ee/cs 480 fall 2007 1 university of portland school of engineering project osprey rc-vtol team aaron...
TRANSCRIPT
![Page 1: EE/CS 480 Fall 2007 1 University of Portland School of Engineering Project Osprey RC-VTOL Team Aaron Duane Jesse Fledderjohann Hilary Henderson Chris Hope](https://reader035.vdocument.in/reader035/viewer/2022072015/56649ed45503460f94be4dc3/html5/thumbnails/1.jpg)
EE/CS 480 Fall 2007
1
University of Portland School of Engineering
Project OspreyRC-VTOL
TeamAaron Duane
Jesse Fledderjohann
Hilary Henderson
Chris Hope
AdvisorDr. Ward
Industry RepresentativeMr. Walt Harrison
![Page 2: EE/CS 480 Fall 2007 1 University of Portland School of Engineering Project Osprey RC-VTOL Team Aaron Duane Jesse Fledderjohann Hilary Henderson Chris Hope](https://reader035.vdocument.in/reader035/viewer/2022072015/56649ed45503460f94be4dc3/html5/thumbnails/2.jpg)
EE/CS 480 Fall 2007
2
University of Portland School of Engineering
Overview
• Introduction
• Scorecard
• Additional Accomplishments
• Plans
• Issues/Concerns
• Conclusions
![Page 3: EE/CS 480 Fall 2007 1 University of Portland School of Engineering Project Osprey RC-VTOL Team Aaron Duane Jesse Fledderjohann Hilary Henderson Chris Hope](https://reader035.vdocument.in/reader035/viewer/2022072015/56649ed45503460f94be4dc3/html5/thumbnails/3.jpg)
EE/CS 480 Fall 2007
3
University of Portland School of Engineering
Introduction
• RC-VTOL: Remote Controlled Vertical Takeoff and Landing
• Combines advantages of helicopters and airplanes
• Complex control processing
• RC: perspective changes
![Page 4: EE/CS 480 Fall 2007 1 University of Portland School of Engineering Project Osprey RC-VTOL Team Aaron Duane Jesse Fledderjohann Hilary Henderson Chris Hope](https://reader035.vdocument.in/reader035/viewer/2022072015/56649ed45503460f94be4dc3/html5/thumbnails/4.jpg)
EE/CS 480 Fall 2007
4
University of Portland School of Engineering
Scorecard
• Completed Project Plan to version 1.0
• Successful Design Review
• Theory of Operations to version 0.95– Work underway, not yet ready for 1.0– Final Revisions
![Page 5: EE/CS 480 Fall 2007 1 University of Portland School of Engineering Project Osprey RC-VTOL Team Aaron Duane Jesse Fledderjohann Hilary Henderson Chris Hope](https://reader035.vdocument.in/reader035/viewer/2022072015/56649ed45503460f94be4dc3/html5/thumbnails/5.jpg)
EE/CS 480 Fall 2007
5
University of Portland School of Engineering
Additional Accomplishments
• All hardware received and ready to use
• Received beta software for Eagle Tree Seagull Wireless Telemetry System– Tested and working correctly
• Software implementation begun– Know what we need, just need to do it!
![Page 6: EE/CS 480 Fall 2007 1 University of Portland School of Engineering Project Osprey RC-VTOL Team Aaron Duane Jesse Fledderjohann Hilary Henderson Chris Hope](https://reader035.vdocument.in/reader035/viewer/2022072015/56649ed45503460f94be4dc3/html5/thumbnails/6.jpg)
EE/CS 480 Fall 2007
6
University of Portland School of Engineering
Plans
• Theory of Operations to 1.0
• Build Classes
• Finalize physical layout
• Begin construction
![Page 7: EE/CS 480 Fall 2007 1 University of Portland School of Engineering Project Osprey RC-VTOL Team Aaron Duane Jesse Fledderjohann Hilary Henderson Chris Hope](https://reader035.vdocument.in/reader035/viewer/2022072015/56649ed45503460f94be4dc3/html5/thumbnails/7.jpg)
EE/CS 480 Fall 2007
7
University of Portland School of Engineering
MilestonesNumber Description Original
11/1/07Previous11/1/07
Present2/1/08
1 Pre approval 9/7/07 9/7/07 9/7/07
2 Functional specification 1.0 10/5/07 10/5/07 10/5/07
3 All parts arrive 11/15/07 11/15/07 10/5/07
4 Project Plan 1.0 11/9/07 11/9/07 11/8/07
5 Design review 12/7/07 12/7/07 12/4/07
6 Theory of Operations 0.90 2/8/08 2/8/08 2/8/08
7 Theory of Operations 0.95 2/15/08 2/15/08 2/15/08
8 Theory of Operations 1.0 2/22/08 2/22/08 2/22/08
9 Founders Day 4/8/08 4/8/08 4/8/08
10 Final Report 0.90 4/11/08 4/11/08 4/11/08
11 Final Report 0.95 4/18/08 4/18/08 4/18/08
12 Final Report 1.0 4/25/08 4/25/08 4/25/08
Exceeded Timetable Met Timetable Behind Timetable Not Complete
![Page 8: EE/CS 480 Fall 2007 1 University of Portland School of Engineering Project Osprey RC-VTOL Team Aaron Duane Jesse Fledderjohann Hilary Henderson Chris Hope](https://reader035.vdocument.in/reader035/viewer/2022072015/56649ed45503460f94be4dc3/html5/thumbnails/8.jpg)
EE/CS 480 Fall 2007
8
University of Portland School of Engineering
Concerns/Issues
• Staying on schedule
• Having time for difficult design challenges
• Airframe problems
• Testing procedure
![Page 9: EE/CS 480 Fall 2007 1 University of Portland School of Engineering Project Osprey RC-VTOL Team Aaron Duane Jesse Fledderjohann Hilary Henderson Chris Hope](https://reader035.vdocument.in/reader035/viewer/2022072015/56649ed45503460f94be4dc3/html5/thumbnails/9.jpg)
EE/CS 480 Fall 2007
9
University of Portland School of Engineering
Conclusions
• RC-VTOL: software based flight system
• Work proceeding on TOp 1.0
• Progress on Telemetry Transmitter
• Mitigated all previous concerns
• Questions?