entrance - politics of edinburgh

1
50 DO NOT SCALE 0 10 A3 6th Floor 200 Broomielaw Glasgow Scotland G1 4RU www.atkinsglobal.com Tel: Fax: +44 (0)141 220 2000 +44 (0)141 220 2001 Copyright C Atkins Limited (2017) Edinburgh Tram Extension Ocean Terminal A3 5149899-ATK-ETE-DRG-HW-00090 Ocean Terminal 5149899-ATK-ETE-DRG-HW-00090 Public Realm Masterplan KEY Existing Tree Proposed Tree Existing grass and shrub area Proposed grass/shrub area Existing Hedges Proposed Hedges Proposed Grasscete Proposed Paving NB: Approx 48 existing trees and 250m of beech hedging will be removed to implement this design ENTRANCE SIGNAGE P02 P04 1:1250 P03 P04 P02 Review Third Issue Forth Issue 16/10/19 30/06/20 20/10/20 LD LL LL SB SB SM SM SM SB LL 20/10/2020 20/10/2020 20/10/2020 For further detailed information refer to: Threesixty Architecture stage 3 report 5149899-ATK-ETE-DRG-EN-00003 5149899-ATK-ETE-DRG-EN-00004 Existing ‘Discovery Garden’ shall be retained as far as possible and integrated into the design proposals. It shall incorporate new entrance signage, illustrated on drawing 5149899- ATK- ETE-DRG-HW-00092, into the curved south boundary of the garden. The removal/ modification of existing garden elements shall be minimised whilst ensuring a coherent public realm proposal. Bus stops consolidated into one location. New bus stances. strategy to be confirmed with lothian buses Totem signage and wayfinding located along pedestrian route to advise of various destinations around the centre: · passenger ferry terminal · porta · britannia · port of leith distillery Delivery area relocated from front of centre to rear of centre. Allocated area to be agreed with centre meanagement. Proposals directly adjacent to the main mall entrance are included in the current Porta scope of works. This includes new paving and the britannia propeller being relocated to entrance plaza with integrated bench and lighting. Location for Edinburgh Just Eat city bikes. 25 spaces Proposals directly adjacent to the rotunda mall entrance are included in the current stage 4 scope of works.This includes new paving and the britannia propeller being relocated to entrance plaza with integrated bench and lighting. Car park reconfigured to include taxi drop off area: taxi spaces: 5 parking spaces: 72 taxi allocation can be amended to suit centre requirements Childrens play area with integrated benches. Wetpour soft play surface. colours tbc. Pedestrian route extended to connect directly with waterfront promenade, allowing easier route finding adjacent to the shopping centre. Drop kerbs & new bollards for pedestrian crossings. Creation of public square with potential for temporary markets. Allowance to be made for power supply. Open to allow views through Curved metal top rail Wood or metel sculptural posts 2.3m Rendered masonry plinth Halo-lit or internally lit (from rear) silhouette lettering Coach parking reconfigured. Number increased to 4 bays. Turning arrangement to be verified by civil engineer. ENTRANCE ENTRANCE ENTRANCE

Upload: others

Post on 15-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENTRANCE - Politics of Edinburgh

50D

O N

OT

SCAL

E0

10

A3

6th Floor200 BroomielawGlasgowScotlandG1 4RU

www.atkinsglobal.com

Tel:Fax:

+44 (0)141 220 2000+44 (0)141 220 2001

Copyright C Atkins Limited (2017)

Edinburgh Tram Extension

Ocean Terminal

A3 NTS GD JR UF16.08.17

P 01

D3

16.08.1716.08.17

P 01

5149

899-

ATK-

ETE-

DR

G-H

W-0

0090

D3

Ocean Terminal 5149899-ATK-ETE-DRG-HW-00090

Public Realm Masterplan

KEY Existing TreeProposed TreeExisting grass and shrub areaProposed grass/shrub areaExisting HedgesProposed Hedges Proposed Grasscete Proposed Paving

NB: Approx 48 existing trees and 250m of beech hedging will be removed to implement this design

ENTRANCE SIGNAGE

P02

P04

1:1250P03

P04

P02 Review

Third Issue

Forth Issue

16/10/19

30/06/20

20/10/20

LD

LL

LL

SB

SB

SM

SMSMSBLL

20/10/2020 20/10/2020 20/10/2020

For further detailed information refer to:Threesixty Architecture stage 3 report5149899-ATK-ETE-DRG-EN-000035149899-ATK-ETE-DRG-EN-00004

Existing ‘Discovery Garden’ shall be retained as far as possible and integrated into the design proposals. It shall incorporate new entrance signage, illustrated on drawing 5149899-ATK- ETE-DRG-HW-00092, into the curved south boundary of the garden. The removal/modification of existing garden elements shall be minimised whilst ensuring a coherent public realm proposal.

Bus stops consolidated into one location. New bus stances. strategy to be confirmed with lothian buses

Totem signage and wayfinding located along pedestrian route to advise of various destinations around the centre:· passenger ferry terminal· porta· britannia· port of leith distillery

Delivery area relocated from front of centre to rear of centre. Allocated area to be agreed with centre meanagement.

Proposals directly adjacent to the main mall entrance are included in the current Porta scope of works. This includes new paving and the britannia propeller being relocated to entrance plaza with integrated bench and lighting.

Location for Edinburgh Just Eat city bikes.25 spaces Proposals directly adjacent to the

rotunda mall entrance are included in the current stage 4 scope of works.This includes new paving and the britannia propeller being relocated to entrance plaza with integrated bench and lighting.

Car park reconfigured to include taxi drop off area:taxi spaces: 5parking spaces: 72taxi allocation can be amended to suit centre requirements

Childrens play area with integrated benches. Wetpour soft play surface. colours tbc.

Pedestrian route extended to connect directly with waterfront

promenade, allowing easier route finding adjacent to the shopping

centre. Drop kerbs & new bollards for pedestrian crossings.

Creation of public square with potential for temporary markets. Allowance to be made for power supply.

Open to allow views through Curved metal top railWood or metel sculptural posts

2.3m

Rendered masonry plinth Halo-lit or internally lit (from rear) silhouette lettering

Coach parking reconfigured. Number increased to 4 bays.

Turning arrangement to be verified by civil engineer.

ENTRANCE

ENTRANCE

ENTRANCE