Benchmark ActivitiesApril-SeptemberPurging, Packing, Storing, Moving and
ConstructionTeacher Staffing Assignments – completed ahead of
schedule in mid-AprilRoom Assignments Identified – completed by building
principals and teachers notified by May 1Student Transition Activities - JunePacking – to be completed by July 1
Benchmark Activities (cont.)Student Placements – notice of class placement
communicated in AugustTransportation Routing – will be completed over the
summerTechnology – reallocation is ongoingNew Team Meetings – end of June through SeptemberCurriculum Planning/Articulation – ongoing, including
appropriate professional development
Technology: Planned Projects SMART Boards from LES will be relocated to each
corresponding teacher’s new location. Existing projectors and devices will be utilized
and mounted – goal is to have this phase up and running by mid/late September.
Computers from LES which are compatible with active directory and Windows 7 will be reallocated across 3 remaining elementary schools.
Space Utilization at IMES and Kindergarten Enrollment Update: There will be a total of 23 regular education classrooms needed at
IMES. There is a schematic of the floor plan and new spaces for small group instruction (OT/PT/ESL/Psychologist/Speech) on the KL Web site. Go to klschools.org > select District drop down > select School Closure Task Force > select Scenario 2.1 IMES Floor Plans.
Current 2014-15 Kindergarten Enrollment (numbers may change over the summer):• IMES: 49 students – 3 sections• KES: 58 students – 3 sections• MPES: 34 students – 2 sections• Numbers are still changing
Logistics
Construction KG&D developed architectural and mechanical
plans for creating small group instruction (SGI) rooms at MPES and IMES and delivered to SED for approval.
We have been notified the plans have already been reviewed by the SED architectural division and are awaiting mechanical approvals.
Construction will begin as soon as approvals are received.
Packing / StorageLES undertook evaluation and purging of outdated/unneeded equipment and supplies (March-April).Storage PODs delivered to LES (April).LES staff provided with packing materials.Boxes were transferred to appropriate storage PODs.Saturday packing hours made available beginning June 7th.Approximately 17 teachers took advantage of the first two Saturdays and 20 are signed up for June 21.IMES POD is ½ full, MPES POD is 1/3 full, and KES boxes are stored in Science Lab.
Packing / Storage (cont.) 50 bags of recycling were generated. Additional large and small boxes have been ordered, as
well as 100 poster tubes, and will be available June 14. PODs will be transferred to destination buildings beginning
early July. Cleaning of elementary school classrooms will be
prioritized for teachers moving from other buildings. New classrooms will be available for unpacking beginning
in late July (subject to change based upon classroom use by town camps and ESY program).
LES will be cleaned throughout July and August.
Student Transition Committee
Transitioning Student VisitsSpecial Services Visit – June 2 Students were accompanied by a teacher and a TA from
IMES to KES. They were greeted by the principal, AP, and special
education supervisor. Students had a full tour of the building and met staff. Students had a snack outside and seemed happy and
excited about their new school.
Transitioning Student Visits4th Grade Visit – June 3 The principal, mascot, and student “buddies” greeted
incoming students, and the principal delivered welcoming remarks.
Students rotated through three stations:• Station 1: Principal read “Brave Irene” and led students through
a discussion about bravery and courage.• Station 2: Students toured the building while completing Venn
Diagram to be taken home and shared with their family.• Station 3: Students shared “Wordles” that they created prior to
the visit. They also completed puzzle pieces to fit into the “Welcome” banner to be displayed in September.
Transitioning Student Visits3rd Grade Visit – June 6 Theme for the visit was “Travel.” Before the visit students received travel tickets and
personalized passports. Upon arrival, students went to their “gate” and were
greeted by student ambassadors and the school mascot. During the visit there were 3 different partner
opportunities:• Scavenger Hunt – solved riddles to find destinations throughout building
and receive stickers on their passport• “A Country Far Away” read aloud and discussed• Art Project – filled a “suitcase” with items to take with you on the
adventure to a new school or grade (to be displayed in September)
Transitioning Student Visits2nd Grade Visit – June 9 The visit included activities based on the 2nd grade butterfly
and Flat Stanley units. Students were welcomed by student ambassadors,
principal, AP and school mascot. Butterfly templates were colored based on “get to know
you” questions. Students went on a scavenger hunt for Flat Stanley in
strategic locations throughout the building. Students participated in entire 2nd grade sing-along. Principal and AP read and discussed the book “First Day
Jitters”. Visiting students returned to their school with a butterfly
signed by new friends and a kid-friendly map of their new school.
Transitioning Student Visits1st Grade Visit – June 12 Prior to the visit, students decorated their Rock Fish in art
class, met the mascots during lunch, and participated in the Rock Fish share activity with a buddy in their own building (to practice for the larger setting).
Students were greeted by the administrators and mascot. Principal read “You Be You” by Linda Kranz as it was
projected on a screen. Students were broken up into small groups and
participated in a sharing activity with their Rock Fish – students took turns sharing something about themselves based on the number of dots on their fish.
Students then visited a classroom with a checklist of things to notice. Students could ask their new friends or the teacher questions about the school.
Transitioning Student VisitsKindergarten Visits June 17 (IMES) and June 19 (MPES) A representative from each building created a digital A to Z
book for parents and students to view prior to the visit. Prior to the visit every student completed a student
inventory with information about themselves, and teachers prepared students on how to introduce themselves.
Students were greeted by administrators and staff. Students were escorted to classrooms for introductions. A
to Z book was shared and students reminded they can watch it at home with their families.
Students toured the building with emphasis on common areas (cafeteria, gym, music, library, etc.)
Students had a snack in a classroom, and then time on the playground.
Staffing
Staffing Update Teachers, teaching assistants and aides officially
notified of reassignment on April 11. Support staff, not including custodians or monitors,
officially notified of reassignment on April 30.
LES Teaching Staff Reassigned:•IMES 13•KES 8•MPES 5•JJHS 2•JJMS 1
LES Support Staff Reassigned:•IMES 1•KES 3•MPES 3•JJHS 1•JJMS 1
Next StepsThe Future of Lewisboro Elementary
School:
Focus is currently on a successful move and consolidation.