Environmental Due Diligence Report
August 2019
Democratic Socialist Republic of Sri Lanka: Second Integrated Road Investment Program (Tranche 2) Prepared by the Road Development Authority, Ministry of Highways & Road Development and Petroleum Resources Development, Government of Sri Lanka for the Asian Development Bank. This environmental due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Second Integrated Road Investment Program (iRoad 2) Due Diligence Report on Environmental Safeguards for
Processing of Tranche 2
April 2019
Report prepared by Project Coordinating Project Implementing Unit
On behalf of
Road Development Authority Ministry of Highways & Road Development and Petroleum Resources
Development
Submitted to Asian Development Bank
CURRENCY EQUIVALENTS
Currency unit
US$1.00= LKR.176.13 (As of March 2019)
ABBREVIATIONS
ADB Asian Development Bank BIQ Basic Information Questionnaire BOQ Bills of Quantities CEA Central Environmental Authority CRC Conventional Road Contracts CSD Context Sensitive Design DSD Divisional Secretariat Division EARF Environmental Assessment and Review Framework EC Environment Checklist EHS Environmental, Health and Safety EMAP Environmental Management Action Plan EMC Environment Monitoring Checklist EMP Environmental Management Plan EMoP Environmental Monitoring Plan EP Eastern Province EPL Environmental Protection License ES Environmental Specialist ESDD Environmental and Social Development Division ESU Environment and Social Unit FAM Project Facility Administration Manual GoSL Government of Sri Lanka GRC Grievance Redress Committee ICB International Competitive Bidding IEE Initial Environmental Examination (Report) IML Industrial Mining License iRoad 2 Second Integrated Road Investment Programme km kilometer LHS Left Hand Side MFF Multi tranche Financing Facility NCB National Competitive Bidding NP Northern Province PD Project Director PFR Periodic Financing Request PIC Project Implementing Consultant PIU Project Implementing Unit PM Project Manager RDA Road Development Authority RE Resident Engineer REA Rapid Environment Assessment Checklist RHS Right Hand Side ROW Right of Way SAPE Survey and Preliminary Engineering works/teams SGRS Social, Gender, Resettlement Specialist SPS Safeguard Policy Statement, 2009 of ADB UP Uva Province WP Western Province
CONTENTS 1. Introduction ................................................................................................................. 1 2. Context and purpose of this report .............................................................................. 2 3. Summary of project status .......................................................................................... 3
3.1 Uva Province ................................................................................................. 3 4. Environmental safeguards requirements of iRoad 2 Programme ................................ 7 5. Methodology and approach ......................................................................................... 8 6. Findings ...................................................................................................................... 8
6.1 Compliance with requirements in the National Environmental Act and ADB, Safeguard Policy Statement, 2009 ................................................................. 8
6.2 Review of project documents ......................................................................... 9 6.2.1 Initial Environmental Examination Report ........................................... 9 6.2.2 Bidding documents ............................................................................. 9
6.3 Compliance with the Loan Agreement (environmental safeguards) .............. 12 6.4 Compliance to the environmental requirements under the project Facility
Administration Manual (FAM) ....................................................................... 15 6.5 Compliance with Environmental Assessment and Review Framework ........ 17 6.6 Environment management and monitoring ................................................... 19 6.7 Availability of licenses and approvals ........................................................... 20 6.8 Tree removal and compensatory replanting program ................................... 20 6.9 Institutional setup ......................................................................................... 22 6.10 Safety requirements in road designs ............................................................ 23 6.11 Health and safety of workers and public during civil works ........................... 23
6.11.1 An overview of health and safety issues reported ............................. 27 6.12 Public grievances with respect to environment issues .................................. 29
7. Public consultation and awareness programs ........................................................... 29 8. Use of the concept of context sensitive design (CSD) in an environment perspective31 9. Conclusions and recommendations .......................................................................... 32
9.1 Conclusions ................................................................................................. 32 9.2 Recommendations ....................................................................................... 33
List of Annexes Annex 1: CEA letter of concurrence with recommendations Annex 2: Package wise summary of preparation and submission of site specific EMAPs
and EMC (Uva Province) Annex 3: Summary of the status of approvals/ licenses Annex 4: Details of disposal and stockpile yards identified and operated in Uva
Province Annex 5: Summary of tree removal and replanting in Uva Province Annex 6: A summary of GRC formation and public grievances received in Uva Province Annex 7: A summary of application of CSD in Uva Province (including elderly, women,
Differently abled and child friendly designs) List of Tables Table 1.1 Summary information at district level Table 3.1 Summary status of civil and consultancy contracts in iRoad 2 Table 3.2 Overall physical progress summary of contract packages in Uva Province
(Cumulative up to end February, 2019) Table 6.1 Compliance with loan agreement (Environmental Safeguards) of tranche one Table 6.2 Compliance with FAM (Environmental Safeguards) in tranche one Table 6.3 Compliance with EARF with respect to tranche one Table 6.4 Summary of environment and road safety awareness programmes conducted
in Uva Province Table 6.5 Details of fire drill training programmes conducted so far in Uva Province Table 6.6 Summary of reported accidents up to 31st of March 2019
Table 7.1 Examples of public awareness programmes conducted in UP (as at end February 2019)
List of Figures Figure 1.1 Provinces considered under iRoad 2 Figure 3.1 Project key map of Badulla District Figure 3.2 Project key map of Monaragala District Figure 6.1 A photograph taken during the visit by TA consultant and ESDD staff Figure 6.2 A tree saved tree at Ch. 2+650 (LHS) on road ID UMO 20 in MO6 Package Figure 6.3 UBA 341 (BA 04 Package) Road Inspection conducted by PIU, PIC, and
Contractor. Project Director highlighted the importance of protecting roadside trees and instructed the contractor to save the tree near the roadside
Figure 6.4 Tree Planting Program at Helathunthala Primary School, Badalkumbura – Road ID. 093 in MO 02 Package
Figure 6.5 An awareness about road safety, conducted by Traffic Police for labourers (MO - 03 package, Kiribbbanwewa)
Figure 6.6 Conducting health and safety toolbox meeting at office premises, of MO-06 package, Athiliwewa
Figure 6.7 Conducting of health and safety toolbox meeting in BA-01 package, Mahiyanganaya
Figure 6.8 Basic first aid training given by 1990 Ambulance Service (MO-05 package) Figure 6.9 Fire drill training in package MO-05 Figure 6.10 A sample of an Accident Green Cross (Source: Monthly Environment and
Social monitoring Report, March 2019, MO-05 Package) Figure 6.11 A sample of public information notice and a complaint collection box Figure 7.1 Public consultation conducted at Community Hall, Dobaghalawela. Road ID.
UMO 054, MO 07 Package Figure 7.2 Environmental awareness session conducted in Liyangahawela Primary
School, BA 07 Package Figure 8.1 (a) Landslide area on UMO 110, MO – 01 Package identified to be constructed
a retaining wall previously; (b) During the field training, identified to improve the culvert in by road and introduced concrete drains to prevent landslide
1. Introduction 1. The Integrated Road Investment Program (iRoad Program) which is operational in the Southern, Sabaragamuwa, Central, North Central and North Western Provinces and Kalutara District in the Western Province, aimed to improve the connectivity between selected rural communities and socioeconomic centers through improved roads. Based on the success achieved in the iRoad Program, the Government of Sri Lanka requested the Asian Development Bank (ADB) in 2017 to finance the Second Integrated Road Investment Program or iRoad 2, which covers Uva Province (UP), Eastern Province (EP), Northern Province (NP) and Western Province (WP). Obliging to this request, ADB formulated a time sliced Multi tranche Financing Facility (MFF) to finance iRoad 2. 2. iRoad 2 intends to upgrade and maintain about 3,400 kilometers (km) of rural access roads to all-weather standard, rehabilitate and maintain about 340 km of national roads in EP, NP, UP and WP, and improve the capacity of road agencies with respect to safeguards, road safety, maintenance, research capacity, and road design and construction. 3. Road rehabilitation and improvement works will be implemented through contracts selected under National Competitive Bidding (NCB) and International Competitive Bidding (ICB). All these contracts will be Conventional Road Contracts (CRC), which are conventional measure and value contracts, requiring detailed contract supervision. These contracts will be used for the rehabilitation of provincial, local authority, and isolated national road sections. Initial construction is to be completed in the first and second years, followed by a three-year maintenance period for rural roads and five-year maintenance period for national roads. Table 1.1 presents a summary of the number of roads, total road length, and CRC packages in each province/district, while figure 1.1 presents the provinces considered under iRoad 2 programme.
Table 1.1 Summary information at district level Province District Total
No. of roads
Total length of roads (km)
Total No. of contract packages
Estimated contract cost (LKR million)
Northern Jaffna 128 289.34 5 13,230
Kilinochchi 47 181.78 3 5,865
Mannar 68 166.32 3 6,380
Vavuniya 64 278.99 4 9,425
Mullaitivu 36 141.34 2 4,835
Eastern Batticaloa 124 221.28 3 7,965
Ampara 158 408.62 5 12,100
Trincomalee 124 215.93 3 7,210
Uva Badulla 153 555.73 8 18,055 (Awarded)
Moneragala 96 488.78 7 15,235 (Awarded)
Western Colombo 149 247.21 3 6,625
Gamapha 183 307.37 4 8,800
Kalutara 102 245.40 3 6,800
Total 1,432 3,748.09 53 122,525
Source: Project Coordinating and Project Implementing Unit of WP (End March 2019).
2
Figure 1.1 Provinces considered under iRoad 2
4. Tranche one (Loan 3579SRI and 3580SRI (COL)) signed between GoSL and ADB on 22 November 2017 became effective in February 2018, which financed the first slice of the MFF. Out of the four Provinces considered under iRoad 2, the contracts in Uva Province have been awarded and the contractors of the 15 packages have commenced civil works with supervision of a Project Implementing Consultant (PIC). 5. As the project implementing agency, the Road Development Authority (RDA) under the Ministry of Highways & Road Development and Petroleum Resources Development is expecting to award the civil works contracts of EP and NP by May and June 2019 respectively. RDA has awarded contracts for PIC in UP and EP and the contract negotiation for PICs for NP and WP have been concluded. 2. Context and purpose of this report 6. With civil works contractors in UP mobilizing in June 2018 and civil works of EP and NP are to be awarded in 2019, it is important to have sufficient funds available for disbursement. Thus, the GoSL intends to submit the next Periodic Financing Request (PFR) to ADB to process Tranche 2 of iRoad 2.
Northern Province
Eastern Province
Uva Province
Western Province
3
7. Paragraph 81 under section VII on “Monitoring and Reporting” of the Environment Assessment and Review Framework (EARF) for iRoad 2 (June 2017) refers to the requirement of preparation and submission of an environment due diligence report on the ongoing tranche before approval of a subsequent tranche. 8. The report is prepared to fulfill this requirement. The report discusses the status of tranche one with respect to procurement of consultants, contractors, and physical progress up to end February, 2019 in Uva Province where civil work contractors have mobilized; compliance with loan requirements with respect to environmental safeguards including EMP and EMoP implementation, findings and recommendations with respect to environmental safeguards compliance in Tranche 1.
3. Summary of project status 9. Out of the Project Implementing Units (PIU) that have to be established in each province, the PIU for project coordination and for UP have been established and are functional. Table 3.1 summarizes the status of civil and consultancy (PIC) contracts in each province.
Table 3.1 Summary status of civil and consultancy contracts in iRoad 2 Province Status of PIC contracts Status of civil works
contracts
North Contract negotiation concluded
Technical Bid Evaluation near in completion (expected date of award 15 June 2019)
East Awarded Egis – GTC JV
Price bid evaluation near in completion (expected date of award 15 May 2019)
Uva Awarded to PEC – CEA JV Works of 15 contracts in progress
Western Contract negotiation concluded To be decided Source: Project Coordinating and Project Implementing Unit of WP (End March, 2019).
10. The section below describes the status of civil works contracts in UP—the only province where civil works have commenced under tranche one. 3.1 Uva Province 11. iRoad 2 in Uva Province is handled by a PIU headed by a Project Director (PD). Established in Badulla District, the PIU includes an Environment and Social Unit (ESU). A PIC has been appointed for the province, which includes a team of engineering, environment and social professionals headed by a Team Leader (TL). 12. Subprojects roads under CRC packages in the two districts (Badulla and Monaragala) of UP have been divided in to fifteen (15) contract packages. All contract packages have been considered under National Competitive Bidding (NCB). Contractors and Project Implementing Consultant (PIC 06) mobilized on 20 June 2018. Figures 3.1 and 3.2 present district key maps of Uva Province, while table 3.2 presents a summary of each contract package.
4
Figure 3.1 Project key map of Badulla District
5
Figure 3.2 Project key map of Monaragala District
6
Table 3.2 Overall physical progress summary of contract packages in Uva Province (Cumulative up to end February 2019) Package
No Contractor Contract
Amount/ (Rs Million)
No of Roads Total Road length / Km
No of Roads Civil Works in Progress
Planned physical progress
%
Actual Physical progress
%
Planned Financial progress
%
Actual Financial progress
%
BA-01 NEM 2,055.89 14 58.00 5 21.01 14.40 8.91 5.20
BA-02 Komuthi-HCM JV 2,262.82 20 81.50 6 24.00 14.00 11.98 8.18
BA-03 CML -MTD 2,458.96 36 83.53 4 14.87 9.28 11.90 4.62
BA-04 CINTIC - RDCE JV 2,118.73 20 65.46 4 16.23 5.40 17.21 5.31
BA-05 CINTIC - RDCE JV 2,504.97 17 79.30 3 23.00 8.17 21.70 6.26
BA-06 CML -MTD 2,345.80 11 61.50 3 14.44 10.00 15.12 5.46
BA-07 CML -MTD 2,461.43 17 67.95 5 18.95 13.02 15.57 5.50
BA-08 Tissa - PND JV 1,847.72 18 60.81 2 18.52 8.02 15.03 3.74
Sub Total 18,056.32 153 557.49 32 18.9 10.3 14.7 5.5
MO-01 AMSK - CGGC JV 2,241.23 10 63.76 4 23.61 16.56 25.12 19.22
MO-02 Tudawe Brothers 1,891.88 14 63.46 4 23.53 13.41 21.50 9.70
MO-03 Maga 2,201.47 21 70.02 11 17.50 17.90 23.56 23.39
MO-04 CML -MTD 2,274.49 12 65.78 3 14.43 13.91 12.25 7.81
MO-05 Tudawe Brothers 2,056.80 14 64.33 2 20.90 15.03 19.97 7.70
MO-06 Hovael Construction 2,713.44 16 97.28 4 24.23 13.00 21.21 10.15
MO-07 Tudawe Brothers 1,858.08 9 64.83 2 21.87 11.34 16.16 6.19
Sub total 15,237.39 96 488.78 30 20.9 14.5 20.0 12.0
Grand Total 33,293.71 249 1,043 62 19.9 12.4 17.3 8.8
7
4. Environmental safeguards requirements of iRoad 2 Programme 13. Schedule four “Procurement of goods, works and consultancy services” of the loan agreement (3580SRI (COL) Ordinary operations, concessional) for Tranche1 lists the following environment safeguards implementing and monitoring requirements: Conditions for award of contract 14. The Borrower shall not award any Works contract which involves environmental impacts until RDA has:
(i) obtained the final approval of the IEE from the CEA; and (ii) incorporated the relevant provisions from the EMP into the Works contract.
15. Further schedule five “Execution of project; Financial Matters” of the same loan agreement lists the following environment safeguards implementing and monitoring requirements: Safeguards
16. The Borrower shall ensure, or cause RDA to ensure, that the preparation, design, construction, implementation, operation and decommissioning of the Project and all Project facilities comply with (a) all applicable laws and regulations of the Borrower relating to environment, health, and safety; (b) the Environmental Safeguards as set out in ADB’s Safeguard Policy Statement 2009; (c) the EARF and IEEs; and (d) all measures and requirements set forth in the respective IEEs and EMPs, and any corrective or preventative actions set forth in a Safeguards Monitoring Report. Safeguards – Related Provisions in Bidding Documents and Works Contracts
17. The Borrower shall ensure, or cause RDA to ensure, that all bidding documents contain provisions that require contractors to:
(i) comply with the measures relevant to the contractor set forth in any safeguards document (including relevant IEEs, EMPs and road- specific EMPs), and any corrective or preventative actions set forth in the Safeguards Monitoring Report;
(ii) make available a budget for all such safeguard measures; and (iii) provide the Borrower with a written notice of any unanticipated environmental,
resettlement or small ethnic community peoples risks or impacts that arise during construction, implementation or operation of the Project that were not considered in the IEEs, EMPs and any other safeguard plans.
Safeguards Monitoring and Reporting
18. The Borrower shall do the following or cause RDA to do the following:
(i) submit annual Safeguards Monitoring Reports to ADB and disclose relevant information from such reports to affected persons promptly upon submission;
(ii) if any unanticipated environmental and/or social risks and impacts arise during construction, implementation or operation of the Project that were not considered in the IEEs, EMPs, and any safeguard documents, promptly inform ADB of the occurrence of such risks or impacts, with detailed description of the event and proposed corrective action plan; and
(iii) report any actual or potential breach of compliance with the measures and requirements set forth in the IEEs, EMPs and any safeguard documents promptly after becoming aware of the breach.
8
5. Methodology and approach 19. This due diligence report on environment safeguards compliance is prepared based on the information collected through desk review of tender documents and other safeguards documents prepared by PIU, PIC and civil works contractors of Uva Province1. The report is further strengthened through information on all roads in UP where civil works have begun, which requires voluntary land donation and 10% sample of roads which the contractors are yet to initiate construction works. Site visits were conducted to validate the documents and reports and confirm compliance with environmental safeguards requirements set forth in the project loan documents, ADB SPS, and local laws, regulations, and requirements. 20. Information on preparation/submission of package/site-Specific Environment Management Action Plans (EMAPs), Environment Monitoring Check Lists (ECs), licenses and approvals for operation of plants, material extraction and disposal sites were assessed and reviewed through information from PIC for UP. Information on tree removal and replanting programs in UP were also reviewed and validated through visit to sample roads. Public complaint registers were reviewed to identify significant public complaints on environment issues, actions taken by contractors and response from the public. 21. A review was conducted on the designs to identify inclusion of Context Sensitive Design (CSD) approach from an environment perspective. This due diligence was carried out during the month of March 2019. 6. Findings 6.1 Compliance with requirements in the National Environmental Act and ADB,
Safeguard Policy Statement, 2009 22. Roads in EP, NP, UP and WP selected for rehabilitation and improvement under iRoad 2 are existing roads and improvements are to be undertaken within the available Right of Way (ROW). Also, none of the roads selected in the four provinces are passing through or close to environmentally sensitive areas as listed under Part 3 of Gazette Extra Ordinary No. 772/22 dated 24 June 1993 and No. 1104/22 dated 5 November 1999. 23. RDA has submitted Basic Information Questionnaire (BIQ) to the Central Environmental Authority (CEA) with respect to proposed road rehabilitation and improvement works in Uva Province. Based on the information submitted, the CEA has listed all subprojects in UP as “non-prescribed” and forwarded their concurrence with recommendations. The letter with recommendations/guidelines forwarded by CEA for Uva Province is attached as Annex 1. 24. The environmental screening process from environment perspective for selection of roads for rehabilitation and improvement works is stipulated in subsection A, “Environmental criteria for selection of project roads” under section IV, “Environment assessment procedure” of the EARF. No road that would cause significant environmental impacts which would trigger as an environment ‘Category A’ tranche in accordance with ADB’s Safeguard Policy Statement, 2009 (SPS, 2009) were selected in any province under iRoad 2. Therefore, the entire iRoad 2 program is classified as environment category B. As there are no new roads or activities considered under Tranche 1, the classification remained as Category B. 25. A Rapid Environment Assessment Checklist (REA) has been prepared during SAPE works for each province under iRoad 2 to comply with requirements stipulated in the EARF. These REAs have been developed based on the information collected under Environment
1 Uva Province is the only Province under iRoad 2 which has commenced civil works so far.
9
Checklists (EC) for each road appraised under iRoad 2. Initial Environment Examination Reports (IEER) have also been prepared for each province under the program. These IEERs included a standard Environment Management Plan (EMP) and Environment Monitoring Plan (EMoP). 26. As required in the loan agreement, the standard EMP, EMoP, and guidelines/recommendations given by CEA have been included in the Bid documents of all CRC packages formulated under iRoad 2. 6.2 Review of project documents 6.2.1 Initial Environmental Examination Report 27. Initial Environment Examination Reports have been prepared for each province appraised under iRoad 2. These IEERs were prepared based on the guidelines given in the EARF. Each IEER includes a standard EMP and EMoP. These IEERs have been disclosed in ADB website in compliance with SPS 2009. 28. No new roads have been appraised under tranche one aside from those already identified in the IEE. 6.2.2 Bidding documents 29. Standard bidding documents have been used for all CRC packages under iRoad 2. 30. Section six (6) of Part II – Employer’s Requirements of the standard bid documents refers to environment and safety requirements of the project. Section 6.5 is on “Traffic control and safety during construction” and section 6.6 is on “Environment Management Plan and Environment Checklist”. Other than these main sections, some other clauses in the bid documents have direct references to mitigation measures listed in the IEER and EMP. These clauses pertain to the following key environmental and safety requirements:
- Compliance with Pollution Control Regulations; - Health and Safety aspects during construction; - Issues relating to equipment, storage of hazardous materials, labour camp etc.; - Compliance with Labour Regulations; - Issues relating to borrow areas; and - Standard drawings that could be utilised to different ROW situations.
31. Preamble of section 6.6 states that the EMP should form part of Bid Documents and shall be considered alongside the specifications. The prescriptions detailed in the EMP are mandatory in nature and also contractually binding. The EMP will also be equally applicable to subcontractors including nominated subcontractors if any. The Contractor will be responsible for the compliance with the requirements of the EMP.
Volume 2 – Conditions of Contract include clauses as follows: 4.8 Safety procedures 6.13 Supply of food staffs 4.14 Avoidance of interference 6.14 Supply of water 4.18 Protection of the environment 6.15 Measures against insect and pest nuisance 4.24 Fossils 6.21 Child labour 6.6 Facilities for staff and labour 6.24 Non-discrimination and equal opportunity 6.7 Health and safety
32. The contract conditions above are reiterated in Volume 3 – Specifications of contract documents. Under volume 3, the following provisions are specifically allowed for environmental and safety requirements.
10
103 Arrangements for traffic with safety precautions during rehabilitation or crossing of existing roads
33. Proceeding clauses of this section include;
• 103.2 Using part of the road, which has two sub sections as; 103.2.1 Initial maintenance of existing road 103.2.2 Routine maintenance of existing roads included in the contract
• 103.3 Temporary diversions
108 Obligations of the contractor and general requirements
11
34. Sub-clause 108.3 under clause 108 refers to HIV-AIDS prevention. This sub-clause specifies that the contractor shall conduct HIV-AIDS awareness programs and conduct information, education and consultation communications campaigns to all sites staff, labour and immediate local communities via an approved service provider.
12
6.3 Compliance with the Loan Agreement (environmental safeguards) 35. Tranche 1 of iRoad 2 is effective from February 2018. However, as of end of March 2019, only Uva Province has commenced civil works. The requirements stipulated in the loan agreement of tranche 1 (under ordinary operations) have been or are being complied with as detailed in the succeeding table.
Table 6.1 Compliance with loan agreement (Environmental Safeguards) of Tranche 1 Item/ Section/ Schedule Description Status of Compliance
Schedule 4 - Procurement of Goods, Works and Consulting Services
Conditions for award of contract 5. The Borrower shall not award any Works contract which involves environmental impacts until RDA has: (a) obtained the final approval of the IEE from the CEA; and (b) incorporated the relevant provisions from the Environment Management Plan (EMP) into the Works contract.
RDA has obtained CEA concurrence for subprojects in Uva Province. The letter of CEA concurrence is attached as Annex 1. The project coordinating PIU at RDA through Environment and Social Development Division (ESDD) or RDA is in the process of obtaining CEA concurrence for the subprojects in EP, NP and WP. None of the subprojects in EP, NP and WP are listed as “Prescribed Projects” under the National Environmental Act (NEA)
Schedule 5 – Execution of the project; Financial matters
Safeguards 2. The Borrower shall ensure, or cause RDA to ensure, that the preparation, design, construction, implementation, operation and decommissioning of the Project and all Project facilities comply with; (a) all applicable laws and regulations of the Borrower relating to environment, health, and safety; (b) the Environmental Safeguards as set out in ADB’s Safeguard Policy Statement; (c) the EARF and IEE; and (d) all measures and requirements set forth in the respective IEE and EMP, and any corrective or preventative actions set forth in a Safeguards Monitoring Report.
Complied with in Uva Province where civil works have commenced. Same conditions shall apply to implementation of iRoad 2 in EP, NP and WP, for all subprojects in all four Provinces appraised under iRoad 2. Initial awareness program has been conducted for Contractors, PIC and PIU staff of Uva province on these requirements. The programme for Badulla staff was conducted on 19 September 2018, while the programme for Monaragala staff conducted on 21 September 2018. Total participants for Badulla
13
Item/ Section/ Schedule Description Status of Compliance
Schedule 5 – Execution of the project; Financial matters
Human and financial resources to implement safeguards requirements 5. The Borrower shall make available, or cause RDA to make available, necessary budgetary and human resources to fully implement the SPS, IEE, EMP and any safeguard documents which may be prepared for the Project. Safeguards – Related provinces in Bidding documents and works contracts 6. The Borrower shall ensure, or cause RDA to ensure, that all bidding documents contain provisions that require contractors to: (a) comply with the measures relevant to the contractor set forth in any safeguards document, and any corrective or preventative actions set forth in the Safeguards Monitoring Report; (b) make available a budget for all such safeguard measures; and (c) provide the Borrower with a written notice of any unanticipated environmental, resettlement or small ethnic community peoples risks or impacts that arise during construction, implementation or operation of the
programmes was 85, while for Monaragala it was 63. Being complied with in all Provinces appraised under iRoad 2. Budgetary allocations are found in the contract documents of Uva Province and same is expected in the other three Provinces where contractors are yet to mobilize. All CRC package contractors in Uva Province have appointed suitable Environmental, Health and Safety (EHS) Officers. An Environment Specialist have been appointed the PIC in Uva Province (PIC6) and eight assistants have been recruited and deployed at each Resident Engineer’s (RE) office. A Social/ Environment Officer has been appointed to PIU of UP. PIU, PIC and civil works contractors of EP, NP and WP are yet to be mobilized. Complied with for projects in the four Provinces appraised under iRoad 2. Tranche 1 has been classified as environment ‘Category B’. With no new projects appraised under Tranche 2, it also is categorized as environment ‘Category B’. Out of the four provinces appraised under iRoad 2, civil works have started on UP (under tranche one), and no unanticipated
14
Item/ Section/ Schedule Description Status of Compliance
Schedule 5 – Execution of the project; Financial matters
Project that were not considered in the IEE, EMP and any other safeguard plans. Safeguards monitoring and reporting 7. The Borrower shall do the following or cause RDA to do the following: (a) submit annual Safeguards Monitoring Reports to ADB and disclose relevant information from such reports to affected persons promptly upon submission; (b) if any unanticipated environmental and/or social risks and impacts arise during construction, implementation or operation of the Project that were not considered in the IEE, EMP, and any safeguard documents, promptly inform ADB of the occurrence of such risks or impacts, with detailed description of the event and proposed corrective action plan; and (c) report any actual or potential breach of compliance with the measures and requirements set forth in the IEE, EMP and any safeguard documents promptly after becoming aware of the breach. Labour standards 9. The Borrower shall ensure that (a) all contractors under the Project comply with all applicable labor laws and regulations, do not allow employment of child labor for Project activities, encourage the employment of the poor, particularly women, and provide appropriate facilities for women and children in work sites; (b) people directly affected by the Project are given priority to be employed by the Project; (c) contractors do not differentiate wages between men and women for work of equal value; and (d) specific clauses ensuring these shall be included in the contracts.
environmental, resettlement or small ethnic community peoples’ risks or impacts have arisen during implementation of civil works so far. PIC6, the Project Implementing Consultant for Uva Province submitted the first annual report on environment safeguard monitoring for the period from June – December 2018. Civil works of other three Provinces appraised under iRoad 2 are yet to start civil works and their respective PICs are yet to be mobilized. No any unanticipated environmental and/or social risks and impacts that were not considered in the IEE, EMP, and any other safeguard documents have arisen during construction works in UP. No any actual or potential breach of compliance on environment safeguards were observed or reported during implementation of civil works contracts in UP, under tranche one. Being complied with for all four Provinces appraised under iRoad 2. Specific contract clauses have been included in Bidding documents of all CRC packages to avoid discrimination of labour, employment of child labour and to encourage women labour. No any incident of using child labour had been observed or reported in Uva Province, where civil work contracts have started. The report includes a separate section on health and safety aspects with respect to Uva
15
Item/ Section/ Schedule Description Status of Compliance
Province where civil works are now in progress.
6.4 Compliance to the environmental requirements under the project Facility Administration Manual (FAM) 36. The requirements stipulated in the Project Facility Administration Manual (FAM), August 2017 for iRoad 2 Tranche 1 on environment safeguards have been or are being complied as summarized in below table.
Table 6.2 Compliance with FAM (Environmental Safeguards) in tranche one Item/ Section/ Schedule Description Status of Compliance
VII Safeguards – Environment
A. Environment 41. Categorization. The scope of works of the MFF involves rehabilitation of existing rural and national roads. There will be no road widening and no roads falling inside protected areas that will be included in the project. Therefore, Tranche 1 and subsequent tranches under the MFF have been categorized as B in accordance with ADB’s Safeguard Policy Statement. Since there are a large number of short roads under the investment program, preparation of individual initial environmental examinations (IEE) for each and every road will be difficult and time consuming. Hence, consolidated province-level IEEs have been prepared for all roads in each province (Eastern, Northern, Uva, and Western) and disclosed on the ADB website. The IEEs were prepared based on completed road-specific environmental checklists with baseline data, public consultations, and literature reviews. An environmental assessment and review framework (EARF) has been prepared to guide the environmental assessment of succeeding tranches under the iRoad 2. Ensuring Implementation of Environmental Standards Paragraph 42. The executing agency and implementing agency will ensure that all environmental safeguard requirements under the program will be implemented as required by the EARF and respective province-level IEEs, including a standard environmental management plan (EMP). The standard EMP is comprehensive and covers all environmental issues that may be expected during road construction and/or maintenance within the respective
Complied with for all four Provinces appraised under iRoad 2 Tranche 1 and Tranche 2. No roads that would cause significant environmental impacts that would trigger as an environment ‘Category A’ tranche in accordance with ADB’s Safeguards Policy Statement, 2009 (SPS, 2009) were selected under any Province appraised under iRoad 2. No new roads have been selected under Tranche 1, hence the classification of “category B” prevails in Tranche 1. Further, the ongoing road rehabilitation and improvement works in UP have not triggered any change in this classification. Civil works have only commenced in Uva Province under Tranche 1. The contractors of CRC packages in UP are submitting package specific Environment Management Action Plans (EMAPs) to PIC6
16
Item/ Section/ Schedule Description Status of Compliance
province. The contractor, who is responsible for preparing the final detailed design of the roads, will be required to prepare contract-specific EMPs and EMOPs based on the final detailed design, validated information in the road specific environment checklists and the standard EMP. These will be subject to approval by the PICs and PIUs. Necessary provisions for these will be included in the bidding documents, and accordingly, the contractor will be required to include all costs for implementing the contract package-specific EMP. Paragraph 43: The EMP is a plan for mitigating all anticipated environment impacts during project construction and operation. Specific mitigation measures with details on location, time, and the responsible agency for implementation are given in the EMP. The PIC will conduct regular monitoring of EMP implementation and review monitoring records maintained by the contractors. The Environment and Social Development Division (ESDD) of the RDA will also conduct on-site monitoring and review of documents at least semi-annually and provide technical advice to enhance EMP implementation as necessary. Paragraph 44. All required clearances, permits and licenses as applicable must be obtained by the project implementation unit (PIU) before start of construction works in the respective road sections. Permits, licenses etc. for activities such as operation of asphalt plants, quarries, borrow areas etc. must be obtained by the contractor before the implementation of the respective construction activity.
for review and approval before commencement of major civil works. Contractors conduct their own transect walks to update the physical information and conduct consultations to solicit community knowledge and requirements that should be reflected in the design. This information is reflected in the Preconstruction level Environment Monitoring Checklists prepared for each road. Civil works in Uva Province have commenced under tranche one. An Environment Specialist (ES) has been appointed by the PIC and another eight environment/social officers have been appointed and deployed at each Resident Engineer’s office. The ES, through these environment/social officers carry out weekly monitoring of implementation of EMAPs by the contractors. The ES also conducts field monitoring on a priority basis, i.e. based on the information provided by environment/social officers. The ES also carry out monitoring visits on a weekly basis. Advice/ guidance is given by this staff of PIC for rectification in places where measures taken by contractors are not sufficient. ESDD has conducted one monitoring visit to Uva Province. Civil works in the other three Provinces are yet to commence. Only the civil works in Uva Province have commenced in iRoad 2 (Tranche 1). Civil works contractors of all packages in UP are obtaining necessary clearances, permits and licenses as indicated in the contract documents. Copies of these clearances,
17
Item/ Section/ Schedule Description Status of Compliance
permits and licenses are submitted to PIC and PIU for information and documentation. Civil works in the other three provinces are yet to commence.
6.5 Compliance with Environmental Assessment and Review Framework (EARF) 37. Guidelines given in the EARF have been or are being complied with under Tranche 1. Details of each item and status of compliance is summarised in the table below.
Table 6.3 Compliance with EARF with respect to Tranche 1 Item Description Status of Compliance
A. Environmental Criteria for Selection of Project Roads
Paragraph 49. Project roads for inclusion in tranches under the investment program will be selected based on priorities for connecting select GND’s to the main trunk roads. The project roads will be further subjected to the following screening criteria on environment safeguards: i) No project roads that will cause significant environmental impacts that would trigger classification as an environment ‘Category A’ tranche in accordance with the ADB’s SPS (2009) will be included. A ‘Category A’ tranche would be one that includes project roads with widening works inside a legally protected area or critical habitat area4 or have direct and irreversible impacts on cultural heritage sites of national and international significance. ii) No project roads falling in part or whole inside a protected area will be selected under the investment program iii) Project roads falling adjacent to protected areas or eco-sensitive areas will be included only if there is no widening of the road “Right of Way” (ROW) or acquiring of land from the protected area or eco-sensitive area. For such project roads proper consultations will be held with the Department of Wildlife Conservation, local community and other relevant stakeholders and appropriate clearances or endorsements should be sought if required. iv) The rehabilitation work of the project road must have minimal or no long-term impacts on other forms of sensitive ecological habitats such as marshes, natural streams, tanks and related wetland habitats
Complied with in selection of roads in four Provinces appraised under iRoad 2. No road falling within such sensitive sites were considered for selection. Screening checklists given in SPS and EARF were used for selection of roads on the basis of environmental sensitivity. During the Survey and Preliminary Engineering (SAPE) work of iRoad 2, the ESDD staff of RDA with SAPE work teams consulted the Forest Department, Department of Wildlife Conservation and Central Environmental Authority in this aspect. No new roads were considered under Tranche 1
18
Item Description Status of Compliance
B. Screening and Classification
Paragraph 52. To fulfil requirements of the Central Environmental Authority (CEA) a Basic Information Questionnaire (BIQ) will be completed for each project road/entire tranche based on the findings of the environmental checklist for each project road or road.
Complied with in selection of roads in four Provinces appraised under iRoad 2. ESDD of RDA had prepared and submitted the BIQ for Uva Province roads. The CEA has classified the project roads in Uva as a “Non-prescribed” under the regulations of NEA. The letter of concurrence is attached as Annex 1 of this report. ESDD of RDA shall be submitting the BIQs for the other three Provinces and obtaining the environment clearance before commencement of civil works of these three Provinces.
C. Environmental Assessment and Environmental Management Plan
Paragraph 53. The scale of this investment program does not allow to compile IEER of an individual road basis. Such approach will be difficult and time consuming. Hence, one IEER will be prepared for each Province considered under iRoad 2 program. The report will be prepared based on the findings of each road as indicated in the ECs of all roads within the province. The report shall clearly present information and issues that may be unique to a district or geographic area or a project road. All sensitive issues identified in the environment checklist for each project road must be clearly documented in the IEER. The IEER will include one general or standard Environment Management Plan that will cover all possible impacts and mitigation measures within the respective province.
Being Complied in all Provinces appraised under iRoad 2. One IEER has been prepared for each of the four Provinces under iRoad 2. Contractors of all CRC packages in UP have prepared package specific Environment Management Action Plans and submitted to PIC for review and approval. Information for preparation of these EMAPs are obtained from standard EMPs available in the IEERs and road-specific environment checklists prepared during SAPE works.
19
6.6 Environment management and monitoring 38. The contract requires all contractors of CRC packages to prepare package specific Environment Management Action Plans (EMAPs). These EMAPs are to be reviewed and approved by the Environment Specialist (ES) of respective PICs before commencement of major civil works. Each contractor should also prepare and submit Environment Monitoring Checklists (EMCs) at different stages of construction (i.e. at pre-construction; during construction at 25%, 50% and 75% of physical progress and at completion of construction) of each road under their respective package. However, preparation of EMCs during construction stage depends on the length of a given road, i.e. preparation of EMCs at 25%, 50% and 75% will be done only if the road length is more than three kilometers (3 km), if not the EMC will be prepared only at 50% completion. 39. Out of the four Provinces appraised under iRoad 2, civil works have only started in Uva Province. The PIU, PIC and contractors of UP are now fully mobilized. Uva Province has now reached around 9% overall physical progress (as of 28 February 2019). Scheduling of works has been done in consideration of the seasons to avoid dealys in implementation as stipulated in the EMP. Flooding and other hydrologic impacts as a result of climate change has been considered in the designs. PIC is tasked to provide guidance and monitor compliance of the contractors with regard to adaptation measures to address climate change impacts (e.g. raising of embankment, increased capacity of drainage structures). 40. A summary of each contract package on availability of EMAPs, EMCs, date of commencement of construction works, percentage physical progress as at end February 2019 on each road basis is presented in Annex 2. It should be noted that civil works of EP, NP and WP are yet to be started. 41. Frequent site inspections are carried out by Environment Specialist of PIC6 with assistance from social/environment officer at RE office. The social/environment officers conduct weekly site visits while the ES of PIC conducts site visits on a priority basis, i.e. visits to sites that need urgent or detailed assistance/ guidance. Such information is provided by the social/environment officers and the EC also conducts site visits on a weekly basis. Environment staff at PIU also assists these visits to monitor the implementation of EMAPs. Assistance is given to the civil works contractors by PIC and PIU to rectify any issues related to environment compliance. As informed by ES of PIC6, no major environment issues have been reported on non-compliance. However minor issues of improper operation of disposal sites and stock pile yards, nuisance of dust to public, poor usage of PPE by some workers and inadequacies of safety and warning signage have been observed by the ES and his assistants for which the ES have made necessary remedial and rectification instructions to contractors through the Team Leader of the PIC. 42. The CSD and Safeguards Consultant of recently concluded TA8473 and a team from ESDD visited Uva Province during September 2018.
20
Figure 6.1 A photograph taken during the visit by TA consultant and ESDD staff 6.7 Availability of licenses and approvals 43. The EARF and, more specifically, the Table 3 in section 6.6 “Environmental Management Plan and Environmental Checklist” of part II- Employer’s Requirements of the Bidding Documents lists out the necessary approvals (including licenses) that a contractor should obtain before commencement of civil works. These approvals and licenses mainly include Environment Protection License (EPL), Industrial Mining License (IML) and Trade licenses. 44. The ESs of PICs are responsible in monitoring the status of these approvals and licenses and their timely renewal. As such the ES of PIC6 (UP) is keeping a close record of these approvals and licenses. 45. Some contractors of Uva Provinces are still establishing their plants and are in the process of obtaining approvals. A contract package-wise summary of the availability of these approvals in contracts of Uva Province is presented in Annex 3. 46. Amount of debris accumulated due to clearing and grubbing works and excavation works is not that significant in the iRoad 2 program owing to the approach of context sensitive design (CSD) and also because there is only a very limited widening of Right of Way (ROW). However, some quantities of such debris get accumulated at sites. These are disposed at material disposal sites approved by PIC with necessary concurrence from local authorities. The guide note developed under TA8473 on opening, operation and rehabilitation of disposal sites is used in iRoad 2 also. The disposal sites and stockpile sites identified and operational in Uva Province is presented in Annex 4. 6.8 Tree removal and compensatory replanting program 47. Under tranche one, the civil works have started only in UP. Removal of road side trees due road improvement works has been kept to the minimum. In some contract packages, the alignment has been shifted to protect trees (e.g. MO 06 package in UP where the alignment of road ID UMO 20 was shifted to prevent a Nuga tree (Ficus sp.) being cut for road improvement).
21
48. After joint site inspection, the PIC and contractors have sometimes agreed only to trim off the branches that project towards the road to avoid cutting the entire tree. An example of such situation is presented in the subsequent photo. Figure 6.2 A tree saved tree at Ch. 2+650 (LHS) on road ID UMO 20 in MO6 Package Figure 6.3 UBA 341 (BA 04 Package) Road Inspection conducted by PIU, PIC, and Contractor. Project Director highlighted the importance of protecting roadside trees
and instructed the contractor to save the tree near the roadside
49. At certain locations, removal of the entire tree/s has become inevitable. As per the guidelines given in the standard EMPs, the contractors, with the guidance from ES of PIC6, are carrying out compensatory replanting programs to compensate the number of trees that are removed due to road improvements. According to the EMP requirements, a replanting ratio of 1:3 has to be maintained. While there are some practical difficulties in achieving the
22
1:3 target, it is observed that the plants used for replanting of this program are not saplings but matured plants having stem diameter of around 1.0 to 1.5 cm. The survival rate of such plants is much higher compared to saplings, and they are also maintained. Unavailability of common or public lands for such programs and unavailability of a wider ROW to carry out avenue planting are also identified as key practical difficulties which the contractors and PIC are facing in finding land for replanting programs. On the other hand, some contractors have scheduled the replanting programs towards the end of their contracts which is also acceptable but requires close monitoring to ensure compliance. PIU of Uva Province with assistance from their respective PIC and contractors undertakes consultations with government agencies such as Forest Department and Department of Wild Life Conservation and local communities to identify suitable locations for tree-planting activities. Figure 6.4 Tree Planting Program at Helathunthala Primary School, Badalkumbura
– Road ID. 093 in MO 02 Package
50. A summary of tree removal and compensatory replanting is given in Annex 5, the information is presented on each contract package basis. 6.9 Institutional setup 51. As the project executing agency the RDA shall establish Project Implementing Units (PIUs) for each province. PIU for UP has been established and is functional. The PIU for WP shall also act as the project coordinating PIU for iRoad 2. All these PIUs are headed by a full time Project Director (PD) assisted by Deputy Project Directors and Project Engineers. An Environment and Social Unit (ESU) have been established with in each PIU to assist the PD in matters related to environment and social safeguards. Each ESU is manned by one Senior Environment Safeguards Officer (SESO), one Senior Social Safeguards Officer and Social/ Environment Officers. During this review, it was observed that the ESU of UP has recruited the SSSO and two social/ environment officers. The position of SESO is yet to be filled. PIUs of other three provinces are yet to be established. While implementation is sufficiently supported by the current safeguards manpower, delay in the hiring process is being addressed at the management level and it is emphasized that staff complement should be ensured prior to implementation in the other provinces. 52. PIC6 (PIC of UP) is headed by the Team Leader (TL). Under the TL there is an Environment Specialist and a Social, Gender and Resettlement Specialist to assist the TL on environment and social matters and to guide contractors in complying with environment and social safeguards requirements. PIC has recruited their ES and SGRS who are working as key staff on a fulltime basis. Due to the geographic spread of this program, the PIC6 has appointed eight Assistant Environmental & Social Officers (supporting Staff appointed under BOQ provision) covering the four RE regions.
23
53. Other than this institutional setup, the ESDD of RDA also shall assist the PICs and PIUs in implementing environment and social safeguards and monitoring. 6.10 Safety requirements in road designs 54. Compliance with safety (safety of road users, pedestrians and work force) is considered an important aspect in the whole iRoad 2 program. During the SAPE works for the four Provinces under iRoad 2, the SAPE work consultants have completed Road Safety Audit (RSA) for a minimum of 10% sample of the roads in each province. With mobilization of contractors, RSA has to be completed for all roads in a given package and the RSA report has to be submitted to respective PIC for review and approval with instructions. This process is duly followed in UP where contractors have mobilized. 6.11 Health and safety of workers and public during civil works 55. Health and safety of workers and public is considered as a key requirement in iRoad 2 programme. As the civil works are now underway in Uva Province the TL of PIC 06 has clearly emphasized to all contractors to ensure the workers and public safety as one of their first priority during the construction stage. All contractors have been instructed to maintain an accident and safety record book, which is critically reviewed during each monthly progress review meetings conducted by PIU and PIC and instructions are given by Project Director, Uva Province and Team Leader (PIC 06). 56. Contractors are encouraged to carry out tool box meetings and other safety training such as First Aid, Firefighting and Public safety. Contractors under the guidance from PIU and PIC have initiated a series of environment and road safety awareness programmes especially focusing on school children to ensure the public safety during the construction works and considering the use of rehabilitated and improved roads. These programmes are conducted in collaboration with Sri Lanka Police.
Table 6.4 Summary of environment and road safety awareness programmes conducted in Uva Province
District Package Venue Conducted Date
Participation F%
Students Teachers Parents Total
M F M F M F
Monaragala MO 04 Arunodaya preschool
12/11/2018 18 14 00 02 01 20 55 65%
Monaragala MO 02 Helatunthala Primary School
21/11/2018 25 20 01 01 00 00 47 45%
Monaragala MO 06 D.S.Senanayaka collage
30/01/2019 43 54 04 05 00 00 106 57%
Badulla BA 01 Senanigama Primary School
23/11/2018 24 18 02 02 04 14 64 53%
Badulla BA 05 Royal collage Walimada
18/01/2019 41 62 02 06 00 00 111 61%
Badulla BA 07 Liyanganghawela Primary School
27/02/2019 28 35 02 03 00 00 68 56%
Total of Road safety awareness programme participants 179 203 11 19 5 34 451 57%
Note: M – Male, F – Female
57. Safety Programmes: Contractors carry out short safety awareness programmes to all labour force before commencement of daily work. Such short awareness programmes are conducted on a daily basis. Emphasis on the importance of using PPE during the work and
24
other specific arrangements to ensure the safety of the public and co-workers are the key topics discussed during such programmes. 58. Tool box meetings: Tool box meetings are conducted once a week with special focus mainly on health and safety of contractor’s staff and the public. During these meetings a weekly plan is developed aligning with health and safety plan. The discussion with labour force during such tool box meetings include lessons learnt from previous weeks. Such lessons are used in developing the health and safety plan for the upcoming week. In addition to the contractor’s staff, the Construction Engineers and ESOs from PIC participate in these meetings.
Figure 6.5 An awareness about road safety, conducted by Traffic Police for labourers (MO - 03 package, Kiribbbanwewa)
25
Figure 6.6 Conducting health and safety toolbox meeting at office premises, of MO-06 package, Athiliwewa
Figure 6.7 Conducting of health and safety toolbox meeting in BA-01 package, Mahiyanganaya
26
59. Special First Aid training programme: First aid training was given to labourers and office staff of MO-05 and MO-07 packages. The service provider of the training was Suwasariya Ambulance Service or 1990. The 1990 ambulance service is a free service offered by Sri Lankan Government and the service is given 24/7. The toll-free number 1990, can be used to call for the service. This training was conducted in few of the contract packages in Bible and Buththala.
Figure 6.8 Basic first aid training given by 1990 Ambulance Service (MO-05 package)
60. Fire Drill Training: As a safety precaution, fire extinguishing points have been established in PD Office, TL Office, RE and CE Offices, project offices, and laboratories. Although these points have been established, staff members are not technically aware of the preventive measures and also how to use fire extinguishing equipment in case of fire. Hence, special training programmes were conducted to fill up the identified gaps in order to empower employees to take necessary action in such situations to minimize the damages. Table 6.5 summarizes the details of fire drill training programs conducted up to end March 2019.
Table 6.5 Details of fire drill training programmes conducted so far in Uva
Province Package Date Venue Resource Person Participation Total
Male Female
MO 07 13/11/2018 Thudawe Main Yard – 3rd Mile Post
Fire Officer – Monaragala Pradeshiya Sabha
28 05 33
MO 01 07/12/2018 Project Office – MO 01
Badulla Fire Service Brigade
21 09 30
MO 05 31/12/2018 Main Stores and Yard Premises – MO 05
Fire Officers – Monaragala Pradeshiya Sabha
28 02 30
27
Figure 6.9 Fire drill training in package MO-05
6.11.1 An overview of health and safety issues reported 61. Out of the four provinces considered under iRoad 2, only Uva province has commenced civil works. No fatal accident has been reported in any of the civil works contracts in Uva province so far. However, few numbers of near misses, first aid cases and lost time injuries have been reported in some of the civil works contractors. The number of each incident is summarized in table 6.6. Most of the contract packages have reported near misses such as injuries due to falling of objectives from heights, injuries due to slipping on muddy road surfaces, working without appropriate PPE, etc. Other than these near misses, minor injuries such as cuts, crushes, and sprains have been reported mainly at workshops and yards in the monthly environment monitoring report submitted by each civil works contractor. An accident green cross is included in these monthly monitoring report and an example of such “Green cross” is presented in figure 6.10. 62. It has been widely reported that workers are not wearing appropriate PPE such as Safety Head gears, High visible safety vests, Safety shoes/boots, gloves etc. PIC staff are on constant alert on these issues and has now taken a decision not allow any construction activities if the supervisory staff and labourers do not wear appropriate PPE. Generally, workers, especially those coming from rural areas, do not have thorough appreciation of the importance of safety and see PPE as burdensome to their work. That is why workers’ safety is given emphasis and iterative trainings are conducted in this project.
Table 6.6 Summary of reported accidents up to 31st of March 2019
Package Near Misses
First aid
cases
Lost time
injuries
Fatal Accidents
BA - 01 6 1 1 0
BA - 02 1 1 0 0
BA - 03 0 3 0 0
BA - 04 0 0 0 0
28
BA - 05 5 3 0 0
BA - 06 1 6 0 0
BA - 07 8 7 1 0
BA - 08 0 0 0 0
MO - 01 6 1 0 0
MO - 02 0 7 0 0
MO - 03 8 5 2 0
MO - 04 1 1 0 0
MO - 05 6 5 0 0
MO - 06 1 1 0 0
MO - 07 0 2 0 0
Total 43 43 4 0
Figure 6.10 A sample of an Accident Green Cross (Source: Monthly Environment
and Social monitoring Report, March 2019, MO-05 Package)
29
6.12 Public grievances with respect to environment issues 63. The Grievance Redress Mechanism for iRoad 2 program is described in the EARF, where grievances are to be addressed at three levels by setting up Grievance Redress Committees (GRCs). Uva Province where the civil works have begun have started establishing these GRCs at the grassroot level, Grama Niladhari Level and at Divisional Secretary Level. A master complaint register is being maintained at each contractor’s Project Manager’s (PM) office. This master register logs all complaints received by different parties (including contractor, PIC and PIU). Contractors have placed “suggestion, request, complaint” collection boxes in each road under construction. A public notice with project related information and contact details of key persons to be contacted in case of any grievance is displayed in each road under construction as per the requirements of EARF. 64. Suggestions, requests and complaints received through telephone calls or in verbal form are also logged in this register. RDA has also developed an “online” complaint receiving system.
Figure 6.11 A sample of public information notice and a complaint collection box
65. Dust and temporary disturbance to access are the most common types of complaints received on environment aspects as contractors take advantage of dry days. These concerns are generally temporary in nature and solutions are readily agreed with complainants. Increasing the frequency of water spraying over dust blowing surfaces and providing platforms for access are the measures taken to resolve these issues, as much as practicable. 66. Progress of formation of GRCs and a summary of most significant complaints received by contractors on package basis in UP is presented in Annex 6. It was observed that the contractors in UP with the assistance from PIC have resolved many of these complaints to the satisfaction of the complainer/s. 7. Public consultation and awareness programs 67. Public consultation was a key feature of the first iRoad program, and such best practices were readily adopted in iRoad 2. Views of the public have been considered in the designs, mainly to develop a road that is acceptable in environmental, social and safety aspects. Public consultations were an integral part of the SAPE works for all provinces appraised under iRoad 2 and as applicable to Tranche 1. With commencement of civil work contracts, the contractors in Uva Province have carried out public consultations as means of updating the information available through environment checklists and transect walk survey reports. This approach towards transparency and collaboration has resulted to better relationships among stakeholders, contractors, PIC, and PIU.
30
68. The Environment Specialist of PIC6 has organized a few public awareness and educational programs on environment conservation and management which further improved project’s reputation in the localities and, therefore, increased support for the project from beneficiaries. The PIU and contractors of Badulla and Monaragala have assisted the PIC in conducting these programs. Below are few examples of such programs.
Table 7.1 Examples of public awareness programs conducted in UP (as at end February 2019)
District Package Venue Date conducted
Number of participants
Monaragala MO 04 Arunodaya preschool 12/11/2018 55
Monaragala MO 02 Helatunthala Primary School 21/11/2018 47
Monaragala MO 06 D.S.Senanayaka collage 30/01/2019 106
Badulla BA 01 Senanigama Primary School 23/11/2018 64
Badulla BA 05 Royal collage Walimada 18/01/2019 111
Badulla BA 07 Liyanghawela Primary School 27/02/2019 68
Total of Road safety awareness program participants 451
Source: PIC6, Uva Province.
Figure 7.1 Public consultation conducted at Community Hall, Dobaghalawela. Road ID. UMO 054, MO 07 Package
31
Figure 7.2 Environmental awareness session conducted in Liyangahawela Primary School, BA 07 Package
8. Use of the concept of context sensitive design (CSD) in an environment
perspective 69. The novel approach of applying the concept of Context Sensitive Design (CSD) has helped the iRoad program to comply with environment safeguards requirements and construct more environmentally sound roads compared to conventional approach. Based on the success of this application, the same concept was adopted in iRoad 2. 70. The TA consultant carried out an awareness workshop targeting contractors’ staff, PIC, and PIU of Uva Province in helping them to understand this concept. As a result, ground-level adoption with CSD has been observed across packages. Majority of the site-specific impacts addressed are on drainage and realignment. Below are a few examples of application of CSD in rural road designs where the environment has also benefited. 71. Following section presents an example of applying CSD which was explained by Mr. Saranga Gajasinghe (TA consultant) during the field training program conducted in September 2018. 72. During the field visit on road ID UMO 110 of MO 1 package, landslide was observed at one section (as shown in figure 8.1). Thus, the design engineers have first considered to construct a retaining wall for which a significant amount of funds shall be required. Further on, it was identified that the reason for the landslide was the altered storm water drainage path due to blockage. As such, the team decided to construct the drainage system (using concrete drains) and re-establish the drainage path, this time away from the slope to avoid or minimize any future landslides.
32
Figure 8.1 (a) Landslide area on UMO 110, MO – 01 Package identified to be constructed a retaining wall previously; (b) During the field training, identified to
improve the culvert in by road and introduced concrete drains to prevent landslide
(a) (b) 73. PIU, PIC, and contractor staff identified the importance of introducing hard shoulders with concrete drainages to prevent soil erosion instead of using a soft shoulder at road ID: UBA 273 due to the existing environmental conditions. A summary of application of CSD in Uva Province is presented in Annex 7 of this report. 9. Conclusions and recommendations 9.1 Conclusions 74. The iRoad 2 program is now operational in Uva Province and RDA intends to start operations in Eastern and Northern Provinces in year 2019. The program is currently under Tranche 1. With two more Provinces considered for civil works, the GoSL plans to submit the next PFR to ADB for processing the next slice of the MFF. This Tranche 2 will finance the second slice of the loan for the four Provinces appraised under iRoad 2. This due diligence report on environment safeguards compliance is prepared to fulfill the requirements stipulated in the project loan documents on processing of subsequent tranches. 75. Contractors of all CRC packages in Uva Province have either developed or are in the process of developing package-specific EMAPs before commencement of major civil works. These EMAPs have been submitted to PIC6 for review and approval. Contractors are also preparing and submitting EMCs to PIC6 for review and approval. 76. All contractors have recruited at least one environment, health and safety officer for each package. PIC of UP has recruited fulltime Environment Specialists and they are assisted by social/ environment officers stationed at each RE office. The Environment and Social Unit at PIU of UP has only one social/environment officer. The SEO position is still vacant. 77. Contractors are operating their plants, material extraction sites, and disposal sites with necessary licenses and approvals. The ES of PIC6 keeps a close observation on these approvals and instructions are given to extend such approvals and licenses where necessary. The ES of PIC is assisted by eight social/ environment officers’ stations at each RE office.
Identified culvert
33
78. No fatal accident had occurred so far in Uva Province due to civil works of iRoad 2 programme. However, a few near misses, first aid cases and lost time injuries have been reported in some of the civil works contractors. The PIU and PIC are constantly reminding the civil works contractors on health and safety requirements of the programme. And in response the contractors are conducting safety daily short awareness sessions and weekly tool box meetings. Contractors are also imposing that workers who are not wearing appropriate PPE will not be allowed to proceed/continue work. 79. Tree removal has been kept to a minimum. For the trees removed, compensatory replanting programs are initiated mostly with the participation of public. 80. Grievance redress mechanism systems have been established in all CRC packages as per the guidelines given in the EARF and are functional. 81. No unanticipated environmental and/or social risks and impacts had arisen during construction works of UP. 82. Also, no actual or potential breach of compliance with the measures and requirements set forth in the IEE, EMP and any safeguard documents had occurred during implementation of tranche one. 83. Tranche two is considered as the second slice of loan for projects appraised under iRoad 2. As there will be no new project roads included under tranche two, it is expected that tranche four will also be classified as environment ‘Category B’. 9.2 Recommendations 84. It is recommended that PIC and PIU in UP continue to monitor the safeguards implementation by contractors and assist them in rectifying any issues that needs more site-specific measures. The same approach should be adopted in other three Provinces appraised under iRoad 2. 85. ESDD should also continue monitoring execution of environment safeguards measures by contractors, PICs and PIUs and assist where required. 86. It is recommended to have many formal and informal awareness sessions on the concept and application of CSD, safeguards and safety for contractors, PIC and PIU staff, initiating from UP and moving to EP, NP and WP with mobilization of contractors, PICs and PIUs of these Provinces. It is recommended that this process continues throughout the iRoad 2 program as was done in iRoad. Such measure will enable the contactors, PIC and PIU to effectively implement safeguards requirements stipulated in the subsequent loan agreements. 87. As most of the contractors have scheduled their replanting programs towards the end of the civil work contracts, it is important that the PICs keep close supervision on this aspect so that they do not fall short of the target of replanting. If 1:3 ratio planting is not possible at least 1: 1 ratio should be achieved using mature plants as ones that are presently used for replanting. Further, it is recommended that the other contractors (other than packages MO1, MO5 and MO7) conduct special first aid and fire training drills as conducted in above three packages (MO1 should also conduct such special first aid training). 88. It is recommended that ESDD/ RDA, with assistance from the Ministry of Highways and Road Development, initiate a dialog with Forest Department and Department of Wildlife Conservation to identify degraded forest patches within reasonable distance from project
34
areas. Such forest patches could be used for replanting under the guidance of Forest Department and Department of Wildlife Conservation. Initiation of planting trees on lands degraded due to landslides could also be considered as another option. Assistance from National Buildings Research Organization should be obtained if such programs are to be carried out. 89. It is recommended that PIC pay more attention to the tree planning programs as some of the contract packages are lagging on them.
90. It is also important that the current level of public consultation is at least maintained or improved during the remaining period of the program. On this note, it is recommended that PIC6 with their respective PIU (of UP) and contractors initiate and conduct more public awareness and educational programs on environment safeguards.
35
Annex 1: CEA letter of concurrence with recommendations
36
37
38
39
Annex 2: Package wise summary of preparation and submission of site specific EMAPs and EMC (Uva Province) BA – 01 Package SSEMAP and EMC Submission Details
SN Code Road Name Road Category
Length (km)
Physical works SSEMAP EMC
Status Progress %
Pre-Con 25% 50% 75% 100%
1 UBA104 Mapakadawewa 20th mile post Junction to 50 Acres Road
PRDD 3.06 On going 12% 27/12/2018 11/12/2018
2 UBA105 Mapakadawewa 20th Mile post Jc. to Paharagammana Road
PRDD 1.81 On going 24% 19/09/2018 19/10/2018 NR NR
3 UBA113 Paharagammana Road (Bodiya) to Senanigama School Road
PS 0.87 On going 55% 19/09/2018 02/11/2018 NR NR
4 UBA005 50th Mile Post-Keselpotha-Mapakada Road PRDD 10.28 On going 10% 27/02/2019 27/02/2019
5 UBA119 Thissapura Keselpotha Junction to Aadaulpatha Road
PRDD 6.02 On going 18% 28/02/2019 25/02/2019
BA – 02 Package SSEMAP and EMC Submission Details SN
Code Road Name Road Category
Length Physical works SSEMAP EMC
Status Progress %
Pre-Con 25% 50% 75% 100%
1 UBA 047 Bubula, Mahathenna, Dadayamthalawa Road
PS 2.94 On going 40 11/02/2019 20/02/2019 NA NA
2 UBA 095 Kandeketiya Badulu oya junction to Thennagamanaya Road
PS 4.14 On going 34 15/11/2018 06/12/2018
3 UBA 199 Kesalwatta Lunugala Road PS 1.75 On going 30 11/02/2019 13/02/2019 NA NA
4 UBA 212 Komarika Galkada Road PS 1.69 On going 77 12/10/2018 19/10/2018 NA NA
5 UBA 238 Makulgolla Welan Landa Road PS 1.83 On going 40 15/11/2018 19/10/2018 NA NA
6 UBA 295 Polgaha Arawa Main Road PS 4.42 On going 41 15/11/2018 31/10/2018
7 UBA 327 Thaldena-Galgelanda Road PS 2.57 On going 33 11/02/2019 13/02/2019 NA NA
8 UBA 329 Thaldena-Bathalawatta Nagolla Road PS 3.83 On going 40 11/02/2019 13/02/2019
40
BA – 03 Package SSEMAP and EMC Submission Details
SN Code Road Name Road
Category Length
(km)
Physical works SSEMAP (Submitted
date)
EMC
Status Progress % Pre-Con 25% 50% 75% 100%
1 UBA074 Atabagahakadura to Kendagolla Dabagasgoda Bridge PRDD 2.85 On going 8.52% 20.02.2019 - NR - NR -
2 UBA240 Malangamuwa Road PRDD 3.33 On going 32.28% 13.02.2019 - - - - -
3 UBA301 Rilpola- Kalugalpitiya Road PRDD 2.88 On going 25.99% 04.01.2019 13.02.2019 NR - NR -
4 UBA026 Approach road to Badulla Weeriyapura Bishop's road PS 0.50 On going 63.09% 30.10.2018 30.10.2018 NR - NR -
5 UBA098 Kendagolla Yodun Ulpatha Bridge to Gurubiththiya Junction
PRDD 2.29 On going 13.56 20.02.2019 - NR - NR -
6 UBA356 Weeryapura Main Road Sec.i PS 1.55 On going 27.21% 04.01.2019 - NR - NR -
BA – 04 Package SSEMAP and EMC Submission Details
SN Code Road Name Road
Category Length
(km)
Physical works SSEMAP
EMC
Status Progress % Pre-Con 25% 50% 75% 100%
1 UBA151.vii Hali Ela Outer Circular Road Sec. vii PS/PRDD 4.85 On going 10% 03/01/19 03/01/19 - - - -
2 UBA244 Malpola to Ambewela bypass Road PS 2.72 - - 05/02/19 05/02/19 - - - -
3 UBA316 Silpolagama Road to Unagolla Road PRDD 2.08 - - 03/01/19 03/01/19 - - - -
4 UBA341 Unagolla to Hali-Ela Road PRDD 2.94 On going 43% 29/10/18 22/09/18 - - - -
BA – 05 Package SSEMAP and EMC Submission Details
SN Code Road Name Road
Category Length
(km)
Physical works
SSEMAP
EMC
Status Progress
% Pre-Con 25% 50% 75% 100%
1 UBA 116 Sapugollagama to Nahakadiya via Telembuwela Road
PRDD 1.95 - - 29.01.2020 20.02.2019 NR - NR -
2 UBA 314 Senanayaka Jc. To Kirawanagama, Galketiya Mankada Road
PRDD 7.76 On going 10 29.01.2020 28.02.2019 - - - -
3 UBA 362 Welimada-Yahalagaha Arawa Imbulgashinna Rahupola Road
PRDD 14.08 On going 16 16.11.2018 16.11.2018 - - - -
4 UBA 290 Pelwinna Road(From Pelwinna Junction)
PS 1.38 On going 55 29.10.2018 16.11.2018 NR - NR -
5 UBA 361 Welimada-Kerandimulla Road PRDD 7.16 On going 14 16.11.2019 24.11.2018 - - - -
41
BA – 06 Package SSEMAP and EMC Submission Details
SN Code Road Name Road
Category Length
(km)
Physical works SSEMAP
EMC
Status Progress % Pre-Con 25% 50% 75% 100%
1 UBA081 Demodara-Beddegama-Springvalley-Rockhill to Badulla Road
RDA 22.00 On going 12% 12/10/18 14/09/18 - - - -
2 UBA084 Ella to 3rd Mile Post (Ella-Passara Road via Ballaketuwa) RDA 4.50 - - - 17/09/18 - - - -
3 UBA055 Demodara-Gawarawela-Beddewela via Ballaketuwa Road PRDD 2.51 On going 0.5% 21/02/19 21/02/19 NR - NR -
4 UBA137 Gawarakele-Nahawila-Hindagala Road PRDD 6.55 - - - 06/09/18 - - - -
5 UBA258 Nawelagama Beddewela Road Sec.I & II PRDD 7.06 - - - 06/09/18 NR - NR -
6 UBA297 Pupula Temple Road PS 1.85 - - - 18/09/18 NR - NR -
BA – 07 Package SSEMAP and EMC Submission Details
SN Code Road Name Road Category
Length (km)
Physical works SSEMAP EMC
Status Progress % Pre-Con 25% 50% 75% 100%
1 UBA242 Maligathenna to Bandarawela main Road RDA 9.10 On going 14% 12.11.2018 23.01.2019
2 UBA271 North Kebillewela Bindunuwewa road PRDD 2.82 On going 29.01.2019 NR NR
3 UBA 373 Chelsiwatta lower Katugaha Road PS 3.54 21.02.2019
4 UBA223 Kurukudegama Post Office to warakadanda pitakandura road
PS 1.68 On going 21.02.2019 29.01.2019 NR NR
5 UBA391 Mahathenna Bypass Road. PS 0.91 21.02.2019 29.01.2019 NR NR
BA – 08 Package SSEMAP and EMC Submission Details
SN Code Road Name Road Category
Length
(km)
Physical works SSEMAP
EMC
Status
Progress %
Pre- Con 25% 50% 75% 100%
1 UBA076 Bathgoda – Okwel road PS 1.19 Ongoing 10% 16.09.2018 14.11.2018 NR NR
2 UBA077 Bathgoda – Ranwanguhawa road PS 1.04 On going 10% 30.08.2018 14.11.2018 NR NR
3
UBA124
From waeliya junction to school road PRDD
0.93
On going 5% 25.02.2019 01.02.2019 NR
NR
4 UBA135 Gampaha – Kolongasthanna road PRDD 8.15 Ongoing
5% 21.02.2019 22.02.2019
5 UBA312 Seelathanne - Maradola Road PRDD 1.54 Ongoing 5% 28.12.2018 03.12.2018
42
MO – 01 Package SSEMAP and EMC Submission Details SN Code Road Name Road
Category Length
(km) Physical works SSEMAP EMC
Status Progress % Pre-Con 25% 50% 75% 100%
1 UMO016 Alupotha Junction to Kalugaha Wadiya Road PS 2.92 Ongoing 35% 21/02/2019 02/11/2019
2 UMO028 Badalkubura- Karawilaella Road PRDA 7.91 Ongoing 15% 21/02/2019 15/02/2019
3 UMO031 Badalkumbura- Bogahapelessa (Lunugala
Janapadaya) Road PRDA 12.18 Ongoing 20% 26/10/2018 28/12/2019
4 UMO058 Madamagama Junction to Yatimulla, Karadawatta
Sec. i &ii PS 3.97 - 21/02/2019
5 UMO098 Maligathanna Road PS 2.26 - 26/10/2018
6 UMO110 Namunukula- Miyanakadura Road PRDA 14.72 Ongoing 10% 12/02/2019
7 UMO143 11 Kanuwa, Madugahapitiya Road PS 1.44 - 26/10/2018
MO - 02 Package SSEMAP and EMC Submission Details
SN Code Road Name Road Category
Length (km)
Physical works SSEMAP EMC
Status Progress %
Pre-Con 25% 50% 75% 100%
1 UMO093 Madukotan Arawa to Udagangoda Road PS 3.45 On going 20% 04.03.19 04.03.19
2 UMO094 Madukotanarawa Tuntala Athlaamulla Road
PS & PRDD
6.39 On going 40% 18.02.19 20.11.18
3 UMO147 Madukotan Arawa Helathunthala Punsisigama Junction Road PS 2.71 On going 50% 29.10.18 20.11.18 NR NR
4 UMO048 Development of the Keepetipola lane PS 0.60 On going 10% - 04.03.19 NR NR
5 UMO041 Buthsaranapitiya-Guruhela Road PS 2.36 On going 40% 18.02.19 05.03.19 NR NR
6 UMO116 Near by Sirigale Hospital to Magandana Mulla Road PS 1.53 On going 30% 04.03.19 05.03.19 NR NR
MO – 03 Package SSEMAP and EMC Submission Details SN Code Road Name Road
Category Length
(km) Physical works SSEMAP EMC
Status Progress % Pre-Con 25% 50% 75% 100%
1 UMO138 Hathporuwwa pola junction Somadewi road PRDD 3.32 On going 48.70% 30/11/2018 30/11/2018 12/02/2019
2 UMO150 Mahagama Saliya Mawatha Sec.i to vii PRDD/PS 4.42 On going 21.50% 22/01/2019 22/01/2019
43
SN Code Road Name Road Category
Length (km)
Physical works SSEMAP EMC
Status Progress % Pre-Con 25% 50% 75% 100%
3 UMO155 Thalapatha ginigala Road PRDD 2.81 On going 29.80% 30/12/2018 30/12/2018 NR NR
4 UMO003 1st Lane, Bogaha Junction PS 1.23 On going 47.00% 30/12/2018 30/12/2018 NR NR
5 UMO052 Diwlana to Kiriibbanara PRDD 3.71 On going 21.00% 06/09/2018 06/09/2018 28/02/2019
6 UMO115 Kiriibbanwewa Bandaranayaka School to Left Bank Road
PS 1.14 On going 21.10% 28/02/2019 28/02/2019 NR NR
7 UMO145 Dalukkatiya watarawuma Road Sec.i & ii PRDD 2.66 On going 15.80% 30/12/2018 30/12/2018 NR NR
8 UMO079 Kandiyapita-Bogaswewa junction to Diulana PS 1.86 On going 12.50% 13/11/2018 31/10/2018 NR NR
9 UMO012 Agunakolapalassa 17 to Wijayapura School PS 2.30 On going 05.60% 22/02/2019 22/02/2019 NR NR
10 UMO089 Laginagala Road Galeramankada to Bogaswawa PRDD 3.27 On going 12.50% 12/02/2019 12/02/2019
11 UMO090 Laginagala-Damwelodaya Road PRDD 4.58 On going 21.45% 22/01/2019 22/01/2019
MO – 04 Package SSEMAP and EMC Submission Details SN Code Road Name Road
Category Length
(km) Physical works SSEMAP EMC
Status Progress % Pre-Con 25% 50% 75% 100%
1 UMO120 Okkampitiya Dabeyaya Road PRDD 1.37 08.12.2018 NR NR
2 UMO121.i Old Buttala Junction To Kukurampola Junction Sec i PS 10.53 On going 10% 08.12.2018 08.11.2018
3 UMO121.ii Old Buttala Junction To Kukurampola Junction Sec ii PS 8.07 08.12.2018 08.12.2018
4 UMO121.vi Old Buttala Junction To Kukurampola Junction Sec vi PS 10.15 - 08.12.2018
5 UMO122 Palwatta Co-operative Vie Gonagodalla-Kukurampola Road
PS 1.95
On going 76.64% 08.11.2018 08.11.2018 NR NR
6 UMO137 Unawatuna,Pasal Mawatha,Lunugala Janapadaya Road
PRDD 2.81
- 23.11.2018 NR NR
7 UMO059 From Pelwatta Juncion To Passara Road RDA 11.7 On going 7% 08.11.2018 08.11.2018
8 UMO072 Horambawa-Suduwathura Aara-Galtemandiya Road PRDD 13.06 - 13.11.2018
MO – 05 Package SSEMAP and EMC Submission Details
SN Code Road Name Road Category
Length (km)
Physical Works SSEMAP EMC
Status Progress %
Pre-Con 25% 50% 75% 100%
3 UMO005 5th Mile Post to Thiththawalkiula PRDD 4.26 On going
23% 05/11/2018 05/11/2018
44
4 UMO006 5th Mile post Yalkubura Road (Via Kotagama Mallhewa ) PRDD 8.24 On going
10% 15/02/2019 08/02/2019
5 UMO039 Bibila Watta Road PS 2.96 On going
12% 03.01.2019 26/12/2018 NR NR
MO – 06 Package SSEMAP and EMC Submission Details
SN Code Road Name Road Category
Length (km)
Physical works SSEMAP EMC
Status Progress % Pre-Con 25% 50% 75% 100%
1 UMO 011 Handapanagala School to Randenigodayaya road PS 4.57 - 27/12/2018 NR NR NR NR
2 UMO 020 Athiliwewa - D.S. Gama road PRDD 4.18 On going 25% 30/10/2018 28/01/2019 NR NR NR NR
3 UMO 021 Athiliwewa junction to D.S. Gama road PRDD 10.66 On going 8% 11/02/2019 28/01/2019 NR NR NR NR
4 UMO 022 Athiliwewa- mahaaragama Ulkanda - Handapanagala road
PRDD 11.65
On going 10% 11/02/2019 27/11/2018 NR NR NR NR
5 UMO 062 From weherayaya junction to siripuragama road PS 5.34
On going 5% 21/02/2019 20/02/2019 NR NR NR NR
MO – 07 Package SSEMAP and EMC Submission Details
SN Code Road Name Road
Category Length (Km)
Physical Works
SSEMAP
EMC
Status Progress
% PRE-CON 25% 50% 75% 100%
1 UMO 57 From 9th mile post to Buddama PRDD 7.54 On going - - 06/03/19 - - - -
2 UMO 77 Kandauda Panguwe 6th Mile Post to Muthukandiya 4th Mile Post
PRDD 7.601 On going 15% 13/11/18 04/12/18 - - - -
3 UMO 130 Siyabalanduwa Ampara (2 Village) PS 3.641 On going 20% - 21/02/19 NR NR -
45
Annex 3: Summary of the status of approvals/ licenses BA – 01 Package License Details
SN Type of Plant
Supplier Name
Location
EPL
EPL, No
TL IML(GSMB)
IML, No From To From To From To
1 Asphalt Plant
NEM Kovilyaya, Mahiyanganaya
18/12/2018 17/12/2019 06721 (R5)
2019.01.01 2019.12.31 NA NA NA
2 Crusher Plant
NEM Kovilyaya, Mahiyanganaya
18/12/2018 17/12/2019 06722 (R5)
2019.01.01 2019.12.31 NA NA NA
3 Quarry Mr. R M. R. Wijesekara
Kowilyahaya, Mahiianganaya
The renewal documents already have been submitted CEA(Payment invoice-BDU40537)
The renewal documents already has been submitted CEA(Payment invoice-BDU40537)
11260 (R1)F1
2019.01.31 2019.12.31
The renewal documents already has been submitted GSMB(Payment invoice-BDU40537)
The renewal documents already has been submitted GSMB (Payment invoice-BDU40537)
IML/B/HO/6524/LR/3
4 Borrow Pit
Ms. Chithrangani
58,Scool road, Wewaththa
EC-No: UPO/BD/08/03/EC/09/2011 N/A N/A 28/01/2019 17/07/2019 IML/B/HO/6019/LR/3
5 Concrete Batching plant
Sunwo Lanka
22/3, Padiyathalawa road, Mahiyanganaya
26/03/2018 25/03/2019 15160 (R3)
2019.01.01 2019.12.31 NA NA NA
BA – 02 Package License Details
SN Type of
Plant Supplier Name Location
EPL EPL, No
TL IML(GSMB) IML, No
From To From To From To
1 Asphalt Plant
Komuthi Engineering (PVT)Limited
Komuthi Engineering (PVT) Limited, Reeppayaya Kelaya, Alikandura,Medayaya, Mahiyanganaya.,
31/10/2018 23/05/2019 04752 (R5)F3
Under Process (Not functioning at the moment)
Under Process (Not functioning at the moment)
NA NA NA
46
SN Type of
Plant Supplier Name Location
EPL EPL, No
TL IML(GSMB) IML, No
From To From To From To
2 Crusher Plant
Komuthi Engineering (PVT)Limited
Komuthi Engineering (PVT) Limited, Reeppayaya Kelaya, Alikandura,Medayaya, Mahiyanganaya.,
31/10/2018 23/05/2019 04752 (R5)F3
Under Process (Not functioning at the moment)
Under Process (Not functioning at the moment)
NA NA NA
3 Quarry Komuthi Engineering (PVT)Limited
Komuthi Engineering (PVT) Limited, Reeppayaya Kelaya, Alikandura,Medayaya, Mahiyanganaya.,
Under Process (Not functioning at the moment)
Under Process (Not functioning at the moment)
Under Process (Not functioning at the moment)
Under Process (Not functioning at the moment)
Under Process (Not functioning at the moment)
Under Process (Not functioning at the moment)
Under Process (Not functioning at the moment)
Under Process (Not functioning at the moment)
4 Borrow Pit
Mr. D.M.Guanpala, Pimbura ulpatha, Aluthgedara
UBA 212 Relevant documents has been sent to CEA. The approval is pending.
5 Concrete Batching plant
Komuthi Engineering (PVT)Limited
16th Mile post, Meegahakivula, Badulla.
10/12/2018 10/12/2019
UPO/BD/07/02/46/2018
Under Process (Not functioning at the moment)
Under Process (Not functioning at the moment)
NA NA NA
BA – 03 Package License Details
SN Type of
Plant Supplier Name Location
EPL
EPL, No
TL IML(GSMB) IML, No
From To From To From To
1 Asphalt Plant
CML-MTD Construction Ltd.
Sooriyawewa Requested Applied (Serial No.: 192153)
29/01/2019 31/12/2019 NA NA NA
2 Crusher Plant
Kingswood Group Hali Ela 05/04/2019 04/04/2019 15214(R0) 29/01/2019 31/12/2019 NA NA NA
47
SN Type of
Plant Supplier Name Location
EPL
EPL, No
TL IML(GSMB) IML, No
From To From To From To
3 Quarry Kingswood Group Hali Ela 08/08/2019 07/08/2019 02988(R6)F1 08/02/2019 31/12/2019 23/05/2018 23/05/2019 IML/A/HO/291
8/LR/6
4 Quarry 2 Weerasekara Metal Crusher
Atumadagala lot 1,Madagaloya, 4c
Dambagolla, Mahiyanganaya
26/06/2018 25/06/2019 01/01/2019 31/12/2019 19/02/2018 18/02/2019 IML/B/HO/565
7/LR/5
5 Borrow Pit Goradiyawaka Goradiyawaka Requested N/A N/A 16/01/2019 16/03/2019
6 Concrete Batching plant
Thudawe and brothers
Hali-ela EPL-Application has submitted, Payment has done (31/08/2018-
188396) N/A N/A N/A
BA – 04 Package License Details
SN
Type of Plant Supplier Name Location
EPL EPL, No TL IML(GSMB) IML, No
From To From To From To
1 Asphalt Plant -
2
Crusher Plant D.M.R.U.Dissa nayake
Nimsara Metel Industry, No.12 Gangabada Road Badulla
15/12/2017 16/12/2018 Updates will be provided later
03555(R5) 01/01/2018 31/12/2018 Updates will be provided later
NA NA NA
48
SN
Type of Plant Supplier Name Location
EPL EPL, No TL IML(GSMB) IML, No
From To From To From To
3
Quarry S.A.Nihal Senewirathna
Queenstown Estate Alugolla HaliEla
24/03/2018 23/03/2019 02661(R6) 01/01/2018 31/12/2018 Updates will be provided later
03/04/2018 02/04/2018 IML/B/HO/2 326/LR/7
4
Borrow Pit
Silpolagama Grama Sanwardhana Samithiya
Unagolla Estate, Field No 10, 84/A Unagolla GN Division, Silpolagama
In Progress In Progress In Progress In Progress In Progress 30/01/2019 02/04/2019 NA
5
Concrete Batching plant
-
- - - - - - - - -
6
Explosive License
- - - - - -
- 2018/11/08 2019/05/07 -
BA – 05 Package License Details
SN Type of Plant
Supplier Name
Location
EPL
EPL, No
TL IML(GSMB) IML, No
From To From To From To
1 Asphalt Plant
Access Engineering
(Pvt) Ltd
Uda Mailapitiya Pahatha Hewaheta 7.227794 80.751927
16.06.2018 15.06.2019 12774 (R2)
01.01.2019 31.12.2019 NA NA NA
49
SN Type of Plant
Supplier Name
Location
EPL
EPL, No
TL IML(GSMB) IML, No
From To From To From To
2 Crusher
Plant P.L.P
Construction
No 14, Nuwara Eliya road Welimada 6.891377 80.931954
05.02.2018 04.02.2019
10433(R3)
Requested for license
NA NA NA
3 Quarry P.L.P
Construction
No 14, Nuwara Eliya road Welimada 6.891377 80.931954
21.03.2018 20.03.2019 05970(R3) Requested for license 03.05.2018 27.03.2019
IML/B/HO/6861/LR/05
4 Borrow Pit - - - - - - - - -
5 Concrete Batching plant
Orient Construction Company (Pvt) ltd
Hetan Road, Kelegala, Nuwara Elila 6.9527310 80.7722720
17.02.2018 16.02.2019 06892 (R4)
Requested for license NA NA NA
BA – 06 Package License Details
SN Type of Plant Supplier Name Location EPL EPL, No TL IML(GSMB) IML, No
From To From To From To
1 Asphalt Plant CML-MTD Construction Ltd.
Sooriyawewa - - Applied (Serial No.: 192153)
29/01/19 31/12/19 NA NA NA
2 Crusher Plant Kingswood Group Hali Ela 05/04/19 04/04/19 15214(R0) 29/01/19 31/12/19 NA NA NA
50
3 Quarry Kingswood Group Hali Ela 08/08/19 07/08/19 02988(R6)F1 08/02/19 31/12/19 23/05/18 23/05/19 IML/A/HO/ 2918/LR/6
4 Borrow Pit Not identified.
5 Concrete Batching plant
Kithmina Batching Plant Bandarawela 23/05/18 22/05/19 12727(R2) 01/01/18 31/12/18 NA NA NA
BA – 07 Package License Details
SN Type of Plant
Supplier Name
Location EPL EPL, No TL IML(GSMB) IML, No
From To From To From To
1 Asphalt Plant
CML-MTD construction
Ltd.
Sooriyawewa Requested receipt no 192153
2019.01.29 2019.12.31 NA NA NA
2 Crusher Plant
Kingdwood Hali-ela 05.04.2018 04.04.2019 15214(R0) 2019.02.08 2019.12.31 NA NA NA
3 Crusher Plant
Kingrose Hali-ela 31.07.2018 30.07.2019 15575(R0) 2019.01.11 2019.12.31 NA NA NA
4 Quarry Kingdwood Hali-ela 08.08.2018 07.08.2019 02988(R6)F1 2019.02.08 2019.12.31 2018.05.24 2019.05.23 IML/A/HO/2918/LR/6
51
6 Concrete Batching
plant
Kithmini Bandarawela 23.05.2018 22.05.2019 12727(R2) 2019.01.29 2019.12.31 NA NA NA
7 Concrete Batching
plant
Thudawa Brothers
Attampitiya 29.01.2019 28.01.2020 16165(R0) 2019.01.20 2019.12.31 NA NA NA
BA – 08 Package License Details
SN
Type of Plant
Supplier
Name
Location
EPL EPL, No
TL IML(GSMB) IML, No
From To From To From To
1
Asphalt Plant
Mr Nilojan (Accon
Engineering)
Kiriella- Rathnapura
04.06.2018
03.06.2019
10942 (R3)
Pending
NA
NA
NA
2
Crusher Plant
Mr Kmilasa ( BNC
Mettle Crusher )
Balangoda
29.11.2018
28.11.2019
02674 (R3)
01.01.2019
31.12.2019
NA
NA
NA
3
Quarry
Mr Kamilas
(BNC Quarries)
Balangoda
16.11.2018
15.11.2019
15991 (R3)
10.10.2019
31.12.2019
31.12.2018
30.06.2019
031283
52
4
Borrow Pit
Mr KMS Singarathna
Hadapanagala Wallawaya
19.11.2018
11.09.2019
NA
Pending
19.11.2018
11.09.2019
033463
5
Concrete Batching
plant
Wight Batching
Plant
At site
NA
NA
NA
NA
NA
NA
NA
NA
MO – 01 Package License Details
SN Type of Plant
Supplier Name Location EPL EPL, No TL IML(GSMB) IML, No
From To From To From To
1 Asphalt Plant
AMSK Construction
(Pvt) Ltd
Yalkumbura Obtaining in progress
Obtaining in progress NA NA NA
2 Crusher Plant
M.B. Chandana Yudaganawa 2019.10.11 15914(R0) 2019.01.01 2019.12.31 NA NA NA
3 Quarry M.B. Chandana Yudaganawa 2018.05.224 2019.05.23 14024(R1) 2019.01.01 2019.12.31 2018.06.20 2019.06.19 IML/B/HO/ 6246/LR/4
4 Borrow Pit K.M. Ruwan Karunadasa
Lunugala colony
2019.12.28 2019.12.27 DO/MG/08/ 03/EC/06/2015
Obtaining in progress 2019.12.28 2019.12.27 IML/B/HO/ 10512/LR/1
5 Concrete Batching
plant
DMP Holdings Yudaganawa 2019.09.28 2019.09.27 15854(R0) Obtaining in progress NA NA NA
53
MO – 02 Package License Details
SN Type of Plant Supplier Name
Location EPL EPL, No TL IML(GSMB) IML, No
From To From To From To
1 Asphalt Plant TBL Bibila 26.08.2018 25.08.2019 06378(R5) 01.01.2019 31.12.2019 NA NA NA
2 Crusher Plant TBL Bibila 26.08.2018 25.08.2019 06379 (R5) 01.01.2019 31.12.2019 NA NA NA
3 Quarry TBL Bibila 01.01.2019 31.12.2019 14290 (R2) 01.01.2019 31.12.2019 24.10.2018 16.08.2019 IML/B/HO /3410/LR/5
4 Borrow Pit R M S P Rathnayake,
Kenanhena, Udagangoda
06.12.18 05.12.2019 ER - - 24.12.19 23.04.2019 033792
5 Concrete Batching plant
TBL Bibila 27.11.2018 26.11.2019 06618(R5) 01.01.2019 31.12.2019 NA NA NA
6 Any other
MO – 03 Package License Details
SN Type of Plant
Supplier Name Location EPL EPL, No TL IML(GSMB) IML, No
From To From To From To
1 Asphalt Plant
Maga Engineering
Beliatta 18/07/2018 17/07/2019 15532(RO) 01/01/2019 31/12/2019 NA NA NA
54
2 Crusher Plant
Kithmina Balangoda 05/06/2018 04/06/2019 06049(R5) 15/01/2019 31/12/2019 NA NA
Rajapaksha Ridiyagama 18/07/2018 17/07/2019 15539(R0) 11/02/2019 31/12/2019 NA NA NA
3 Quarry Rajapaksha Ridiyagama 09/01/2019 08/01/2020 14903(R1) 05/01/2019 31/12/2019 09/01/2019 08/01/2020 IML/B/HO/ 11130/LR/1
4 Borrow Pit
R.Gunadasa Middeniyaya 30/08/2018 29/08/2019 DO/MG/08/ 03/EC/58/2017
11/12/2018 10/03/2019 IML/A/HO/ 12/238
W.W.L.Priyanka
Middeniyaya 22/12/2017 21/12/2018 DO/MG/08/ 03/EC/34/2017
22/01/2018 21/06/2018 IML/A/HO/ 11/459
A.K Jayalath Nugegalayaya
28/12/2018 27/12/2019 DO/MG/08/ 03/EC/35/2017
04/01/2019 18/06/2019 IML/A/HO/ 12/579
5 Concrete Batching
plant
• Site mixing use for the concrete supply
MO – 04 Package License Details
SN Type of Plant
Supplier Name Location EPL EPL, No TL IML(GSMB) IML, No
From To From To From To
1 Asphalt Plant
CML-MTD construction
Ltd.
Bolhinda, Thelawilla, Koggalla.
10/08/2018 09/08/2019 07039(R3) RENEWAL
SERIAL NO:
112430
29/01/2019 31/12/2019 NA NA NA
2 Crusher Plant
Dharamasena Metal Crusher
1st lane, Monaragala road,
Buththal.
24/12/2018 23/12/2019 CEA A 76897
28/0 1/2019 31/12/2019 NA NA NA
Nishantha Metal Crusher
Temple road, Yudhaganawa,
Buththala
04/09/2018 03/09/2019 CEA A 93672
23/11/2018 22/11/2019 NA NA NA
Rathna Metal Crusher
Viharagama, Yudhaganawa,
Buththala.
12/10/2018 11/10/2019 CEA A 93703
14/02/2019 31/02/2019 NA NA NA
55
SN Type of Plant
Supplier Name Location EPL EPL, No TL IML(GSMB) IML, No
From To From To From To
3 Quarry Chandrika Priyadarshani
1st lane, Monaragala road,
Buththal.
24/12/2018 23/12/2019 CEA A 76896
28/01/2019 31/12/2019 29/03/2018 28/03/2019 IML/B/HO/8895/LR/2
D.M. punchibanda
Temple road, Yudhaganawa,
Buththala
- - RENEWAL SERIAL
NO: H.91617
23/11/2018 22/11/2019 - - RENEWAL SERIAL NO:
322932
Rathna Metal Crusher
Viharagama, Yudhaganawa,
Buththala.
24/05/2018 23/05/2019 CEA A 92094
14/02/2019 31/12/2019 20.06.2018 19.06.2019 IML/B/HO/6246/LR/4
4 Borrow Pit S.M. Buddhadasa
Horabokka, Uva-Pelwaththa.
processing - - processing - 03/01/2019 02/10/2019 IML/B/HO/12570
k. Janaka Nishantha
Polgasyaya, Kumbukkana
processing - - processing - 23/01/2019 30/08/2019 IML/B/HO/12636
5 Concrete Batching
plant
DMP Ready mix
Temple road, Yudhaganawa,
Buththala
28/09/2018 27/09/2019 CEA A 93687
31/10/2018 30/10/2019 NA NA NA
56
MO – 05 Package License Details
MO – 06 Package License Details
Type of Plant Location EPL EPL No TL IML (GSMB) IML No Operated by
Validity Validity Validity
Quarry Madagama 21/01/2019 UVB00672 (R0)
31/12/2018 31/01/2019 IML/B/HO/9159/LR/1 Supplier
Crusher Plant Pitakubura, Bibila
25/08/2019 06379 (R5) 31/12/2018 NR NR Own
Asphalt Plant Pitakubura, Bibila
25/08/2019 06378(R5) 31/12/2018 NR NR Own
Concrete Batching Plant
Bibila 26/11/2018 06618(R4) 31/12/2019 NR NR Own
26/11/2019 06618(R5)
SN Type of Plant
Supplier Name
Location EPL EPL, No TL IML(GSMB) IML, No
From To From To From To
1 Asphalt Plant
Hovael construction
(pvt) ltd
05th Mile Post, Anapallama, Wellawaya
Pending Pending NA 05/02/2019 31/12/2019 Pending Pending NA
57
MO – 07 Package License Details
SN Type of Plant Supplier Name
Location EPL EPL, NO
TL IML(GSMB) IML, NO
From To From To From To
1 Asphalt Plant Tudawe Brothers (Pvt)
Ltd.
Kongaha Kiula Land 7th mile post
Pitakumbura
26/08/2018 25/08/2019 06378 (Rs)
27/01/2019 31/12/2019 NA NA NA
2 Crusher Plant Tudawe Brothers (Pvt)
Ltd.
Kongaha Kiula Land 7th mile post
Pitakumbura
26/08/2018 25/08/2019 06379 (Rs)
06/02/2019 31/02/2019 NA NA NA
2 Crusher Plant
Hovael construction
(pvt) ltd
05th Mile Post, Anapallama, Wellawaya
01/10/2018 30/09/2019 15913(R0) 05/02/2019 31/12/2019 NA NA NA
3 Quarry Rented by Hovael
construction (pvt) ltd
No. L/03, New road, Etiliwewa.
GPS coordinates 160239 N 240878 E
07/11/2018
06/11/2019 15986(R0)
25/01/2019
31/12/2019
02/05/2018
10/03/2019
IML/B/HO/11758
4 Borrow Pit Mr. W.A.K.C. Rohana
GPS coordinates 6.634929 N, 81.138609 E
Mahaaragama
NA NA DO/MG/08/03/EC/27/2
018
05/02/2019 31/12/2019 22/10/2018 19/07/2019 IML/B/HO/12381
5 Concrete Batching
plant
Not yet established
6 Any other NA NA NA NA NA NA NA NA NA NA
58
3 Quarry Chandra Construction
Infront of Govi farm Badulla Road
Bibila.
01/01/2019 31/12/2019 14290 (Rs)
17/01/2019 31/12/2019 24/10/2018 11/08/2019 IML/B/HO/3410/LR/5
4 Borrow Pit Mr. B. L. Eranda
Dharmasena
Berraliyakanda NA NA NA NA NA 18/12/2018 17/12/2019 IML/B/HO/8473/LR/2
5 Concrete Batching
plant
Tudawe Brothers (Pvt)
Ltd.
Nilgala 7th mile post Panmadilla
27/11/2018 26/11/2019 06378 (Rs)
28/01/2019 31/12/2019 NA NA NA
Annex 4: Details of disposal and stockpile yards identified and operated in Uva Province BA – 01 Package
Ro
ad
ID
Details of Disposal yards Approval and other requirements
Completion Details Remarks
Location of Yard (Address or chainage)
Capacity
GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Re
sto
rati
on
pla
n
Sta
tus
(In
pro
gre
ss
/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Ha
nd
ed
Ov
er
UBA105 & 113
No 09, Rohanaroad, Mapakadaweva
2000 m3 UBA105 N- 7.298475° E- 81.013779
D.M. Chandresekara
✓ ✓ ✓ ✓ ✓ In progress
X X
59
UBA 104
NO,93/3, Mapakadaweva 100m3 UBA104 N-07.297439 E-81.023639
R.M.Sunilpala ✓ ✓ ✓ ✓ ✓ In progress
X X
UBA 119
Yaya 02/56, Uva thissapura ,Mapakada wava
1000m3 UBA119 N-7.300869° E-81.096475°
J.M. Piyadasa ✓ ✓ ✓ ✓ ✓ In progress
X X
UBA 005
11-134,Keselpotha,Mapakadawava,
100m3 Lat-7.332750° Lon-81.091885
R.M.kamalasiliee
✓ ✓ ✓ ✓ ✓ In progress
X X
Ro
ad
ID
Details of Stockpile yards Approval and other requirements
Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Re
sto
rati
on
pla
n
Sta
tus
(In
pro
gre
ss
/
Co
mp
lete
)
NO
ob
jecti
on
le
tte
r
ob
tain
ed
Ha
nd
ed
Ov
er
UBA 105,104 & 113
No 133/c, Senanigama, Mapakadaweva
6000m3
UBA113 N-7.301952 E-81.017074
K.G.W.Premalatha ✓ ✓ ✓ ✓ ✓ In progress
X X
60
UBA 119
Yaya 02/56, Uva thissapura ,Mapakada wava
1000m3
UBA119 N-7.300869° E-81.096475°
J.M. Piyadasa ✓ ✓ ✓ ✓ ✓ In progress
X X
UBA 005
Dikkandayaya Uva thissapura
10000m3
N- 7.174230 E- 81.04023
N.M.Somavathi ✓ ✓ ✓ ✓ ✓ In progress
X X
BA – 02 Package
Ro
ad
ID
Details of Disposal yards Approval and other requirements
Completion Details
Remarks
Location of Yard (Address or chainage)
Capacity / m3
GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
o
n p
lan
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
) N
O
ob
jecti
on
lett
er
ob
tain
ed
H
an
ded
Over
212 01 Mile Post, Akurujaduwa, Galkada.
300 7007’41.88” N 81003’20.01”E
D.M.Abeykoon
✓ ✓ ✓ ✓ ✓ X X X
212 Egoda Gedara, Akurukaduwa
300 7007’43.66” N 81003’22.62”E
J.M Jayasundara ✓ ✓ ✓ ✓ ✓ X X X
212 Aluth Gedara, Galkada road, Akurukadwa
350 7007’47.18” N 81003’28.30”E
D.M.Gunapala ✓ ✓ ✓ ✓ ✓ X X X
212 Pita pokuna, Akurujaduwa, Galkada.
350 7007’52.82” N 81003’35.74”E
S.M.Rajapaksha ✓ ✓ ✓ ✓ ✓ X X X
212 Bosath Sewana Temple, Athuru ela
380 7007’58.03” N 81003’35.74”E
Ven Udawela Guanawansa Thero
✓ ✓ ✓ ✓ ✓ X X X
238 Miyulani House, Makulugolla, Meegahakivula
350 7007’27.29” N 81002’44.95”E
R.M Siriyawathi ✓ ✓ ✓ ✓ ✓ X X X
238 Palalgolla, Meegahakivula. 340 7007’21.35” N 81002’55.54”E
L.J.M..Premalatha
✓ ✓ ✓ ✓ ✓ X X X
61
Ro
ad
ID
Details of Disposal yards Approval and other requirements
Completion Details
Remarks
Location of Yard (Address or chainage)
Capacity / m3
GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
o
n p
lan
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
) N
O
ob
jecti
on
lett
er
ob
tain
ed
H
an
ded
Over
238 Akurukaduwa, Meegahakivula. 360 7007’13.94” N 81003’09.86”E
R.M.Heenbanda ✓ ✓ ✓ ✓ ✓ X X X
238 Wealanalanda, Akurukaduwa 350 7007’08.98” N 81003’09.26”E
G.M.Bandaramenika ✓ ✓ ✓ ✓ ✓ X X X
238 Wealanalanda, Akurukaduwa. 350 7007’07.85” N 81003’09.28”E
S.M.Gamini Smarakoon
✓ ✓ ✓ ✓ ✓ X X X
238 “Sumudu”, Akurukaduwa, Meegahakivula.
300 7007’06.78” N 81003’20.78”E
D.M.Kamani Mangalika
✓ ✓ ✓ ✓ ✓ X X X
238 Welanlanda, Akurukaduwa, Meegahakivula.
300 7007’10.13” N 81003’20.78”E
D.M.Sudumenika ✓ ✓ ✓ ✓ ✓ X X X
295 Arawa, Meegahakivula. 400 7008’38.37” N 81005’18.06”E
B/Polgaharawa Vidyalaya
✓ ✓ ✓ ✓ ✓ X X X
295 Pahala Kade watta, Near the school, Arawa,Badulla
400 7009’48.20” N 81005’06.23”E
D.M.Samaraweera
✓ ✓ ✓ ✓ ✓ X X X
295 “Deepthi”,Polgaharawa, Arawa 350 7008’31.28” N 81005’19.29”E
D.M.Thilakaratne
✓ ✓ ✓ ✓ ✓ X X X
295 “Priya”,Polgaharawa, Arawa 300 7008’21.76” N 81005’38.65”E
T.M.Piyadasa ✓ ✓ ✓ ✓ ✓ X X X
295 “Dilani”, Polgaharawa, Arawa 350 7008’44.98” N 81005’14.90”E
W.M.Siripala ✓ ✓ ✓ ✓ ✓ X X X
295 “Rathnasiri”,Madurumandiya hena, Polgaharawa, Arawa
320 7008’31.28” N 81005’19.29”E
D.M.Premaratne ✓ ✓ ✓ ✓ ✓ X X X
295 Polgaharawa, Arawa. 600 7008’40.16” N 81005’14.23”E
W.M.Karunasundara ✓ ✓ ✓ ✓ ✓ X X X
095 Unit 4/A34, Baduluoya, Badulla.
300 70 10’30.26” N 81000’28.67”E
D.M.Gayani Rupika
✓ ✓ ✓ ✓ ✓ X X X
095 Badulu oya East, Baduluoya 300 70 10’29.95” N 81000’34.97”E
Government land
✓ ✓ ✓ ✓ ✓ X X X
095 “Samagi” preschool,30 A, Baduluoya
200 70 10’29.95” N 81000’34.97”E
R.M.Sunethra
✓ ✓ ✓ ✓ ✓ X X X
62
Ro
ad
ID
Details of Disposal yards Approval and other requirements
Completion Details
Remarks
Location of Yard (Address or chainage)
Capacity / m3
GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
o
n p
lan
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
) N
O
ob
jecti
on
lett
er
ob
tain
ed
H
an
ded
Over
095 Dehigas Arawa, Wellewelatenna, Baduluoya.
350 70 10’23.58” N 81001’17.67”E
D.M.Samatha Kumara
✓ ✓ ✓ ✓ ✓ X X X
199 0+320 (RHS) 350 7006’37.26”N 81003’54.54”E
D.M.Wimalasena ✓ To be obtaine
d
To be obtain
ed
✓ ✓ X X X
199 1+740 (RHS)
350 7007’01.52”N 81003’34.61”E
Chief incumbent ✓ To be obtaine
d
To be obtain
ed
✓ ✓ X X X
327 1+407 (RHS) 300 7006’02.90”N 81002’45.56”
W.M.Gunapala ✓ To be obtaine
d
To be obtain
ed
✓ ✓ X X X
327 1+851 (RHS) 300 7006’09.21”N 81002’47.08”E
R.M.Sudubanda ✓ To be obtaine
d
To be obtain
ed
✓ ✓ X X X
327 1+852 (RHS) 300 7006’11.98”N 81002’47.11”E
R.M.Duminda Jayaratne
✓ To be obtaine
d
To be obtain
ed
✓ ✓ X X X
329 0+870 (RHS) 300 7005’17.64”N 81002’31.86”E
R.M.Premadasa ✓ To be obtaine
d
To be obtain
ed
✓ ✓ X X X
329 1+232 (LHS) 300 7005’15.00”N 81002’29.32”E
R.M.Priyantha Kumara
✓ To be obtaine
d
To be obtain
ed
✓ ✓ X X X
Ro
ad
ID
Details of Stockpile yards Approval and other requirements
Completion Details
Remarks
Location of Yard (Address or chainage)
Capacity GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
o
n p
lan
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
) N
O
ob
jecti
on
lett
er
ob
tain
ed
H
an
ded
Over
63
Ro
ad
ID
Details of Disposal yards Approval and other requirements
Completion Details
Remarks
Location of Yard (Address or chainage)
Capacity / m3
GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
o
n p
lan
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
) N
O
ob
jecti
on
lett
er
ob
tain
ed
H
an
ded
Over
212 Kawadi ella, Athuru ela, Meegahakivula
350 7007’41.88”N 81003’24.71”E
S.M. Dissanayaka ✓ ✓ ✓ ✓ ✓ X X X
212 Komarikagoda, Galkada 350 7007’54.82”N 81003’30.98”E
O.P.K.Ariyawansha
✓ ✓ ✓ ✓ ✓ X X X
238 Nuga gaha, Welanlanda,Meegahakivula
350 7007’05.90”N 81003’13.73”E
G.M.Bandaramenika
✓ ✓ ✓ ✓ ✓ X X X
238 Akurukaduwa, Meegahakivula 360 7007’05.65”N 81003’12.63”E
R.M.Heenbanda ✓ ✓ ✓ ✓ ✓ X X X
238 Miyulani House, Makulugolla, Meegahakivula
300 7007’05.42”N 81003’13.78”E
R.M Siriyawathi ✓ ✓ ✓ ✓ ✓ X X X
295 “Rathana”, Polgaharawa, Meegahakivula
400 7007’05.42”N 81003’13.78”E
R.M.Jinadasa
✓ ✓ ✓ ✓ ✓ X X X
295 Polgaharawa, Meegahakivula
450 7007’05.42”N 81003’13.78”E
R.M.Sunil Shantha
✓ ✓ ✓ ✓ ✓ X X X
095 Badulu oya East, Baduluoya
450 7007’05.42”N 81003’13.78”E
Government Land ✓ ✓ ✓ ✓ ✓ X X X
199 0+320 (LHS) 850 m3
7007’02.72”N 81003’36.55”E D.M.Wimalasena
✓ To be obtain
ed
To be obtain
ed
✓ ✓ X X X
199 1+750 (LHS) 400 m3
7006’34.16”N 81003’48.84”E
Ven. Sri Girithale Reavindralankara Thero
✓ To be obtain
ed
To be obtain
ed
✓ ✓ X X X
327 2+040 (LHS) 500 m3
7006’20.66”N 81003’48.84”E D.M.Karunawathi
✓ To be obtain
ed
To be obtain
ed
✓ ✓ X X X
329 1+230 (LHS) 400 m3 7005’15.00”N
81002’29.32”E R.M.Priyantha Kumara
✓ To be obtain
ed
To be obtain
ed
✓ ✓ X X X
64
BA – 03 Package
Ro
ad
ID
Details of Disposal yards Approval and other
requirements Completion Details
Remarks Location of Yard
(Address or chainage)
Capacity m3
GPS Coordinates
Name
Ow
ner
GN
DS
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
H
an
ded
Over
UBA 026
0+230-0+255 (LHS)
400
Jayantha Hennayaka ✓ ✓ ✓ ✓
In progress
X X
UBA 356
0+240 RHS 30
G.P.Sisirakumara ✓ ✓ ✓ ✓
In progress
X X
UBA 026
0+560 RHS 400(approximately)
Bishop Land ✓ ✓ ✓ In
progress X X
UBA 356
1+400 RHS
Kovil Land ✓ ✓ In
progress X X
BA – 04 Package
Ro
ad
ID
Details of Disposal yards Approval and other requirements Completion Details Remarks
Location of Yard (Address or chainage)
Capacity
GPS Co:
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
65
UBA 316
0+190 LHS Unagolla Silpolagama Play Ground
3500 - Silpolagama Grama Sanwardhana Samithiya
✓ ✓ ✓ ✓ ✓ Currently Not using
X X -
UBA 090
0+950 RHS D.M.Aberathna
1000 - D.M.Aberathna ✓ ✓ ✓ ✓ ✓ Currently Not using
X X -
UBA 090
0+990 RHS D.M.Asanka Sanjeewa
2000 - D.M.Asanka Sanjeewa
✓ ✓ ✓ Pending
✓ Currently Not using
X X -
UBA 151 vii
0+920 RHS Timber Block Unagolla Division
10000 - Mr.Charith Manager Unagolla Estate
✓ ✓ ✓ - ✓ Currently Not using
X X -
UBA 244
0+890 LHS R.M.Aberathna Siri Niwasa,Malpola,Ambewela.
1500 - R.M.Aberathna
✓ ✓ Pending
- - Currently Not using
X X -
Ro
ad
ID
Details of Stockpile yards Approval and other requirements
Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In p
rog
ress
/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
66
UBA 316
0+190 LHS Unagolla
Silpolagama Play Ground
3500
Silpolagama Grama
Sanwardhana Samithiya
✓ ✓ ✓ ✓ ✓ Currently not using
X X -
UBA 090
1+855 RHS Miriskotuwa Hathakama,
Hali-Ela.
1000 D.M.Abesinhe ✓ ✓ ✓ ✓ ✓ Currently not using
X X -
UBA 244
0+680 LHS Pubudu paropakara
committee Malpola,Ambewela..
5000
Pubudu Paropakara committee
✓ ✓ Pending - - Currently not using
X X -
BA – 05 Package
Ro
ad
ID
Details of Disposal yards Approval and other
requirements Completion Details
Remarks Location of Yard
(Address or chainage)
Capacity GPS
Coordinates Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
UBA 361
Mrs. B.D.Sunethra Nadungamuwa (5+650 LHS)
Cube 150 - Mrs. B.D.Sunethra ✓ ✓ ✓ ✓ ✓ In progress X X
67
Ro
ad
ID
Details of Disposal yards
Approval and other requirements
Completion Details
Remarks Location of Yard
(Address or chainage)
Capacity GPS
Coordinates Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
UBA 362
S.P. Nishshanka Weliarawa (11+300 RHS)
Cube 800 - S.P. Nishshanka ✓ ✓ ✓ ✓ ✓ In progress X X
UBA 362
Moragolla (1+800 LHS)
Cube 800 6.55544 80.55548
Broshin State
✓ ✓ ✓ ✓ ✓ In progress X X
UBA 290
R.M.C.Ramanayaka Pelwinna (1+205 RHS)
Cube 500 6.53244 80.52157
R.M.C.Ramanayaka
✓ ✓ ✓ ✓ ✓ In progress X X
UBA 336
Ihalakorandekumbura (1+800 RHS)
Cube 150 - H.M.R.Hemantha
✓ ✓ ✓ ✓ ✓ In progress X X
UBA 204
H.M.Lokumenika Wangiyagoda (2+100 RHS)
Cube 300 - H.M.Lokumenika
✓ ✓ ✓ ✓ ✓ In progress X X
Ro
ad
ID
Details of Stockpile yards Approval and other
requirements Completion Details Remarks
68
Ro
ad
ID
Details of Disposal yards
Approval and other requirements
Completion Details
Remarks Location of Yard
(Address or chainage)
Capacity GPS
Coordinates Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
Location of Yard
(Address or chainage)
Capacity GPS
Coordinates Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
UBA 204 Wangiyagoda (2+100 RHS)
Cube 400 -
H.M.Lokumenika ✓ ✓ ✓ ✓ ✓
In progress
X X
UBA 362
Moragolla Madagama
Land (2+150)
Cube 800 - Uva Paranagama Pradesiya Saba
✓ ✓ ✓ ✓
In progress
X X
UBA 290 (1+210
km,LHS) Cube 800 - Pelwinna Ground ✓ ✓ ✓ ✓ ✓
In progress
X X
69
BA – 06 Package
Ro
ad
ID
Details of Disposal yards Approval and other requirements Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS Co:
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In p
rog
ress
/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
UBA081
8th Mile Post, Near Milk Board, Uduwara, Demodara
Cube 1000
R.M. Amara Rajapaksha
✓ ✓ ✓ ✓ ✓ In progress X X
UBA088 Madhuragama, Hela-Halpe, Halpe (3+300)
Cube 500
H.M. Gunarathna Banda
✓ ✓ ✓ ✓ ✓ In progress X X
UBA088 Bokotuwahinna, Gotuwala, Ella
Cube 100 S.M.K.
Chandrasena
✓ ✓ ✓ ✓ ✓ Not functioning
X X
UBA081
No.35/1, Polwaththa, Gawarawela, Demodara
Cube 75
S. Manohar ✓ ✓ ✓ ✓ ✓ Not functioning
X X
UBA088 Madhuragama Road, Hela Halpe (3+400)
Cube 100 T.A. Somasiri ✓ ✓ ✓ ✓ ✓ In progress X X
70
Ro
ad
ID
Details of Disposal yards Approval and other requirements Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS Co:
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In p
rog
ress
/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
UBA081 “Aruni”, Gawarawela, Demodara. (5+100)
Cube 200 S. Wilson Pieris ✓ ✓ ✓ ✓ ✓ Completed X X
UBA088 Galpoththe Kumbura, Naulla, Demodara. (0+625)
Cube 100 R.M. Vipul
Anuruddha
✓ ✓ ✓ ✓ ✓ Completed X X
UBA081 Wewelhinnawaththa, Demodara (6+500)
Cube 75 R.M.U.
Jayashantha
✓ ✓ ✓ ✓ ✓ In progress X X
UBA081 Bd/Wewelhinna Tamil Vidyalaya.(6+400)
Cube 1000 Bd/Wewelhinna
Tamil Vidyalaya
✓ ✓ NR ✓ ✓ In progress X X
UBA109 Deed No.3114, Helagedarawaththa, Halpe.
Cube 75 B.M.P.P.
Basnayaka
✓ ✓ ✓ ✓ ✓ Not functioned yet.
X X
UBA081 Othumbewaththa, Gawarawela, Demodara. (5+900)
Cube 1000 M.H.M.
Leelarathna
✓ ✓ - - ✓ Completed X X
UBA081 Bookirinda, Gawarawela, Demodara. (5+950)
Cube 100 W.D. Wimal
Kumarasiri
✓ ✓ - - ✓ Not functioned yet.
X X
71
Ro
ad
ID
Details of Disposal yards Approval and other requirements Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS Co:
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In p
rog
ress
/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
UBA081
No.133, “Madhumihira”, Gawrawela, Demodara
Cube 50
M.H. Ranawaka ✓ ✓ - - - Not functioned yet.
X X
UBA081
No.145/1, Katukithularawa, Gawarawela, Demodara.
Cube 30
M.H.M. Nandawathi
✓ ✓ - - - Not functioned yet.
X X
UBA081 “Wasana Niwasa”, Springvalley
Cube100 Upali Rathnayaka ✓ ✓ - - - Not
functioned yet.
X X
UBA081
Bd/Beddegama Maha Vidyalaya, Springvalley. (9+000)
Cube 300
Bd/Beddegama Maha Vidyalaya
✓ - - - - Not functioned yet.
X X
UBA081 1st Mile Post, Springvalley Road, Demodara. (1+625)
Cube 500 K. Kalei Chelvi ✓ ✓ ✓ - ✓ Not
functioned yet.
X X
72
Ro
ad
ID
Details of Stockpile yards Approval and other requirements
Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In p
rog
ress
/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
UBA081 8th Mile Post, Near Milk Board, Uduwara, Demodara
Cube 300
R.M. Amara Rajapaksha
✓ ✓ ✓ ✓ ✓ In progress
X X
UBA088 Madhuragama, Hela Halpe
Cube 100 H.M. Gunarathna
Banda
✓ ✓ ✓ ✓ ✓ In progress
X X
UBA088 Sri Nagarukkharamaya, Gotuwala, Ella.
Cube 150 Rilpola
Vimalakeerthi Thero
✓ ✓ ✓ ✓ ✓ In progress
X X
UBA088 “Mal Sewana”, Naulla, Demodara.
Cube 100 B.M.P.P.
Basnayaka
✓ ✓ ✓ ✓ ✓ In progress
X X
73
BA – 07 Package
Ro
ad
ID
Details of Disposal yards Approval and other
requirements Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In p
rog
ress
/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
UBA 242
2+300 RHS
500 cubes
D.M Amarawathi’s land ✓ ✓ ✓ ✓ ✓ Complete X X
Imple
menting
resto
ratio
n p
lan
is in p
rogre
ss.
UBA 242/UBA 373
1+100 RHS 500 cubes
Mudalindarama temple katugaha
✓ ✓ ✓ ✓ ✓ In progress
UBA 242 350 cubes
R.M. Mallika’s land ✓ ✓ ✓ ✓
Docum
ents
to b
e
subm
itte
d t
o P
IC.
74
Ro
ad
ID
Details of Disposal yards Approval and other requirements
Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In p
rog
ress
/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
UBA 391 Premasiri Tennakoon,
380 cubes
Katugaha,Mahathenna, Maliththa
✓ ✓ ✓
UBA 223 0+190 (RHS) 100 cubes
D.L.Premadasa ✓ ✓ ✓
✓ In
progress
75
Ro
ad
ID
Details of Stockpile yards Approval and other requirements
Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In p
rog
ress
/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
UBA 242 3+280 (RHS)
Amunudowa ground.
✓ ✓ ✓ ✓ In
progress X X
UBA 391 Premasiri Tennakoon,
, Premasiri Tennakoon,
✓ ✓
✓
Mate
rial
sto
ckin
g h
as
not sta
rte
d
yet.
76
BA – 08 Package R
oad
ID
Details of Disposal yards Approval and other requirements Completion Details Remarks
Location of Yard (Address or chainage)
Capacity
GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
H
an
ded
Over
UBA 076
0+850 (RHS)
2000 M3
Medicing plantation Land, Haldummulla
In progress
X X
UBA 077
Sri Mariruththu amman Kovil
2000 M3
Sri Mariruththu amman Kovil - Kalupahanawaththa
In progress
X X
UBA 135 0+000 (LHS) 3500 M3 Gampaha School Land - Gampaha
In progress
X X
UBA 135
2+400 (LHS)
3000 M3
Kolongasthenna School - Kolongasthenna
In progress
X X
UBA 312 0+200 (LHS) 1000 M3 Mr Pathmasiri Ananda
In progress
X X
77
Details of yards
Approval and other requirements
Completion Details
Remarks
Location of Yard (Address or chainage)
Capacity
GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus
(In
pro
gre
ss/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Over
UBA 076 0+450 LHS-(Okwel road - Bathgoda
3000 M3 Mr DMS Bandara In progress
X X
UBA 077
0+900 LHS(Kalupahanawaththa)
6000 M3
Miss M Kamaleshwari
In progress
X X
UBA 135
Colombo – Wallawaya road( 210 km post)
5000 M3
Pradeshiya sabawa- Haldummulla
In progress
X X
UBA 162
Colombo – Wallawaya road( 210 km post)
5000 M3
Pradeshiya sabawa- Haldummulla
In progress
X X
UBA 196
Colombo – Wallawaya road( 210 km post)
5000 M3
Pradeshiya sabawa- Haldummulla
In progress
X X
78
MO – 01 Package
Ro
ad
ID
Details of Disposal yards
Approval and other requirements
Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
) NO
ob
jecti
on
lett
er
ob
tain
ed
H
an
ded
Over
004 2+640 700 6.884589 N 81.223263 E
R.M.Punchibanda ✓ ✓ ✓ ✓ ✓ In progress
016 0+750 1200 6.892668 N 81.208558 E
Alupotha Public Land
✓ ✓ ✓ ✓ ✓ In progress
031 0+950 150 6.891951 N 81.227377 E
D.M.Danasena ✓ ✓ ✓ ✓ ✓ Complete
031 1+030 350 6.891175 N 81.225914 E
Nimal Chaminda ✓ ✓ ✓ ✓ ✓ Complete
031 1+550 150 6.886104 N 81.222570 E
R.M.Punchibanda ✓ ✓ ✓ ✓ ✓ In progress
031 3+340 500 6.872553 N 81.217510 E
R.M.Gunawardan ✓ ✓ ✓ ✓ ✓ In progress
031 4+360 800 6.865566 N 81.217414 E
Sunil Dayawansha
✓ ✓ ✓ ✓ ✓ In progress
110 11+050 1700 6.870264 N 81.156138 E
Miyanakadura school
✓ ✓ ✓ ✓ ✓ In progress
110 12+850 500 6.866685 N 81.163452 E
Sumith Bandara ✓ ✓ ✓ ✓ ✓ In progress
110 12+900 500 6.866500 N 81.163554 E
V.G.Senevirathna ✓ ✓ ✓ ✓ ✓ In progress
028 0+330 200 6.898985 N 81.237043 E
Abeykoon ✓ ✓ ✓ ✓ In progress
028 1+730 200 6.911054 N 81.236580 E
Dissanayaka ✓ ✓ ✓ ✓ In progress
028 3+280 300 6.916912 N 81.244086 E
R.M.jayaweera ✓ ✓ ✓ ✓ In progress
028 1+960 1000 6.983488 N 81.236795 E
R.M.D.Wilson ✓ ✓ ✓ ✓ In progress
79
Ro
ad
ID
Details of Disposal yards
Approval and other requirements
Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
) NO
ob
jecti
on
lett
er
ob
tain
ed
H
an
ded
Over
028 2+650 800 6.983653 N 81.239823 E
Prasanna Pradep ✓ ✓ ✓ ✓ In progress
028 3+835 700 6.921172 N 81.246181 E
R.M.Anulawathi In progress
16 0+700 1000 cubes
6.892396 N 81.208811 E
Alupotha Mosque land
✓ ✓ ✓ ✓ In progress
31 3+330 750 cubes
6.873943 N 81.217544 E
R.M.Karunapala ✓ ✓ ✓ ✓ ✓ In progress
110 12+350 1500 cubes
6.868725 N 81.161131 E
V.G.Uppurala ✓ ✓ ✓ ✓ In progress
80
MO – 02 Package
Ro
ad
ID
Details of Disposal yards Approval and other requirements Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
UMO 094 4+098 RHS 2000 Cu 6.867287N 81.265485E
D M Sugathapala ✓ ✓ ✓ ✓ ✓ In progress
X X
UMO 094 3+075 LHS 1000 Cu 6.868910N 81.266377E
R M Gnanawardena
✓ ✓ ✓ ✓ ✓ In progress
X X
UMO 094 2+290 LHS 1000 Cu 6.871212N 81.266897E
Sri Bodhimalu Wiharaya
✓ ✓ ✓ ✓ ✓ In progress
X X
UMO 094 1+880 RHS 1000 Cu 6.872189N 81.267165E
R M Premawathi ✓ ✓ ✓ ✓ ✓ In progress
X X
UMO 094 0+825 RHS
150CuCu
6.887447N 81.264344E
H M Chandasena ✓ ✓ ✓ ✓ ✓ In progress
X X
UMO 094 0+460 LHS
150Cu
6.889268N 81.267321E
S Amarawathi ✓ ✓ ✓ ✓ ✓ In progress
X X
UMO 094 5+515 LHS
150Cu
6.889248N 81.266125E
Kumari Shanthilatha
✓ ✓ ✓ ✓ ✓ In progress
X X
UMO 093 0+200 LHS 1000Cu 6.891617N 81.270469E
R M Gnanasiri ✓ ✓ ✓ ✓ ✓ In progress
X X
81
Ro
ad
ID
Details of Disposal yards Approval and other requirements Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
UMO 093 1+530 LHS
2000Cu
6.888510N 81.273027E
R M Jayawardena
✓ ✓ ✓ ✓ ✓ In progress
X X
UMO 147 2+020 RHS
100Cu
6.868338N 81.251855E
R S M Engohami ✓ ✓ ✓ ✓ ✓ In progress
X X
UMO 147 2+000 LHS
1000Cu
6.868093N 81.252219E
Piyal wickramasinghe
✓ ✓ ✓ ✓ ✓ In progress
X X
Ro
ad
ID
Details of Stockpile yards Approval and other requirements
Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS Coordinates
Name O
wn
er
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
82
Ro
ad
ID
Details of Disposal yards Approval and other requirements Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
UMO 094
Obbegoda- Madagama Road, near by 11Km post, Iluklanda
5000 m3
6 56 26.91 N 81 20 23.37 E
Divisional Secretariat, Madagama
✓ ✓ ✓ ✓ ✓ In progress
X X
UMO 041 0+600 RHS Kukurumangoda Land
1000 m3
6 54 00.52 N 81 18 05.01 E
D M Nandasena ✓ ✓ ✓ ✓ ✓ In progress
X X
UMO 041 Buthsaranapitiya-Guruhela Road, 0+850 LHS
1000 m3
6 54 13.63 N 81 18 28.32 E
R M Samarakoon, Naranwana, Nakkala
✓ ✓ ✓ ✓ ✓ In progress
X X
UMO 041 Madukotanarawa Junction, Badalkumbura
4000 m3 6 53 35.70 N 81 16 01.78 E
R M Senadheera
✓ ✓ ✓ ✓ ✓ In progress
X X
UMO 116 0+400 LHS Raththanapitiya
400 m3 6. 53 35.37 N 81 20 19.28 E
D M Ajantha Jayalath
✓ ✓ ✓ ✓ ✓ In progress
X X
UMO 155 Ampitiya, Dombagahwela
2000 m3
6 86 96 .10 N 81 43 45.30 E
G G Baboris
✓ ✓ ✓ ✓ ✓ In progress
X X
83
MO – 03 Package
Ro
ad
ID
Details of Disposal yards Approval and other requirements Completion Details Remarks
Location of Yard (Address or chainage)
Capacity (M3)
GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
H
an
ded
Over
UMO52 0+723 RHS 3500
6°21'38.67"N 80°56'44.24"E
S.A Gunawardhana
✓ ✓ ✓ ✓ ✓ In progress
X X
UMO115 0+985 RHS 800 6°21'50.54"N 80°57'39.04"E
Savithra Sanjeewani
✓ ✓ ✓ ✓ ✓ In progress
X X
UMO138 1+480 RHS 6000 6°18'28.84"N 80°56'20.05"E
Somadevi School ✓ ✓ ✓ ✓ ✓ In progress
X X
UMO03 Bogaha junction,kiriibbanaara
6000 6°23'28.25"N 80°57'43.86"E
Bogaha junction ground
✓ ✓ ✓ ✓ ✓ In progress
X X
UMO155 2+200 RHS 3500 6°23'3.53"N 80°52'52.19"E
Isurugiri temple ✓ ✓ ✓ ✓ ✓ In progress
X X
UMO145 Dalukkatiya grund ,Kowlaara
5000 6°22'7.04"N 80°52'18.73"E
Dalukkatiya Ground
✓ ✓ ✓ ✓ ✓ In progress
X X
UMO090 3+030 LHS 4500 6°37'4.09"N 80°53'27.87"E
Damwalodaya Ground
✓ ✓ ✓ ✓ ✓ In progress
X X
Ro
ad
ID
Details of Stockpile yards Approval and other requirements
Completion Details Remarks
Location of Yard (Address or chainage)
Capacity (m3)
GPS Coordinates
Name O
wn
er
GN
LA
PIC
Ap
pro
val
Resto
rati
o
n p
lan
Sta
tus (
In
pro
gre
ss/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
H
an
ded
Over
UMO52 0+723 RHS 3500 6°21'38.67"N 80°56'44.24"E
S.A Gunawardhana
✓ ✓ ✓ ✓ ✓ In progress
X X
84
UMO115 0+985 RHS 800 6°21'50.54"N 80°57'39.04"E
Savithra Sanjeewani
✓ ✓ ✓ ✓ ✓ In progress
X X
UMO138 1+480 RHS 6000 6°18'28.84"N 80°56'20.05"E
Somadevi School ✓ ✓ ✓ ✓ ✓ In progress
X X
UMO03 Bogaha junction,kiriibbanaara
6000 6°23'28.25"N 80°57'43.86"E
Bogaha junction ground
✓ ✓ ✓ ✓ ✓ In progress
X X
UMO155 2+200 RHS 3500 6°23'3.53"N 80°52'52.19"E
Isurugiri temple ✓ ✓ ✓ ✓ ✓ In progress
X X
UMO145 Dalukkatiya grund ,Kowlaara
5000 6°22'7.04"N 80°52'18.73"E
Dalukkatiya Ground
✓ ✓ ✓ ✓ ✓ In progress
X X
UMO090 3+030 LHS 4500 6°37'4.09"N 80°53'27.87"E
Damwalodaya Ground
✓ ✓ ✓ ✓ ✓ In progress
X X
85
MO – 04 Package
Ro
ad
ID
Details of Disposal yards Approval and other requirements Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In p
rog
ress
/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
UMO 059 27+280 (RHS) 50 perch
6.763013N, 81.187124E
Sameera sahabandu
✓ ✓ ✓ ✓ ✓ In progress
× ×
86
Ro
ad
ID
Details of Stockpile yards Approval and other requirements
Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
p
lan
Sta
tus (
In p
rog
ress
/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
UMO 059 22+770 Km (LHS)
30 perch
6.794089N, 81.190471E
R.M.S. Lalani ✓ ✓ ✓ ✓ ✓ In progress
× ×
UMO 059 27+280 (RHS) 50 perch 6.763013N, 81.187124E
Sameera sahabandu
✓ ✓ ✓ ✓ ✓ In progress
× ×
87
MO – 05 Package
Details of yards Approval and other requirements Completion Details Remarks
R o a d I D
Location of
Ow
ner
GN
LA
PIC
A
ppro
val
Res
t
orat
i
onpl
an
S t a t u s ( I n p r o g r e s s / C o m p l e t e )
N O o b j e c t i o n l e t t e r o b t a i n e d
Han
ded
Ove
r
Yard GPS
Capacity Name
(Address or Coordinates
chainage)
UMO005
Thithawalkula
800m3
U.G. In X X
5th Mile Post, Chandrawathi
progress
Pitiyawatta
Bibilawatta Finlay’s Estate In X X
UMO039 Road 500m3 progress
Bibila Estate
5th Mile post, D.C. In X X
UMO006
Yalkumbura
750m3
Ketapearachchi
progress
.Kotagama
Junction
UMO001
Abagolla
800m3
D.M. Not X X
Sinhapura road Wijesundara operated
88
Bibilamulla
1000m3
D.M. Gamini Not X X
UMO038/013/111 Yalkubura road operated
MO – 06 Package
Ro
ad
ID
Details of Disposal yards Approval and other requirements Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS Coordinates
Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In p
rog
ress
/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
UMO -020
0+150 LHS 0.5 Acre
Mr. Ajith Priyantha
✓ ✓ ✓ ✓ ✓ In progress
X X
UMO -020
4+100 LHS 0.5 Acre
Mo/D.S. Senanayake scholl
✓ ✓ ✓ ✓ ✓ In progress
X X
UMO -022
1+040 RHS 0.5 Acre Mr.T.K.S.I. Sudarshana
✓ ✓ ✓ ✓ ✓ Completed ✓ ✓
UMO -022
1+800 RHS 0.5 Acre Mr. D.M. Gunapala
✓ ✓ ✓ ✓ ✓ In progress
X X
UMO -022
3+720 RHS 0.5 Acre Mr. R.M. Karunaratne
✓ ✓ ✓ ✓ ✓ In progress
X X
89
UMO -021
1+010 RHS 0.5 Acre Mrs. R.M. Bandaramenika
✓ ✓ ✓ ✓ ✓ In progress
X X R
oad
ID
Details of Stockpile yards Approval and other requirements
Completion Details Remarks
Location of Yard (Address or chainage)
Capacity GPS
Coordinates Name
Ow
ner
GN
LA
PIC
Ap
pro
val
Resto
rati
on
pla
n
Sta
tus (
In p
rog
ress
/
Co
mp
lete
)
NO
ob
jecti
on
lett
er
ob
tain
ed
Han
ded
Ove
r
UMO - 011
1+241 RHS
1.5 acre
Mrs. R.M. Padmawathie Keerthiratne
✓ ✓ ✓ ✓ NA In progress
X X
UMO - 011
3+960 RHS 1 acre
Mr. L.H. Mahinda Ratne
✓ ✓ ✓ ✓ NA In progress
X X
UMO - 022
2+500 LHS 1 acre
Mr. D.M. Indika Namal
✓ ✓ ✓ ✓ NA In progress
X X
UMO - 022
5+130 RHS 1.5 acre Mr. B.M. Wijeratne ✓ ✓ ✓ ✓ NA In progress
X X
UMO - 022
8+770 LHS 1.5 acre Mr. D.M. Ariyadasa ✓ ✓ ✓ ✓ NA In progress
X X
UMO - 139
No69, Batahelayaya, Warunagama
1.5 acre Mr. R.M. Punchi Banda
✓ ✓ ✓ ✓ NA In progress
X X
90
MO -07 Package
ROAD ID
Details of Disposal yards APPROVAL AND
OTHER REQUIREMENTS
COMPLETION DETAILS
REMARKS
LOCATION OF YARD (ADDRESS OR CHAINAGE)
CAPACIT
Y
GPS
CO: NAME
OW
NE
R
GN
LA
PIC
AP
PR
OV
AL
RE
ST
OR
AT
ION
PL
AN
ST
AT
US
(IN
PR
OG
RE
SS
/
CO
MP
LE
TE
)
NO
OB
JE
CT
ION
LE
TT
ER
OB
TA
INE
D
HA
ND
ED
OV
ER
UMO 131
Nawgala Kandaudapanguwa (3+875) DM Sumanasiri √ √ √ √ √
UMO 131
Nawgala Kandaudapanguwa (6+125) JMN Kumara √ √ √ √ √
UMO 131
6th mile post Kandaudapanguwa Ampara Road Monaragala (0+300)
DM Karunawathi √ √ √ √ √
UMO 057
Buddhama Road Ullapola Buddhama (1+605) DM Dissanayake √ √ √ √ √
UMO 077
Tangalmandiya Temple Kandaudapanguwa Monaragala (3+150)
√ √ √ √ √
UMO 077
6th mile post Kandaudapanguwa Ampara Road D M
Punchimahaththaya
√ √ √ √
UMO 130
MO/ Bambaragasroda School Siyambalanduwa Principle √ √
UMO 077
No 18 Dry Farm Muthukandiya RM Dushantha √ √
UMO 057
No 39 Kiramanaberaliya Buddhama KM Thushara
Kelum Bandara √ √
√
√
91
ROAD ID
Details of Disposal yards APPROVAL AND
OTHER REQUIREMENTS
COMPLETION DETAILS
REMARKS
LOCATION OF YARD (ADDRESS OR CHAINAGE)
CAPACIT
Y
GPS
CO: NAME
OW
NE
R
GN
LA
PIC
AP
PR
OV
AL
RE
ST
OR
AT
ION
PL
AN
ST
AT
US
(IN
PR
OG
RE
SS
/
CO
MP
LE
TE
)
NO
OB
JE
CT
ION
LE
TT
ER
OB
TA
INE
D
HA
ND
ED
OV
ER
UMO 130
2nd Villge Community Hall Siyambalanduwa
Pradeshiya Sabha
√ √ √
√
92
ROAD ID
Details of Stockpile yards APPROVAL AND OTHER
REQUIREMENTS COMPLETION
DETAILS REMARKS
LOCATION OF YARD (ADDRESS OR CHAINAGE)
CAPACITY GPS
COORDINATES
NAME
OW
NE
R
GN
LA
PIC
AP
PR
OV
AL
RE
ST
OR
AT
ION
PL
AN
ST
AT
US
(IN
PR
OG
RE
SS
/
CO
MP
LE
TE
)
NO
OB
JE
CT
ION
LE
TT
ER
OB
TA
INE
D
HA
ND
ED
OV
ER
Main Yard
3rd Mile Post, Ampara Road,
Siyabalanduwa. TBL √ √ √
UMO 130
2 Village Community Ground
Siyambalanduwa
Pradeshiya Sabha
√ √ √
UMO 057
Near To the School Pallewela
Kandaudapanguwa DM Somawathi √ √
UMO 130/ 077
4th Mile Post, Ampara Road,
Siyambalanduwa
Athar Kariyawasam
√ √
UMO 130
No. 07 Zone 02, Dry farm
Muthukandiya Siyambalanduwa
HB Sumanasiri
Menike √ √
UMO 077
NO 09 Usgallanda Samanalabedda.
DM Ariyarathna √ √
UMO 077
NO 09 Usgallanda Samanalabedda
PM Ukkubanda √ √
93
Annex 5: Summary of tree removal and replanting in Uva Province Contract Package
No. of Trees Removed
No. of Trees to be Re-planted
No. of tree planting programmes (Date)
No. of trees planted
Badulla district
BA 01 1 3 -
BA 02 35 105 -
BA 03 11 33 -
BA 04 4 12 -
BA 05 No trees removed - -
BA 06 1 3 -
BA 07 12 36 1 (29-11-2018) 85
BA 08 No trees removed - -
Total 64 192 85
Monaragala district MO 01 75 225 -
MO 02 154 462 1 (13-2-2019) 76
MO 03 1 3 -
MO 04 11 33 -
MO 05 0 0 -
MO 06 3 9 1 (30-1-2019) 65
MO 07 1 3 -
Total 245 735 141 Note: Information as at 1 March 2019.
94
Annex 6: A summary of GRC formation and public grievances received in Uva Province
Summary of GRC Formation in Badulla and Monaragala Districts of Uva Province as
at 1 March 2019 District Package Total No.
of DSDs
DSD level Total No. of GNDs
GND level
Established To be Established
Established To be Established
Bad
ulla
BA 01 2 2 - 30 10 20
BA 02 3 3 - 33 10 23
BA 03 3 2 1 62 8 54
BA 04 1 1 - 30 7 23
BA 05 2 2 - 45 14 31
BA 06 2 2 - 34 16 18
BA 07 2 2 - 36 15 21
BA 08 2 2 - 26 5 21
Sub Total 17 16 1 296 85 211
Monara
ga
la
MO 01 2 2 29 17 12
MO 02 4 4 - 29 18 11
MO 03 2 2 - 24 17 7
MO 04 3 2 1 21 16 5
MO 05 3 3 - 31 9 22
MO 06 3 3 - 37 18 19
MO 07 2 2 - 24 22 2
Sub Total 19 18 1 195 117 78
Grand Total 36 34 2 491 202 289
95
A Summary of Public Grievances, Requests, Suggestions and Complaints received in Uva Province (as at 1 March 2019)
Dis
tric
t
Pac
kag
e
No
. o
f ro
ad
in
wo
rk p
rog
ress
(in
clu
din
g
main
ten
an
ce)
No
. o
f
Req
uests
No
. o
f
Su
gg
esti
on
s
No
. o
f
Co
mp
lain
ts
To
tal
No
. o
f
Co
mp
lete
ly
Sett
led
So
luti
on
s in
pro
gre
ss
Bad
ulla
BA 01 5 8 0 1 9 8 1
BA 02 6 28 0 2 30 6 24
BA 03 4 8 1 1 10 5 5
BA 04 4 7 2 3 12 6 6
BA 05 4 3 1 2 6 4 2
BA 06 3 12 0 3 15 13 2
BA 07 5 17 2 3 22 8 14
BA 08 2 7 0 0 7 0 7
Sub Total 33 90 6 15 111 50 61
Mo
nara
gala
MO 01 4 17 0 0 17 8 9
MO 02 4 75 0 0 75 74 1
MO 03 11 33 1 1 35 17 18
MO 04 3 18 0 1 19 8 11
MO 05 2 2 2 1 5 3 2
MO 06 4 14 0 0 14 12 2
MO 07 2 8 0 5 13 4 9
Sub Total 30 167 3 5 178 126 52
Grand Total 63 257 9 20 289 176 113
96
Annex 7: A summary of application of CSD in Uva Province (including elderly, women, Differently abled and child friendly designs)
SN Package Road ID
Name of the Road Request Request made by
Changes made Status of Satisfaction
1 BA - 01 UBA 113
Paharagammana Road (Bodiya) to Senanigama School Road
Parking improvement in front of Senanigama primary school
Principal 0+835 - 0+855 LHS location enhancing the parking area and introducing rumble strips. Demarcating the road crossing area using white lines.
Design in progress
2 BA - 02 UBA 295
Polagaharawa Main Road
New Culvert Transect Walk People
2+410 - New culvert under construction
Satisfied - Construction in progress
3 BA - 02 UBA 295
Polagaharawa Main Road
New Culvert Transect Walk People
2+680 - New culvert under construction
Satisfied - Construction in progress
4 BA - 02 UBA 295
Polagaharawa Main Road
New Culvert Transect Walk People
3+600 - New culvert under construction
Satisfied - Construction in progress
5 BA - 04 UBA 054
Dematawalhinna Via Dalukhinna Road
Protect the water spring at LHS of the road UBA 054, 2+800
Transect walk participant
Shift the center line toward the RHS and Build-up a retaining wall to protect the spring at LHS at 2+800, Protect the spring by introducing a proper concrete structure
Design in progress
6 BA - 04 UBA 316
Silpolagama to Unagolla Road
Request to avoid the water flow across the road
Transect walk participant
Build up a cross drain at 0+320 Design in progress
7 BA - 05 UBA 361
Welimada -Kerandimulla Road
New culvert Transect walk participant
New culvert to be constructed at 1+068km
Design in progress
97
SN Package Road ID
Name of the Road Request Request made by
Changes made Status of Satisfaction
8 BA - 05 UBA 290
Pelwinna Road (from pelwinna Junction)
Due to culvert leader way, rain water flows over villagers paddy land and covered with sand. Because of that they requested to change proposed drain pathway.
Peliarawa Farmers
Changed the drain path and diverse storm water in to another culvert
Design in progress
9 MO - 01 UMO 028
Badalkumbura Karawilaella Road
Request for retaining wall
Principal Retaining wall was under construction with a protection fence.
Satisfied - Construction in progress
10 MO - 01 UMO 031
Badalkumbura - Bogahapelessa lunugala Janapadaya road
Remove a tree and reduce a bend
Villagers Tree was removed and bend was smoothed
Satisfied
11 MO - 02 UMO 144
Batugammana Waralanda Road
Protect the 'BO' tree at 0+153 LHS
Transect walk participant
Shifting of Center Line at 0+153 LHS
Satisfied
12 MO - 02 UMO 140
Weheragala Ampitiya Road
Protect the 'BO' tree at 5+050 RHS
Transect walk participant
Shifting of Center Line at 5+050 RHS
Satisfied
13 MO - 02 UMO 147
Madukotan Arawa Helatunthala Punsisigama Junction Road
Protect the 'Jak' tree 2+544 RHS
Transect walk participant
Shifting of Center Line at 2+544 RHS
Satisfied
14 MO - 03 UMO 138
Hathporuwa pola junction to Somadevi school road
Increase road width up to 6.2 m
Transect walk participant
Increase the asphalt width up to 6.2m
Satisfied
15 MO - 04 UMO 122
Palwatta Co-operative via Gonagodalla-Kukurampola Road
New culvert D.M. Lahiru Janaka
New culvert to be constructed at 0+139
Design in progress
98
SN Package Road ID
Name of the Road Request Request made by
Changes made Status of Satisfaction
16 MO - 04 UMO 122
Palwatta Co-operative via Gonagodalla-Kukurampola Road
New culvert Transect walk participant
New culvert to be constructed at 1+320 & 1+541
Design in progress
17 MO - 04 UMO 120
Okkampitiya-Dabeyaya road
Improve bends Transect walk participant
Decide to design 0+525 dangerous bend is widening to LHS side to avoid accident
Design in progress
18 MO - 04 UMO 072
Horambawa-Suduwathura aara-Galtemandiya Road
Improve bends Transect walk participant
Decide to design dangerous bend is widening side to avoid accident
Design in progress
19 MO - 04 UMO 121.ii
Divisional irrigation engineer, Buththala
Request from regional irrigation engineer construct the causeway along the Rahathangama tank without changing spill level & reducing the causeway length.
Divisional irrigation engineer, Buththala
causeway design is in progress considering their request
Design in progress
20 MO - 04 UMO 121.ii
Niranjan Aththanayaka, secretary, unit of Agriculture Oraganization, No: 15/16, Rahathangama, Buththala.
Request construct the spill way of the Rahathangama tank.
Niranjan Aththanayaka, secretary, unit of Agriculture Oraganization, No: 15/16, Rahathangama, Buththala.
causeway design is in progress considering their request
Design in progress