energy efficiency project st michael’s college & elc
TRANSCRIPT
assuranceconsulting.com.au
THE STEPS IN THE AUDIT PROCESS:
ENERGY EFFICIENCY PROJECTST MICHAEL’S COLLEGE & ELC
THE CHALLENGE:St Michael’s wanted
to investigate ways to reduce their increasing
electricity costs.
THE SOLUTION:In May 2016 St Michael’s
engaged Assurance Consulting to conduct an Electrical Energy Efficiency Audit for the College & Early Learning Centre (ELC) to identify exactly where & how St Michaels could save energy &
money.
STEP 1: Collect &
analyse energy consumption data
STEP 2: Walk through
Audit
STEP 3: Calculate energy consumption &
savings potentials
STEP 4: Create integrated
solutions
STEP 5: Present findings
& solutions
STEP 6: Implement Solutions
THE INTEGRATED SOLUTION
LED LightingSolar PV System
Power Factor
Correction
Circuit TimersTariff AdjustmentsBehavioural Change
Even after one month of power supply subsequent to project completion, the savings predicted by Michael are already flowing through by showing a substantial decrease in our electricity expenditure. It has been an absolute pleasure dealing with Assurance Consulting.
- Steve PardyFinance Manager, St. Michaels College, Nov 2016
The Solar PV Systems were installed during the
September School holidays with the remainder of the
project installed soon after.
Implemented by Assurance Solar &
Electrical as part of a total turn key solution
for the School.
Project completed on time & within budget, with minimum impact on school operations.