Emerald Coast Home ShowPublic Outreach Event to Solicit Citizen Input on the FY14-18 Project Priorities
On September 8th and 9th, staff had a
booth at the Emerald Coast Home Show.
The following information is a summary of the
surveys filled out by citizens in
attendance. There were a total of 49 Project Priority surveys and 75 general surveys
completed.
Roadway17%
Traffic Signals16%
Bike Lanes23%
Sidewalk 16%
Transit11%
Congestion17%
What aspect of the transportation system needs improvement the MOST?
Project Priority Survey ResultsTPO’s Draft
Rank
PROJECT DESCRIPTIONNumber of
VotesCitizens' Ranking
1 Widen SR123 to 4 lanes 17 12 Traffic Signal Synchronization System Enhancements 17 23 Advanced Traffic Management System 11 64 Destin Cross Town Connector – 2 lanes enhanced capacity 11 85 Bicycle and Pedestrian Projects 17 36 Corridor Management Plans/Studies 1 187 Corridor Management Projects 1 168 Intelligent Transportation System (ITS) 9 79 Widen US98 to 4 lanes from SR87 to Hurlburt Field 16 510 US98 at Stahlman Ave – Intersection Improvement 5 1111 Crestview Bypass/PJ Adams/Antioch Rd (Ferdon Blvd to US90) 2 1312 Crestview Bypass West (US90 to SR85N) 3 1213 Hollywood Blvd Extension from US98 to Hill Avenue 6 514 Express Transit Service from DeFuniak Springs to South Walton 1 2015 Express Transit Service from Niceville to Destin 8 1016 Express Transit Service from Ft. Walton to Destin 11 917 Park & Ride Lot at SR85 and Commerce Drive 2 1418 Park & Ride Lot at SR85 and Rattlesnake Bluff Rd 2 1519 Park & Ride Lot at SR20 and East Bay Loop Rd 2 1720 Park & Ride Lot at US331 and Rockhill Rd 1 19
22) MBB
"What SPECIFIC transportation problem would you want improved?"
1) Roadways2) Congestion in Crestview3) Roadway construction should be finished in a timely manner. Roadwork by airport almost caused an accident 4) Bus Service for Pensacola Beach during the week. 5) Sidewalks and beach access walkways across Santa Rosa Blvd. 6) Check with state of Oregon ‐ huge green approach to transit.7) Make traffic lights more in tune with each other.8) Left turn or double left turn at Beal and Carmel.9) Fix pot holes.10) More public transportation.11) 98 West form Airport Rd to Destin bridge.12) Better markings on roadways, especially turn lanes.13) Check the time ‐ Some signals, lights are on when traffic isn't coming out.14) Get a transportation system up and running between Pensacola, Ft. Walton Beach, Destin, and Panama City 15) The idea to add hotels. Parking garages to downtown FWB will only increase the congestion in the area. 16) Increase amount of sidewalks in neighborhoods.17) Flooding problems on Santa Rosa Blvd.18) Sidewalks in downtown neighborhoods.19) I think there should be some kind of sensor for the traffic lights ‐ the lights seem to take forever even when there is no car in sight. Brooks Bridge is so congested. Hwy 98!20) Too much traffic in Destin.21) Hwy 98 is very congested.22) Fi th l f MBB t T t Fi US98 Fix potholes from to Target. Fix US98.23) More bike lanes.24) I think Okaloosa Transportation doe s a great job and serves a very important service for our area. My brother used the service while he was alive and I am very appreciative. Thank you!25) Would like to see more public transport, more stops, and reasonable fares. 26) Less traffic signals and improve roadways.27) Reset signals, some are too slow.28) More sidewalks. Bypass around Destin on US98.29) Time traffic signals by the time of day.30) Toll Bridges?31) Less lights.32) Congestion is a big problem. Don't know how to fix this. Sidewalks should be a must in every city. Bike lanes need to the safe, too many hits on bikes. 33) The gasoline, because it does something wrong with the environment. 34) Bike lanes on Hwy 9835) Paint bike lanes down on the road in our neighborhood.36) Repave roadways so people will be safe on their bikes.37) Wider bike lanes and safety marketing for cyclists. 38) Widen the bike lanes so it would be safer. 39) We need pedestrian friendly transportation solutions. 40) Educate bikers that they need to share road with motorized vehicles.
41) The traffic signals.42) Bus routes need to be tweaked. People can walk to where they go faster than riding a bus. No transportation on weekends. Also, stopping at 7 limits when people can work.43) Larger bike lanes so people would use them.44) Bike lanes on major roadways.45) No problems once tourists leave. Grateful for the tourists when they are here. 46) Buses need to start earlier and end later. Transportation on weekends and should run more often so people don't have to walk to where they go and get there before the bus does. 47) Easier access to transportation for underprivileged families/those in need. Would like accessibility to bus 48) More cops to get people who run red lights.49) Review roadways and sidewalks.50) Street lights at intersection of Lewis Turner and Hwy 85 (near museum).51) Sychronize traffic lights where you do not sit stopped at every one.52) Additional lane on HWY 9853) There should be a sidewalk on Greenbriar; many people walk along that road to get to the Shell station and 54) Transit that stays in local areas as well as surrounding areas; make it affordable.55) Hwy98 and Benning traffic light too long.56) I live off 98 and wish there was a sidewalk to run on. 57) Better weater website (for tourists looking to travel to Destin).58) Cars coming from Shalimar Ponte ‐ speeding down the road, need speed bumps put in on the straght away. Meigs is a 20mph drive road. Can't ride a bike safely, walking is unsafe. Roads are closed off. We have flooding every time there's a storm or heavy rain. Something need to be done by lift station. 59) Traffic lanes heading south ‐ prior to red light at Mary Esther/Beale Pwky intersetion, the right turn lane begins a nice distance from intersection, however, sopme cars get into the right lane so they can get ahead of the cars backed up in the 2 lanes heading south. They then swtich into the lane to the left of the right turn lanes. 60) High speed train from Jacksonville to New Orleans (2 people made this comment)61) Lower tolls on toll bridges62) More, safer bike paths. Sadly too many bikers and walkers killed. 63) Park & Ride from Bluewater/Niceville to Destin Commons/Walmart64) Community transportation ‐ Improve wait times for pick‐ups65) Traffic in Destin is a daily nightmare! Bypass would be good. 66) US98 Bypass ‐ Hwy 87 to Hurlburt to Eglin67) I agree with you top 3 items, now, just get it done!
Priority From
Phases in Green are Cost Feasible with State/Federal Funds in the 2035 LRTP - Red phases are NOT Cost Feasible with
State/Federal Funds ImprovementDesign Funded FY11/12 Project # 4111022
Need for Right-of-Way Under ReviewConstruction
Design - Funded FY11/12 Project # 4111023Need for Right-of-Way Under Review
Construction
3
Design
Advanced Traffic Management System Enhancement- 2202394 e.g.
Closed circuit television, detection system, software upgrades
$400,000 Annually for Operations and Maintenance
$200,000 Annually for Operations and Maintenance
$300,000 Annually for Upgrades
TABLE 2: FY14‐18 NON‐STRATEGIC INTERMODAL SYSTEM PROJECT PRIORITIES
Area wide Traffic Signal System in Okaloosa - 4097971
Area wide Traffic Signal System in Walton- 4097972
Project Name
2
To
SR 123 North of SR 85S North of Toms Creek1A 4 Lane
1B SR 123 North of Toms Creek North of Turkey Creek 4 Lane
Destin Cross Town Connector (Ph 1 A l E t i 2 2 L E h dRight-of-Way
Construction
Garret Pit Road
1b. Pedestrian Overpass2a. Aplin Road Sidewalk
(4300382 – CST in FY16/17)SR 85 Rayburn St
Anderson Street
SR 85
Forrest Road
Beal PkwyOwls Head Rd
US 98Anchors St
1. Beal Pkwy Mary Esther Blvd2 Racetrack Rd SR 85
3. US 331 I-104. Mary Esther Blvd Anchors St
5. Mary Esther Cutoff Beal Pkwy
Beal PkwyOwls Head Rd
US 98
Anchors StI-10
SR 85
Medley Drive
Egan Drive
All Phases
I-10 at Antioch Rd
$125,000 Annually for Corridor Management
Plans
$400,000 Annually for Bicycle and Pedestrian Projects (Appendix B)
Beal Pkwy
Anchors St
$1,625,000 Annually for Corridor Management
Improvement Projects
US 98
Huntington Road
Bent Creek Road
All Phases
All Phases
2c. Long Drive Sidewalk (4300382 – CST in FY16/17)
3. Rocky Bayou Drive Extension Sidewalk
7
3. Mary Esther Blvd4. Mary Esther Cutoff
61. Racetrack Road
2. US 331
4 (Phase 1 - Azealea Extension - 2 new lanes of capacity from Beach to
Benning)
Stahlman Ave Main Street 2 Lanes Enhanced Capacity
5
1a. Antioch Road Sidewalk
2b. North Avenue Sidewalk (4300382 – CST in FY16/17)
Priority From
Phases in Green are Cost Feasible with State/Federal Funds in the 2035 LRTP - Red phases are NOT Cost Feasible with
State/Federal Funds Improvement
TABLE 2: FY14‐18 NON‐STRATEGIC INTERMODAL SYSTEM PROJECT PRIORITIES
Project Name To
PD&EDesign
Right-of-WayConstruction
PD&EDesign
Right-of-WayConstruction
Design Funded FY13/14 Project # 4219971Right-of-Way11 Crestview Bypass - PJ Adams
/Antioch Rd SR10 (US90) SR 85 Ferdon Blvd Provide 4 lanes of capacity
$1,140,000 to Implement Master
Plan Projects (Appendix C)
1. Traffic Operations Center $500,0002. Convert Existing ATMS to IP Ethernet $40,000
3. Intersection Detection Systems $600,0008 Intelligent Transportation System
(ITS) All Phases
10 US98 (SR30) at Stahlman Avenue Major intersection improvement
9 US98 (SR30)SR87 (Santa Rosa
County) Hurlburt Field Entrance Provide 6 lanes of capacity
ConstructionPD&EDesign
Right-of-WayConstruction
PD&EDesign
Right-of-WayConstruction
14 Express Transit Service South Walton County Feasibility Study Provide express transit service
15 Express Transit Service Destin Feasibility Study Provide express transit service
16 Express Transit Service Destin Feasibility Study Provide express transit service
17 All Phases Build Park and Ride Lot
18 All Phases Build Park and Ride Lot
19 All Phases Build Park and Ride Lot
20 All Phases Build Park and Ride Lot
12 Crestview Bypass West US90 SR 85 N Provide 4 lanes of capacity
/Antioch Rd capacity
SR20 and East Bay Loop Road (Freeport)
US331 (SR83) and Rockhill Road
DeFuniak Springs
SR85 & Commerce Drive in the Crestview Community Center parking lot
Rattlesnake Bluff Road and SR85
Niceville
Fort Walton Beach
13 Hollywood Blvd. Extension US98 (SR30) Hill Avenue Provide 2 lanes of capacity
Priority Project Name From To Phases Funded in 2035 LRTP ImprovementDesign - Funded FY11/12 Project # 4111022
Need for Right-of-Way Under Review
Construction
Design - Funded FY11/12 Project # 4111023
Need for Right-of-Way Under Review
Construction
PD&E - Funded FY10/11 Project # 4141321
Design- Funded FY10/11 Project # 4141321
Right-of-Way
Construction
TABLE 3: FY14‐18 STRATEGIC INTERMODAL SYSTEM PROJECT PRIORITIES
SR 123 North of SR 85S North of Toms Creek
SR 123 North of Toms Creek North of Turkey Creek
1A
1B
2 US 98 Danny Wuerrfel Way (SR 293)
4 Lane
4 Lane
Tang-o-Mar 6 Lane
Project ID
Funding Source Project Name From To Phases in 2035 LRTP as
Locally Funded Improvement
A Local or Alt Funding
Destin Crosstown Connector (Phase 1 - Azealea Extension - 2 new
lanes of capacity from Beach to Benning)
Stahlman Ave Main St Design, Right-of-Way, and Construction
Provide 2 Lanes Enhanced Capacity
B Toll Funded Mid-Bay Bridge Road (SR 293) Mid-Bay Bridge North Approach
Mid-Bay Bridge South Approach
PD&E, Design, Right-of-Way, & Construction 4 Lane
C Toll Funded Mid-Bay Bridge Road (SR293) Range Road SR 85 PD&E, Design, Right-of-Way, & Construction 4 lane
D Local or Alt Funded
Northwest Florida Transportation Corridor Authority – Airport Connector SR85S SR123 PD&E 2 Lanes
TABLE 4: Local and/or Alternative Funded Projects
E Local or Alt Funded SR 189 (Beal Pkwy) Extend EBLT lane at SR 393 (Mary Esther Cutoff)
TRANSPORTATION SYSTEMS MANAGEMENT (TSM)
PROJECT PRIORITIES
TABLE 5:
COMMITTED PROJECTS (Funded for Construction within first 3 years of the Work Program)
TABLE 6:
FY14-18 PROJECT PRIORITIES
CONSTRUCTION
SCHEDULE
MAJOR
STREET
MINOR
STREET
IMPROVEMENT
FY 11/12
4241051
SR 83
(US 331)
CR 278
(Coy Burgess
Loop)
NBLT with 100 feet of storage
FY 12/13
4175971
US 98 Santa Rosa Line
to Beal Pkwy
Construction of turn lanes and median
modification projects as identified in
US98 Congestion Management Report
FY13/14
(This will be constructed
with resurfacing project
#4288451)
SR187
(US331)
Walton Rd Construct a Southbound left turn lane
with 100 feet of storage
FY14/15
4241052
SR 83
(US 331)
Sherwood Construct a Southbound left turn lane
with 100 feet of storage
FY14/15
4241053
SR 83
(US 331)
Bruce Avenue Construct Northbound right turn lane
with 150 feet of storage on SR 83 (US
331)
Funded as a Traffic
Operations Push Button
Project #2208769 in
FY 2013
SR 10 SR 85 Construct an EBRT lane with 100 ft of
storage.
The problem at this
location will be fixed with
the US331 Resurfacing
project
SR83 CR282/Rockhill
Rd
Construct a Northbound right turn lane
with 100 feet of storage
This was added to
4246232 in FY14
SR20 Eglin AFB Site
C-6 Road
Construct Eastbound left turn lane with
100 feet of storage
PRIORITY MAJOR
STREET
MINOR
STREET
DESCRIPTION Estimated Cost
1
Area Wide Traffic Signal System
(Okaloosa)
$400,000 Annually For Operations and
Maintenance
If NOT funded with Capacity Funds
$400,000 Annually
Area Wide Traffic Signal System
(Walton)
$200,000 Annually For Operations and
Maintenance
If NOT funded with Capacity Funds
$200,000 Annually
ENHANCEMENT PROJECT PRIORITIES
TABLE 7:
COMMITTED PROJECTS Project Project Name From To Description 4280971 Wright Pkwy
(Funded with Enhancement
Funds – CST in FY12/13)
SR 393 US 98 3,450 linear feet of sidewalk to
fill gaps on both sides of road
4281151 Twelfth Ave Sidewalks
addition
(Funded with Enhancement
Funds – CST in FY13/14)
Eglin Pkwy 12th
Street .87 mi of sidewalk on the south
side
4193141 Mooney Road and Lewis
Turner Blvd Crosswalks
(This is being constructed in
FY12 as part of the resurfacing
project)
Crosswalk facilities to include
pedestrian actuated signals and
striping at all three corners
TABLE 8:
FY14-18 PROJECT PRIORITIES Priority Project Name From To Description
1* Antioch Road Sidewalk Addition Garret Pit Road Egan Drive .5 mi of sidewalk on the
west side
2 Hutchison St
Bike Lanes Multi-Use Trail and
Sidewalk
Scenic Hwy 98 US Hwy 98 Length is approx. 2100’
3** Rocky Bayou Drive Sidewalk
Extension Forrest Road
Huntington
Road
1 mile of sidewalk on the
north side
*The Okaloosa County Community Traffic Safety Team has recommended these projects for possible
funding through the Safe Routes to School Program
** The Okaloosa County Community Traffic Safety Team has recommended these projects for possible
funding through the Highway Safety Program
Table 9: Public Transportation Project Priorities
Work
Program # Project Description
Funding Source %
Proposed 2014
Proposed 2015
Proposed 2016
Proposed 2017
Proposed 2018
FTA 5307 CAPITAL (80/20) FTA 100 1,920,000 1,045,000 415,000 945,000 995,000
FDOT TOLL REVENUE CREDITS FOR 5307 FDOT 100 480,000 261,250 103,750 236,250 248,750
FTA 5307 OPERATING FTA 50 650,000 650,000 650,00 650,000 650,000
FTA 5309 CAPITAL (80/20) FTA 100 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000
FDOT TOLL REVENUE CREDITS FOR 5309 FDOT 100 250,000 250,000 250,000 250,000 250,000
FDOT BLOCK OPERATING ASSISTANCE FDOT 50 462,020 485,121 509,377 534,846 561,588
FDOT COMMUTER ASSISTANCE FDOT 50 10,000 10,000 10,000 10,000 10,000
FDOT SERVICE DEVELOPMENT FDOT 50 200,000 200,000 200,000 200,000 200,000
FTA/FDOT 5311 RURAL OPERATING ASSIST
FTA/ FDOT 50 195,000 195,000 195,000 195,000 195,000
FDOT CORRIDOR MANAGEMENT FDOT 100 280,589 290,000 300,000 300,000 300,000
FTA SECTION 5316 (JARC) FTA 50 600,000 600,000 650,000 675,000 675,000
FTA SECTION 5317 (NEW FREEDOM) FDOT 50 500,000 500,000 550,000 550,000 550,000
Table 10: Transportation Disadvantaged Trust Fund (TDTF)
2014 Project Description FTA State Local
Total Cost
Okaloosa County TDTF – Trip/Equip 379,414 42,157 421,571
Okaloosa County TDTF – Planning 20,695 20,695
Walton County TDTF – Trip/Equip 303,676 33,742 337,418
Walton County TDTF – Planning 18,149 18,149
2015 Project Description FTA State Local
Total Cost
Okaloosa County TDTF – Trip/Equip 379,414 42,157 421,571
Okaloosa County TDTF – Planning 20,695 20,695
Walton County TDTF – Trip/Equip 303,676 33,742 337,418
Walton County TDTF – Planning 18,149 18,149
2016 Project Description FTA State Local
Total Cost
Okaloosa County TDTF – Trip/Equip 379,414 42,157 421,571
Okaloosa County TDTF – Planning 20,695 20,695
Walton County TDTF – Trip/Equip 303,676 33,742 337,418
Walton County TDTF – Planning 18,149 18,149
2017 Project Description FTA State Local
Total Cost
Okaloosa County TDTF – Trip/Equip 379,414 42,157 421,571
Okaloosa County TDTF – Planning 20,695 20,695
Walton County TDTF – Trip/Equip 303,676 33,742 337,418
Walton County TDTF – Planning 18,149 18,149
2018 Project Description FTA State Local
Total Cost
Okaloosa County TDTF – Trip/Equip 379,414 42,157 421,571
Okaloosa County TDTF – Planning 20,695 20,695
Walton County TDTF – Trip/Equip 303,676 33,742 337,418
Walton County TDTF – Planning 18,149 18,149
FLORIDA DEPARTMENT OF TRANSPORTATION
JACIP ONLINE 6 YEAR WORK PROGRAM REPORTPage 1 of 75/31/2012
Airport: Defuniak Springs Airport FDOT District: 3 03153.*ASite No.:
WP Item: PFL0000254UPIN:414126 1
Terminal and Security Improvements (Phase 2)
2011 2012 2013 2014 2015 2016 2017 Total
DDR $2,500 $0 $0 $0 $0 $0 $0 $2,500
LF $625 $0 $0 $0 $0 $0 $0 $625
Total $3,125 $0 $0 $0 $0 $0 $0 $3,125
WP Item: PFL0000502UPIN:414125 1
Terminal and Security Improvements (Phase 1)
2011 2012 2013 2014 2015 2016 2017 Total
DDR $2,000 $0 $0 $0 $0 $0 $0 $2,000
LF $500 $0 $0 $0 $0 $0 $0 $500
Total $2,500 $0 $0 $0 $0 $0 $0 $2,500
WP Item: PFL0001396UPIN:414121 1
Construct Apron
2011 2012 2013 2014 2015 2016 2017 Total
DPTO $0 $0 $1,695 $0 $0 $0 $0 $1,695
FAA $0 $0 $64,410 $0 $0 $0 $0 $64,410
LF $0 $0 $1,695 $0 $0 $0 $0 $1,695
Total $0 $0 $67,800 $0 $0 $0 $0 $67,800
WP Item: PFL0001399UPIN:420395 1
General Aviation Site Development, Phase II
FLORIDA DEPARTMENT OF TRANSPORTATION
JACIP ONLINE 6 YEAR WORK PROGRAM REPORTPage 2 of 75/31/2012
2011 2012 2013 2014 2015 2016 2017 Total
DPTO $80,000 $0 $0 $0 $0 $0 $0 $80,000
LF $20,000 $0 $0 $0 $0 $0 $0 $20,000
Total $100,000 $0 $0 $0 $0 $0 $0 $100,000
WP Item: PFL0001400UPIN:420397 1
General Aviation Site Development , Phase III
2011 2012 2013 2014 2015 2016 2017 Total
DPTO $40,000 $0 $0 $0 $0 $0 $0 $40,000
LF $10,000 $0 $0 $0 $0 $0 $0 $10,000
Total $50,000 $0 $0 $0 $0 $0 $0 $50,000
WP Item: PFL0001401UPIN:422299 1
Remove Power Poles, Purchase and Install AWOS, and Relocate Beacon - Phase 2
2011 2012 2013 2014 2015 2016 2017 Total
DPTO $0 $32,000 $0 $0 $0 $0 $0 $32,000
LF $0 $8,000 $0 $0 $0 $0 $0 $8,000
Total $0 $40,000 $0 $0 $0 $0 $0 $40,000
WP Item: PFL0001406UPIN:414120 1
Construct Apron
2011 2012 2013 2014 2015 2016 2017 Total
DPTO $0 $0 $19,200 $0 $0 $0 $0 $19,200
LF $0 $0 $4,800 $0 $0 $0 $0 $4,800
Total $0 $0 $24,000 $0 $0 $0 $0 $24,000
WP Item: PFL0002453UPIN:425634 1
Airport Signs
FLORIDA DEPARTMENT OF TRANSPORTATION
JACIP ONLINE 6 YEAR WORK PROGRAM REPORTPage 3 of 75/31/2012
2011 2012 2013 2014 2015 2016 2017 Total
DPTO $0 $0 $0 $8,000 $0 $0 $0 $8,000
LF $0 $0 $0 $2,000 $0 $0 $0 $2,000
Total $0 $0 $0 $10,000 $0 $0 $0 $10,000
WP Item: PFL0002455UPIN:425634 2
Complete Taxiway
2011 2012 2013 2014 2015 2016 2017 Total
DDR $0 $0 $0 $0 $5,000 $0 $0 $5,000
FAA $0 $0 $0 $0 $190,000 $0 $0 $190,000
LF $0 $0 $0 $0 $5,000 $0 $0 $5,000
Total $0 $0 $0 $0 $200,000 $0 $0 $200,000
WP Item: PFL0005753UPIN:423597 4
Runway and Taxiway Marking Phase I.
2011 2012 2013 2014 2015 2016 2017 Total
DPTO $42,050 $0 $0 $0 $0 $0 $0 $42,050
LF $10,513 $0 $0 $0 $0 $0 $0 $10,513
Total $52,563 $0 $0 $0 $0 $0 $0 $52,563
WP Item: PFL0006503UPIN:423597 1
General Aviation Site Development, Phase 1
2011 2012 2013 2014 2015 2016 2017 Total
DDR $550,014 $0 $0 $0 $0 $0 $0 $550,014
DPTO $67,036 $0 $0 $0 $0 $0 $0 $67,036
LF $155,200 $0 $0 $0 $0 $0 $0 $155,200
Total $772,250 $0 $0 $0 $0 $0 $0 $772,250
FLORIDA DEPARTMENT OF TRANSPORTATION
JACIP ONLINE 6 YEAR WORK PROGRAM REPORTPage 4 of 75/31/2012
WP Item: PFL0006504UPIN:423597 5
North Terminal Complex Site Development(T-Hangar 1)
2011 2012 2013 2014 2015 2016 2017 Total
DDR $0 $205,670 $0 $0 $0 $0 $0 $205,670
DPTO $0 $38,330 $0 $0 $0 $0 $0 $38,330
LF $0 $61,000 $0 $0 $0 $0 $0 $61,000
Total $0 $305,000 $0 $0 $0 $0 $0 $305,000
WP Item: PFL0006505UPIN:423597 6
North Terminal Complex Site Development(T-Hangar 2)
2011 2012 2013 2014 2015 2016 2017 Total
DDR $0 $0 $10,000 $0 $0 $0 $0 $10,000
DPTO $0 $0 $258,000 $0 $0 $0 $0 $258,000
LF $0 $0 $67,000 $0 $0 $0 $0 $67,000
Total $0 $0 $335,000 $0 $0 $0 $0 $335,000
WP Item: PFL0006506UPIN:425635 1
North Terminal Complex Site Development(T-Hangar 3)
2011 2012 2013 2014 2015 2016 2017 Total
DPTO $0 $0 $0 $264,000 $0 $0 $0 $264,000
LF $0 $0 $0 $66,000 $0 $0 $0 $66,000
Total $0 $0 $0 $330,000 $0 $0 $0 $330,000
WP Item: PFL0006507UPIN:423597 7
North Terminal Complex Site Development(T-Hangar 4)
FLORIDA DEPARTMENT OF TRANSPORTATION
JACIP ONLINE 6 YEAR WORK PROGRAM REPORTPage 5 of 75/31/2012
2011 2012 2013 2014 2015 2016 2017 Total
DDR $0 $0 $0 $0 $160,382 $0 $0 $160,382
DPTO $0 $0 $0 $0 $109,218 $0 $0 $109,218
LF $0 $0 $0 $0 $67,400 $0 $0 $67,400
Total $0 $0 $0 $0 $337,000 $0 $0 $337,000
WP Item: PFL0008331UPIN:423597 8
Install Automated Weather Observation System (AWOS) and relocate Rotating Beacom
2011 2012 2013 2014 2015 2016 2017 Total
DDR $3,750 $0 $0 $0 $0 $0 $0 $3,750
FAA $142,500 $0 $0 $0 $0 $0 $0 $142,500
LF $3,750 $0 $0 $0 $0 $0 $0 $3,750
Total $150,000 $0 $0 $0 $0 $0 $0 $150,000
WP Item: PFL0008913UPIN:425634 3
Extend and Widen Runway 9/27 to 5000' X 75'
2011 2012 2013 2014 2015 2016 2017 Total
DPTO $0 $0 $0 $0 $0 $42,050 $0 $42,050
FAA $0 $0 $0 $0 $0 $1,597,900 $0 $1,597,900
LF $0 $0 $0 $0 $0 $42,050 $0 $42,050
Total $0 $0 $0 $0 $0 $1,682,000 $0 $1,682,000
WP Item: PFL0008955UPIN:
Construct Access Road (Phase 1)
2011 2012 2013 2014 2015 2016 2017 Total
DDR $0 $1,495,505 $0 $0 $0 $0 $0 $1,495,505
Total $0 $1,495,505 $0 $0 $0 $0 $0 $1,495,505
FLORIDA DEPARTMENT OF TRANSPORTATION
JACIP ONLINE 6 YEAR WORK PROGRAM REPORTPage 6 of 75/31/2012
WP Item: PFL0009354UPIN:
10-Unit T-Hangar (North Hangar Complex
2011 2012 2013 2014 2015 2016 2017 Total
DDR $0 $0 $0 $0 $0 $0 $500,000 $500,000
LF $0 $0 $0 $0 $0 $0 $125,000 $125,000
Total $0 $0 $0 $0 $0 $0 $625,000 $625,000
2011 2012 2013 2014 2015 2016 2017 Total
DDR $562,014 $1,701,175 $10,000 $0 $165,382 $0 $500,000 $2,938,571
DPTO $229,086 $70,330 $278,895 $272,000 $109,218 $42,050 $0 $1,001,579
FAA $285,000 $0 $64,410 $0 $190,000 $1,597,900 $0 $2,137,310
LF $204,338 $69,000 $73,495 $68,000 $72,400 $42,050 $125,000 $654,283
Total $1,280,438 $1,840,505 $426,800 $340,000 $537,000 $1,682,000 $625,000 $6,731,743
Airport Summary Report: Defuniak Springs Airport
District Summary Report: 3
2011 2012 2013 2014 2015 2016 2017 Total
DDR $558,264 $1,701,175 $10,000 $0 $165,382 $0 $500,000 $2,934,821
DPTO $229,086 $70,330 $278,895 $272,000 $109,218 $42,050 $0 $1,001,579
FAA $142,500 $0 $64,410 $0 $190,000 $1,597,900 $0 $1,994,810
LF $200,588 $69,000 $73,495 $68,000 $72,400 $42,050 $125,000 $650,533
Total $1,130,438 $1,840,505 $426,800 $340,000 $537,000 $1,682,000 $625,000 $6,581,743
Total Summary Report
FLORIDA DEPARTMENT OF TRANSPORTATION
JACIP ONLINE 6 YEAR WORK PROGRAM REPORTPage 7 of 75/31/2012
2011 2012 2013 2014 2015 2016 2017 Total
DDR $562,014 $1,701,175 $10,000 $0 $165,382 $0 $500,000 $2,938,571
DPTO $229,086 $70,330 $278,895 $272,000 $109,218 $42,050 $0 $1,001,579
FAA $285,000 $0 $64,410 $0 $190,000 $1,597,900 $0 $2,137,310
LF $204,338 $69,000 $73,495 $68,000 $72,400 $42,050 $125,000 $654,283
Total $1,280,438 $1,840,505 $426,800 $340,000 $537,000 $1,682,000 $625,000 $6,731,743
Table 12: Okaloosa County Airport Project Priorities
2014 Priority FM Item Description Local FDOT FAA Total
1 4256141 Overlay Public Parking Lot at Northwest
Florida Regional 1,800,000 1,000,000 0 2,800,000
2 4256151 Destin: Air Traffic Control Tower-
Construct/Equip 271,500 271,500 8,265,000 8,808,000
3 4256161 Bob Sikes Apron
on East Side 150,000 150,000 5,700,000 6,000,000
4 4256171 BobSikes: Overlay Aircraft Parking
Apron 97,500 97,500 3,705,000 3,900,000
5 425618 Bob Sikes Site Devel/Util/stormwater
SE Quad 112,500 112,500 4,275,000 4,500,000
2015 Priority FM Item Description Local FDOT FAA Total
1 4256142 NWFRA: Install High Mast Lighting for
RON Apron 36,250 36,250 427,500 500,000
2 425616 NWFRA: Expand Bag Claim 150,000 150,000 5,700,000 6,000,000
3 4223032 Construct Parallel Taxiway at Destin
Airport 75,000 75,000 2,850,000 3,000,000
4 4223033 Relocate Destin Fuel Farm 620,000 620,000 450,000 1,690,000
5 4256182 Bob Sikes Additional Public Parking 332,356 332,386 0 664,742
6 4256183 Bob Sikes: Design/Construct Utility
expansion 150,000 150,000 5,700,000 6,000,000
2016 Priority FM Item Description Local FDOT FAA Total
1 4256152 Airport Maintenance Building at Destin 150,000 150,000 0 300,000
2 4256184 Replace High Mast Lighting at Bob
Sikes Airport 150,000 150,000 150,000 450,000
3 4256172 Design South Access Road at Bob
Sikes Airport 331,675 1,258,658 0 1,593,333
4 4181933 Rehab NWFRA Employee Parking Lot 1,000,000 900,000 0 1,900,000
2017 Priority FM Item Description Local FDOT FAA Total
1 425613 Rehab Destin Apron 310,500 1,240000 0 1,550,000
3 425612 Design Construct South Access Road
at Bob Sikes Airport 334,675
1,238,700
0 1,573,375
3 425612 Construct South Access Road at Bob
Sikes Airport 103,750 415,000 0 518,750
2018 Priority FM Item Description Local FDOT FAA Total
1 TBD Expand Bag Claim Area at NWFRA 150,000 150,000 5,700,000 6,000,000
2 TBD Replace Regional Boarding Ramps at
NWFRA 40,000 40,000 1,520,000 1,600,000
3 TBD Demo and Contruct New Flight Service
Station at Bob Sikes 125,000 125,000 4,750,000 5,000,000
e
on the south side
Avenue, Jasmine Avenue, Florida (West), Poinciana & Tennessee
at all three corners
to fill gaps on both sides of road
o
y g y D p $3,483 290.69 B5 9
Bicycle & Pedestrian Project PrioritiesCommitted Projects
Project # / Year Construc Roadtion Name From To Description
4257781 / FY10‐11
ValparaisoBicycle/PeSidewalks
destrian
Multiple Sidewalks: Montana Street, Vine Street, Rose Court, MississippiAvenue, Grandview Avenue, Bayshore Drive, Georgia & Fern Dell Avenue
Avenue, Georgia & Fern Dell Avenue (East)4280971 / FY12‐13 Wright Pkwy SR393 US98 3,450 linear feet of sidewalk4281151 / FY13‐14 Twelfth Ave Eglin Pkwy 12th Street .87 mi of sidewalk
Construction in FY12 as presurfacing of Lewis Tur
(4193141)Mooney RLewis Turn
art of ner oad and
er Blvd Crosswalk facilities to include pedestrian actuated signals and striping
FY14‐18 Project Priorities
ID Road Name From To Mode Modal LOS
RecFa
ommencility T
ded yp
Total Cost
Benefit-Cost Index
Rank in
Plan
Overall Priority
1.0 Antioch Road Garret Pit Road Egan DrivePedestrian
n/a 0.5 mth
i of sidee west s
walk oide
n n/a n/a n/a 1A*
3B I-10 at Antioch RoadPedestrian
n/a 288 ft pedeoverpas
strians
n/a n/a n/a 1B*
2A Aplin Road SR 85 Rayburn StreetPedestrian
n/a 0.25 mi of siden rth sid
walk e
2Aon n/a n/a n/a
2A (4300382 – CST in FY16/17)
2B North Avenue Anderson Street Medley DrivePedestrian
n/a 0.33 mthe
i of sidesouth
walk side
on n/a n/a n/a2B
(4300382 – CST in FY16/17)
2C Long Drive SR85 Bent Creek RoadPedestrian
n/a 1056 fth
t of sidee north s
walk ide
on n/a n/a n/a3C
(4300382 – CST in FY16/17)
2.0 Rocky Bayou DExtension
rive Forest Rd Huntington RdPedestrian
n/a 1 mi of sidewanorth sid
lk on te
he n/a n/a n/a 3**
101.1 SR 30 (US 98) SR 189 Western Leg SR 85 Bicycle E Re-Stripe Candidate $3,483 717.21 B1 4
10.0CR 20 Martin LutheJr. Boulevard
r King Lovejoy Road Ajax Drive Bicycle E Re-Stripe Candidate $3,290 695.63 B2 5
137.0 SR 85 US 98 (SR 30) 1st Street Bicycle D Re-Stripe Candidate $2,516 547.11 B3 6
139.0 SR 85SR 188/ RRoad/ 4th
acetrack Avenue W end of bridge Pedestrian D
Add Sidewalk (MinoRegrading)
r $2,581 443.54 P1 7
138.2 SR 85 S end of bridge N end of bridge Bicycle D Re-Stripe Candidate $4,064 392.49 B4 8
120.1120.1SR 397 John Sims Parkway S end of bridge Bayshore Drive Bicycle DBicycle Re-Stripe Candidate $3,483 290.69 B5 9
eID Road Name From To Mode Modal LOS
RecFa
ommencility T
ded yp
Total Cost
Benefit-Cost Index
Rank in
Plan
Overall Priority
102.1 SR 30 (US 98) Perry Avenue Santa Rosa Blvd Bicycle E Re-Stripe Candidate $10,450 276.75 B6 10113.0 SR 30 (US 98) CR 393 Veterans Road Bicycle E Re-Stripe Candidate $9,870 256.79 B7 11
102.3 SR 30 (US 98) Pier Road
MilitarBoundEntran
y ary/Beace
ch Pk Pedestrian D
Add Sidewalk (MinoRegrading)
r $5,450 247.43 P2 12
64.3 SR 10 (US 90) 4th Street Baldwin Avenue Bicycle E Re-Stripe Candidate $9,482 226.79 B8 13139.1 SR 85 W end of bridge E end of bridge Bicycle D Re-Stripe Candidate $9,095 211.17 B9 14
68.0 SR 145 Perry Street US98 (SR30) SR85/ Eglin Parkway Pedestrian DAdd Sidewalk (
Regrading)Minor
$14,628 172.30 P3 1549.4 Old Hwy 98 Pedestrian Overpass Summer Haven Trail Bicycle D Re-Stripe Candidate $5,806 141.24 B10 16
112.1 SR 30 (US 98)ThompsonTolbert Rd
Rd/Bishop-CR 393 Bicycle F Re-Stripe Candidate $19,546 138.00 B11 17
107.0 SR 30 (US 98) Matthew Blvd Kel-Wen Circle Bicycle D Re-Stripe Candidate $15,482 112.88 B12 18
10.0CR 20 Martin LutheJr. Boulevard
r King Lovejoy Road Ajax Drive Pedestrian E
Add Sidewalk (MinoRegrading)
r $24,380 109.43 P4 19
102.2 SR 30 (US 98) Santa Rosa Boulevard Pier Road Pedestrian EAdd Sidewalk (
Regrading)Minor
$19,504 105.25 P5 20107.1 SR 30 (US 98) Kel-Wen Circle Walton County Line Bicycle D Re-Stripe Candidate $23,609 88.89 B13 2152.1 Rocky Bayou Dr Forest Rd Huntington Rd Bicycle D Re-Stripe Candidate $19,352 83.03 B14 22
106.0 SR 30 (US 98)Emerald COld US98
oast Pkwy/ Matthew Blvd Bicycle D Re-Stripe Candidate $39,285 79.70 B15 23
139.2 SR 85 E end of bridge 12th Avenue Pedestrian DAdd Sidewalk (Mino
Regrading)r
$19,576 79.65 P6 2460.0 SR 10 (US 90) SR 85/ Ferdon Blvd Sikes Drive Bicycle F Road Diet Candidate $57,404 72.70 B16 2519.0 CR 2390 SR 85 Terminus Bicycle D Road Diet Candidate $38,537 62.82 B17 26
102.0 SR 30 (US 98)Eastern Le85/Florida
g SR Place Perry Avenue Bicycle E
Detailed Corridor StuNeeded
dy $47,288 62.46 B18 27
102.1 SR 30 (US 98) Perry Avenue Santa Rosa Boulevard Pedestrian FAdd S
Stidewalk (udy Need
Detaileed)
d $63,839 56.53 P7 28
18.1 CR 2390 Memorial Parkway SR 189 Pedestrian DAdd Sidewalk (
Regrading)Minor
$112,936 50.73 P8 29
147.0 SR 85 I-10 (SR8) Duggan Avenue Pedestrian EAdd Sidewalk (Mino
Regrading)r
$56,361 46.70 P9 30
92.1 SR 201000 ft. WCounty Lin
of Walton e Walton County Line Pedestrian E
Add Sidewalk (MajRegrading)
or $66,182 43.62 P10 31
138.1 SR 85 Perry Avenue S end of bridge Pedestrian DAdd Sidewalk (Mino
Regrading)r
$56,719 38.62 P11 32
14.0 CR 2376 (Niceville) SR 20 SR 285 Pedestrian DAdd Sidewalk (Mino
Regrading)r
$68,837 35.87 P12 33
e
e
Choctawatchee Bay Add Sidewalk
e
ID Road Name From To Mode Modal LOS
RecFa
ommencility T
ded yp
Total Cost
Benefit-Cost Index
Rank in
Plan
Overall Priority
90.1 SR 20Juniper DrBoulevard
ive/Bullock Rocky Bayou Bridge Pedestrian E
Add Sidewalk (MinoRegrading)
r $168,723 31.80 P13 34
148.1 SR 85 Jones Road Garden Street Pedestrian EAdd Sidewalk (Mino
Regrading)r
$88,915 31.09 P14 35
91.0 SR 20N end of Rbridge
ocky Bayou S endbridge
of Rocky Bayou Pedestrian E
Add SSt
idewalk (udy Need
Detaileed)
d $122,949 30.22 P15 36
78.0 SR 189 Beal ParkwaySR 393/ MBoulevard/
ary Esther Oak St
SR 18Road
8/ Racetrack Pedestrian F
Add Sidewalk (MinoRegrading)
r $189,733 29.78 P16 37
73.1SR 189 Lewis TurneBoulevard
r Roberts Boulevard Mooney Road Pedestrian E
Add Sidewalk (MajoRegrading)
r $135,848 23.65 P17 38
12.0
CR 20 Martin LutheJr Boulevard/ GreAcres Drive
r King n
Hurlburt Field Road Green Acres Drive Pedestrian EAdd Sidewalk (Mino
Regrading)r
$137,675 21.08 P18 39
38.1 Denton Boulevard Bob Sikes Road SR 188 Pedestrian DAdd S
Stidewalk (udy Need
Detaileed)
d $118,221 20.92 P19 40
2.0 Bay St Duggan Ave Randolph Court Pedestrian DAdd Sidewalk (Mino
Regrading)r
$47,326 16.82 P20 41
127.1 SR 83 (US 331S) Chat HolleChoctawatchee
y Road Bridge (S end Bay
of span) Pedestrian EAdd Sidewalk (Minor
Regrading)(Minor
$131,938 15.73 P21 42
94.0 SR 285Swift Cree(South end
k Bridge )
CollegWL UBound
e Boulevrbanizedary
ard. O Area
K-
Pedestrian DAdd Sidewalk (Mino
Regrading)r
$106,124 15.43 P22 43
12.1
CR 20 Martin LutheJr Boulevard/ GreAcres Drive
r King n
Green Acres Drive SR 189 Pedestrian EAdd Sidewalk (Mino
Regrading)r
$217,985 15.21 P23 44
19.0 CR 2390 SR 85 Terminus Pedestrian DAdd Sidewalk (Mino
Regrading)r
$137,675 14.95 P24 45
9.0 CR 20 Hill Avenue Hollywood Boulevard Lovejoy Road Pedestrian EAdd Sidewalk (Mino
Regrading)r
$209,380 14.48 P25 46
45.0 Lewis St/Mayflower Ave SR 189 James L Lee Rd Pedestrian DAdd Sidewalk (Mino
Regrading)r
$182,132 13.98 P26 47
38.0 Denton Boulevard Mayflower Avenue Bob Sikes Road Pedestrian DAdd S
Stidewalk (udy Need
Detaileed)
d $236,441 12.98 P27 48
53.0 Santa Rosa Boulevard Eglin AFB Boundary US 98 (SR30) Pedestrian EAdd Sidewalk (Mino
Regrading)r
$281,372 10.44 P28 49
148.2 SR 85 Garden StreetCR 18Road
8/ Old Bethel Pedestrian E
Add SSt
idewalk (udy Need
Detaileed)
d $241,170 10.08 P29 50
*The Okaloosa County Community Traffic Safety Team has recommended these projects for possible funding through the Safe Routes to School Program ** The Okaloosa County Community Traffic Safety Team has recommended these projects for possible funding through the Highway Safety Programy y y p j p g g g y y g