https://reader031.vdocument.in/reader031/viewer/2022012021/6168a2abd394e9041f715e8d/html5/thumbnails/12.jpg)
12 | PAGE
Photo Gallery
Al-Zour Power Station on (2014-15)
Gas oil Tanks (AZ-Zour) Power Station (2014-2015)
![Page 13: ECONOMY GROUP](https://reader031.vdocument.in/reader031/viewer/2022012021/6168a2abd394e9041f715e8d/html5/thumbnails/13.jpg)
13 | PAGE
CHAIRMAN
![Page 14: ECONOMY GROUP](https://reader031.vdocument.in/reader031/viewer/2022012021/6168a2abd394e9041f715e8d/html5/thumbnails/14.jpg)
14 | PAGE
ECONOMY GROUP is committed to provide quality construction service and products to clients and customers through fulfilling and compliance to the integrated management system that contain Quality management, Health & Safety Management & Environmental Management.
ECONOMY GROUP is committed to understand customer requirement, and meet expectations, comply with government rules, regulations, and International standards, regulatory, statutory and other relevant requirement.
ECONOMY GROUP is committed to continually improve, communicate and review the effectiveness of integrated management system implantation to all department and projects, with the intend that all employees are made aware of their individual QHSE obligation.
ECONOMY GROUP shall bring into effect any alteration to this policy brought about by changes in legislation or which ECONOMY GROUP believes to improve its services, competency of our employees, protection of injury and ill health of our employees in order to continually improved the effectiveness of our performance and processes including general public, which can be achieved through implementation of integrated Management System Audit, Periodic Management Review and relevant Data Analysis.
CHAIRMAN [email protected]
QUALITY STATEMENT
QHSE POLICY
![Page 15: ECONOMY GROUP](https://reader031.vdocument.in/reader031/viewer/2022012021/6168a2abd394e9041f715e8d/html5/thumbnails/15.jpg)
15 | PAGE
ECONOMY GROUP defines Quality in terms of successful performance of attributes such as excellence in design, material suitability, manufacturing compliance, workplace efficiency safety and cleanliness, timely delivery and business process effectiveness that are entrusted to us by our clients.
ECONOMY GROUP complies with its Quality System by continually improving technical capabilities, shop floor work processes, material selection and use through effective and focused training.
ECONOMY GROUP encourages taking positive action on feedback and suggestions from employees, customers and suppliers that enhance quality, increase productivity and provide an environmental or workplace benefit.
The effectiveness of our Quality system is measured and reported periodically in terms of continuous improvement through reduction in non-conformance, rework and customercomplaints.
Abdulla AskarGeneral Manager
QUALITY STATEMENT
![Page 16: ECONOMY GROUP](https://reader031.vdocument.in/reader031/viewer/2022012021/6168a2abd394e9041f715e8d/html5/thumbnails/16.jpg)
16 | PAGE
![Page 17: ECONOMY GROUP](https://reader031.vdocument.in/reader031/viewer/2022012021/6168a2abd394e9041f715e8d/html5/thumbnails/17.jpg)
17 | PAGE
![Page 18: ECONOMY GROUP](https://reader031.vdocument.in/reader031/viewer/2022012021/6168a2abd394e9041f715e8d/html5/thumbnails/18.jpg)
18 | PAGE
![Page 19: ECONOMY GROUP](https://reader031.vdocument.in/reader031/viewer/2022012021/6168a2abd394e9041f715e8d/html5/thumbnails/19.jpg)
Contact Us
Office No. 36, Building No.9 BasementMangaf, Kuwait
Tel: (+965) 23718049 Fax: (+965) 23718049