Electronic Systems Support
CAN Branch PSU
Designed: Bjorn HalgrenPH-ESS Responsible: Paul Harwood
16
June 2
00
4C
AN
Bra
nch
PSU
2
What is it? A 6U crate, containing
Power supply modules (up to 8) CAN patch modules (up to 4) Control & monitoring (ELMB)
Capacity Maximum of 16 isolated branches Each branch powering up to 32 CAN
devices (depending on load)
16
June 2
00
4C
AN
Bra
nch
PSU
3
What does it do for you? Provides the required CAN supply voltages
Provides a convenient method of ‘patching’ the CAN bus into the cabling to the remote devices
Connects directly to a Kvaser interface
Provides; via a CAN interface (DCS) Monitoring (current, voltage) of each CAN bus
branch. ON/OFF control of each branch.
16
June 2
00
4C
AN
Bra
nch
PSU
4
Crate Details 6U x 160mm Contains ELMB for monitoring &
control
16
June 2
00
4C
AN
Bra
nch
PSU
5
Power Supply Module 2 CAN branches
Each branch electrically isolated
12V, 2A CAN bus supply
12V, 3A Digital + Analogue supply
16
June 2
00
4C
AN
Bra
nch
PSU
6
Patch Module 4 CAN branches
Fitted to rear of crate, patches power & CAN bus together
Takes 4 CAN inputs, or 1 25way connector from Kvaser interface
16
June 2
00
4C
AN
Bra
nch
PSU
7
Current Status Current activities
Electrical, Thermal & Operational testing about to commence
Building of 5 pre-production units to satisfy immediate requirements
5 crates, 20 PSU modules, 10 patch modules
This gives 5 half populated crates (8 branches), or an alternate combination
16
June 2
00
4C
AN
Bra
nch
PSU
8
What will it cost? Costs are currently only estimates Final unit costs will depend on
production quantities and the final production contractor
Estimates shown below should be close, but could vary in either direction
16
June 2
00
4C
AN
Bra
nch
PSU
9
Current Actions Fix quantities required
ALICE: ? ATLAS: 40-50 CMS: ? LHCb: 3-6
Search for a suitable contractor to build and supply the production units (price enquiry)
Complete the testing, including EMC, environmental etc.
Review production aspects of the design, to improve cost, safety, reliability etc.
16
June 2
00
4C
AN
Bra
nch
PSU
10
Future Support PH-ESS will
Procure Against advance payments
As for VME crates, TTC equipment, VMEbus SBCs
Test Provide second-line support
Repair First-line support (spares) with
experiments