Page 1: ECS Florida, LLC

 

 

                  

  

ECS Florida, LLC Geotechnical Engineering Report 

Terraces at Wesley Chapel 

 

New River Road and SR 54 Wesley Chapel, Florida   ECS Project Number 41:1946, Revision 1  July 18, 2017 Revised August 24, 2017   

    

Page 2: ECS Florida, LLC
Page 3: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 1 

 

 

TABLE OF CONTENTS  

EXECUTIVE SUMMARY ............................................................................................................... 3 1.0 INTRODUCTION .................................................................................................................... 4 

1.1 General ................................................................................................................................... 4 1.2 Scope of Services .................................................................................................................... 4 1.3 Authorization .......................................................................................................................... 4 

2.0 PROJECT INFORMATION ....................................................................................................... 5 2.1 Project Location...................................................................................................................... 5 2.2 Current Site Conditions .......................................................................................................... 5 

3.0 FIELD EXPLORATION ............................................................................................................. 6 3.1 Field Exploration Program ...................................................................................................... 6 

3.1.1 Test Borings .................................................................................................................. 6 3.2 Soil Survey Mapping ............................................................................................................... 6 3.3 Subsurface Characterization .................................................................................................. 7 3.4 Groundwater Observations .................................................................................................... 8 

4.0 LABORATORY TESTING ......................................................................................................... 9 5.0 DESIGN RECOMMENDATIONS ............................................................................................ 10 

5.1 Building Design ..................................................................................................................... 10 5.1.1 Foundations ................................................................................................................ 10 5.1.2 Floor Slabs ................................................................................................................... 11 

5.2 Site Design Considerations ................................................................................................... 12 5.2.1 Pavement Sections ..................................................................................................... 12 5.2.2   Stormwater Pond ...................................................................................................... 14 

5.3 Sinkhole Potential ................................................................................................................ 14 6.0 SITE CONSTRUCTION RECOMMENDATIONS ........................................................................ 15 

6.1 Subgrade Preparation .......................................................................................................... 15 6.1.1 Subgrade Preparation, Stripping and Grubbing ......................................................... 15 6.1.2 Proofrolling ................................................................................................................. 15 6.1.3 Subgrade Stabilization ................................................................................................ 15 

6.2 Earthwork Operations .......................................................................................................... 16 6.2.1 Structural Fill Materials............................................................................................... 16 6.2.2 Compaction ................................................................................................................. 17 

6.3 Foundation and slab observations ....................................................................................... 18 6.4 Utility Installations ............................................................................................................... 19 6.5 General Construction Considerations .................................................................................. 19 

7.0 CLOSING ............................................................................................................................. 21  APPENDICES  Appendix A – Drawings & Reports  

Site Location Diagram  

Boring Location Diagram    

Page 4: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 2 

 

Appendix B – Field Operations  

Reference Notes for Boring Logs 

Boring Logs B‐1 through B‐14  Appendix C – Laboratory Testing  

Laboratory Test Results Summary  

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

       

Page 5: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 3 

 

EXECUTIVE SUMMARY 

The following summarizes the main findings of the exploration, particularly those that may have a cost  impact on  the planned development.   Further, our principal  foundation  recommendations are summarized.  Information gleaned from the executive summary should not be utilized in lieu of reading the entire geotechnical report.  

The geotechnical exploration performed  for  the planned development  included 14  soil test borings drilled to depths between 15 and 45 feet.   

 

Subsurface  conditions within  the borings  generally  consisted of  approximately 8  to 17 feet of sand with various amounts of fines, underlain by clayey soils and limestone.  The upper soils were predominately very loose to loose. 

  Foundation Recommendations 

The  four‐story  multi‐family  buildings  may  be  supported  on  conventional  shallow foundations  consisting  of  column  or  strip  footings  bearing  on  natural  soils  with  an allowable net bearing capacity of 2,500 psf.  Due to the presence of very loose soils in the upper eight  feet,  it  is  recommended  the building pads be  rolled with a vibratory  roller weighing  at  least  20  tons making  at  least  10  passes  in  each  perpendicular  direction.  Details of  the assumed  foundation  subgrade elevations and  loads are contained  in  the body of the report.   

 Stormwater Pond Recommendations 

It  is our understanding  the project  site will have  two ponds along  the western extent.  ECS drilled  four soil  test borings  identified as borings B‐11  through B‐14.   Borings B‐11 and  B‐12 were  conducted within  the  northwestern  pond  and  borings  B‐13  and  B‐14 within the southwestern pond.  Borings B‐11 and B‐12 generally encountered fine sand in the  upper  six  to  12  feet  overlaying  clayey  sand.    Borings  B‐13  and  B‐14  generally encountered fine sand in the upper two to six feet overlaying clayey sand.  Groundwater was not encountered in the borings at the time of drilling.  

 Pavement Recommendations 

In  general,  we  recommend  the  following  flexible  pavement  section  designs. Recommendations for heavy duty pavement are included in our report. 

 Flexible Pavement Heavy‐Duty Section: 

2 inches asphaltic concrete surface course (FDOT Type S‐1 or S‐3) 

8 inches base course 

12 inches stabilized subgrade  

Flexible Pavement Standard‐Duty Section: 

1.5 inches asphaltic concrete surface course (FDOT Type S‐1 or S‐3) 

6 inches base course 

12 inches stabilized subgrade    

Page 6: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 4 

 

1.0 INTRODUCTION 

1.1 GENERAL 

The  purpose  of  this  study  was  to  provide  geotechnical  information  for  the  design  and construction of five four‐story multifamily structures, two stormwater ponds, parking spaces, and driveways.   The  recommendations developed  for  this  report  are based on project  information  supplied by your office.  This report contains the results of our subsurface explorations and laboratory testing programs, site characterization, results of engineering analyses, and recommendations.   1.2 SCOPE OF SERVICES  To obtain the necessary geotechnical  information required for design of the four‐story buildings and  stormwater ponds,  soil  test borings were performed at  locations  selected by our office. A laboratory  testing program was also  implemented  to  characterize  the physical and engineering properties of the subsurface soils.    This  report  discusses  our  exploratory  and  testing  procedures,  presents  our  findings  and evaluations and includes the following.  

A brief review and description of our field and laboratory test procedures and the results of testing conducted. 

A review of surface topographical features and site conditions. 

A review of area and site geologic conditions. 

A review of subsurface soil stratigraphy with pertinent available physical properties. 

Final copies of our soil test borings. 

Recommendations  for site preparation and construction of compacted  fills,  including an evaluation  of  on‐site  soils  for  use  as  compacted  fills  and  delineation  of  potentially unsuitable soils and/or soils exhibiting excessive moisture at the time of sampling. 

Recommended foundation type(s). 

Recommendations for stormwater pond.  

1.3 AUTHORIZATION 

Our  services were  provided  in  accordance with  our  Proposal No.  41:1918‐GP,  dated  June  26, 2017,  as authorized by  you on  July 5, 2017,  and  includes  the  Terms  and Conditions of  Service outlined with our Proposal.    

Page 7: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 5 

 

2.0 PROJECT INFORMATION 

2.1 PROJECT LOCATION 

The site is located southeast of the intersection of New River Road and SR 54, as shown below on Figure 2.1.1 Site Location.   Based on the Site Plan, provided by Charlan, Brock & Associates, we understand the proposed construction will consist of multifamily housing, two stormwater ponds, parking, and drive areas. 

 

 Figure 2.1.1.  Site Location  

2.2 CURRENT SITE CONDITIONS  

The site is currently vacant with tall grass and sparse tree cover. Please note that ground surface elevations were not available and a site survey was not performed as part of our scope of work. It should be noted based on historical aerials, it appears the site has remained vacant since at least 1990.     

Page 8: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 6 

 

3.0 FIELD EXPLORATION 

3.1 FIELD EXPLORATION PROGRAM 

The field exploration was planned with the objective of characterizing the project site  in general geotechnical and geological terms and to evaluate subsequent field and laboratory data to assist in the determination of geotechnical recommendations.  3.1.1 Test Borings  The subsurface conditions were explored by drilling ten soil test borings within the building pads (B‐1 to B‐10) and four soil test borings  in the stormwater pond footprints (B‐11 to B‐14). An all‐terrain  vehicle  (ATV)‐mounted  drill  rig was  utilized  to  drill  the  soil  test  borings.   Borings were generally  advanced  to  depths  of  15  to  45  feet  below  the  current  ground  surface.    Subsurface explorations were completed under  the general supervision of an ECS geotechnical engineer or geologist.    Boring  locations were  identified  in the field by ECS personnel using GPS techniques or by taping from existing features prior to mobilization of our drilling equipment.  The approximate as‐drilled boring  locations  are  shown  on  the  Boring  Location  Diagram  in  Appendix  A.    Ground  surface elevations noted on our boring  logs were  interpolated  from published  topographic  information. No site survey was performed.  Standard penetration  tests  (SPTs) were conducted  in  the borings at  regular  intervals  in general accordance with ASTM D 1586.   Small representative samples were obtained during  these tests and were used to classify the soils encountered.   The standard penetration resistances obtained to provide a general indication of soil shear strength and compressibility.   

3.2 SOIL SURVEY MAPPING 

Based  on  the  Soil  Survey  for  Pasco County,  Florida  by  the  US  Department  of  Agriculture  Soil Conservation Service  (USDA)  the predominant predevelopment soil  type at  the site  is  identified and a summary of characteristics of this soil series is included below.  

Table 3.2.1 1Soil Survey 

Soil Type  Constituents  Drainage Class  Water Table 

6 — Tavares Fine Sand, 0 to 5 percent slopes 

Sand Moderately Well 

drained 42 to 72 inches 

    

Page 9: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 7 

 

Soil mapping of the site vicinity is presented in Figure 3.2.2 below.   

 Figure 3.2.2: Site Soil Survey 

3.3 SUBSURFACE CHARACTERIZATION 

The  subsurface  conditions  encountered  were  generally  consistent  with  published  geological mapping.    The  following  sections  provide  generalized  characterizations  of  the  soil  strata encountered during our subsurface exploration.  For subsurface information at a specific location, refer to the Boring Logs in Appendix B.            

Page 10: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 8 

 

Table 3.3.1 Subsurface Stratigraphy Approximate 

Depth Range (ft) Stratum  Description  Ranges of 

SPT(1) N‐values (bpf) 

0‐27 ft  I – Upper Sandy Soils 

Very Loose to Medium Dense Fine Sand with Silt (SP‐SM) and Silty Fine Sand (SM) 

1 to 22 

2‐45 ft  II – Clayey Soils 

Very Loose to Dense Clayey Sand (SC)  2 to 34 

32‐45 ft  III – Lean Clay and Limestone 

Sandy Lean Clay (CL) and Weathered Limestone (Borings B‐2, B‐5, and B‐7 through B‐10) 

4 to over 50 blows per increment 

Notes: (1)  Standard Penetration Test  

3.4 GROUNDWATER OBSERVATIONS 

Water  levels  were measured  in  our  borings  as  noted  on  the  soil  boring  logs  in  Appendix  B.  Groundwater depths were not encountered  in  the upper 10  feet  in  the borings at  the  time of drilling.  To  determine  the  depth  of  groundwater,  ECS  recommends  placing  temporary piezometers across the project site.  Variations in the long‐term water table may occur as a result of changes  in precipitation, evaporation, surface water runoff, construction activities, and other factors.  The groundwater will fluctuate seasonally depending upon local rainfall. The rainy season in Florida  is normally between  June and September. Based upon our site‐specific field data, our review  of  the  USDA  Soils  Survey  of  Pasco County,  the  USGS  topographic  map  of  the  area, published lake level data, the expected regional hydrogeology and our experience in the area, we estimate the seasonal high groundwater levels to be eight to nine feet below existing grade. The contractor  should  determine  actual  groundwater  conditions  prior  to  construction  to  evaluate their impact on the work.                     

Page 11: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 9 

 

4.0 LABORATORY TESTING 

The laboratory testing performed by ECS for this project consisted of selected tests performed on samples obtained during our  field exploration operations.   Classification and  soil property  tests were performed on representative soil samples obtained from the test borings  in order to aid  in classifying soils according  to  the Unified Soil Classification System and  to quantify and correlate engineering  properties.  Laboratory  tests  performed  on  selected  samples  included  grain  size analysis tests and moisture content tests.   An experienced geotechnical engineer/engineering  geologist  visually  classified each  soil  sample from  the  test borings on  the basis of  texture and plasticity  in accordance with  the Unified Soil Classification  System  (USCS)  and  ASTM  D‐2488  (Description  and  Identification  of  Soils‐Visual/Manual Procedures).   After classification, the geotechnical engineer/engineering geologist grouped the various soil types into the major zones noted on the boring  logs in Appendix B. The group symbols  for each soil  type are  indicated  in parentheses  following  the soil descriptions on the boring logs.  The stratification lines designating the interfaces between earth materials on the boring logs are approximate; in situ, the transitions may be gradual.  

Page 12: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 10 

 

5.0 DESIGN RECOMMENDATIONS 

5.1 BUILDING DESIGN 

The recommendations presented in this report are based on the project information provided to us,  the  results  of  the  soil  test  borings,  laboratory  testing,  and  the  engineering  analyses. Considering the results of our field exploration, and our experience with similar projects, it is our judgment  that  the  site  is  suitable  for  the proposed development utilizing  a  foundation  system consisting  of  spread  footings,  provided  that  the  subgrade  soils  have  been  properly  prepared, provided that the recommendations herein are followed. Due to the presence of very loose soils in the upper eight feet,  it  is recommended the site be rolled using a  large vibratory roller with a weight of at least 20 tons making at least 10 passes in each perpendicular direction.  The following sections provide recommendations for foundation design and soil supported slabs.  5.1.1 Foundations  According to  the soil borings  for the proposed multifamily building, the materials anticipated at normal footing depths below the proposed floor slabs should consist of sandy soils with various amount of fines (SP, SP‐SM), with no roots and  less than 5 percent organic content. Clayey soils (SC) are more moisture sensitive and can be easily eroded with the presence of water. Therefore, Structural  Fill  and/or  foundation/slab  concrete  should  be  placed  as  early  in  the  construction stages as practical to minimize subgrade exposure.  No structural  information has been provided to us for the proposed development, however; we the  structural  loads  for  the  residential  buildings  are  in  the  order  of  150  kips  and  5  kips/lf  for columns  and walls  or  less. We  also  assumed  that  final  grades will  be within  about  2  feet  of existing elevations.  Once  the  site  is  prepared  based  upon  our  geotechnical  recommendations;  the  geotechnical analyses of  the  test boring data  indicate  the  sandy  soils expected at  footing bearing  levels and provided subgrades and structural fills are prepared as discussed herein, the proposed structure can  be  supported  by  conventional  shallow  foundations:    individual  column  footings  and continuous wall footings.  The design of the foundation shall utilize the following parameters: 

              

Page 13: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 11 

 

Table 5.1.1.1 Foundation Design Design Parameter  Column Footing  Wall Footing 

Net Allowable Bearing Pressure1  2,500 psf  2,500 psf 

Acceptable Bearing Soil Material  Loose SAND (SP/SP‐SM) ‐ Stratum I  

Loose SAND (SP/SP‐SM) ‐ Stratum I 

Minimum Width  24 inches  16 inches 

Minimum Footing Embedment Depth (below slab or finished grade) 

24 inches  18 inches 

Estimated Total Settlement  1 inch  1 inch 

Estimated Differential Settlement  Less than 0.5 inches between columns 

Less than 0.5 inches over 50 feet 

 1.  Net allowable bearing pressure is the applied pressure in excess of the surrounding overburden soils above the base of the foundation. 

Our settlement analysis assumes the soils from the bottom of the footings to depths 2 feet below the bottom of  the  footing have been compacted prior  to placing concrete  in  the  footings when placed on structural fill material. As such, we recommend this zone be compacted to at  least 98 percent of  the maximum dry density, as determined by  the Modified Proctor Compaction Test (ASTM D‐1557).   Most of the soils at the foundation bearing elevation are anticipated to be suitable for support of the proposed structure.  If soft or unsuitable soils are observed at the footing bearing elevations, the unsuitable  soils  should be undercut and  removed with approved  structural  fill or with  lean concrete  (f’c  ≥  1,000  psi  at  28  days)  or No.  57  stone,  as  applicable,  up  to  the  original  design bottom of footing elevation.   5.1.2 Floor Slabs  The on‐site natural  soils are considered  suitable  for  support of  the  lowest  floor  slabs, although moisture control during earthwork operations may be necessary.  It appears that the slabs for the structure will bear on the Stratum  I. This material  is  likely suitable  for the support of a slab‐on‐grade, however, clayey  fine sand and silty  fine sand may be encountered at the subgrade  level, which may be moisture sensitive and can be easily eroded with the presence of water. Therefore, Structural Fill and/or concrete should be placed as early in the construction stages as practical to minimize subgrade exposure.  

Page 14: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 12 

 

The following graphic depicts our soil‐supported slab recommendations:   

  

        Figure 5.1.2.1  

1.  Drainage Layer Material:  GRAVEL (GP, GW), SAND (SP, SW)  

2.  Subgrade compacted to 98% maximum dry density per ASTM D698  

 Subgrade Modulus: Provided the placement of Structural Fill and Granular Drainage Layer per the recommendations discussed herein,  the slab may be designed assuming a modulus of subgrade reaction, k1 of 150 pci (lbs/cu. inch).  The modulus of subgrade reaction value is based on a 1 ft by 1 ft plate load test basis.   

5.2 SITE DESIGN CONSIDERATIONS 

5.2.1 Pavement Sections   General Recommendations: Our  scope of  services did not  include extensive  sampling  and  LBR testing  of  existing  subgrade  or  potential  sources  of  imported  fill  for  the  specific  purpose  of  a detailed pavement analysis. Instead, we have assumed pavement‐related design parameters that are  considered  to  be  typical  for  the  area  soil  types.  The  recommended  pavement  thicknesses presented in this report section are considered typical and minimum for the assumed parameters in the general site area. We understand that budgetary considerations sometimes warrant thinner pavement  sections  than  those  presented.  However,  the  client,  the  owner,  and  the  project designers should be aware that thinner pavement sections may result  in  increased maintenance costs and lower than anticipated pavement life. We recommend the following pavement section designs:  

Flexible Pavement Heavy‐Duty Section: 

2 inches asphaltic concrete surface course (FDOT Type S‐1 or S‐3) 

8 inches base course 

12 inches stabilized subgrade 

 

Flexible Pavement Standard‐Duty Section: 

1.5 inches asphaltic concrete surface course (FDOT Type S‐1 or S‐3) 

6 inches base course 

12 inches stabilized subgrade 

All pavement subgrades should be prepared in accordance with the recommendations presented in the section entitled Earthwork Operations.    

Concrete Slab Vapor Barrier 

Granular Capillary Break/Drainage Layer   

      Compacted Subgrade 

Page 15: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 13 

 

In areas where Portland  cement  concrete pavement  is planned,  the  concrete  should be placed upon a minimum of 12 inches of compacted, free draining material and compacted to 98% of the Modified Proctor maximum dry density (ASTM D‐1557).   In  areas  where  asphaltic  concrete  pavements  are  used,  we  suggest  stabilizing  the  subgrade materials  to a minimum Florida Bearing Value  (FBV) of 75 pounds per  square  inch  (psi).   As an alternate  for  the  FBV, materials  can  have  a  Limerock  Bearing  Ratio  (LBR)  of  40  percent.    All stabilized subgrade materials should be compacted to 98 percent of the Modified Proctor (ASTM D‐1557)  maximum  dry  density  and  meet  specification  requirements  for  Type  B  or  Type  C Stabilized Subgrade by the Florida Department of Transportation (FDOT).  The stabilized subgrade may consist of imported material or a blend of on‐site soils and imported materials.  If a blend is proposed, we  recommend  that  the  contractor performs a mix design  to  find  the optimum mix proportions.  Base Course: Based on the encountered water table we have assumed that groundwater will not be  within  2  feet  below  pavement  subgrade.    ECS  anticipates  that  limerock  will  be  the most economical base  course  for  this project.   Alternatively,  crushed  concrete may be used as base material.  Limerock or crushed concrete should follow the FDOT specification for material qualifications and placement.  Place  limerock or crushed concrete base  in maximum 6‐inch  lifts and compact  to a minimum  density  of  95  percent  of  the Modified  Proctor maximum  dry  density  according  to specification in ASTM D‐1557.  Perform compliance testing for the base course to a depth of 1 foot at a frequency of one test per 5,000 square feet, or at a minimum of two test locations, whichever is greater.  Effects  of Groundwater: One  of  the most  critical  influences  on  the  pavement  performance  in Western  Central  Florida  is  the  relationship  between  the  pavement  subgrade  and  the  seasonal high groundwater  level. Many  roadways and parking areas have been destroyed as a  result of deterioration  of  the  base  and  the  base/surface  course  bond.  Regardless  of  the  type  of  base selected, we recommend that the seasonal high groundwater and the bottom of the base course be separated by at least 12 inches for crushed concrete and 18 inches for limerock.  Landscape Drains  and  Curbing:  If  needed, where  landscaped  sections  are  located  adjacent  to parking  lots  or  driveways,  we  recommend  that  drains  be  installed  around  these  landscaped sections  to protect  the asphalt pavement  from excess  rainfall and over  irrigation. Migration of irrigation water  from  the  landscape  areas  to  the  interface  between  the  asphalt  and  the  base usually occurs unless landscape drains are installed. This migration often causes separation of the wearing  surface  from  the  base  and  subsequent  rippling  and  pavement  deterioration.  The underdrains  or  strip  drains  should  be  routed  to  a  positive  outfall  at  the  pavement  area  catch basins.  Curbing around landscaped sections adjacent to parking lots and driveways should be constructed with full‐depth curb sections. Using extended curb sections which  lie directly on top of the final asphalt  level,  or  eliminating  curbing  entirely,  can  allow migration  of  irrigation water  from  the landscaped areas to the interface between the asphalt and the base. This migration often causes 

Page 16: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 14 

 

separation  of  the  wearing  surface  from  the  base  and  subsequent  rippling  and  pavement deterioration.  5.2.2   Stormwater Ponds  General: Based on the information provided by you, we understand that the project includes two stormwater  ponds;  one  located  near  the  northwestern  extent  of  the  site  and  one  near  the southwestern extent of the site.  The stormwater pond footprints currently consist of grassland.   ECS drilled four soil test borings  identified as borings B‐11 through B‐14.   Borings B‐11 and B‐12 were  conducted  within  the  northwestern  pond  and  borings  B‐13  and  B‐14  within  the southwestern pond.  Borings B‐11 and B‐12 generally encountered fine sand in the upper six to 12 feet overlaying clayey sand.  Borings B‐13 and B‐14 generally encountered fine sand in the upper two to six feet overlaying clayey sand.   Groundwater was not encountered  in the borings at the time of drilling.  

5.3 SINKHOLE POTENTIAL 

Based on our subsurface exploration, no significant indications were observed that would suggest the presence of  sinkholes,  voids, or  in‐filled  voids within  the  site,  such  as  caving or  collapsing borehole.  During  drilling,  boreholes  appeared  to  be  stable.  Additionally,  the  presence  of  a cohesive layer indicates limited ability for raveling of looser soils.  No sinkhole remediation actions are recommended at this time.                         

Page 17: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 15 

 

6.0 SITE CONSTRUCTION RECOMMENDATIONS 

6.1 SUBGRADE PREPARATION  

6.1.1 Subgrade Preparation, Stripping and Grubbing  The subgrade preparation should consist of complete removal of existing vegetation. Additionally, any  underground  utilities  or  underground  tanks  that will  not  be  part  of  the  new  construction should be properly capped and abandoned or removed.    Stripping  soft  or  unsuitable  material  from  the  building  and  pavement  areas  should  also  be performed.   Unsuitable material consists of soils with more  than 5 percent organics content or more than 12 percent passing the No. 200 sieve. Any other soft or unsuitable materials from the 10‐foot expanded building and 5‐foot expanded pavement  limits.   ECS should be called to verify that  topsoil  and  unsuitable  surficial  materials  have  been  completely  removed  prior  to  the placement of Structural Fill or construction of structures.  6.1.2 Proofrolling  After removing all unsuitable surface materials, and prior to the placement of any structural fill or other  construction materials,  the  exposed  subgrade  should  be  examined  by  the  Geotechnical Engineer or authorized representative.   The exposed subgrade should be thoroughly proofrolled with previously approved  construction equipment having a minimum axle  load of 20  tons  (e.g. large vibratory rollers).  The areas subject to proofrolling should be traversed by the equipment in two perpendicular (orthogonal) directions with at least 10 overlapping passes of the vehicle under the  observation  of  the Geotechnical  Engineer  or  authorized  representative.    This  procedure  is intended  to assist  in  identifying any  localized yielding materials.      In  the event  that unstable or “pumping”  subgrade  is  identified by  the proofrolling,  those  areas  should be marked  for  repair prior to the placement of any subsequent structural fill or other construction materials.  Methods of repair of unstable subgrade, such as undercutting or moisture conditioning should be discussed with  the  Geotechnical  Engineer  to  determine  the  appropriate  procedure  with  regard  to  the existing conditions causing the  instability.   A test pit(s) may be excavated to explore the shallow subsurface materials in the area of the instability to help in determined the cause of the observed unstable materials and to assist  in the evaluation of the appropriate remedial action to stabilize the subgrade.  6.1.3 Subgrade Stabilization  Subgrade  Compaction:  Upon  completion  of  subgrade  documentation,  the  exposed  subgrade within  the 10‐foot expanded building and 5‐foot expanded pavement  limits should be moisture conditioned to within ‐1 and +3 % of the soil’s optimum moisture content and be compacted with suitable equipment (minimum 10‐ton roller) to a depth of 10 inches. Subgrade compaction within the expanded building and pavement limits should be to a dry density of at least 98 percent of the Modified Proctor maximum dry density (ASTM D1557). ECS should be called on to document that proper subgrade compaction has been achieved.   

Page 18: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 16 

 

Subgrade Compaction Control: The expanded limits of the proposed construction areas should be well  defined,  including  the  limits  for  buildings,  pavements,  fills,  and  slopes,  etc.  Field  density testing of subgrades will be performed at frequencies in Table 6.1. 

 Table 6.1.3.1 Frequency of Subgrade Compaction Testing 

Location  Frequency of Tests 

Expanded Building Limits  1 test per 2,500 sq. ft. 

Pavement Areas  1 test per 10,000 sq. ft. 

Outparcels/SWM Facilities  1 test per 2,500 sq. ft. 

All Other Non‐Critical Areas  1 test per 10,000 sq. ft. 

6.2 EARTHWORK OPERATIONS 

6.2.1 Structural Fill Materials  Unsatisfactory Materials: Unsuitable material typically consists of soils with more than 5 percent organics content or more than 12 percent passing the No. 200 sieve, as well as topsoil and organic materials (OH, OL). In some cases, soils with more than 5 percent organics content or more than 12 percent passing the No. 200 sieve may be used at depths greater than 4 feet below pavement subgrades.  Borrow Suitability: The  following Engineered/Structural Fill  types are  recommended  for use on this project:  Fine sand (SP) can be utilized as structural and pavement subgrade fill material provided that the natural moisture content is within a desirable range to obtain compaction.  Fine  sand  with  silt  (SP‐SM)  and  fine  sand  with  clay  (SP‐SC)  can  be  utilized  as  structural  and pavement subgrade fill material provided that the natural moisture content  is within a desirable range to obtain compaction.  It should be noted that due to higher fine content, soil may be more sensitive to moisture and may require more handling.  Clayey  fine  sand  (SC)  is more difficult  to use  as  fill because  they  are more moisture  sensitive. These soils may be used as structural fill but will require moisture conditioning.  It is recommended that all materials to be used for Engineered Fill be analyzed and approved by the Geotechnical Engineer prior to their use on the site.   Subgrade soils disturbed by contractor operations shall be  recompacted  to  the specifications of this report. Subgrade soils which are excessively wet but otherwise suitable by soil classification (inorganic  soil  material  meeting  the  specifications  above)  are  not  considered  unsuitable  by definition and shall be moisture conditioned and recompacted.   

Page 19: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 17 

 

6.2.2 Compaction  Structural  Fill Compaction: Assuming  that  the organic  content of  the  soils does not exceed 10 percent, structural fill should be placed in loose lifts, which do not exceed 12 inches in thickness, and should be compacted to at  least 98 percent of the maximum dry density, as determined by the Modified Proctor Compaction Test  (ASTM D‐1557) within  the  lift  thickness.   Generally,  the moisture content of the fill materials should be maintained between 2 percentage points below to the optimum moisture content for the fill material, as determined by ASTM D‐1557.  Fill placed in non‐structural  areas  (e.g.  grassed  areas)  should  be  compacted  to  at  least  90  percent  of  the maximum dry density according  to ASTM D‐1557,  in order  to avoid significant subsidence. ECS should be called on to document that proper fill compaction has been achieved.  Fill Compaction Control: The expanded  limits of the proposed construction areas should be well defined,  including  the  limits  of  the  fill  zones  for  building  and  pavements  at  the  time  of  fill placement.  Grade  controls  should  be maintained  throughout  the  filling  operations.  All  filling operations  should  be  observed  on  a  full‐time  basis  by  a  qualified  representative  of  the construction  testing  laboratory  to  determine  that  the minimum  compaction  requirements  are being achieved. Field density testing of fills will be performed at the frequencies shown  in Table 6.2.2.1, but not less than 1 test per lift. 

 Table 6.2.2.1 Frequency of Compaction Tests in Fill Areas 

Location  Frequency of Tests 

Expanded Building Limits  1 test per 2,500 sq. ft. per lift 

Pavement Areas  1 test per 10,000 sq. ft. per lift 

Utility Trenches  1 test per 200 linear ft. per lift 

Outparcels/SWM Facilities  1 test per 5,000 sq. ft. per lift 

All Other Non‐Critical Areas  1 test per 10,000 sq. ft. per lift 

 Compaction Equipment: Compaction equipment suitable to the soil type being compacted should be used to compact the subgrades and fill materials. A vibratory steel drum roller should be used for compaction of coarse‐grained soils (Sands) as well as for sealing compacted surfaces.  Fill  Placement  Considerations:  Fill  materials  should  not  be  placed  on  excessively  wet  soils. Excessively wet soils or aggregates should be scarified, aerated, and moisture conditioned.  

At  the  end  of  each  work  day,  all  fill  areas  should  be  graded  to  facilitate  drainage  of  any precipitation and the surface should be sealed by use of a smooth‐drum roller to limit infiltration of surface water. During placement and compaction of new fill at the beginning of each workday, the Contractor may need to scarify existing subgrades to a depth on the order of 4 inches so that a weak plane will not be formed between the new fill and the existing subgrade soils.  Proper drainage  should be maintained during  the earthwork phases of construction  to prevent ponding of water which has a tendency to degrade subgrade soils.   

Page 20: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 18 

 

If any problems are encountered during the earthwork operations, or if site conditions deviate from those encountered during our subsurface exploration, the Geotechnical Engineer should be notified immediately.  We recommend that favorable unit rates be established in the construction contract for undercutting and backfilling. Unit rates could be established as follows: 

a. Undercut and backfill with Imported Engineered Fill, per cubic yard in place;  b. Undercut and backfill with On‐site Borrow Engineered Fill, per cubic yard in place; c. Undercut and backfill with Aggregate Base Material, per ton; d. Undercut and backfill with No. 57 Stone (wet areas and below footings), per ton; e. Dispose of undercut material off‐site, per cubic yard, f. Place medium duty, woven and non‐woven geotextile  fabrics, per square yard. Suitable 

non‐woven  fabric  for  use  in  stabilization  and  separation would  include Mirafi  160N  or equivalent. Suitable woven fabric would include Mirafi 600X or equivalent.   

 The Geotechnical Engineer  should be  called on  to  recommend and/or approve material  type and placement procedures where subgrade remediation is required.  

6.3 FOUNDATION AND SLAB OBSERVATIONS 

Protection of Foundation Excavations: Exposure to the environment may weaken the soils at the footing bearing  level  if  the  foundation excavations  remain open  for  too  long a  time. Therefore, foundation  concrete  should be placed  the  same day  that excavations are made.  If  the bearing soils are  softened by  surface water  intrusion or exposure,  the  softened  soils must be  removed from  the  foundation  excavation  bottom  immediately  prior  to  placement  of  concrete.  If  the excavation must remain open overnight, or  if rainfall becomes  imminent while the bearing soils are exposed, a 1 to 3‐inch thick “mud mat” of “lean” concrete should be placed on the bearing soils before the placement of reinforcing steel.  Footing  Subgrade  Observations:    Most  of  the  soils  at  the  foundation  bearing  elevation  are anticipated to be suitable for support of the proposed structure.  It will be important to have the geotechnical  engineer  of  record  observe  the  foundation  subgrade  prior  to  placing  foundation concrete,  to  confirm  the bearing  soils are what was anticipated.    If  soft or unsuitable  soils are observed at the footing bearing elevations, the unsuitable soils should be undercut and removed.  Any undercut should be backfilled with lean concrete (f’c ≥ 1,000 psi at 28 days) up to the original design  bottom  of  footing  elevation;  the  original  footing  shall  be  constructed  on  top  of  the hardened lean concrete.    Slab  Subgrade  Verification:  A  representative  of  ECS  should  be  called  on  to  observe  exposed subgrades within  the  expanded building  limits prior  to  Structural  Fill Placement  to  assure  that adequate subgrade preparation has been achieved. A proofrolling using a drum roller or  loaded dump  truck  should  be  performed  in  their  presence  at  that  time.  Once  subgrades  have  been prepared to the satisfaction of ECS, subgrades should be properly compacted and new Structural Fill can be placed. Existing subgrades to a depth of at least 10 inches and all Structural Fill should be moisture conditioned to within ‐1/+3 percentage points of optimum moisture content then be compacted to the required density. If there will be a significant time lag between the site grading work and  final grading of concrete  slab areas prior  to  the placement of  the  subbase  stone and 

Page 21: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 19 

 

concrete,  a  representative  of  ECS  should  be  called  on  to  verify  the  condition  of  the  prepared subgrade.  Prior  to  final  slab  construction,  the  subgrade  may  require  scarification,  moisture conditioning, and re‐compaction to restore stable conditions. 

6.4 UTILITY INSTALLATIONS 

Utility Subgrades: The soils encountered in our exploration are expected to be generally suitable for support of utility pipes. The pipe subgrade should be observed and probed for stability by ECS to  evaluate  the  suitability  of  the  materials  encountered.  Any  loose  or  unsuitable  materials encountered at the utility pipe subgrade elevation should be removed and replaced with suitable compacted Structural Fill or pipe bedding material.   Utility Backfilling: The granular bedding material  should be at  least 4  inches  thick, but not  less than  that  specified  by  the  project  drawings  and  specifications.  Fill  placed  for  support  of  the utilities,  as well  as  backfill  over  the  utilities,  should  satisfy  the  requirements  for  Structural  Fill given in this report. Compacted backfill should be free of topsoil, roots, ice, or any other material designated  by  ECS  as  unsuitable.  The  backfill  should  be  moisture  conditioned,  placed,  and compacted in accordance with the recommendations of this report.  Excavation Safety: All excavations and slopes should be made and maintained in accordance with OSHA  excavation  safety  standards.  The  contractor  is  solely  responsible  for  designing  and constructing stable, temporary excavations and slopes and should shore, slope, or bench the sides of the excavations and slopes as required to maintain stability of both the excavation sides and bottom. The contractor’s responsible person, as defined in 29 CFR Part 1926, should evaluate the soil exposed  in  the excavations as part of  the contractor’s safety procedures.  In no case should slope  height,  slope  inclination,  or  excavation  depth,  including  utility  trench  excavation  depth, exceed  those  specified  in  local,  state,  and  federal  safety  regulations.  ECS  is  providing  this information solely as a service  to our client. ECS  is not assuming  responsibility  for construction site safety or the contractor’s activities; such responsibility is not being implied and should not be inferred. 

6.5 GENERAL CONSTRUCTION CONSIDERATIONS 

Moisture Conditioning: During  rainy  season of  the  year, delays and additional  costs  should be anticipated. At these times, moisture conditioning may be required. The rainy season in Florida is normally between June and September. Alternatively, during the drier times of the year, moisture may  need  to  be  added  to  the  soil  to  provide  adequate  moisture  for  successful  compaction according to the project requirements.    Subgrade  Protection: Measures  should  also be  taken  to  limit  site disturbance,  especially  from rubber‐tired  heavy  construction  equipment,  and  to  control  and  remove  surface  water  from development areas, including structural and pavement areas. It would be advisable to designate a haul  road  and  construction  staging  area  to  limit  the  areas  of  disturbance  and  to  prevent construction  traffic  from  excessively  degrading  sensitive  subgrade  soils  and  existing  pavement areas.  Haul  roads  and  construction  staging  areas  could  be  covered  with  excess  depths  of aggregate to protect those subgrades. The aggregate can later be removed and used in pavement areas.  

Page 22: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 20 

 

Surface  Drainage:  Surface  drainage  conditions  should  be  properly maintained.  Surface  water should be directed away  from the construction area, and the work area should be sloped away from  the  construction  area  at  a  gradient  of  1  percent  or  greater  to  reduce  the  potential  of ponding water and the subsequent saturation of the surface soils. At the end of each work day, the subgrade soils should be sealed by rolling the surface with a smooth drum roller to minimize infiltration of surface water.    Erosion Control: The surface soils may be erodible. Therefore, the Contractor should provide and maintain good site drainage during earthwork operations to maintain the integrity of the surface soils.  All  erosion  and  sedimentation  controls  should  be  in  accordance with  sound  engineering practices and local requirements.   

Page 23: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 21 

 

7.0 CLOSING 

ECS  has  prepared  this  report  of  findings,  evaluations,  and  recommendations  to  guide geotechnical‐related design and construction aspects of the project.    

The description of the proposed project is based on information provided to ECS by your office.  If any of this information is inaccurate, either due to our interpretation of the documents provided or site or design changes that may occur later, ECS should be contacted immediately in order that we  can  review  the  report  in  light  of  the  changes  and  provide  additional  or  alternate recommendations as may be required to reflect the proposed construction.  We recommend that ECS be allowed to review the project’s plans and specifications pertaining to our work so that we may ascertain consistency of those plans/specifications with the intent of the geotechnical report.   Field observations, monitoring,  and quality  assurance  testing during earthwork  and  foundation installation  are  an  extension  of  and  integral  to  the  geotechnical  design  recommendation. We recommend that the owner retains these quality assurance services and that ECS be allowed to continue  our  involvement  throughout  these  critical  phases  of  construction  to  provide  general consultation  as  issues  arise.  ECS  is  not  responsible  for  the  conclusions,  opinions,  or recommendations of others based on the data in this report. 

  

Page 24: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 1 

 

APPENDIX A – Drawings & Reports  

Site Location Diagram Boring Location Diagram 

  

Page 25: ECS Florida, LLC

7/18/2017

Service Layer Credits: USGS The National Map: Orthoimagery

²

ENGINEER

SCALE

41:19461 OF 2

PROJECT NO.

SHEET

DATE

RCM

LBD WESLEY CHAPEL, LLC WESLEY CHAPEL FL 33543

SITE LOCATION DIAGRAM TERRACES AT WESLEYCHAPEL GEO

NTS

Page 26: ECS Florida, LLC

SOURCE: Charlan, Brook & Associates

FIGURE NO.2

SCALENTS

DATE07-17-17

DRAWN BYRCM

CHECKED BYSVS

JOB NO.41-1946

Approximate Locations of Borings

BORING LOCATION DIAGRAM

Terraces at Wesley ChapelNew River Road and SR 54

Wesley Chapel, Florida

N

Page 27: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 2 

 

APPENDIX B – Field Operations  

Reference Notes for Boring Logs Boring Logs B‐1 through B‐14 

 

Page 28: ECS Florida, LLC

Reference Notes for Boring Logs (FINAL 10-13-2016) © 2016 ECS Corporate Services, LLC. All Rights Reserved

COHESIVE SILTS & CLAYS

UNCONFINED

COMPRESSIVE

STRENGTH, QP4

SPT5

(BPF)

CONSISTENCY7

(COHESIVE)

<0.25 <3 Very Soft

0.25 - <0.50 3 - 4 Soft

0.50 - <1.00 5 - 8 Medium Stiff

1.00 - <2.00 9 - 15 Stiff

2.00 - <4.00 16 - 30 Very Stiff

4.00 - 8.00 31 - 50 Hard

>8.00 >50 Very Hard

GRAVELS, SANDS & NON-COHESIVE SILTS

SPT5

DENSITY

<5 Very Loose

5 - 10 Loose

11 - 30 Medium Dense

31 - 50 Dense

>50 Very Dense

REFERENCE NOTES FOR BORING LOGS

1Classifications and symbols per ASTM D 2488-09 (Visual-Manual Procedure) unless noted otherwise.

2To be consistent with general practice, “POORLY GRADED” has been removed from GP, GP-GM, GP-GC, SP, SP-SM, SP-SC soil types on the boring logs.

3Non-ASTM designations are included in soil descriptions and symbols along with ASTM symbol [Ex: (SM-FILL)].

4Typically estimated via pocket penetrometer or Torvane shear test and expressed in tons per square foot (tsf).

5Standard Penetration Test (SPT) refers to the number of hammer blows (blow count) of a 140 lb. hammer falling 30 inches on a 2 inch OD split spoon sampler required to drive the sampler 12 inches (ASTM D 1586). “N-value” is another term for “blow count” and is expressed in blows per foot (bpf).

6The water levels are those levels actually measured in the borehole at the times indicated by the symbol. The measurements are relatively reliable when augering, without adding fluids, in granular soils. In clay and cohesive silts, the determination of water levels may require several days for the water level to stabilize. In such cases, additional methods of measurement are generally employed.

7Minor deviation from ASTM D 2488-09 Note 16.

8Percentages are estimated to the nearest 5% per ASTM D 2488-09.

RELATIVE

AMOUNT7

COARSE GRAINED

(%)8

FINE

GRAINED

(%)8

Trace <5 <5

Dual Symbol (ex: SW-SM)

10 10

With 15 - 20 15 - 25

Adjective (ex: “Silty”)

>25 >30

WATER LEVELS6

WL Water Level (WS)(WD)

(WS) While Sampling

(WD) While Drilling

SHW Seasonal High WT

ACR After Casing Removal

SWT Stabilized Water Table

DCI Dry Cave-In

WCI Wet Cave-In

DRILLING SAMPLING SYMBOLS & ABBREVIATIONS

SS Split Spoon Sampler PM Pressuremeter Test

ST Shelby Tube Sampler RD Rock Bit Drilling

WS Wash Sample RC Rock Core, NX, BX, AX

BS Bulk Sample of Cuttings REC Rock Sample Recovery %

PA Power Auger (no sample) RQD Rock Quality Designation %

HSA Hollow Stem Auger

PARTICLE SIZE IDENTIFICATION

DESIGNATION PARTICLE SIZES

Boulders 12 inches (300 mm) or larger

Cobbles 3 inches to 12 inches (75 mm to 300 mm)

Gravel: Coarse ¾ inch to 3 inches (19 mm to 75 mm)

Fine 4.75 mm to 19 mm (No. 4 sieve to ¾ inch)

Sand: Coarse 2.00 mm to 4.75 mm (No. 10 to No. 4 sieve)

Medium 0.425 mm to 2.00 mm (No. 40 to No. 10 sieve)

Fine 0.074 mm to 0.425 mm (No. 200 to No. 40 sieve)

Silt & Clay (“Fines”) <0.074 mm (smaller than a No. 200 sieve)

MATERIAL1,2

ASPHALT

CONCRETE

GRAVEL

TOPSOIL

VOID

BRICK

AGGREGATE BASE COURSE

FILL

3 MAN-PLACED SOILS

GW WELL-GRADED GRAVEL

gravel-sand mixtures, little or no fines

GP POORLY-GRADED GRAVEL gravel-sand mixtures, little or no fines

GM SILTY GRAVEL

gravel-sand-silt mixtures

GC CLAYEY GRAVEL

gravel-sand-clay mixtures

SW WELL-GRADED SAND

gravelly sand, little or no fines

SP POORLY-GRADED SAND

gravelly sand, little or no fines

SM SILTY SAND

sand-silt mixtures

SC CLAYEY SAND

sand-clay mixtures

ML SILT non-plastic to medium plasticity

MH ELASTIC SILT

high plasticity

CL LEAN CLAY low to medium plasticity

CH FAT CLAY

high plasticity

OL ORGANIC SILT or CLAY

non-plastic to low plasticity

OH ORGANIC SILT or CLAY

high plasticity

PT PEAT highly organic soils

Page 29: ECS Florida, LLC

0

5

10

15

20

25

30

S-1

S-2

S-3

S-4

S-5

S-6

S-7

S-8

S-9

SS

SS

SS

SS

SS

SS

SS

SS

SS

24

24

24

24

24

18

18

18

18

24

24

24

24

24

18

18

18

18

(SP) SAND, brown, moist, very loose

(SP-SM) SAND WITH SILT, brown, moist, loose

(SC) CLAYEY SAND, gray, wet, medium denseto very loose

2212

2222

3223

3323

4543

798

1198

667

1075

3

4

4

5

9

17

17

13

12

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-1

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

CONTINUED ON NEXT PAGE.

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

1 OF 2

Page 30: ECS Florida, LLC

35

40

45

50

55

60

S-10

S-11

S-12

SS

SS

SS

18

6

18

18

6

18

(SC) CLAYEY SAND, gray, wet, medium denseto very loose

Weight-of-Hammer (WOH) 38.5-43.5'

(SC) CLAYEY SAND, orangish gray, wet,medium dense, with Limestone

END OF BORING @ 45'

962

WOHWOHWOH

857

8

12

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-1

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

2 OF 2

Page 31: ECS Florida, LLC

0

5

10

15

20

25

30

S-1

S-2

S-3

S-4

S-5

S-6

S-7

S-8

S-9

SS

SS

SS

SS

SS

SS

SS

SS

SS

24

24

24

24

24

18

18

18

18

24

24

24

24

24

18

18

18

18

(SP) SAND, gray and brown, moist, loose tovery loose

(SC) CLAYEY SAND, gray, wet, medium dense

2222

2112

2322

3332

1243

121213

8109

578

767

4

2

5

6

6

25

19

15

13

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-2

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

CONTINUED ON NEXT PAGE.

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

1 OF 2

Page 32: ECS Florida, LLC

35

40

45

50

55

60

S-10

S-11

SS

SS

18

18

18

18

(SC) CLAYEY SAND, gray, wet, medium dense

(SC) CLAYEY SAND, gray, wet, loose, withLimestone

LIMESTONE, Highly Weathered, with Clay

END OF BORING @ 40'

343

756

7

11

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-2

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

2 OF 2

Page 33: ECS Florida, LLC

0

5

10

15

20

25

30

S-1

S-2

S-3

S-4

S-5

S-6

S-7

S-8

S-9

SS

SS

SS

SS

SS

SS

SS

SS

SS

24

24

24

24

24

18

18

18

18

24

24

24

24

24

18

18

18

18

(SP) SAND, gray and brown, moist, very loose

(SC) CLAYEY SAND, gray, wet, medium dense

(SP-SM) SAND WITH SILT, brown and gray,wet, medium dense

1111

1212

3222

3221

2112

9810

878

556

6911

2

3

4

4

2

18

15

11

20

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-3

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

CONTINUED ON NEXT PAGE.

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

1 OF 2

Page 34: ECS Florida, LLC

35

40

45

50

55

60

S-10

S-11

SS

SS

18

18

18

18

(SP-SM) SAND WITH SILT, brown and gray,wet, medium dense

(SC) CLAYEY SAND, gray, wet, loose

END OF BORING @ 40'

233

323

6

5

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-3

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

2 OF 2

Page 35: ECS Florida, LLC

0

5

10

15

20

25

30

S-1

S-2

S-3

S-4

S-5

S-6

S-7

S-8

S-9

SS

SS

SS

SS

SS

SS

SS

SS

SS

24

24

24

24

24

18

18

18

18

24

24

24

24

24

18

18

18

18

(SP) SAND, brown, moist, loose to very loose

(SP-SM) SAND WITH SILT, brown, wet, loose

(SP) SAND, brown, wet, medium dense

(SC) CLAYEY SAND, gray, wet, medium denseto very loose

2463

2222

2122

2322

2234

6710

887

8910

355

10

4

3

5

5

17

15

19

10

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-4

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

CONTINUED ON NEXT PAGE.

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

1 OF 2

Page 36: ECS Florida, LLC

35

40

45

50

55

60

S-10

S-11

SS

SS

18

18

18

18

(SC) CLAYEY SAND, gray, wet, medium denseto very loose

END OF BORING @ 40'

344

222

8

4

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-4

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

2 OF 2

Page 37: ECS Florida, LLC

0

5

10

15

20

25

30

S-1

S-2

S-3

S-4

S-5

S-6

S-7

S-8

S-9

SS

SS

SS

SS

SS

SS

SS

SS

SS

24

24

24

24

24

18

18

18

18

24

24

24

24

24

18

18

18

18

(SP) SAND, brown, moist, loose to very loose

(SC) CLAYEY SAND, gray, wet, loose tomedium dense

(SC) CLAYEY SAND, orangish gray, wet, loose,with Limestone

2332

2112

2121

3332

3467

7810

7911

448

343

6

2

3

6

10

18

20

12

7

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-5

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

CONTINUED ON NEXT PAGE.

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

1 OF 2

Page 38: ECS Florida, LLC

35

40

45

50

55

60

S-10

S-11

SS

SS

18

18

18

18

(SC) CLAYEY SAND, orangish gray, wet, loose,with Limestone

LIMESTONE, Highly Weathered, with Clay

50% Loss of Circulation (LOC)

END OF BORING @ 40'

1179

251813

16

31

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-5

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

2 OF 2

Page 39: ECS Florida, LLC

0

5

10

15

20

25

30

S-1

S-2

S-3

S-4

S-5

S-6

S-7

S-8

S-9

SS

SS

SS

SS

SS

SS

SS

SS

SS

24

24

24

24

24

18

18

18

18

24

24

24

24

24

18

18

18

18

(SP) SAND, gray and brown, moist to wet, looseto very loose

(SP-SM) SAND WITH SILT, brown, wet,medium dense

(SC) CLAYEY SAND, gray, wet, loose

2312

2122

2232

4434

1234

8811

8109

71012

446

4

3

5

7

5

19

19

22

10

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-6

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

CONTINUED ON NEXT PAGE.

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

1 OF 2

Page 40: ECS Florida, LLC

35

40

45

50

55

60

S-10

S-11

SS

SS

18

18

18

18

(SC) CLAYEY SAND, gray, wet, loose

100% Loss of Ciculation (LOC)

END OF BORING @ 40'

455

333

10

6

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-6

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

2 OF 2

Page 41: ECS Florida, LLC

0

5

10

15

20

25

30

S-1

S-2

S-3

S-4

S-5

S-6

S-7

S-8

S-9

SS

SS

SS

SS

SS

SS

SS

SS

SS

24

24

24

24

24

18

18

18

18

24

24

24

24

24

18

18

18

18

(SP) SAND, brown, moist, loose to very loose

(SP-SM) SAND WITH SILT, brown, moist, loose

(SC) CLAYEY SAND, gray, wet, medium denseto very loose

2112

1122

2324

4232

1343

111415

687

445

843

2

3

5

5

7

29

15

9

7

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-7

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

CONTINUED ON NEXT PAGE.

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

1 OF 2

Page 42: ECS Florida, LLC

35

40

45

50

55

60

S-10

S-11

S-12

SS

SS

SS

18

18

3

18

18

3

(SC) CLAYEY SAND, gray, wet, medium denseto very loose

Weight-of-Hammer (WOH) 38.5-39'

LIMESTONE, Highly Weathered, with Clay

END OF BORING @ 45'

444

WOH12

50/3

8

3

50/3

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-7

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

2 OF 2

Page 43: ECS Florida, LLC

0

5

10

15

20

25

30

S-1

S-2

S-3

S-4

S-5

S-6

S-7

S-8

S-9

SS

SS

SS

SS

SS

SS

SS

SS

SS

24

24

24

24

24

18

18

18

18

24

24

24

24

24

18

18

18

18

(SP) SAND, brown, moist, loose to very loose

(SC) CLAYEY SAND, gray and orange, wet,medium dense to loose

3222

2122

2222

3322

3223

131111

567

436

332

4

3

4

5

4

22

13

9

5

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-8

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

CONTINUED ON NEXT PAGE.

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

1 OF 2

Page 44: ECS Florida, LLC

35

40

45

50

55

60

S-10

S-11

SS

SS

18

18

18

18

(SC) CLAYEY SAND, gray and orange, wet,medium dense to loose

LIMESTONE, Highly Weathered, with Clay

END OF BORING @ 40'

988

111315

16

28

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-8

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

2 OF 2

Page 45: ECS Florida, LLC

0

5

10

15

20

25

30

S-1

S-2

S-3

S-4

S-5

S-6

S-7

S-8

S-9

SS

SS

SS

SS

SS

SS

SS

SS

SS

24

24

24

24

24

18

18

18

18

24

24

24

24

24

18

18

18

18

(SP) SAND, brown, moist, loose to very loose

(SC) CLAYEY SAND, gray, moist, loose

(SP-SM) SAND WITH SILT, gray, wet, mediumdense

(SC) CLAYEY SAND, gray, wet, medium denseto loose

2321

2111

2121

2111

1234

7910

12129

346

9810

5

2

3

2

5

19

21

10

18

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-9

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

CONTINUED ON NEXT PAGE.

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

1 OF 2

Page 46: ECS Florida, LLC

35

40

45

50

55

60

S-10

S-11

SS

SS

18

18

18

18

(SC) CLAYEY SAND, gray, wet, medium denseto loose

(CL) LEAN CLAY WITH SAND, orangish gray,wet, firm

END OF BORING @ 40'

223

234

5

7

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-9

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

2 OF 2

Page 47: ECS Florida, LLC

0

5

10

15

20

25

30

S-1

S-2

S-3

S-4

S-5

S-6

S-7

S-8

S-9

SS

SS

SS

SS

SS

SS

SS

SS

SS

24

24

24

24

24

18

18

18

18

24

24

24

24

24

18

18

18

18

(SP) SAND, brown, moist, loose to very loose

(SC) CLAYEY SAND, gray, wet, medium denseto very loose

2321

2112

11

WOH2

2223

8633

889

477

442

211

5

2

1

4

9

17

14

6

2

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-10

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

CONTINUED ON NEXT PAGE.

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

1 OF 2

Page 48: ECS Florida, LLC

35

40

45

50

55

60

S-10

S-11

SS

SS

18

18

18

18

(SC) CLAYEY SAND, gray, wet, medium denseto very loose

Weight-of-Hammer (WOH) 35-36.5'

100% Loss of Ciculation (LOC)(CL) LEAN CLAY WITH SAND, gray, wet, soft

END OF BORING @ 40'

111

222

2

4

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-10

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

2 OF 2

Page 49: ECS Florida, LLC

0

5

10

15

20

25

30

S-1

S-2

S-3

S-4

S-5

S-6

SS

SS

SS

SS

SS

SS

24

24

24

24

24

18

24

24

24

24

24

18

(SP) SAND, gray and brown, moist, loose tovery loose

(SP-SM) SAND WITH SILT, brown, moist, loose

(SC) CLAYEY SAND, gray, wet, medium dense

END OF BORING @ 15'

2221

2121

2343

2334

4333

6712

4

3

7

6 10.7

6 9.4

19

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-11

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/11/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

1 OF 1

Page 50: ECS Florida, LLC

0

5

10

15

20

25

30

S-1

S-2

S-3

S-4

S-5

S-6

SS

SS

SS

SS

SS

SS

24

24

24

24

24

18

24

24

24

24

24

18

(SP) SAND, light brown, moist, loose to veryloose

(SC) CLAYEY SAND, gray, moist, mediumdense

(SP) SAND, light gray, wet, dense

END OF BORING @ 15'

2322

2121

2234

45811

13121419

111616

5

38.8

510.9

13 15.6

26

32

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-12

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/11/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/11/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

1 OF 1

Page 51: ECS Florida, LLC

0

5

10

15

20

25

30

S-1

S-2

S-3

S-4

S-5

S-6

SS

SS

SS

SS

SS

SS

24

24

24

24

24

18

24

24

24

24

24

18

(SP) SAND, brown, moist, loose to very loose

(SC) CLAYEY SAND, gray, moist to wet, looseto medium dense

END OF BORING @ 15'

2221

1222

2322

3246

45912

121413

4

4

7.3

5 7.9

6 19.6

14

27

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-13

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/12/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

1 OF 1

Page 52: ECS Florida, LLC

0

5

10

15

20

25

30

S-1

S-2

S-3

S-4

S-5

S-6

SS

SS

SS

SS

SS

SS

24

24

24

24

24

18

24

24

24

24

24

18

(SP) SAND, light brown, moist, loose

(SC) CLAYEY SAND, brown and orangish gray,moist, loose to dense

(CL) LEAN CLAY WITH SAND, gray, wet, verystiff

END OF BORING @ 15'

2332

2234

1247

7101318

15161816

101113

6 6.7

516.8

6

23

34

24

CLIENT

LBD Wesley Chapel, LLC

Job #:

41:1946

BORING #

B-14

SHEET

PROJECT NAME

Terraces at Wesley Chapel GEO

ARCHITECT-ENGINEER

LBD Wesley Chapel, LLCSITE LOCATION

New River Road and SR 54, Wesley Chapel, Pasco County, FLNORTHING EASTING STATION

THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL.

WL GNE WS WD BORING STARTED 07/12/17 CAVE IN DEPTH

WL(SHW) WL(ACR) BORING COMPLETED 07/12/17 HAMMER TYPE Manual

WL RIG ATV FOREMAN Justin M DRILLING METHOD Mud RotaryDRILLING METHOD Mud Rotary

DE

PT

H (

FT

)

SA

MP

LE

NO

.

SA

MP

LE

TY

PE

SA

MP

LE

DIS

T.

(IN

)

RE

CO

VE

RY

(IN

)

SURFACE ELEVATION

DESCRIPTION OF MATERIAL

WA

TE

R L

EV

ELS

ELE

VA

TIO

N (

FT

)

BLO

WS

/6"

10 20 30 40 50+

20% 40% 60% 80% 100%

1 2 3 4 5+

ENGLISH UNITS

BOTTOM OF CASING LOSS OF CIRCULATION

CALIBRATED PENETROMETER TONS/FT2

PLASTICLIMIT %

WATERCONTENT %

LIQUIDLIMIT %

ROCK QUALITY DESIGNATION & RECOVERY

RQD% REC.%

STANDARD PENETRATIONBLOWS/FT

1 OF 1

Page 53: ECS Florida, LLC

Terraces at Wesley Chapel    July 18, 2017, Revised August 24, 2017 ECS Project No. 41:1946, Revision 1    Page 3 

 

APPENDIX C – Laboratory Testing  

Laboratory Test Results Summary  

Page 54: ECS Florida, LLC

B-11S-4 6.00 - 8.00 10.7 SP 4.2S-5 8.00 - 10.00 9.4 SP-SM 5.6

B-12S-2 2.00 - 4.00 8.8 SP 4.9S-3 4.00 - 6.00 10.9 SP 4.1S-4 6.00 - 8.00 15.6 SC 24

B-13S-2 2.00 - 4.00 7.3 SP 3.1S-3 4.00 - 6.00 7.9 SP 3.6S-4 6.00 - 8.00 19.6 SC 33

B-14S-1 0.00 - 2.00 6.7 SP 4.4S-2 2.00 - 4.00 16.8 SC 17

Laboratory Testing Summary

Notes: 1. ASTM D 2216, 2. ASTM D 2487, 3. ASTM D 4318, 4. ASTM D 1140, 5. See test reports for test method, 6. See test reports for test method

Definitions: MC: Moisture Content, Soil Type: USCS (Unified Soil Classification System), LL: Liquid Limit, PL: Plastic Limit, PI: Plasticity Index, CBR: California Bearing Ratio, OC: Organic Content (ASTM D 2974)

Project No. 41:1946

Project Name: Terraces at Wesley Chapel GEO

PM: Robert C. Mixson

PE: Surendra V Sagi

Printed On: Wednesday, July 19, 2017

SampleSource

SampleNumber

Depth(feet)

MC1

(%)Soil

Type2 LL

Atterberg Limits3

PL PI

PercentPassingNo. 200Sieve4

MaximumDensity

(pcf)

Moisture - Density (Corr.)5

OptimumMoisture

(%)

CBRValue6 Other

Page 1 of 1