ENGM 732 Network Flow Programming Network Flow Models

Upload: marlene-morris

Post on 28-Dec-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENGM 732 Network Flow Programming Network Flow Models

ENGM 732Network Flow Programming

Network Flow Models

Page 2: ENGM 732 Network Flow Programming Network Flow Models

Transportation Models(Flow, Cost)

[External Flow]

[2]

[4]

[3] [-3]

[-3]

[-3](3,3)(1,1)

(0,4)

(2,2)

(3,3)(0,3)

(0,4)

1

2

3

4

5

6

Page 3: ENGM 732 Network Flow Programming Network Flow Models

Transportation Models(Flow, Cost)

[External Flow]

[2]

[4]

[3] [-3]

[-3]

[-3](3,3)(1,1)

(0,4)

(2,2)

(3,3)(0,3)

(0,4)

1

2

3

4

5

6

Properties1. All arcs have infinite

capacity.2. All nodes have nonzero

fixed external flows.3. The sum of the external

flows over all nodes is zero.

Page 4: ENGM 732 Network Flow Programming Network Flow Models

Assignment Models(Flow, Cost)

[External Flow]

[1]

[1]

[1] [-1]

[-1]

[-1](0,4)(1,1)

(1,3)

(1,2)

(0,4)

(0,2)

1

2

3

4

5

6

(0,8

)

Page 5: ENGM 732 Network Flow Programming Network Flow Models

Assignment Models(Flow, Cost)

[External Flow]

[1]

[1]

[1] [-1]

[-1]

[-1](0,4)(1,1)

(1,3)

(1,2)

(0,4)

(0,2)

1

2

3

4

5

6

(0,8

)Assignment1. All demands and supplies

are unity.2. Find the one-to-one

pairing of the two sets that minimizes the sum of the pairing costs.

Page 6: ENGM 732 Network Flow Programming Network Flow Models

Shortest Path (Flow, Cost)

[External Flow]

[1] [-1]

(0,3)

(0,5)(0,4)

(1,1)

2

1

4

53(0,6)(1,2)

(0,5) (1,4)

Page 7: ENGM 732 Network Flow Programming Network Flow Models

Shortest Path (Flow, Cost)

[External Flow]

[1] [-1]

(0,3)

(0,5)(0,4)

(1,1)

2

1

4

53(0,6)(1,2)

(0,5) (1,4)

Shortest Path1. One node is the source.2. One node is the sink.3. Optimal path is the

sequence of arcs such that the sum of the arc costs on the path are minimized.

Page 8: ENGM 732 Network Flow Programming Network Flow Models

Maximum Flow Models(Flow, Capacity)

(0,3

)

(2,2)(5,7)

(0,8

)

(3,6)

1

2

3

4

5

6

(6,8)

(3,3)

(4,4)

(4,10)

Page 9: ENGM 732 Network Flow Programming Network Flow Models

Maximum Flow Models(Flow, Capacity)

(0,3

)

(2,2)(5,7)

(0,8

)

(3,6)

1

2

3

4

5

6

(6,8)

(3,3)

(4,4)

(4,10)

Maximal Flow1. Capacity is only relevant

parameter.2. Find maximal flow from

source to sink.

Page 10: ENGM 732 Network Flow Programming Network Flow Models

Maximum Flow Models(Flow, Capacity)

(0,3

)

(2,2)(5,7)

(0,8

)

(3,6)

1

2

3

4

5

6

(6,8)

(3,3)

(4,4)

(4,10)

Maximal Flow1. Capacity is only relevant

parameter.2. Find maximal flow from

source to sink.

Page 11: ENGM 732 Network Flow Programming Network Flow Models

Maximum Flow Models(Flow, Capacity)[External Flow]

(0,3

)

(2,2)(5,7)

(0,8

)

(3,6)

1

2

3

4

5

6

(6,8)

(3,3)

(4,4)

(4,10)

Maximal Flow1. Capacity is only relevant

parameter.2. Find maximal flow from

source to sink.

S S

[M] [-M]

Page 12: ENGM 732 Network Flow Programming Network Flow Models

Network with Gains

2

1

3

4

[3] [-3]

(Flow, capacity, gain, cost)[External Flow]

(1,2,.5,3)

(2,2,.5,2)

(0,2

,1,1

)

(1,2

,1,-1

)

(0,4,2,5)

(1.5,4,2,1)

Page 13: ENGM 732 Network Flow Programming Network Flow Models

Relationships

Less General More General

Assignment

Transpor- tation

ShortestPath

Pure MinCost Flow

Maximal Flow

GeneralMin Cost

Flow

Linear Program

Page 14: ENGM 732 Network Flow Programming Network Flow Models

Network with Slack External Flow

2

1

3

4

[2,2,1] [-1]

[External Flow, max slack external flow, slack cost]

[0,-2,1]

[-1,2,-2]

Page 15: ENGM 732 Network Flow Programming Network Flow Models

Pure Min Cost FlowConsider K-Chair Corp.

Plant Cost / Chair Max Production Min Production 1 $5 500 0 2 7 750 400 3 3 1000 500 4 4 250 250

Wood comes from 1 of 2 suppliers and K-Chair agrees to buy 8 tons (800 chairs at 20 lbs / chair) from each supplier. Cost is $0.10 per lbs from supplier one and $0.075 per lbs from supplier 2. Transportation costs follow.

P1 P2 P3 P4Supplier 1 0.01 0.02 0.04 0.04Supplier 2 0.04 0.03 0.02 0.02

Page 16: ENGM 732 Network Flow Programming Network Flow Models

Pure Min Cost FlowChairs are sold in NY, Houston, San Francisco, and Chicago. Transportation costs From each plant to each city follows

NY H SF CP1 1 1 2 0P2 3 6 7 3P3 3 1 5 3P4 8 2 1 4

Selling price, maximum demand, and minimum demand follow

SP Max MinNY $20 2000 500H 15 400 100SF 20 1500 500C 18 1500 500

Page 17: ENGM 732 Network Flow Programming Network Flow Models

K-Chair (Supplier)

1

2

3

4

5

6

[800,M,2]

[800,M,1.5]

(lower, upper, cost)[Fixed, slack, cost]

(0,M

,.2)

Page 18: ENGM 732 Network Flow Programming Network Flow Models

K-Chair (Production)

1

2

3

4

5

6

[800,M,2]

[800,M,1.5]

(lower, upper, cost)[Fixed, slack, cost]

(0,M

,.2)

7

8

9

10

(400,750,7)

Page 19: ENGM 732 Network Flow Programming Network Flow Models

K-Chair (Shipping)

1

2

3

4

5

6

[800,M,2]

[800,M,1.5]

(lower, upper, cost)[Fixed, slack, cost]

(0,M

,.2)

7

8

9

10

(400,750,7)

NY

H

SF

C

(0,M,1)

(0,M,1)

(0,M,2)

(0,M,0)

Page 20: ENGM 732 Network Flow Programming Network Flow Models

K-Chair (Sales)

1

2

3

4

5

6

[800,M,2]

[800,M,1.5]

(lower, upper, cost)[Fixed, slack, cost]

(0,M

,.2)

7

8

9

10

(400,750,7)

NY

H

SF

C

(0,M,1)

(0,M,1)

(0,M,2)

(0,M,0)

[-500,-1500,-20]

[-100,-300,-15]

[-500,-1000,-20]

[-500,-1000,-18]

(0,500,5)

(500,1000,3)

(250,250,4)