engr-1020-100 fall 2007 wind turbine team 1 jerry bernardini project overview
TRANSCRIPT
![Page 1: ENGR-1020-100 FALL 2007 WIND TURBINE TEAM 1 JERRY BERNARDINI Project Overview](https://reader035.vdocument.in/reader035/viewer/2022072014/56649e865503460f94b89928/html5/thumbnails/1.jpg)
ENGR-1020-100FALL 2007
WIND TURBINETEAM 1
JERRY BERNARDINI
Project Overview
![Page 2: ENGR-1020-100 FALL 2007 WIND TURBINE TEAM 1 JERRY BERNARDINI Project Overview](https://reader035.vdocument.in/reader035/viewer/2022072014/56649e865503460f94b89928/html5/thumbnails/2.jpg)
Project Goals
Design and build a Picoturbine improved wind turbine
Build the turbine with used hard drive magnets
The no-load voltage will be three times the Picoturbine
The turbine will be weather proofProject ready for testing by Thanksgiving
![Page 3: ENGR-1020-100 FALL 2007 WIND TURBINE TEAM 1 JERRY BERNARDINI Project Overview](https://reader035.vdocument.in/reader035/viewer/2022072014/56649e865503460f94b89928/html5/thumbnails/3.jpg)
Project Team and Skills
Jerry Bernardini - Electrical Engineering Major Electrical circuits
Tom Jones – Civil Engineering Major Wood working
Billy Joel – Computer networking Major Spread sheets and ideas
Clark Gable – Acting Major Presentations and reports
![Page 4: ENGR-1020-100 FALL 2007 WIND TURBINE TEAM 1 JERRY BERNARDINI Project Overview](https://reader035.vdocument.in/reader035/viewer/2022072014/56649e865503460f94b89928/html5/thumbnails/4.jpg)
Project Description
A purchased kit was built and testedThe kit parts used as part of a larger turbineMagnets obtained from hard drivesWind new coilsTest new magnet coil combinationBuild wind capture sectionComplete constructionTest
![Page 5: ENGR-1020-100 FALL 2007 WIND TURBINE TEAM 1 JERRY BERNARDINI Project Overview](https://reader035.vdocument.in/reader035/viewer/2022072014/56649e865503460f94b89928/html5/thumbnails/5.jpg)
Competitive Analysis
Strengths Weaknesses
Team-1 Balanced skill set , good math skills, great idea people
Getting everyone to a meeting
Team-2 Seems like a smart teamWill build a HAWT
Seems disorganized
Team-3 Good team spritGood skill set
No obvious weaknesses
Team-4 Good ideas but secretive about their plans
Have not been using Engineering Journals
![Page 6: ENGR-1020-100 FALL 2007 WIND TURBINE TEAM 1 JERRY BERNARDINI Project Overview](https://reader035.vdocument.in/reader035/viewer/2022072014/56649e865503460f94b89928/html5/thumbnails/6.jpg)
Technology Features
Moving Permanent magnets No commutate needed
Coils wound to 400-turns with 20 Gauge wire More voltage Lower coil resistance
Wood turbine construction Vibration reduction Easy to modify
![Page 7: ENGR-1020-100 FALL 2007 WIND TURBINE TEAM 1 JERRY BERNARDINI Project Overview](https://reader035.vdocument.in/reader035/viewer/2022072014/56649e865503460f94b89928/html5/thumbnails/7.jpg)
Team Resources
People Four team members that show up for every meeting
Equipment Hand toolsDrillPower saw
Skills Electrical, wood working drafting
Outside Sources Machine shop if needed
Work Locations Team member basement and garage
Materials Aluminum sheets availableBuy most wood
![Page 8: ENGR-1020-100 FALL 2007 WIND TURBINE TEAM 1 JERRY BERNARDINI Project Overview](https://reader035.vdocument.in/reader035/viewer/2022072014/56649e865503460f94b89928/html5/thumbnails/8.jpg)
Team Procedures
Jerry is the leader for the first seven weeksFrank is the leader for the last seven weeksHighlight any procedural differences from
regular projects of this typeDiscuss requirements, benefits, and issues of
using new proceduresE-mail during weekMeet before every classExchange Engineering Journal sketches and
notes
![Page 9: ENGR-1020-100 FALL 2007 WIND TURBINE TEAM 1 JERRY BERNARDINI Project Overview](https://reader035.vdocument.in/reader035/viewer/2022072014/56649e865503460f94b89928/html5/thumbnails/9.jpg)
Schedule
High-level schedule milestones
SepOct Nov Dec
Phase 1Picoturbine
Phase 1Picoturbine
Phase 2Phase 2
Phase 3Phase 3
![Page 10: ENGR-1020-100 FALL 2007 WIND TURBINE TEAM 1 JERRY BERNARDINI Project Overview](https://reader035.vdocument.in/reader035/viewer/2022072014/56649e865503460f94b89928/html5/thumbnails/10.jpg)
Current Status
High-level overview of progress against schedule On-track in what areas Behind in what areas Ahead in what areas
Unexpected delays or issues Wire for new coils are delayed