Enabling Sustainability A presentation by Clifford Devlin 17 th Aug 2010. Clifford Devlin Limited. Demolition. Asbestos Management. Building Works. Clifford Devlin Limited. Clifford Devlin Limited. Clifford Devlin Limited. Clifford Devlin Limited. Noise Vibration Air Quality - PowerPoint PPT Presentation

TRANSCRIPT

  • Enabling Sustainability A presentation by Clifford Devlin 17th Aug 2010

  • Clifford Devlin Limited

  • Clifford Devlin Limited

  • Clifford Devlin Limited

  • Clifford Devlin Limited

  • Clifford Devlin Limited

  • Environmental impacts Noise Vibration Air Quality Ecology Archaeology Architecture Waste Water/material use Energy

  • Environmental impacts Noise Vibration Air Quality Ecology Archaeology Architecture Waste Water/material use Energy

  • Local environment Noise Vibration Air Quality Ecology Archaeology Architecture Waste Water/material use Energy

  • Pollution

  • Pollution control

  • Pollution control

  • Pollution control

  • Pollution control

  • Pollution control

  • Pollution control

  • Local community

  • Local environment

  • Local community

  • Environmental impacts Noise Vibration Air Quality Ecology

  • Ecology

  • Ecology

  • Ecology

  • Ecology

  • Environmental impacts Noise Vibration Air Quality Ecology Archaeology

  • Archaeology

  • Archaeology

  • Archaeology

  • Environmental impacts Noise Vibration Air Quality Ecology Archaeology Architecture

  • Architecture

  • Crown House

  • Global environment Waste Water/material use Energy

  • Waste

  • Waste98%

  • Waste

  • Environment

    Waste materialQuantity %MethodologyApproved supplierHardcore4600 tonnes87.4Crushed on-siteBricks97000 (262 tonnes)4.98Salvaged/cleanedCleanawayFerrous metals54.5 tonnes1.03RecycleEMRNon Ferrous metals15 tonnes0.28RecycleEMRPlasterboard9.5 tonnes0.18RecyclePBRGlass20 tonnes0.38RecycleBerrymanTimber24 tonnes0.46Recycle/re-useGBNWaste Overall (rubbish ) 20m3 (240 tonnes)4.56Sort at transfer station, Dispose non recyclable at LandfillVeoliaAsbestos39.9 tonnes0.76LandfillPinden Quarry

  • Waste

  • Environment

    Waste materialQuantity %MethodologyApproved supplierHardcore4600 tonnes87.4Crushed on-siteBricks97000 (262 tonnes)4.98Salvaged/cleanedCleanawayFerrous metals54.5 tonnes1.03RecycleEMRNon Ferrous metals15 tonnes0.28RecycleEMRPlasterboard9.5 tonnes0.18RecyclePBRGlass20 tonnes0.38RecycleBerrymanTimber24 tonnes0.46Recycle/re-useGBNWaste Overall (rubbish ) 20m3 (240 tonnes)4.56Sort at transfer station, Dispose non recyclable at LandfillVeoliaAsbestos39.9 tonnes0.76LandfillPinden Quarry

  • Waste

  • Environment

    Waste materialQuantity %MethodologyApproved supplierHardcore4600 tonnes87.4Crushed on-siteBricks97000 (262 tonnes)4.98Salvaged/cleanedCleanawayFerrous metals54.5 tonnes1.03RecycleEMRNon Ferrous metals15 tonnes0.28RecycleEMRPlasterboard9.5 tonnes0.18RecyclePBRGlass20 tonnes0.38RecycleBerrymanTimber24 tonnes0.46Recycle/re-useGBNWaste Overall (rubbish ) 20m3 (240 tonnes)4.56Sort at transfer station, Dispose non recyclable at LandfillVeoliaAsbestos39.9 tonnes0.76LandfillPinden Quarry

  • Waste

  • Waste

  • Environment

    Waste materialQuantity %MethodologyApproved supplierHardcore4600 tonnes87.4Crushed on-siteBricks97000 (262 tonnes)4.98Salvaged/cleanedCleanawayFerrous metals54.5 tonnes1.03RecycleEMRNon Ferrous metals15 tonnes0.28RecycleEMRPlasterboard9.5 tonnes0.18RecyclePBRGlass20 tonnes0.38RecycleBerrymanTimber24 tonnes0.46Recycle/re-useGBNWaste Overall (rubbish ) 20m3 (240 tonnes)4.56Sort at transfer station, Dispose non recyclable at LandfillVeoliaAsbestos39.9 tonnes0.76LandfillPinden Quarry

  • Waste

  • Environment

    Waste materialQuantity %MethodologyApproved supplierHardcore4600 tonnes87.4Crushed on-siteBricks97000 (262 tonnes)4.98Salvaged/cleanedCleanawayFerrous metals54.5 tonnes1.03RecycleEMRNon Ferrous metals15 tonnes0.28RecycleEMRPlasterboard9.5 tonnes0.18RecyclePBRGlass20 tonnes0.38RecycleBerrymanTimber24 tonnes0.46Recycle/re-useGBNWaste Overall (rubbish ) 20m3 (240 tonnes)4.56Sort at transfer station, Dispose non recyclable at LandfillVeoliaAsbestos39.9 tonnes0.76LandfillPinden Quarry

  • Waste

  • Environment

    Waste materialQuantity %MethodologyApproved supplierHardcore4600 tonnes87.4Crushed on-siteBricks97000 (262 tonnes)4.98Salvaged/cleanedCleanawayFerrous metals54.5 tonnes1.03RecycleEMRNon Ferrous metals15 tonnes0.28RecycleEMRPlasterboard9.5 tonnes0.18RecyclePBRGlass20 tonnes0.38RecycleBerrymanTimber24 tonnes0.46Recycle/re-useGBNWaste Overall (rubbish ) 20m3 (240 tonnes)4.56Sort at transfer station, Dispose non recyclable at LandfillVeoliaAsbestos39.9 tonnes0.76LandfillPinden Quarry

  • Waste

  • Environment

    Waste materialQuantity %MethodologyApproved supplierHardcore4600 tonnes87.4Crushed on-siteBricks97000 (262 tonnes)4.98Salvaged/cleanedCleanawayFerrous metals54.5 tonnes1.03RecycleEMRNon Ferrous metals15 tonnes0.28RecycleEMRPlasterboard9.5 tonnes0.18RecyclePBRGlass20 tonnes0.38RecycleBerrymanTimber24 tonnes0.46Recycle/re-useGBNWaste Overall (rubbish ) 20m3 (240 tonnes)4.56Sort at transfer station, Dispose non recyclable at LandfillVeoliaAsbestos39.9 tonnes0.76LandfillPinden Quarry

  • Waste

  • Waste

  • Global environment Waste Water/material use

  • Materials

  • Materials

  • Global environment Waste Water/material use Energy

  • Energy

  • Energy

  • Energy

  • Energy14kg/tonne

  • Reporting

  • ReportingWe were very impressed with the documentationthat has supported the sustainability and environmental initiatives which are being implemented in this project. We received a letter confirming this from the British Standards Institute, who recently carried out an audit for ISO 14001. They were similarly impressed with the environmental feedback and reporting we receive from our supply chain.

    Terry Gallagher, London Borough of Camden

    The empirical data contained in the Clifford Devlins close-out report for this project not only allowed us to demonstrate compliance with Site Waste Management Plan Regulations and BREAM but the photographic evidence of the various stages of the demolition provide an essential body of reference material that we can forward to developers and local authorities and apply to future projects.

    Matt Heshmati, Project Manager, Wates Construction