Curriculum Vitae for Claudio Cavalieri A highly organized, motivated, energetic, creative person with effective planning and excellent leadership. Claudio has Twenty Four years in the Design/Build and Development industry and has managed over 60 facilities. Claudio has a reputation of honesty and fairness. EMPLOYMENT EXPERIENCE Cavalieri & Associates Ltd. November 2008 – Current President Pre-Development assignments are: Assist clients and their brokers in researching potential sites; Work with the designers on the design development of projects; Develop outline specifications; Provide value engineering; Prepare detailed schedules; Assist in the selection of qualified Design Build or General Contractors to bid on the project; Prepare bid documents; Tender the Project to the qualified Contractors and manage the tendering process including addendums and post tender addendums; Analyze bids; Interview the Contractors and assist in the final selection of the Contractor;

Upload: hoangtuyen

Post on 01-May-2018

218 views

Category:

Documents


2 download

TRANSCRIPT

Curriculum Vitae for Claudio Cavalieri

A highly organized, motivated, energetic, creative person with effective planning and excellent leadership. Claudio has Twenty Four years in the Design/Build and Development industry and has managed over 60 facilities. Claudio has a reputation of honesty and fairness.

EMPLOYMENT EXPERIENCE

Cavalieri & Associates Ltd. November 2008 – Current

President

Pre-Development assignments are: Assist clients and their brokers in researching potential sites; Work with the designers on the design development of projects; Develop outline specifications; Provide value engineering; Prepare detailed schedules; Assist in the selection of qualified Design Build or General Contractors to bid on the

project; Prepare bid documents; Tender the Project to the qualified Contractors and manage the tendering process

including addendums and post tender addendums; Analyze bids; Interview the Contractors and assist in the final selection of the Contractor; Oversee the final design development to ensure the outline specifications are achieved;

Project Monitoring Assignments are: Work with Contractors or Architects in expediting the Site Plan Approval and Building

Permits; Act as a liaison between the Contractor and “the client”; Monitor the construction progress and provide monthly reports; Attend bi-weekly site meetings and participate in sub-contractor meetings; Review the monthly progress payments and make adjustments as required; Review of contemplated change orders and provide recommendations;

Monitor the workmanship; Coordinate final inspections and sign off by the Municipality; Coordinate the Substantial Completion and Occupancy; Establish a deficiency report with the contractor; Ensure warranties, manuals and “as-built” drawings are assembled and issued to the

client; Follow up with the contractor to ensure deficiencies are corrected;

Panattoni Development Company November 2006 – December 2008

Senior Project Manager

Evaluating sites for the speculative development of offices, industrial use, end user opportunities, design build, retail and self storage

Prepare construction estimates and schedules Once a site has been established assemble the design team and manage the design Prepare specifications and tender documents and tender the project to qualified Design

Build or General Contractors Review and analyze the submitted proposals and interview the prospective proponents Prepare and issue the construction contract Monitor the on site construction and manage all issues on behalf of Panattoni Prepare a detailed monthly report for all investors and head office Review the monthly applications for payment from the contractor, make any

adjustments necessary and issue a certificate for payment Upon Substantial Completion prepare a detailed deficiency list with the contractor and

ensure the deficiencies are correct prior to release of holdback payment Ensure as-built drawings and maintenance manuals are received Ensure final sign off from the governing authorities is issued Work with the Realtors in preparing lease proposals Over see any Tenant improvements and ensure the Tenant occupies in accordance to

the lease agreements

Cooper Construction Limited January 2003 – November 2006

Project Director

Identify industrial and office design build opportunities through cold calling, referrals and marketing strategies

Develop and manage relationships with landlords, developers, real estate agents, architects, engineers, and direct users

Assemble the design team for each proposal Coordinate the design development Prepare outline specifications Prepare all aspects of the proposal documents Assist the estimating department in the tendering process Proposal presentation Negotiate the final agreement Prepare the construction contracts Issue all the major subcontracts Submit and manage the Site Plan Approval process Manage “the client” through the proposal and contract negotiations prior to handing

over the project to the Project Manager

Cooper Construction Limited October 1999 – January 2003

Project Manager

Assist the Consultants with design development Acquire all permits from various governing authorities Perform all tendering and awarding of contracts Create and maintain the construction schedules Co-ordinate with the site superintendent Maintain cost control Estimate any revisions to the project Manage the client’s throughout the construction process

Internorth Construction Company Limited February 1987 – October 1999

Project Manager

Assist the Consultants with design development Acquire all permits from various governing authorities Perform all tendering and awarding of contracts Create and maintain the construction schedules Co-ordinate with the site superintendent Maintain cost control Estimate any revisions to the project Manage the client’s throughout the construction process

Bay City Construction Inc. March 1986 – February 1987Title - Site Superintendent/Project Manager

On site superintendent and Project Manager

Regional Municipality of Halton February 1985 – March 1986Title - Services Permit Technician

Review and approve water and sewer connections to the Regions services Consult with fire, plumbing building and planning departments

McCormick, Rankin Consulting Engineers June 1984 – January 1985Title - Project Manager

Supervise the construction of a CP Rail bridge Performed surveying, drafting, approval of progress payments

EDUCATION

Civil Engineering TechnologyHigh Honours Graduate Seneca College, Toronto, Ontario