The project involves: • Installing new wires on approxi- mately 41 miles of 138-kilovolt transmission line • Replacing aging wooden structures with sturdier steel structures • Work to rebuild the transmission line begins early 2020 and concludes Summer 2022 The planned upgrades to the 61-year-old transmission line increase electric reliability for customers and support economic growth in the area. The transmission line rebuild project begins at the Shidler Substation located off of State Highway 18, southeast of Shidler and continues east approximately 35 miles to the Osage-Washington counties line north of Bartlesville. The line then travels south and parallels Sunset Boulevard in Bartlesville for a short distance to where it ends at the Eliza Creek Substation in west Bartlesville. The company expects to complete most of the work in existing company-owned easements, although it might need to supplement some easements to bring them to current standards. WHAT WHY WHERE ELIZA CREEK SHIDLER TRANSMISSION LINE REBUILD PROJECT Proposed power line upgrades in northeastern Oklahoma are expected to increase electric reliability for customers. Plans involve updating an electric transmission line between Bartlesville and Shidler to reduce the frequency and duration of power outages. PROJECT SCHEDULE PROJECT ANNOUNCEMENT AND PRELIMINARY FIELD ACTIVITIES BEGIN Spring 2019 OPEN HOUSE Fall 2019 ROW* SUPPLEMENTAL EASEMENT ACQUISITION BEGINS Fall 2019 CONSTRUCTION BEGINS Spring 2020 ROW* RESTORATION Summer 2020 - Fall 2023 FACILITIES PLACED IN SERVICE Summer 2022 PRE-CONSTRUCTION ACTIVITIES BEGIN Fall 2019 Timeline subject to change. Timeline subject to change. *ROW: Right-of-Way *ROW: Right-of-Way 2019 2020 2022 2021 2024 2023

Upload: others

Post on 12-Jul-2022

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ELIZA CREEK ˜ SHIDLER

The project involves:• Installing new wires on approxi-mately 41 miles of 138-kilovolt transmission line

• Replacing aging wooden structures with sturdier steel structures

• Work to rebuild the transmission line begins early 2020 and concludes Summer 2022

The planned upgrades to the 61-year-old transmission line increase electric reliability for customers and support economic growth in the area.

The transmission line rebuild project begins at the Shidler Substation located off of State Highway 18, southeast of Shidler and continues east approximately 35 miles to the Osage-Washington counties line north of Bartlesville. The line then travels south and parallels Sunset Boulevard in Bartlesville for a short distance to where it ends at the Eliza Creek Substation in west Bartlesville.

The company expects to complete most of the work in existing company-owned easements, although it might need to supplement some easements to bring them to current standards.

WHAT WHY WHERE

ELIZA CREEK SHIDLERTRANSMISSION LINE REBUILD PROJECT

Proposed power line upgrades in northeastern Oklahoma are expected to

increase electric reliability for customers. Plans involve updating an electric

transmission line between Bartlesville and Shidler to reduce the frequency and

duration of power outages.

PROJECT SCHEDULE

PROJECT ANNOUNCEMENT AND PRELIMINARY FIELD ACTIVITIES BEGINSpring 2019

OPEN HOUSEFall 2019

ROW* SUPPLEMENTAL EASEMENT ACQUISITION BEGINSFall 2019

CONSTRUCTION BEGINSSpring 2020

ROW* RESTORATIONSummer 2020 - Fall 2023

FACILITIES PLACED IN SERVICESummer 2022

PRE-CONSTRUCTION ACTIVITIES BEGINFall 2019

Timeline subject to change.Timeline subject to change.*ROW: Right-of-Way*ROW: Right-of-Way

2019 2020 20222021 20242023

Page 2: ELIZA CREEK ˜ SHIDLER

123

75

60

60

11

10

18

99

SHIDLERSHIDLER

PAWHUSKAPAWHUSKA

BARTLESVILLEBARTLESVILLE

OSA

GE

CO

UN

TYO

SAG

E C

OU

NTY

WAS

HIN

GTO

N C

OU

NTY

WAS

HIN

GTO

N C

OU

NTY

ELIZA CREEKSUBSTATION

SHIDLERSUBSTATION

WEST PAWHUSKASUBSTATION

DOMESUBSTATION

TALLGRASS PRAIRIEPRESERVE

TALLGRASS PRAIRIEPRESERVE

OSAGERESERVATION

OSAGERESERVATION

PSO VALUES YOUR INPUT ON THIS PROJECT. PLEASE SEND COMMENTS AND QUESTIONS TO:

*Exact structure, height and right-of-way requirements may vary depending on final engineering

08/27/201908/27/2019

TYPICAL STRUCTURES

JULIET CAPEHEARTProject Outreach [email protected]/ElizaCreek-Shidler

Structure A Information:Typical Structure Height: Approximately 95 feetTypical Distance between Structures: Approximately 550 feetTypical Right-of-Way Width: Approximately 100 feet

Structure B Information:Typical Structure Height: Approximately 80 feetTypical Distance between Structures: Approximately 700 feetTypical Right-of-Way Width: Approximately 100 feet

STRUCTURE A STRUCTURE B

ELIZA CREEK SHIDLER TRANSMISSION LINE REBUILD PROJECT

EXISTING TRANSMISSION LINE TO BE REBUILT EXISTING SUBSTATION N