EID MANAGEMENT SYSTEM AND TOOLS
Erick J. PerezPhilippine Economic Zone Authority
-
EcoEco--Industrial DevelopmentIndustrial Development
Management approach to enhance environmental managementEncourages sustainable production practices resulting to resource savings and higher efficiencyMinimizes conflicts between ecozones/locators and local communities over environmental issuesAwareness and compliance to environmental regulations to avoid high environment-related costs specifically on fines and penalties
Management Approach to Eco-Industrial Development of Philippine Economic Zones
-
EID ApproachEID Approach
Environment
Air/Water QualityHazardous Wastes
Residual/Solid WastesEIA
Sustainable Development
Society
EmploymentCommunityEconomy
ProductionExports
Management Approach to Eco-Industrial Development of Philippine Economic Zones
-
Role of PEZARole of PEZA
Given this vision on the emerging role of PEZA on the environment, society and economy, PEZA is then asked to respond and join the ranks of other progressive global organizations as an agent for sustainable development and value creation.
Thus, the demand has to be addressed with better tools and methodologies.
Management Approach to Eco-Industrial Development of Philippine Economic Zones
-
OUTLINE
Baseline Analysis Toolkit (BAT)Information Management System (IMS)
-
WHAT ARE THE OBJECTIVESOF BAT?
-
OBJECTIVES:
Obtain basic information on the Eco-Zone, identify hot-spots and core sectors.
Provide a guideline and useful tools
Address issues on core area
-
WHAT IS THE SCOPE?
-
SCOPE:Rely on existing / available dataLimit work and durationEstablish a standard approach and provide comparable baseline data for later benchmarking
-
WORKING STEPS OF AN EIDWORKING STEPS OF AN EID--BASELINE ANALYSISBASELINE ANALYSIS
Baseline Analysis
PEZA EID Baseline Analysis Toolkit
Definition of Scope of the BA
Information of Stake-holders
Data Collection
Assessment and Con-solidation
Conclusions & Draft
Strategy
Infor-mation of
Stake-holders
Operational Plan
-
WORKING STEPS OF AN WORKING STEPS OF AN EIDEID--BASELINE ANALYSISBASELINE ANALYSIS
Baseline Analysis
PEZA EID Baseline Analysis Toolkit
Definition of Scope of the BA
Information of Stake-holders
Data Collection
Assessment and Con-solidation
Conclusions & Draft
Strategy
Infor-mation of
Stake-holders
Operational Plan
-
OBJECTIVE:OBJECTIVE:Create adequate working and
communication structures for the
execution of the BA. Definition of
Scope of the BA
REQUIREMENTS:REQUIREMENTS:Clear responsibilities for the sub-steps
Reliable communication
-
SUBSUB--STEPS & OUTPUTS:STEPS & OUTPUTS:• Establish a team for
implementationTeam Matrix, Responsibilities, Communication Structure
• Provide a tentativeschedule for the BA
Tentative Work Plan
-
WORKING STEPS OF AN WORKING STEPS OF AN EIDEID--BASELINE ANALYSISBASELINE ANALYSIS
Baseline Analysis
PEZA EID Baseline Analysis Toolkit
Definition of Scope of the BA
Information of Stake-holders
Data Collection
Assessment and Con-solidation
Conclusions & Draft
Strategy
Infor-mation of
Stake-holders
Operational Plan
-
OBJECTIVES:OBJECTIVES:Get the stakeholders on board
Provide basic information
Find out their attitude towards the project
Information of Stake-holders
-
SUBSUB--STEPS:STEPS:
1. Planning and preparation of the event
2. Execution of the event
3. Documentation of the outcomes of the event
-
WORKING STEPS OF AN WORKING STEPS OF AN EIDEID--BASELINE ANALYSISBASELINE ANALYSIS
Baseline Analysis
PEZA EID Baseline Analysis Toolkit
Definition of Scope of the BA
Information of Stake-holders
Data Collection
Assessment and Con-solidation
Conclusions & Draft
Strategy
Infor-mation of
Stake-holders
Operational Plan
-
OBJECTIVES:OBJECTIVES:
Data acquisition and collection
Identification of data / information gaps
Data Collection
-
ELEMENTS:ELEMENTS:
1.General Information on the Economic Zone
2.Profile of the local PEZA Structure
3.Profile of Key Actors
4.Profile of technical infrastructure in the zone
5.Profile of the Locators
-
WORKING STEPS OF AN WORKING STEPS OF AN EIDEID--BASELINE ANALYSISBASELINE ANALYSIS
Baseline Analysis
PEZA EID Baseline Analysis Toolkit
Definition of Scope of the BA
Information of Stake-holders
Data Collection
Assessment and Con-solidation
Conclusions & Draft
Strategy
Infor-mation of
Stake-holders
Operational Plan
-
OBJECTIVES:OBJECTIVES:
Interpretation of data
Additional activities to fill the gaps
Draft a EID strategy for the EcoZone
Assessment and
Consolidation
Conclusions & Draft
Strategy
-
SUBSUB--STEPS:STEPS:
1.Elaborate the 5 Profiles
2.Draw conclusions for each profile
3.Draft the EID strategy
-
WORKING STEPS OF AN WORKING STEPS OF AN EIDEID--BASELINE ANALYSISBASELINE ANALYSIS
Baseline Analysis
PEZA EID Baseline Analysis Toolkit
Definition of Scope of the BA
Information of Stake-holders
Data Collection
Assessment and Con-solidation
Conclusions & Draft
Strategy
Infor-mation of
Stake-holders
Operational Plan
-
OBJECTIVES:OBJECTIVES:
Strengthen the commitment
Dissemination and discussion of findings
Discussion of the EID Strategy
Information of
Stakeholders
-
SUBSUB--STEPS:STEPS:
1.Planning and preparation of the event
2.Execution of the event
3.Documentation of the outcomes of the event
-
WORKING STEPS OF AN WORKING STEPS OF AN EIDEID--BASELINE ANALYSISBASELINE ANALYSIS
Baseline Analysis
PEZA EID Baseline Analysis Toolkit
Definition of Scope of the BA
Information of Stake-holders
Data Collection
Assessment and Con-solidation
Conclusions & Draft
Strategy
Infor-mation of
Stake-holders
Operational Plan
-
OBJECTIVES:OBJECTIVES:
Project Structure
Work plan for implementation
Management, Communication, Documentation and M&E structure in place
Operational Plan
-
SUBSUB--STEPS:STEPS:
1.Establish a team for project implementation
2.Define requirements for external support
3.Formulation of work packages
4.Establish management, communication, documentation and M&E structure between ESG, FISD and the local stakeholders
-
WHAT ARE THE OUTPUTS?
-
OUTPUTS:Establish 5 Profiles characterizing the main features of the Economic Zone with regard to the EID approachDevelop a Strategy for the EID-Initiative in the Economic ZoneEstablish a Project Team with appropriate Management, Implementation and M&E StructuresElaborate a Plan of Operations for the EID-Initiative
-
What is the IMS?What is the IMS?
Initiates and supplements the incorporation of EID approaches in PEZA operationsFocuses on the internalizing the EID management concept within the processes of specific PEZA units:
Environmental Safety Group (ESG)Fire & Industrial Safety Division (FISD) in the respective Public Ecozones and eventually across other PEZA units nationwide
Management Approach to Eco-Industrial Development of Philippine Economic Zones
-
Current SettingCurrent Setting
Difficulties in tracking environmental performanceChallenges in collecting required data:
Cost of data collectionGeneral reluctance by the companies to share data
An oversight on the overall environmental performance of ecozones and locators
Management Approach to Eco-Industrial Development of Philippine Economic Zones
-
ObjectivesObjectives
Real-time monitoring of ecozone and locator environmental performance. Improved data collection and processing at reduced costs Decision support systemLocators to self-evaluate their environmental performance
Management Approach to Eco-Industrial Development of Philippine Economic Zones
-
Process Process
data
Management Approach to Eco-Industrial Development of Philippine Economic Zones
-
Benefits to LocatorsBenefits to Locators
Provides a central source of relevant & reliable information about operation issues (environmental monitoring and compliance – permits and clearances, etc)Makes available environmental reporting in mutually-recognized format for use in complying with reporting requirements of other agencies (i.e. DENR – EMB, LLDA, etc)Self-evaluation on the performance of the facility for water use, energy use, production, etcUseful tips, CP guides, government incentive programs, news around an Ecozone
Management Approach to Eco-Industrial Development of Philippine Economic Zones
-
Benefits to PEZABenefits to PEZA
Encourages transparency, accountability, time and cost effectiveness of PEZA processesAn effective measure for data collectionA basis for overall environmental performance evaluationFacilitate voluntary networking activities among industries/locatorsIntegrated analysis, strategic planning and priority settingCan serve as a direct communication platform between PEZA ecozones, central offices and locators
Management Approach to Eco-Industrial Development of Philippine Economic Zones
-
Requirements for Successful ImplementationRequirements for Successful Implementation
Development of useful content to attract participantsData securityHigh AvailabilityMutual trust between PEZA Ecozone and Locators
Management Approach to Eco-Industrial Development of Philippine Economic Zones
-
IMS FeaturesIMS Features
Main databasing, processing and archiving tool for EID issues, with quick and easy information delivery to support decision making within PEZA operations. Standardize environment related activities monitoring and reporting across ecozones and locatorsWeb-based system accessible from any connected computer with IMS certified user names and passwords anytime, anywhereSecured with defined user access levels (e.g. Administrator, PEZA-ESG, FISDs & Ecozone offices, MMT, PEZA Units, Developers, Locator Companies, External users and general public)
Management Approach to Eco-Industrial Development of Philippine Economic Zones
-
IMS FeaturesIMS Features
Integrated system with the following ESG processes and services as components: (a) Environmental Compliance Monitoring, (b) MMT, (c) SMR, (d) Waste Management, (e) Online EID Management Manual and (f) PEZA Management DashboardAutomated and on-demand reports needed by PEZA managementLinked to PEZA MIS and will be co-managed with ESG and FISDsDesigned to accommodate future expansions (e.g. GIS, additional database functions and map server)Can be accessed at http://124.105.32.236/smr
Management Approach to Eco-Industrial Development of Philippine Economic Zones
http://124.105.32.236/smr
-
Work ProgramWork Program
Initial assessment of existing systems and procedures to facilitate information managementDetermine resource requirementsDesign a system considering functional requirements by the PEZA units and possible resource requirementsDevelop the system modules (system applications) for selected processes, conduct of testing and appropriate capacity development
Management Approach to Eco-Industrial Development of Philippine Economic Zones
-
Work ProgramWork Program
Will initially develop PEZA Management Dashboard taken from the EID management concept which will provide the perspective to capture management indicators and decision tools eventually elevating the IMS into a business intelligence systemWill initially address environmental compliance processes, permitting, and monitoring functions mandated for PEZA to perform
Management Approach to Eco-Industrial Development of Philippine Economic Zones
-
Thank you!
Eco-Industrial DevelopmentEID ApproachRole of PEZAOUTLINEWHAT ARE THE �OBJECTIVES �OF BAT?OBJECTIVES: �WHAT IS THE SCOPE?SCOPE:WORKING STEPS OF AN EID-BASELINE ANALYSISWORKING STEPS OF AN EID-BASELINE ANALYSISOBJECTIVE:SUB-STEPS & OUTPUTS:WORKING STEPS OF AN EID-BASELINE ANALYSISOBJECTIVES:SUB-STEPS:WORKING STEPS OF AN EID-BASELINE ANALYSISOBJECTIVES:ELEMENTS:WORKING STEPS OF AN EID-BASELINE ANALYSISOBJECTIVES:SUB-STEPS:WORKING STEPS OF AN EID-BASELINE ANALYSISOBJECTIVES:SUB-STEPS:WORKING STEPS OF AN EID-BASELINE ANALYSISOBJECTIVES:SUB-STEPS:WHAT ARE THE �OUTPUTS?OUTPUTS:What is the IMS?Current SettingObjectivesProcess Benefits to LocatorsBenefits to PEZARequirements for Successful ImplementationIMS FeaturesIMS FeaturesWork ProgramWork ProgramThank you!
/ColorImageDict > /JPEG2000ColorACSImageDict > /JPEG2000ColorImageDict > /AntiAliasGrayImages false /CropGrayImages true /GrayImageMinResolution 300 /GrayImageMinResolutionPolicy /OK /DownsampleGrayImages true /GrayImageDownsampleType /Bicubic /GrayImageResolution 300 /GrayImageDepth -1 /GrayImageMinDownsampleDepth 2 /GrayImageDownsampleThreshold 1.50000 /EncodeGrayImages true /GrayImageFilter /DCTEncode /AutoFilterGrayImages true /GrayImageAutoFilterStrategy /JPEG /GrayACSImageDict > /GrayImageDict > /JPEG2000GrayACSImageDict > /JPEG2000GrayImageDict > /AntiAliasMonoImages false /CropMonoImages true /MonoImageMinResolution 1200 /MonoImageMinResolutionPolicy /OK /DownsampleMonoImages true /MonoImageDownsampleType /Bicubic /MonoImageResolution 1200 /MonoImageDepth -1 /MonoImageDownsampleThreshold 1.50000 /EncodeMonoImages true /MonoImageFilter /CCITTFaxEncode /MonoImageDict > /AllowPSXObjects false /CheckCompliance [ /None ] /PDFX1aCheck false /PDFX3Check false /PDFXCompliantPDFOnly false /PDFXNoTrimBoxError true /PDFXTrimBoxToMediaBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXSetBleedBoxToMediaBox true /PDFXBleedBoxToTrimBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXOutputIntentProfile () /PDFXOutputConditionIdentifier () /PDFXOutputCondition () /PDFXRegistryName () /PDFXTrapped /False
/Description > /Namespace [ (Adobe) (Common) (1.0) ] /OtherNamespaces [ > /FormElements false /GenerateStructure false /IncludeBookmarks false /IncludeHyperlinks false /IncludeInteractive false /IncludeLayers false /IncludeProfiles false /MultimediaHandling /UseObjectSettings /Namespace [ (Adobe) (CreativeSuite) (2.0) ] /PDFXOutputIntentProfileSelector /DocumentCMYK /PreserveEditing true /UntaggedCMYKHandling /LeaveUntagged /UntaggedRGBHandling /UseDocumentProfile /UseDocumentBleed false >> ]>> setdistillerparams> setpagedevice