ensemble d5.2 project presentation ntua-v0.20

12
FP7 Call 5 Support Action, FP7-ICT- 257548 NTUA PROJECT PRESENTATION D5.2 September 26 th , 2010 Fenareti Lampathaki, Sotiris Koussouris NTUA [email protected] nareti.lampathak

Upload: ensemblefines

Post on 05-Dec-2014

620 views

Category:

Documents


1 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Ensemble d5.2 project presentation ntua-v0.20

FP7 Call 5 Support Action, FP7-ICT-257548

NTUA

PROJECT PRESENTATIOND5.2

September 26th, 2010

Fenareti Lampathaki,

Sotiris KoussourisNTUA

[email protected]

fenareti.lampathaki

Page 2: Ensemble d5.2 project presentation ntua-v0.20

At a glance

0 ENSEMBLE: Envisioning, Supporting and Promoting Future Internet

Enterprise Systems Research through Scientific Collaboration0 Funding Scheme:

Coordination and Support Action (CSA)0 FP7 WorkProgramme 2009/10 Objective:

1.3 Internet of Things and Enterprise Environments0 Start date: 01/09/20100 Duration: 24 months0 Project Coordinator:

National Technical University of Athens (NTUA),Decision Support Systems Laboratory (DSSLab)

Project Presentation, September 26th, 2010 2

Page 3: Ensemble d5.2 project presentation ntua-v0.20

Context

Enterprise Interoperability (EI)

Future Internet Enterprise Systems (FInES)

0 Future Internet revolutionizes the rules of the game in the European economy

0 New opportunities for innovation, collaboration and revenue generation open up for Enterprises (especially SMEs)

0 Enterprise Interoperability (EI) has been a thriving applied research domain during the last years

0 Yet, the scientific foundations that would permit its generalization and complete reuse, have not been established

Project Presentation, September 26th, 2010 3

Page 4: Ensemble d5.2 project presentation ntua-v0.20

Objectives

0 IO.1 - Establishing the ENSEMBLE network

0 IO.2 - Establishing the Fundamental Foundations for the Interoperability Science

0 IO.3 - Envisioning Future Research Directions

0 IO.4 - Collaborating with Research Projects under Challenge 1

0 IO.5 - Deploying a Collaboration Portal

0 IO.6 - Increasing awareness and spreading knowledge

Project Presentation, September 26th, 2010 4

Page 5: Ensemble d5.2 project presentation ntua-v0.20

Implementation Methodology

Project Presentation, September 26th, 2010 5

Page 6: Ensemble d5.2 project presentation ntua-v0.20

ENSEMBLE Consortium & Roles

Project Presentation, September 26th, 2010 6

Page 7: Ensemble d5.2 project presentation ntua-v0.20

ENSEMBLE Stakeholders

0 ENSEMBLE Consortium 0 ENSEMBLE Experts Scientific Committee

0 ENSEMBLE Validation Community

0 Public

FInES Cluster FIA

Other Scientific CommunitiesIndustry

Project Presentation, September 26th, 2010 7

Page 8: Ensemble d5.2 project presentation ntua-v0.20

Timeplan

ENSEMBLE Set-up (September 2010-

February 2011)

• Community mobilized and actively communicating

• Collaboration scheme with the Cluster Projects

• Methodology and Action Plan for EISB Development

• EISB & Research State of Play

• Collaboration Environment running flawlessly

ENSEMBLE 1st Wave (March 2011 - August

2011)

• Development of the 1st “wave’s” elements of the EISB

• Methodology for Roadmapping

• A FInES Roadmap and a Collaboration Report, validated and presented in the 1st ENSEMBLE Workshop

ENSEMBLE 2nd Wave (September 2011 -

February 2012)

• Community expanded and actively communicating

• Development of the 2nd “wave’s” elements of the EISB

• A FInES Roadmap Update, validated and presented in the 2nd ENSEMBLE Workshop

ENSEMBLE 3rd Wave (March 2012 - August 2012)

• Development of the 3rd “wave’s” elements of the EISB,

• A FInES Roadmap Update and a Collaboration Report, validated and presented during the ENSEMBLE large workshop / conference

Project Presentation, September 26th, 2010 8

Page 9: Ensemble d5.2 project presentation ntua-v0.20

Fundamental EISB Questions

What is EI? What falls within the scope of EI? What is a Science Base?

Which are our offerings to the scientific communities /

researchers?

How will the industry be involved?

How can we effectively bridge the past and the future in the EI domain?

Which are the metrics measuring success in

building the Science Base?

Project Presentation, September 26th, 2010 9

Page 10: Ensemble d5.2 project presentation ntua-v0.20

Setting the Foundations for a new Science

0 From the EI lanscape and the neighbouring sciences paradigms

0 To.. an Action Plan elaborating or even redefining the 3 high-level Waves

Project Presentation, September 26th, 2010 10

Page 11: Ensemble d5.2 project presentation ntua-v0.20

Key Challenges

0 Engage an active community of researchers that enlarges the existing FInES cluster by0 Gaining visibility in «non-cluster» international events0 Bringing together renowned experts in neighbouring domains 0 Establishing a successful social media presence

0 Envision future research directions for enterprises by0 Incorporating all the recent project achievements 0 Identifying future challenges to be put forward0 Recognizing which declared challenges and objectives in the existing

FInES roadmap are not any more valid0 Provide a Web 2.0-oriented main point of access and

collaboration that will be embraced by the FInES cluster and referenced by the research community

Project Presentation, September 26th, 2010 11

Page 12: Ensemble d5.2 project presentation ntua-v0.20

www.ensemble-csa.eu

Join Us!

FP7 Call 5 Support Action, FP7-ICT-257548

NTUA

THANKS FOR YOUR ATTENTION!

Fenareti Lampathaki,

Sotiris KoussourisNTUA

[email protected]

fenareti.lampathaki

September 26th, 2010