World Bank Financed Shanxi Gas Utilization Project--
Yangcheng County Gas Utilization Sub-Project
Environmental Impact Assessment
Report
Project Implementing Agency: Shanxi Provincial Guoxin Energy Development Group
Co., Ltd.
EA Agency: Institute of Coal Chemistry of Chinese Academy of Sciences
February 2017, Taiyuan
SFG3473
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
-
Name of Project: World Bank Financed Shanxi Gas Utilization Project-- Yangcheng
County Gas Utilization Project
Type of Document: Comprehensive Environmental Impact Assessment Report
EA Agency: Institute of Coal Chemistry of Chinese Academy of Sciences
Legal Representative: Wang Jianguo (Director, Research Fellow)
Project Leader: Dong Guiyan (Senior Engineer)
Wang Jianhua (Engineer)
-
Table of Contents
1 Overvierw ................................................................................................................................ 1
1.1 Project Background and Origin .................................................................................... 1
1.2 Objectives of Environmental Impact Assessment ........................................................ 4
1.3 Screening of Environmental Impact Assessment Factors ............................................ 5
1.4 Assessment Scope ........................................................................................................ 8
1.5 Assessment Period ........................................................................................................ 9
1.6 Assessment Rating ....................................................................................................... 9
1.7 Assessment Methods .................................................................................................. 10
1.8 Key Points of Assessment .......................................................................................... 10
1.9 Assessment Procedures .............................................................................................. 10
1.10 Environmental Protection Objectives ....................................................................... 11
2 Environmental Policies, Framework of Laws and Regulations and Basis for EA Preparation
.................................................................................................................................................. 15
2.1 Environmental Protection Laws and Regulations ...................................................... 15
2.2 Local Regulations ....................................................................................................... 16
2.3 Environmental Protection Technical Specifications .................................................. 16
2.4 World Bank Safeguard Policies and EHS of World Bank Group .............................. 17
2.5 Assessment Standards (Compared with EHS Standards) .......................................... 18
2.6 Urban Planning, Atmospheric Pollution Regulation Planning and Environmental
Functional District Planning Documents ......................................................................... 20
2.7 Analysis of Conformity and Consistency of the Proposed Project with Relevant
Regional Policies and Plans ............................................................................................. 21
3 Project Description ................................................................................................................ 23
3.1 Contents ...................................................................................................................... 23
3.2 Construction Plan and Method ................................................................................... 27
-
4 Environmental Situation ........................................................................................................ 31
4.1 General Introduction of Natural Environment ........................................................... 31
4.2 Overview of Eco-environment ................................................................................... 34
4.3 Overview of Social-economic Environment .............................................................. 35
4.4 Current Environmental Quality .................................................................................. 37
4.5 Major Environmental Issues ....................................................................................... 38
5 Environmental Impact Analysis and Environmental Protection Measures ........................... 40
5.1 Analysis of Environmental Problems of Domestic Similar Projects ......................... 40
5.2 Ambient Air Impact Analysis and Protective Measures ............................................ 43
5.3 Water Environment Impact Analysis and Protection Measures ................................. 45
5.4 Solid Waste Impact Assessment and Protective Measures ........................................ 47
5.5 Acoustic Environmental Impact Assessment and Acoustic Environmental Protection
Measures ........................................................................................................................... 49
5.7 Social Environment Impact Assessment and Protective Measures ............................ 52
5.8 Impacts on Physical Cultural Resources and Protective Measures ............................ 58
6 Analysis of Regional Cumulative Environmental Impacts ................................................... 62
6.1 Analysis of Cumulative Impacts on Ambient Air ...................................................... 62
6.2 Analysis of Social Cumulative Impacts ..................................................................... 64
6.3 Analysis of Culmulative Impacts of Risks of Gas Pipeline Network in Shanxi
Province ............................................................................................................................ 64
6.4 Measures to Address Cumulative Impacts ................................................................. 65
7 Due Diligence Review .......................................................................................................... 71
7.1 Due Diligence Review of Pipeline related projects ................................................... 71
7.2 Due Diligence of Existing Gas Facilities Upgrading Project ..................................... 72
8 Alternatives Analysis ............................................................................................................ 74
8.1 Alternatives Analysis for “With” and “Without” the Project .................................... 74
-
8.2Alternatives Analysis of Transmission and Distribution Pipeline Network ............... 75
9 Environmental Risk Analysis and Mitigation Measures ....................................................... 81
9.1. Environmental Risk Identification ............................................................................ 81
9.2 Source Analysis .......................................................................................................... 83
9.3 Analysis of Environmental Risk Consequences ......................................................... 84
9.4 Protection and Mitigation Measures for Environmental Risks .................................. 85
9.5 Emergency Preparedness Plan for Risks .................................................................... 86
9.6 Summary .................................................................................................................... 91
10 Analysis of Impacts of Land Acquisition and Relocation................................................... 93
10.1 Land Acquisition and Its Impacts............................................................................. 93
10.2 Resettlement Policies and Compensation Standard ................................................. 93
10.3 Resettlement ............................................................................................................. 94
10.4 Information Disclosure, Public Participation and Consultation ............................... 96
10.5 Vulnerable Groups ................................................................................................... 97
10.6 Institutional Setup .................................................................................................... 98
10.7 Monitoring and Assessment ..................................................................................... 99
10.8 Financing and Implementation Plan ......................................................................... 99
11 Public Consultation and Information Disclosure .............................................................. 101
11.1 Purpose of Public Consultation and Information Disclosure ................................. 101
11.2 Methods for Public Consultation ............................................................................ 101
11.3 Summary of Public Consultation Minutes, Opinions and Feedbacks .................... 106
11.4 Information Disclosure ........................................................................................... 108
12 Environmental Management Plan ..................................................................................... 110
12.1 Purpose of EMP ..................................................................................................... 110
12.2 Contents of EMP .................................................................................................... 110
-
12.3 Environmental Management System ..................................................................... 110
12.4 Environmental Management Agencies .................................................................. 116
12.5 Environmental Management Training ................................................................... 121
12.6 Environmental Management Regulations .............................................................. 122
12.7 Environmental Protection Investment Estimate ..................................................... 123
12.8 Environmental Reporting System .......................................................................... 139
12.9 Public Complaint Mechanism ................................................................................ 140
13 Conclusion of Environmental Impact Assessment ............................................................ 142
13.1 Compliance with Relevant Policies and Plans ....................................................... 142
13.2 Conclusion of Evaluation on Current Environmental Quality ............................... 143
13.3 Conclusion of Environmental Impact Assessment ................................................. 143
13.4 Mitigation Measures for Environmental Impacts ................................................... 144
13.5 Conclusion of Environmental Benefit Analysis ..................................................... 146
Annex A:Safety Management Plan ..................................................................................... 147
Annex B: Physical Cultural Resources Management Plan .................................................... 165
Annex C:Regulations on Management of Pipe Stacking During the Construction Period .... 168
Annex D: Regulations on Management of Construction Camp of Pipeline network
Component ............................................................................................................................. 170
Annex E: ECOP Checklist ..................................................................................................... 174
Annex F:Public Consultation and Information Disclosure ................................................. 193
Figure 1: Geographical Location of Subprojects ................................................................... 198
Figure 2: Schematic Diagram of “Building a Gas-fueled Shanxi” Project ............................ 199
Figure 3:Yangcheng County Gas Network Planning .......................................................... 200
Figure 4: Geographical Location and Noise Monitoring Points of Yangcheng Gas Utilization
Sub-project ............................................................................................................................. 201
-
Preface
World bank financed Shanxi Gas Utilization Project consists of 6 subprojects, and 2 of which
are CHP subprojects, namey the Xiyang County CHP Subproject and Baode County CHP
Subproject; 4of which are Urban Gas pipeline network subproject, namely the Changzhi
County Gas Utilization Subproject, Xiangyuan County Gas Utilization Subproject, Tunliu
County Gas Utilization Subproject and Qingxu County Gas Utilization Subproject. Shanxi
Guoxin Energy Development Group Co., Ltd. is the Project loan subject responsible for the
smooth implementation of the project.in the financing, project construction, staffing and other
aspects.
The project entered the implementation phase in 2014. In November 2016, Shanxi Guoxin
Energy Development Group Co., Ltd. applied for interim adjustment to the bank's inspection
team, planning to cancel the phase II projects of Changzhi, Xiangyuan, Tunliu pipeline
network, and increase the Yangcheng county gas utilization project, with Shanxi Guoxin
Zhonghaosheng Natural Gas Co., Ltd.as the main body of construction.
The 3 Gas Utilization Subprojects of Changzhi County, Tunliu County and Xiangyuan
County in the World Bank Financed Shanxi Gas Utilization Project are planning a total of
$16.5 million for World Bank funds, the Feasibility study approved the design and
construction of pipeline length of 222.3 kilometers, with the Changzhi County subproject 52.7
kilometers (25 km in phase I, 27.7 km in phase II), Tunliu County subproject 86.4 kilometers
(40 km, in phase I, 46.4 km in phase II), Xiangyuan County subproject 83.21 kilometers (44
km, in phase I, 39.21 km in phase II). All 3 subprojects are planned to implement in two
phases. At present, the first phase of the world bank project has completed all procurement
bidding, using world bank loans funds of 62.44 million yuan.In recent years, the economic
environment and market environment in Shanxi have changed greatly. The decline of coal
industry, the decrease of resource utilization, the slow development of gas market, and the
relocation of villages and towns have caused insufficient demand for gas market in Changzhi,
Xiangyuan and Tunliu counties.For the rational allocation of world bank funds, to avoid
waste of public resources, Coal Bed Methane (Natural Gas) Co., Ltd proposed to adjusted the
phase II of the world bank project on a comprehensive basis: Cancel the construction of total
of 113 kilometers pipeline of 3 subprojects in Changzhi, Xiangyuan and Tunliu, propose the
Yangcheng County gas utilization project instead.
At present, natural gas use in Yangcheng County has a good foundation, 60 thousand
households and more than 200 industrial and commercial users and the public welfare
institutions use natural gas in the 6 villages and towns of Yangcheng County.
Yangcheng County gas utilization project will build a new urban medium pressure pipeline
network 27.79 kilometers, and upgrade some of the arlier constructed gas facilitiese with
hidden danger. The subproject construction unit is Shanxi Guoxin Zhonghaosheng Natural
Gas Co., Ltd.
-
See Table 0-1 for the specific implementation and changes of World Bank Financed Shanxi
Gas Utilization Project.
The feasibility study report of Yangcheng Gas Utilization project is prepared by CCTEG
Chongqing Engineering Co., Led. According to the requirements of the domestic
environmental impact assessment laws and regulations and the world bank safeguard policies,
Shanxi Guoxin Energy Development Group Co., Ltd. formally commissioned the Institute of
Coal Chemistry of Chinese Academy of Sciences to carriy out the comprehensive
environmental impact assessment work of World Bank Financed Shanxi Gas Utilization
Project - Yangcheng Gas Utilization Subproject.
The environmental impact assessment of the project includes the collection of relevant
information on environmental impact assessment, Investigation on the sensitive factors of the
surrounding environment of selection site of Yangcheng subproject, identification, selection
and classification of environmental impact factors, public consultation and disclosure,
environmental impact analysis and environmental protection measures, analysis of regional
cumulative environmental impacts, Alternatives Analysis, environmental risk analysis and
mitigation Measures. Meanwhile, the Yang Cheng subproject will be included in the
environmental management plan of Shanxi Gas Utilization Project.
Tabel 0-1 Subprojects and Distribution Areas
No. Item Subproject Name Prefecture-level
City or County
Construction Unit
Origin
al
project
1
CHP
Xiyang County
CHP Subproject
Xiyang County, Jinzhong
City
Baode thermal power branch,
Shanxi Natural gas Co., Ltd.
2 Baode County
CHP Subproject Baode County, Xinzhou City
Xiyang thermal power
branch, Shanxi Natural gas Co., Ltd.
3
Gas
Utilization
Subproject
Qingxu Gas
Utilization
Subproject
Qingxu County, Taiyuan City Qingxu County Kaitong
Natural Gas Co., Ltd.
Chang
ed
items
in the
origina
l plan
4
Gas
Utilization
Subproject
ChangzhiGas
Utilization
Subproject
Changzhi County, Changzhi
City Shanxi Coal Bed Methane
(Natural Gas) Gathering and
Transportation Co., Ltd. 5
Tunliu Gas
Utilization
Subproject
Tunliu County, Changzhi
City
6
Xiangyuan Gas
Utilization
Subproject
Xiangyuan County, Changzhi
City
Xiangyuan County
Zhangjiang Coal Bed
Methane (Natural Gas)
Gathering and Transportation
Co., Ltd.
Additi
onal
project
7
Yangcheng county
Gas Utilization
Subproject
Yangcheng County, Jincheng
City
Shanxi Guoxin
Zhonghaosheng Natural Gas
Co., Ltd.
-
1
1 Overvierw
1.1 Project Background and Origin
Lying in the heart of the Yellow River basin, Shanxi Province neighbors Hebei Province in
the east with the Taihang Mountain as a natural barrier, faces Shaanxi and Henan Provinces in
the west and south across the Yellow River, and adjoins Inner Mongolia Autonomous Region
in the north with the Great Wall as the boundary. It is named for its location in the west of
Taihang Mountain. The province covers a total area of 156,700km2, with a total population of
36.108 million people. It has 119 counties in 11 prefecture-level cities, including 85 counties,
11 county-level cities and 23 municipal districts.
Shanxi Province’s main energy consumption lies on coal. The coal consumption takes up
more than 98% of the total consumption. As either a major province of resources or a main
province of energy consumption and emission that shoulders arduous energy conservation and
emission reduction tasks, Shanxi Province has an urgent need for changing the energy
consumption structure dominated by coal, and gradually achieving the diversification of
energy consumption. To change the energy consumption structure and realize the leap from
coal to gas, Shanxi vigorously carried out “Building a Gas-fueled Shanxi” project during the
"12th Five-Year (2011 -2015)" period. As of August 2016, Shanxi province " Building a
Gas-fueled Shanxi " project completed a total investment of 25.5 billion yuan, the cumulative
gas supply reached 15.6 billion cubic meters, gasfueled area covering the province's 104
counties (cities, districts), the gasification rate of 52%, far exceeding the national average.
Successful implementation of Building a Gas-fueled Shanxi has played an important role to
complet the state issued emission reduction targets, improve the environmental quality of
Shanxi Province, and promote regional economic development in the "12th Five-Year"
period.
To continue to consolidate the results of the "12th Five-Year " period, the outline of the 13th
Five-Year Plan (2016-2020) for National Economic and Social Development of Shanxi
Province put forward that "Spare no efforts to promote green development.Adhere to the basic
state policy of conserving resources and protecting the environment, adhere to sustainable
development, and vigorously promote the energy revolution". The Outline also proposed to
accelerate the construction of gas pipeline network, and strive to achieve full coverage of the
province's network. By 2020, the total mileage of the provincial pipeline exceeded 15
thousand kilometers".
As the main force and leader in “Building a Gas-fueled Shanxi”, Guoxin Energy spares no
effort in the Project under the context that transformation and comprehensive reform
experimental areas are established in the province.So far, Guoxin Energy has been listed as
one of the 12 key provincial-level pilot enterprises by CPC Shaanxi Provincial Committee
and Shaanxi Provincial Government; the Project of “Building a Gas-fueled Shanxi” also has
been listed as one of the key 30 provincial-levelprojects.
-
2
WB Financed SGUP is an important component of “Building a Gas-fueled Shanxi”. Upon
completion, the Project will be conducive to improve the current energy consumption
structure overly dependent on coal in the locality, turn the main energy consumption of
resident and industrial users into clean energy gas and power, enhance the energy utilization
efficiency, promote energy conservation and emission reduction, and improve the
atmospheric environment, public quality of life and health level, and even plays an important
role in the sustainable economic and social development of Shanxi Province.
World Bank Financed Shanxi Gas Utilization Project was planning to built 2 CHP
subprojects,and 4 Gas utilization subprojects. In recent years, the economic environment and
market environment in Shanxi have changed greatly. The decline of coal industry, the
decrease of resource utilization, the slow development of gas market, and the relocation of
villages and towns have caused insufficient demand for gas market in Changzhi, Xiangyuan
and Tunliu counties. The phase II of the three subprojects, Changzhi, Xiangyuan and Tunliu,
no longer have the demand for gasification. For the rational allocation of world bank funds, to
avoid waste of public resources, Guoxin Energy plan to cancel the phase II construction of 3
subprojects, and propose to implement the Yangcheng County gas utilization project.
After acceptance of the EIA commission, in November 26, 2016 we conducted a detailed field
investigation along the pipeline. On the basis of various types of relevant information, such as
revised feasibility study reports, social evaluation reports and resettlement plans, etc.,
reference of the comprehensive environmental impact assessment report of World Bank
Financed Shanxi Gas Utilization Project, and continuous communication with related units,
finally, completed the preparation of this report.
1.1.1 Brief Description of the Project
The implementation uint of Yangcheng Gas Utilization Project(hereinafter referred to as “the
Yangcheng subproject”) is Shanxi Guoxin Zhonghaosheng Natural Gas Co., Ltd., which is a
holding subsidiary of Shanxi Guoxin Energy Development Group Co., Limited.
See Table1-1 for Yangcheng Gas Utilization Project details.
Table1-1 Description of World Bank Financed Shanxi Gas Utilization Project-Yangcheng
Gas Utilization Project
Project Location PIU Capacity Composition
Yangchen
g Gas
Utilizatio
n Project
Yangche
ng
County,
Jincheng
Shanxi
Guoxin
Zhonghaoshe
ng Natural
Gas Co., Ltd.
Anyang gas distribution
station-Dongye town urban
gas pipeline: Total gas supply
is 56.2798 million m3/a
New construction of 20.2 km pipeline
at 0.8 MPa;8 surge tanks;Road crossing
26 times, river crossing twice, channel
crossing once. After completion, it will
supply gas for residents, commercial
and some industrial users along the
pipeline.
-
3
Lanhua151# valve wells
-Yanli county urban gas
pipeline
New construction of 7.59 km pipeline
at 0.8 MPa; 1 surge tanks; Road
crossing 12 times. After completion, it
will be the second gas source for
residents, commercial business, and
public construction in Yanli township
Upgrading of existing gas
facilities in Yangcheng
To upgrade the membrane meters and
26800 m pipeline behind the meter for
the 13411 residents user of existing gas
project in Yangcheng County.
1.1.2 Development Objectives of the Project
The development objectives of the Project are to enhance gas utilization rate and replace coal
with gas to reduce air pollutants and greenhouse gas emission in Shanxi Province. Meanwhile
to upgrad the existing gas facilities in Yangcheng County and eliminate the hidden dangers of
existing gas facilities.
1.1.3 Overview Of the Project Loan Subject and Construction Units
1.1.3.1 Overview Of the Project Loan Subject
Shanxi Guoxin Energy Development Group Co., Ltd. is the Project loan subject responsible
for the smooth implementation of the project.in the financing, project construction, staffing
and other aspects. Founded in 1981, Shanxi Provincial Guoxin Energy Development Group
Co., Ltd. is a large modern state-owned multi-business energy enterprise group with gas and
Chinese medicinal materials and trade as the dominance, owns the leading right to operate the
95% of the province's mixed gas resources, and praised as the main force for “Building a
Gas-fueled Shanxi” by the provincial government.By the end of 2015, the company has total
assets of 32.885 billion yuan, 16 thousand employees on the job, including 48 subsidiaries of
which is a listed companies, has 5 big gas company in gas sector: Shanxi gas company,
Shanxi Natural Gas Co., Ltd., Shanxi compressed gas company, Shanxi Coal Bed Methane
(Natural Gas) Co., Ltd., Shanxi Coal Bed Methane (Natural Gas) Co., Ltd., Taiyuan gas group
and Shanxi gas industry group.
In recent years,Guoxin Energy Corp adhere to the "five service" concept as: service of
low carbon productivity, low carbon consumption, new industrial clusters, the construction of
ecological civilization and the construction of new urbanization, vigorously implement the
Building a gas fuled Shanxi strategy, has built up long distance pipeline 6100 km. So far,
Guoxin Energy Group has built up long-distance transmission pipeline 3,004km, Urban
pipeline 5220 km, total length of over 10 thousand km, 163 CNG/LNG gas stations, 8 gas
peak regualation facilities, 1 gas cogeneration project and 1 carbon four deep processing
project, the annual pipe transmission capacity of more than 28 billion cubic meters, Gas fule
-
4
covers18 million people of 5.5 million households in 104 counties (cities, districts) in the
province, 2200 gas supply towns, 520 industrial users, 10000 commercial welfare users, 120
thousand CNG/LNG vehicles, the gasification rate in the province reaches 52%.
1.1.3.2 Overview of Construction Units
The construction unit of the prposed new Yangcheng County Gas utilization Project is Shanxi
Guoxin Zhonghaosheng Natural Gas Co., Ltd.. which is registered In January 2013 in
Yangcheng County Administration for Industry and commerce registration, the registered
capital of 60 million yuan, is jointly funded by the Jincheng ZhonghaoSheng Industry and
Trade Co., Ltd.and Shanxi province Guoxin Energy Group Co., Ltd.. Among them, Shanxi
province Guoxin Energy Group Co., Ltd. invested 30 million 600 thousand yuan, holds 51%
of the equity, Jincheng ZhonghaoSheng Industry and Trade Co., Ltd. invested 29 million 400
thousand yuan, holding 49% of the shares. ZhonghaoSheng Company has 3 wholly-owned
subsidiaries, Yangcheng County Senzhong Gas Co., Ltd., Yangcheng County, Jinneng Energy
Co., Ltd. and Yangcheng County Zhongtai Gas Co., Ltd. The company's main business is the
investment, construction, operation and management of natural gas stations and natural gas
pipeline network in the Yangcheng County area. As of September 2016, Zhonghaosheng
company has invested nearly 300 million yuan, with the construction and operation of the
urban medium and low pressure grade 2 pipe network of more than 1000 km. Pipeline
network covering 120 villages and residential areas of 6 townships as Fengcheng, Tingdian,
Xihe, Yan Li, Gu Long, Beiliu, serving more than 60,000 households of all types of users.
The compant constructed more than 20 kilometers of gas supply line of Tingdian-Anyang
Industrial Park. 1 Daning CNG compression base station is under construction and 1 Daning
LNG/CNG combined stationi into operation soon. The Tingdian gas distribution (gathering,
transportation, pressurization) station, and Qinshui-Tingdian Gas source filling pipe are under
construction. As the main unit of "Gas fuled Yangcheng" project, the company has
accumulated rich experience in project construction.。
1.2 Objectives of Environmental Impact Assessment
(1) Through environmental impact assessment on the proposed project, we have learned about
the current natural and social environmental quality in the plant area and areas along the gas
pipeline network, determined the regional impact scope and impact degree of project
implementation, and demonstrated the rationality of the site and pipeline route selection plans
from the perspective of environmental protection, so as to provide decision-making basis for
the implementation of the Project.
(2) An analytic demonstration is made on the feasibility and rationality of engineering
contents proposed in the engineering design documents, in order to propose environmental
protection measure plans and suggestions for mitigating and avoiding environmental harms.
Meanwhile, considerations are given to strengthen or improve the plans or suggestions for
positive environmental impacts of the Project, and provide feedback and guidance to
-
5
engineering design, so as to realize the synchronic development of the project construction
and environmental protection measures, minimize the negative environmental impacts, and
promote the harmonious development of the project construction in terms of economic benefit,
environmental benefit and social benefit.
(3) Efforts are made to assess positive and negative impacts arising from the project
implementation, and encourage residents living along the pipeline to take an active part in the
project demonstration by means of public investigation, public notification on journals and
websites, publicity announcement, telephone consulting and symposium for public
participation, encourage residents living along the pipeline to take an active part in the project
demonstration, so as to make the demonstration process and assessment conclusion more
democratic and scientific, and play a positive role in publicizing environmental protection
laws and regulations and enhancing the public awareness in environmental protection.
1.3 Screening of Environmental Impact Assessment Factors
1.3.1 Identification of Environmental Impact Factors
The project is relatively simple. Their negative environmental impacts are mainly
concentrated in the construction stage. Because there are a smaller number of workers on the
same site in the same period, the construction camp is not required. In the construction stage,
their impacts include construction dust, materials transportation and storage, pipeline welding,
tail gas of oil-fueled machines, and borrowed and discarded earth. The components have
slight negative impacts on ambient air, land vegetation and nearby residents in the
construction stage. Upon completion of the construction stage, these negative impacts will
disappear. Despite such potential risks as explosion and fire disaster in the operation stage, the
subprojects would still have positive environmental impacts as a result of replacing coal with
gas. According to above analysis, a recognition matrix is developed for environmental
impacts of the project. See Table 1-2 for details, and Table 1-3 shows the indentification
results of environmental impact factors of the project
Table 1-2 Assessment of Environmental Impact Factors of the Project in Different Stages
Engineering Features
Impact Factors
The Construction Stage The Operation Stage
Construct
ion
Site
Cleaning
Construct
ion
Site
Cleaning
Construct
ion
Site
Cleaning
Nat
ura
l
En
vir
onm
ent Ambient Air -○ -○ -○ -☆
Surface Water -○
Groundwater
Acoustic
Environment -☆ -○ -☆
-☆
Ec
ol
og ic al
En
vir on m en t
Farm Crops -○ -○
-
6
Soil -○ -○
Land
Vegetation -○
Land Use -○ -○ -○
So
cial
En
vir
on
men
t
Economic
Development +☆ +○
Expansion of
Employment +○ +○ +○
Occupational
Health -○ -○
-★
Quality of
Life
-○ -☆
Environmenta
l Landscape -☆ -☆
Note: + positive impact, - negative impact; ★ significant impacxt, ☆ moderate impact, ○ slight impact
Table1-3 Indentification Results of Environmental Impact Factors of the Project
Behaviors with
Potential Impacts
on Environmental
Resources And
Values
Potential Damages
or Benefits to
Natural or Social
Environment
Basis for Impact
Analysis
Typical Mitigation
Measures
Identification
of Potential
Impact
Factors
1. Potential Environmental Problems of Components in the Construction Stage
Land Occupation
Caused by
Temporary
Storage of
Building
Materials
Impacts on land use
and production
Land occupation
area, purpose,
location
Supervise construction
activities √
Construction
camp renting
camp wastewater,
solid waste, impacts
on health and
surrounding
environment
location, social
impact,
environmental
impact
Stipulate obligations of
contractors
Employment of
Constructors
Employment of
local labor force
could bring direct
benefits to local
residents, there is no
cultural difference
Predicted number of
employees
Stipulate obligations of
contractors to Ensure
the health and safety of
constructors
Elimination of
Vegetation
Damage to forest
land and arable land
Damaged vegetation
type/area, economic
value
Elimination, Restoration
and compensation, methods
√
Earthworks Soil erosion and
nutrient loss
Location of
excavation,
backfilling and
temporarily
earthwork storage,
natural water
discharge mode
Obligations of
contractors
√
-
7
Temporary land
occupation and
damage to water
conservancy
facilities
Location, scope,
purpose of land
occupation
Contractors have the
obligation to submit a
“management plan for
temporary land
occupation and water
conservancy facilities”
√
Emission of
particulate matters
such as dust
Location and
distance of
residential area,
wind direction
Form for engineering
construction progress
Obligations of
contractors (watering in
windy dusty weather)
√
Transportation of
Construction
Materials and
Engineering
Equipment
Particulate matters
and noise
Material volume,
freight volume
Prohibit unconcealed
transportation √
Use of
Construction
Equipment
Impacts of noise and
waste gas on nearby
residents and
physical cultural
resources
Required
construction
equipment,
construction work
plan
Distance to the
nearest residential
area and its
population density
Wind direction and
wind velocity
Noise and waste gas
emission standards
Occupational health
Prohibit construction
operation of large
equipment at night
Inform nearby residents
of the construction
operation time
Select low-noise
equipment
Obligations of
contractors: execution
of EMP
Monitoring
√
Generation of
Solid Waste
Pollution to air, soil
and rivers
Type and number of
wastes: domestic
waste, construction
wastes, discarded
earth
Waste management and
disposal plan
Obligations of
contractors: execution
of EMP
√
Project
Completion
Failure in
recovering the
construction site
Location and area of
temporary land
occupation
Equipment that is
possibly used and
wastes generated
Contractors have the
obligation to submit a
“site recovery plan after
completion”
The recover plan shall
include the recovery
costs
√
2. Potential Environmental Problems in the Components in the Operation Stage
Gas Supply
Substitute coal with
gas to reduce
emission of waste
gas pollutants
Reduce emission of
pollutants —— √
Upgrading of
existing gas
facilities
Eliminate potential
safety hazard and
improve gas safety
—— —— √
1.3.2 Screening of Environmental Impact Factors
-
8
The work is based on environmental impact factors indentified in pollution source analysis for
the project, environmental features of areas where the projects are located, relevant national
and local environmental protection standards, control indicators listed in the regulations, and
relevant World Bank requirements. See Table 1-4 for the assessment and screening results of
the project.
Table 1-4 Screenig Results of Assessment Factors of the Project
Environmental Elements Assessment Factors
Ambient Air Status Quo Assessment Normal pollutant: SO2, NO2, PM10
Regional Surface
Water
Environment
Status Quo Assessment CODCr, BOD5, NH3-N, petroleum
Noise Ambient Noise LAeq
Construction Noise LAeq
Ecology Impact Analysis Vegetation, land use, water and soil erosion
Solid Waste Impact Analysis of Solid Waste
Disposal
Domestic waste, borrowed and discarded earth,
slurry, waste building materials, waste pipes and
waste membrane meters
Environmental
Risk
The operation stage: fire
disaster, explosion Impact analysis of life, property safety
Social Impact
The construction stage: traffic
congestion, stores with street
frontage, schools, residents’
quality of life, impact of land
acquisition and relocation
The operation stage: payment
capacity, gender issues
Impact analysis
1.4 Assessment Scope
This project is Yangcheng County gas utilization project. It includes the construction of two
feeder lines and the upgrading of existing gas facilities. The evaluation scope is as follows:
(1) Anyang gas distribution station-Dongye town urban gas pipeline: The total gas supply is
56.2798 million m3/a, with 20.2 km pipeline at 0.8 MPa;8 surge tanks;road crossing 26 times,
river crossing twice, channel crossing once. After completion, it will supply gas for residents,
commercial and some industrial users along the pipeline.
(2)Lanhua151# valve wells -Yanli county urban gas pipeline:The total gas supply is 2.62
million m3/a, with 7.59 km pipeline at 0.8 MPa;1 surge tank ;road crossing 12 times. After
completion, it will be the second gas source for residents and commercials in Yanli Township.
(3)Upgrading of existing gas facilities in Yangcheng:To upgrade the membrane meters and
26800 m pipeline behind the meter for the 13411 residents user of existing gas project in
Yangcheng County.
-
9
In summary, pursuant to the impact scope, environmental elements, environmental
protection objectives, the assessment scope is determined separately for the construction stage
and the operation stage. See Table 1-5 for details.
Table 1-5 Environmental Impact Assessment Scope of the Project
Works
Assessment Scope
Stage Ambient Air
Acoustic
Environme
nt,
Vibration
Water
Environm
ent
Ecological
Environment
Physical
Cultural
Resources
Social
Environment
Gas
Supply
Pipeline
Constr
uction
Area within
100m at both
sides of the
pipeline
Area
within
100m at
both sides
of the
pipeline
Pass
through
partial
water
body
Wasteland
within 6m, dry
land within
4m, forest land
within 3m and
road within
0.5m at both
sides of the
pipeline
As per the
protection
requirements of
Xingshan
temple, the
assessment
scope is limited
to the
construction
area where
the gas pipeline
through the
Xingshan
temple
Affected urban
area along the
pipeline
Operat
ion None None None None
None
Surge
Tank
Constr
uction
Area within
100m around
surge tanks
Area
within 50m
around
surge tanks
None
Area within
100m around
surge tanks
None
Users within the
gas supply scope
Operat
ion None
Area
within 50m
around
surge tanks
None None None
Upgradi
ng of
existing
gas
facilities
Constr
uction None
Residents
around
membrane
meters
None None None Residents around
membrane meters
upgrading area Operat
ion None None None None None
1.5 Assessment Period
According to the implementation progress of the Project, the assessment period is divided into
the construction stage and the operation stage.
1.6 Assessment Rating
-
10
According to the environmental impact assessment outline of the World Bank Financed
Shanxi Gas Utilization Project(6 components), as well as the minutes of WB’s safety
guarantee conference in the project concept stage, full assessment will be performed for the
two CHP subprojects under the Project, whereas partial assessment will be performed for the
four gas pipeline network subprojects. The project is a gas pipeline network subproject, and
partial assessment performed.
1.7 Assessment Methods
(1) The model forecasting method is adopted for the atmospheric environmental impact
assessment;
(2) The analytical method is adopted for the water environmental impact assessment;
(3) The model forecasting method is adopted for the acoustic environmental impact
assessment;
(4) The combined method of investigation and analogy analysis is adopted for the ecological
environmental impact assessment;
(5) The investigation and analysis method is adopted for the social environment and public
consultation.
1.8 Key Points of Assessment
(1) Impacts of construction activities on nearby sensitive targets;
(2) Disposal of construction waste and domestic waste in the construction stage;
(3) Analysis of social environment impacts;
(4) Alternatives Analysis;
(5) Public consultation and information disclosure;
(6) Risk analysis in the pipeline network operation stage (fire and explosion risks);
(7) Impacts on public facilities;
(8) Environmental management plan of the Project;
(9) Due diligence for industrial users.
1.9 Assessment Procedures
Assessment Procedures see Figure 1-1
-
11
1.10 Environmental Protection Objectives
According to the characteristics investigation of the surrounding environment along the
pipeline, The project, Anyang gas distribution station-Dongye town urban gas pipeline will
pass through Xingshan Temple. According to the investigation, it is not in the list of cultural
relics protection in Yangcheng County. It is a local folk custom building built by the local
villagers with raising funds.
As the Project does not involve such sensitive targets as water resource protection area,
natural protection area and scenic area, environmental protection targets of this assessment are
residential areas along the pipelines, Xingshan Temple and the river crossed by the pipeline,
etc.. See Table 1-6 for details.
-
12
Figure 1-1 Environmental Assessment Procedures of WB Financed SGUP
Yangcheng Gas Utilization Subproject
EA agency starts environmental assessment.
Field visit
November 2016 - December 2017
Public participation Data collection
Compilation of outline and
report
Public participation
Data collection
Project implementation unit and the project design unit provide the feasibility
study report, relevant assessments and other materials.
Completion of the report, EMP and Environmental
Executive Summary
Early December 2016 – February2017
WB review
Submission of the report to WB
June 2017
Translation of the
report
Modification
-
13
Table1-6 Environmental Protection Targets of Yangcheng Gas Utilization Project
Item Sensitive
Factor No. Period
Protection
Target Direction
Distance
to the
Plant
Boundary
(m)
Remarks A
nyan
g g
as d
istr
ibuti
on s
tati
on
-Dongye
tow
n u
rban
gas
pip
elin
e
Ambient
Air,
Noise
1
Co
nst
ruct
ion
Hongshang
Village S 5 Category 1 Standard in
Acoustic Environment
Quality Standards
(GB3096-2008) is executed for the village
area.
Category 2 Standard in
Acoustic Environment
Quality Standards
(GB3096-2008) is executed for the township
areas.
Category 4a Standard in
Acoustic Environment
Quality Standards
(GB3096-2008) is executed for areas within
30m at both sides of roads
2 Laoquan
Village E 84
3 Qia Village W 7
4 Baisang W 160
5 Shangbaisang W 6
6 Longzhang
Village SW 60
7 Shijiu
Village W 24
8 Beiyao
Village N 68
9 Nanyao
Village S 49
10 Zhaojia
Village N 41
11 Jianping
Village S 138
12 Dongye SE 17
Cultural
Relic 1
Construction
Xingshan
Temple S 25
Xingshan Temple is the
local folk custom building
built by the local villagers
with raising funds.
Surface
Water 1
Construction
River Crosing
Category IV Standard in
Surface Water
Environment Quality
Standards (GB3838-2002)
Ground
water 1
Construction
Drinking
water well
Category III water quality
standard in Groundwater
Quality Standards
(GB/T14848-93)
Trans-
boundary
Works
1
Construction Provincial Rd S229(3 places),
XiMang Road(1place),
YangDong Road(4places),other
roads(18places) Obtain approval from relevant management
department
2
Construction
Huoze River(1 place)
Xiajie River(1 place)
Ecology Along the
pipeline
Crops,
vegetation
Reduce the impact
on crops
Lanhua151#
valve well
Ambient
Air, 1 Construction
Huwuagou
Village W 110
Category 1 Standard in
Acoustic Environment
-
14
-Yanli
county
urban gas
pipeline
Noise 2
Guaipo
Village E 105
Quality Standards
(GB3096-2008) is executed for the village
area.
Category 2 Standard in
Acoustic Environment
Quality Standards
(GB3096-2008) is executed for the township
areas.
Category 4a Standard in
Acoustic Environment
Quality Standards
(GB3096-2008) is executed for areas within
30m at both sides of roads
3 Xianyi
Village W 193
4 Shangqingchi
Village NE 93
5 Dongpo
Village W 118
6 Shangli
Village N 58
7
Zhong
Zhuang
S 54
Ground
water 1
Construction
Drinking
water source
Category III water quality
standard in Groundwater
Quality Standards
(GB/T14848-93)
Trans-
boundary
Works
1
Construction Chongli Avenue(1 place
Other road(11 places)
Obtain approval from
relevant management
department
Ecology Along the
pipeline
Crops,
vegetation
Reduce the impact
on crops
-
15
2 Environmental Policies, Framework of Laws and Regulations
and Basis for EA Preparation
2.1 Environmental Protection Laws and Regulations
1) Environmental Protection Law of the People’s Republic of China (December 26,
1989);
2) Environmental Impact Assessment Law of the People’s Republic of China (Jan 1,
2016);
3) Law of the People’s Republic of China on Atmospheric Pollution Prevention and
Control (April 29, 2000);
4) Law of the People’s Republic of China on Prevention and Control of Ambient
Noise Pollution (October 29, 1996);
5) Law of the People’s Republic of China on Water Pollution Prevention and
Control (February 28, 2008);
6) Law of the People’s Republic of China on Prevention and Control of
Environmental Pollution Caused by Solid Waste (April 24, 2015);
7) Law of the People’s Republic of China on Soil and Water Conservation
(December 25, 2010);
8) Law of the People’s Republic of China on Protection of Cultural Relics
(Amendment adopted and implemented from December 29, 2007);
9) Law of the People’s Republic of China on Promoting Clean Production (2012
Amendment, came into force from July 1, 2012);
10) Law of the People’s Republic of China on Energy Conservation (April 1, 2008);
11) Renewable Energy Law of the People’s Republic of China (February 28, 2005);
12) Regulations on Environmental Protection Administration of Construction
Projects (November 29, 1998, No. 253 Decree of the State Council);
13) Decisions of the State Council for Implementing the Scientific Development
Paradigm and Strengthening Environmental Protection (Guo Fa [2005] No.39,
December 3, 2005);
-
16
14) Interim Measures of the State Environmental Protection Administration for the
Public Consultation and Information Disclosure of Environmental Impact Assessment
(Huan Fa [2006] No. 28, implemented from March 18, 2006);
15) Guiding Catalogue for Industrial Restructuring (2011) (amended in 2013);
16) Notice on Strengthening Environmental Impact Assessment Management and
Preventing Environmental Risks (Huan Fa [2005] No. 152, December 16, 2005);
17) Opinions on Improving Industrial Water Conservation (No.1015 [2000] of the
State Economic and Trade Commission, October 25, 2000);
18) Law of the People’s Republic of China on Protection of Cultural Relics (October
28, 2002).
2.2 Local Regulations
1) Regulations of Shanxi Province on Environmental Protection (July 30, 1997);
2) Regulations of Shanxi Province on the Prevention and Control of Atmospheric
Pollution (September 3, 1996);
3) Subproject of Shanxi Province on Regionalization of Surface Water Environment
Management (Jin Huan Fa [2005] No. 208, May 16, 2005);
4) Notice of the General Office of the People’s Government of Shanxi Province on
Forwarding the Guiding Catalogue of Shanxi Development and Reform Commission
for Industrial Investment (2006 Version) (Jin Zheng Ban Fa [2006] No. 1, January 6,
2006);
5) Notice on Printing the Interim Provisions of Shanxi Province on Strengthening the
Environment Management of Development Projects (Jin Huan Fa [2011] No. 160, July
6, 2011);
6) Implementation Opinions of the General Office of the People’s Government of Shanxi
Province on Accelerating the Comprehensive Treatment and Utilization of Coal-mine
Gas (Jin Zheng Ban Fa [2007] No. 125, October 2007);
2.3 Environmental Protection Technical Specifications
1) Technical Guidelines on EIA of Construction project: General Prgramme (HJ
2.1-2016)
2) Technical Guidelines on EIA: Atmospheric Environment (HJ 2.2- 2008);
-
17
3) Technical Guidelines on EIA: Surface Water Environment (HJ/T2.3-93);
4) Technical Guidelines on EIA: Acoustic Environment (HJ2.4-2009);
5) Technical Guidelines on Assessment of Environmental Risks of Development Projects
(HJ/T 169-2004);
6) Technical Guidelines on EIA: Ecological Impacts (HJ19-2011);
2.4 World Bank Safeguard Policies and EHS of World Bank Group
(1)World Bank Safeguard Policies
Anyang gas distribution station-Dongye town urban gas pipeline will pass through Xingshan
Temple. It is a local folk custom building built by the local villagers, and no classification of
cultural relics protection was carried out.
According to the analysis of the sensitivity, environmental impact extent of the project, this
subproject is an integral part of the Shanxi Gas Utilization Project which has been classified
into Category A, hence the environmental impact assessment of this subproject will be carried
out in accordance with the requirement of Category A. According to the analysis of the
correlation between the Project and World Bank safeguard policy documents, policy
documents applicable to the Project include OP4.01 (Environmental Impact Assessment),
OP4.11 (Physical Cultural Resources) and OP4.12 (Involuntary Resettlement); please refer to
Table 2-1 for details.
Table 2-1 Analysis of Correlation between the Project and World Bank Safeguard Policy
Documents
No. World Bank Safeguard
Policy Documents
Correlated to
the Project or
not
Remarks
1
OP4.01 Environmental
Assessment Correlated
The project construction would have some impacts on
the surrounding environment, thus environmental
assessment needs to be conducted. Yangcheng The
project is to replace the 3 components of Changzhi,
Xiangyuan, and Tunliu in the World bank finced
SGUP(6 components), as the SGUP has been
classified as a Category A project, the project will be
assesed as Category A.
2
OP4.04 Natural
Habitats Uncorrelated
No natural reserves in the project areas. The Gas
pipeline network cuts across some rivers, which have
been listed as environmentally sensitive targets to
ensure their safety during the flooding season. In most
months of a year, there is no water in these rivers and
relevant local authorities have confirmed that there are
no rare or precious specicies in the rivers.
3 OP4.09 Pest
Management Uncorrelated
The Project does not involve use or storage of
pesticides
-
18
4 OP4.10 Indigenous
Peoples Uncorrelated No indigenous peoples in the project areas.
5
OP4.11 Physical
Cultural Resources Correlated
The project, Anyang gas distribution station-Dongye
town urban gas pipeline will pass through Xingshan
Temple. It is a local folk custom building built by the
local villagers with raising funds, not in the list of
cultural relics protection.
6 OP4.12 Involuntary
Resettlement Correlated The Project does not involve land acquisition.
7 OP4.36 Forestry Uncorrelated
The Project does not involve forestation or
commercial logging. Woods land where the Gas
pipeline network Component cuts across is small plots
of plantations scattering along the pipeline.
8 OP4.37 Dam Safety Uncorrelated The Project does not involve dams.
9 OP7.60 Projects in
Disputed Areas Uncorrelated The Project is not located in any disputed area.
10 OP7.50 International
Waterways Uncorrelated The Project does not involve international waterways
(2)EHS of World Bank Group
International Finance Corporation: Environment, Health and Safety Guidelines (General
EHS Guidelines), including atmospheric emissions and ambient air quality, energy
conservation, wastewater and environmental water quality, waste management, noise;
occupational health and safety, power transmission and Transformation.
2.5 Assessment Standards (Compared with EHS Standards)
For the purpose of this assessment, comparative analysis would be carried out according to
applicable national standards, International Finance Corporation’s Environment, Health and
Safety Guidelines (General EHS Guidelines)
2.5.1 Environmental Quality Standards
2.5.1.1 Ambient Air
As China consumes large amount of coal, the ambient air quality standards shall be Chinese
standards conforming to China’s national conditions. All 6 subprojects are located in zones
mixed with rural areas, industrial districts and commercial districts, the ambient air functions
of which belong to Category II areas, thus Category II standard in Ambient Air Quality
Standards (GB3095-2012) shall be enforced, as detailed in Table 2-1.
Table 2-1 Assessment Standards for Ambient Air Quality (Unit: ug/Nm3)
Item Average time Ambient Air Quality Standards (GB3095-2012)
Category II Standard (ug/m3)
TSP Annual average 200
-
19
24-hour average 300
1-hour average --
PM10
Annual average 70
24-hour average 150
1-hour average --
PM2.5
Annual average 35
24-hour average 75
1-hour average --
SO2
Annual average 60
24-hour average 150
1-hour average 500
NO2
Annual average 40
24-hour average 80
1-hour average 200
NOx
Annual average 50
24-hour average 100
1-hour average 250
2.5.1.2 Surface Water
Category IV Standard in Surface Water Environment Quality Standards (GB3838-2002)
would be enforced for the project, see details in Table 2-3.
Table 2-3 Assessment Standards for Surface Water
No. Item Unit Standard Value Surface Water Standard
1 CODCr mg/L ≤30 Category IV Standard GB3838-2002
2 BOD5 mg/L ≤6 Category IV Standard GB3838-2002
3 NH3-N mg/L ≤1.5 Category IV Standard GB3838-2002
4 pH —— 6-9 Category IV Standard GB3838-2002
5 Petroleum mg/L ≤0.5 Category IV Standard GB3838-2002
2.5.1.3 Acoustic Environment Standards
Category II Standard of Environmental Acoustic Quality Standards (GB3096-2008)
would be enforced for noise at construction site boundary; Category I Standard of
Environmental Acoustic Quality Standards (GB3096-2008) would be enforced for noise in
sensitive spots; Category 4a Standard in Environmental Acoustic Quality Standards
(GB3096-2008) would be enforced for traffic noise. Refer to Table 2-4 for standard values
and noise level standards of EHS.
As shown in the table, domestic noise level standards for residence, office, culture and
education are the same as those in EHS enforced by World Bank; domestic noise level
standards for industrial and commercial facilities are stricter than those in EHS enforced by
World Bank; but there is no provision in EHS as to zones mixed with commercial and
residential areas. Therefore, appropriate domestic standards would be enforced for the Project.
-
20
Table 2-4 Assessment Standards for Acoustic Environment (Unit: [dB(A)])
Acoustic Environment
Environmental Acoustic
Quality Standards
(GB3096-2008)
Noise Level Standards of EHS
Category Daytime Night Time Daytime
(07:00~22:00)
Night Time
(22:00~07:00)
Area along
pipeline(zones mixed
with commercial and
residential)
2 60 50 70 70
Villages and schools at
sensitive spots 1 55 45 55* 45
Arterial traffic 4a 70 55 -- --
Note: *--Residence, office, culture and education facilities.
2.5.2 Pollutant Discharge Standards
This project is a pipeline project, there is no waste gas and solid waste discharge during the
operation stage.
During the construction period, the Emission Standard of Ambient Noise at Construction Site
Boundary (GB12523-2011) would be enforced for noise; for standard limit values, refer to
Table 2-5.
Table 2-5 Emission Standards for Ambient Noise at Construction Site Boundary
Time Interval Daytime [dB(A) ] Night Time [dB(A) ] Scope of Application
Standard value 75 55 All items
2.6 Urban Planning, Atmospheric Pollution Regulation Planning and
Environmental Functional District Planning Documents
1) The 13th Five-Year Plan for National Environmental Protection (December 2011);
2) Master Plan of Yancheng County, Jincheng City of Shanxi Province (2010-2030);
3) Comprehensive Working Program of Shanxi Province for Energy Conservation and
Emission Reduction in the 13th Five-Year Plan Period;
4) Report of Yangcheng County on Ecological Economic Zoning;
-
21
5) Outline of the 13th Five-Year Plan (2016-2020) for National Economic and Social
Development of Shanxi Province;
6) The 13th Five-Year Plan for Environmental Protection of Shanxi Province (Jin Zheng
Fa [2016] No. 66);
7) Development Planning of Shanxi Province for the Industrial Integration of “Four
Types of Gas” (November 2, 2009);
8) Several Opinions of the General Office of the People’s Government of Shanxi
Province on Accelerating and Promoting the Industrial Integration of “Four Types of
Gas” in the Province (Jin Zheng Ban Fa [2010] No. 72);
9) Outline of Guoxin Energy on Gas Industrial Development;
2.7 Analysis of Conformity and Consistency of the Proposed Project with
Relevant Regional Policies and Plans
2.7.1 Plan of Shanxi Province on Emission Reduction of Atmospheric
Pollutants
According to the statistic of the13th Five-Year Plan for Environmental Protection of
Shanxi Province. During the whole "12th Five-Year" period, Shanxi vigorously promoted the
comprehensive treatment of environmental pollution. By the end of 12th Five-Year, the
average annual concentration of ambient fine particulate matter (PM2.5) decreased by 27.3%
compared with 2013, the average number of ambient air quality in 11 cities with districts
increased by 70 days on average in 2013. Total emissions reduction of sulfur dioxide,
nitrogen oxides, soot and industrial dust were 195.8%, 180.1%, 157.7% and 162.1%,
respectively, of the reduction targets of 12th Five-Year plan, overall excess national and
provincial emission reduction tasks, the overall ambient air quality has been improved.
During 13th Five-Year, the environmental protection targets for air:in the "Shanxi
provincial environmental protection planning" is, by 2020, the quality air environment in
Shanxi will be phased improved, and the total amount of major pollutants discharged will
complete national and provincial emission reduction tasks, and the environmental risks will
be effectively controlled. The average annual concentration of PM2.5 in 11 municipalities
with districts dropped by20%. The proportion of urban air quality in good days reached
75.4%. The main pollutants SO2, NOx will complete the state assigned total emission
reduction task in "13th Five-Year". Smoke and dust emissions decreased by 10% compared
with 2015. The pollutant emission reduction target of Shanxi Province has been decomposed
to the prefecture level, and all pollutant emission reduction projects are being gradually
promoted and implemented. After the implementation of the Project,the utilization of coal of
the residents, industrials, commercials and public buildings along the pipeline will be replaced,
-
22
and the emission of atmospheric pollutants will be reduced in Shanxi Province.
Implementation of the Project conforms to the atmospheric pollutant emission reduction plan
of Shanxi Province.
2.7.2 Analysis of Conformity and Consistency of the project with Relevant
Regional Policies and Plans
According to the National Energy Administration's "energy development strategy action
plan" (2014-2020 years), in these six years, the energy sector will vigorously develop green
low-carbon strategy, gradually reduce the proportion of coal consumption, increase the
proportion of natural gas consumption. By 2020, the proportion of natural gas will reach more
than 10%, and the proportion of coal consumption should be less than 62%. Implementation
of gasification urban livelihood projects. New natural gas should be given priority to protect
residents' living and replace the scattered coal use, and organize the implementation of the
clean utilization plan for urban residents. By 2020, urban residents had access to natural gas.
The overall plan of the county town of Yangcheng County also puts forward the development
target of adopting clean energy and increasing gas ratio.
The project is Yangcheng Gas Utilization Project,includes construction of gas pipelines
and upgrading of existing gas facilities.The construction of the project will help improve the
network system in Yangcheng County, increase the capacity of gas supply and expand the
scope of gas supply.After the completion of the project, it will help reduce the amount of coal
consumed in the region, improve the environment, reduce regional air pollution, and the
project complies with the relevant planning.
-
23
3 Project Description
3.1 Contents
3.1.1 Basic Information
The main contents of this project include two natural gas pipeline networks(Anyang gas
distribution station-Dongye town urban gas pipeline and Lanhua151# valve well -Yanli
county urban gas pipeline)and the construction of relevant facilities, the renovation of the
residents gas meter and the pipe behind the meter.
Anyang gas distribution station-Dongye town urban gas pipeline, starts from the Anyang gas
distribution station on the southwest side of the Anyang village of Yangcheng Town, and the
pipeline is laid to the South after connected to the gas station, it goes by the west side of
Hongshang Village, through the industrial park, after setting valve wells and regional
regulator cabinet in Hongshang village, it goes through Laoquan village to Baisang, setting
setting valve wells and regional regulator cabinet then goes by the west side of Zhangzhuang
to Shangbaisang, setting valve wells and regional regulator cabinet at Shangbaisang, then it
goes southward, setting valve wells and regional regulator cabinet in the north of Longzhang
Village, then set truncated split valve well and regional pressure regulating cabinet to the
north of Shijiu Village, it goes southward, setting valve wells and regional regulator cabinet in
the west of Nanyao village, goes through the the middle land of the village, setting valve well
and regional pressure regulating cabinet in the north of Jianping Village, then goes across Jian
river, reaches Dongye Township, setting valve wells and regional regulator cabinet to the west
of the end point Dongye Township.
Lanhua151# valve well -Yanli county urban gas pipeline connect the pressure lever exitt of
the Lanhua151# gas well then lays to the southeast, it goes by Huwagua Village to Xianyi
Village, then cross the road after Shangqingchi Village to the southeast side of Yanli
township. It will provide gas supply for the resident and commercial users in Yanli Township.
The gas pipeline planning see Figure 4.
The location, scale and main contents of the project are shown in Table 3-1. The route of the
project is shown in figure 4.
3.1.2 Investment and Funding Source
The total investment of the Project is approximately RMB 65.2277 milion yuan, and the fund
consists of self-owned funds of enterprises and loans from the World Bank and domestic
commercial bank.
3.1.3 Project construction period
-
24
The final design period of the project pipe network is to the end of 2030.
Since 2031, the gas supply will reach the design capacity of this project. The project
construction schedule is as follows: April 2017 to August 2018, complete the installation of
the main pipeline network and pressure adjustment and metering facilities; September 2018 to
the end of 2030, complete branch pipeline laying step by step, and complete installation and
commissioning of gas transmission and distribution automation monitoring and management
system in different stages.
3.1.4 Gas Consumption
The construction of the pipeline network can realize the gasification of the villages and towns,
new rural residential areas and major industries in the county area. Table 3-4 shows the gas
consumption of the project.
-
25
Table 3-1 Project Composition
Item
Project
Location and
surrounding
environment
Capacity Composition Gas source Service area
Yangcheng
pipeline
network
Anyang gas
distribution
station-Dongye
town urban gas
pipeline
New
construction of
gas
transmission
and distribution
system, with
annual gas
supply of
5627.98×104N
m3
1) New construction of 20.2 km hypo-high pressure pipeline
at 0.8 MPa; with diameter of D323.9×6.3. The buried
depth of pipeline (depth from pipe top to surface
ground covering soil) shall be carried out according to
the Code for Design of Urban Gas (GB50028-2006),
specifically: Buried in the roadway: ≥1.2m; Buried in
the roadway under non: ≥1.0m. Pipeline
crossingProvincial Rd S229(3 places)Xi-Mang Road
(1 place),Yang-Dong Road(4 places),other road
(18 places);Huoze river crossing once,Jian river
crossing once, Channel crossing once.
2) 8 surge tanks;
3) 7 Single valve well(DN150),1 Double valve well
(DN200、DN300),135 of Mark piles, Mileage stake,
Cross pile, Corner piles and 58 warning signs;
4) Auto-monitoring system for gas network Tin
gdia
n b
oo
ster
sta
tion,
co
nst
ruct
ion h
as b
een c
om
ple
ted
Along the pipeline
network, county residents,
commercial business in
Yangcheng County, and
township residents,
commercial business, new
rural residents and the
surrounding industrial gas
users etc. within the county
-
26
Lan
hua1
51# v
alve
wel
l -Y
anli
county
urb
an g
as
pip
elin
e
New
construction of
gas
transmission
and distribution
system, with
annual gas
supply of
262×104Nm3
1) New construction of 7.59 km hypo-high pressure
pipeline at 0.8 MPa; with diameter of D219.1×5.6.
The buried depth of pipeline (depth from pipe top to
surface ground covering soil) shall be carried out
according to the Code for Design of Urban Gas
(GB50028-2006), specifically: Buried in the roadway:
≥1.2m; Buried in the roadway under non: ≥1.0m.
Pipeline crosses Chongli Avenue once, other road 11
places.
2) 1 surge tanks;
3) 1 Single valve well(DN200), 51 of Mark piles,
Mileage stake, Cross pile, Corner piles and 24
Warning signs;
4) Auto-monitoring system for gas network
Lan
hua1
51# g
as w
ell
in X
ihe
tow
nsh
ip,
Yan
gch
eng C
ounty
, co
nst
ruct
ion h
as b
een
com
ple
ted Second gas source for
residents, commercial
business, and public
construction in Yanli
township
Upgrading of
existing gas
facilities in
Yangcheng
Replacement of
gas meter and
pipeline behind
the meter in the
resident
houshold
To upgrade the membrane meters and 26800 m pipeline behind the
meter for the 13411 residents user of existing gas project in
Yangcheng County.
——
Residents of the existing
gas pipeline network of
Yangcheng with the
membrane meters and
pipeline behind it to be
upgraded.
-
27
Table 3-2 Gas Consumption
NO. User type
Daily Gas
Consumption
(103m3/d)
Annual Gas
Consumption
(104m3/a) Proportion(%)
Yangcheng gas Utilization:gas consumption proportion of industrial use to civil use is
88:5.7
1 Residential
users 0.88 322.85 5.74
2 Commercial
users 0.19 70.22 12.48
3 Industrial
users 13.75 4950.00 87.95
4 Unforeseen
consumption 0.78 284.91 5.06
5 Total 16.42 5627.98 100
3.2 Construction Plan and Method
This is a natural gas pipeline project, no need for the the gate station, regional regulator
station engineering. The construction site should be cleaned up before pipeline construction;
The excavation of pipeline ditch adoptes single side dump, assembling and welding should be
done on the top of ditch. After the completion of the trench excavation, road crossing, river
crossing and other basic work, in accordance with the construction specifications, the pipeline
will be sent to the site for welding, pressure testing, interface corrosion prevention, and then
lowered down into the pipe trench.
The project adopts directional drilling to cross the ditch due to the stone masonry slope
protection, and adoptes direct excavation to cross the river. Concrete pressure block shall be
added to the pipe section to stabilize the pipe. The buried depth of the pipeline is in the stable
layer of the river bottom; The buried depth of pipe top is about 1m below scouring layer; The
Pipe jacking should be adopted to cross roads.
After the above construction is completed, the pipeline pressure test will be carried out.
The project uses clean water for atmospheric pressure test, and then backfill soil, clean up the
site, restore the landscape, and restore the vegetation.
3.2.1 List of Construction Methods
The construction methods of the project see Tabel 3-3.
-
28
Table3-3 Construction Methods
Project Subproject Pipelin construction Y
angch
eng
pip
elin
e
Anyang gas distribution
station-Dongye town urban gas
pipeline
New construction of 20.2 km pipeline at 0.8 MPa; 8 surge
tanks;
Pipeline crossing Provincial Rd S229(3 place)Xi-Mang
Road(1 places),Yang-Dong Road(4 places),other road
(18 places); The pipeline of the project crosses Huoze River once and
Jina river once, ditch once.。 Use pipe jacking when crossing roads
Use dry excavation to cross river
Directional drilling is adopted for canal and ditch crossing.
Lanhua151# valve well -Yanli
county urban gas pipeline
New construction of 7.59 km pipeline at 0.8 MPa;
1 surge tanks;
Pipeline crosses Chongli Avenue once, other road 11 places.
Use pipe jacking when crossing roads
Upgrading of existing gas
facilities in Yangcheng.
To upgrade the membrane meters and pipeline behind the
meter for the 13411 residents user of existing gas project in
Fengcheng toenship,Yangcheng County.
3.2.2 Construction Methods
During the pipeline laying of the project, the direct excavation method is adopted to lay the
crossing works including river, channel crossing and highway crossing. The construction
methods are stated as follows:
1、Roads Crossing
Roads the pipeline engineering goes across include national roads, provincial roads and rural
roads. The engineering for crossing roads adopt the pipe jacking method. The pipe jacking
method doesn’t destroy the road pavement, or block traffic, with small perturbed surface and
slight environmental impacts. The construction method and machinery of pipe jacking method
are as follows:
(1) Construction method: first of all, set up the pedestal and install hydraulic jack in the
operation pit to penetrate tool pipe or heading machine through the earth to the receiving pit
and lift up them by using the propulsive force of main jack oil tank, pipeline room and relay
room; and then follow the tool pipe or heading machine to jack the prefabricated section of
pipe into the ground and bury the pipe between the two pit.
(2) Construction machinery: head (including small oil jack), oil press, main jack oil tank,
bridge crane (hoisting machine), resistance box and other power-supply units, electric welder,
measuring apparatus, pipe-like track, jacking block and back.
2、Channel Crossing
-
29
The project pipeline goes across the channel once. The pipeline construction adopts the direct
excavation method. As for Zhujiachuan River, Songxi River and Zhanghe River, the crossing
engineering adopts the directional drilling method, which is featured by short construction
period, small site disturbance and slight impacts on surroundings and can ensure the buried
depth of the pipeline. Construction method and machinery of directional drilling are as
follows:
(1) Construction method: first, make use of existing roads to transport equipment to the
construction site, and then conduct the excavation of slurry pond in drill site; meanwhile,
calibrate the position of main equipment with gray lines, and then place main equipment in
correct place at time of equipment access; start the construction of guide hole according to the
requirements of codes and design, and then start the construction of pre-reaming hole and
pipeline back dragging in order; after crossing, put equipment in order, clean the construction
site; after mud sedimentation, conduct clean-water discharge and backfill mud with earth to
restore landscape.
(2) Construction machinery and material: drill and drilling bit, back reamer, drill stem and
other accessory equipment, clay, power generator, blender and water pump.
3、River Crossing
(1) Construction method: The pipeline of the project crosses Huoze River once and Jina river
once, both are seasonal small rivers. Pipeline construction adopts the excavation method when
crossing river, and in the first, dry season shall be selected, rainy season shall be avoided; If
there is water flow in the river during construction, the river should be cleaned first, then one
side should be enclosed for diversion and the other side be excavated. After completion of the
whole construction, the river channel should be cleaned.
(2) Construction machinery
Excvavtors, cutting machine and shovels.
4、General routes
Pipe construction adopts the excavation method, which is featured by simple and direct
construction and low construction cost and has no impacts on revegetation and land
reclamation after earth backfilling. Therefore, general pipe section of the subproject adopts
the excavation method. As for excavation method, the Pipeline trench shall be excavated
according to the plane position and elevation stated in the design. In case of manual
excavation without Groundwater, the reservation value of trench bottom shall be 0.05-0.10m;
in case of mechanical excavation with Groundwater, the reservation value of trench bottom
shall be not less than 0.15m. Conduct manual bottom cleaning to elevation before pipeline
installation, and then start pipeline construction.
-
30
(1) Pipe trench backfilling
The pipe trench backfilling shall adopt fine earth to fill the pipe bottom and both sides of the
pipeline first, and then backfill the pipeline to 0.5m above the top of the pipe. The backfilling
soil on both sides of the pipe and 0.5m above the top of pipe shall not include gravel, brick,
litter and other sundries and shall not use frozen soil. The backfilling soil shall be tamped
layer by layer, with the layer thickness of 0.2-0.3m. The backfilling soil on both sides of the
pipe top and 0.5m above the pipe top must be tamped manually. When the height of
backfilling soil exceeds 0.5m of pipe top, small machinery shall be used for tamping. Each
layer of loose soil shall be 0.25-0.4m in thickness.
(2) Construction machinery
Excvavtors, cutting machine and shovels.
3.2.3 Construction Camp
The gas facilities renovation project is located in Yangcheng County, and the construction
workers are all local staff, no need for setting up construction camps. The two pipe network of
the project will be constructed in sections. The design takes 5km as a section, each section has
a construction period of about 50 days, and there will be no more than 8 people during the
peak construction period. Construction camps use the the nearby village rental housing, the
use of local living facilities, set up canteens, the largest number of people eating in the
canteen will be no more than 8. Clean fuel canned liquefied gas should be selected for the
onstruction personnel canteen, coal is strictly prohibited; Workers will produce some
domestic waste, garbage collection barrels will be set, regularly collected and disposed by the
sanitation department; The hand wash water should be spilled to suppress the dust, other
small amount of living water be collected into the bucket, after precipitation, use the upper
clean water to spray the dust and the bottom dregs be dumped into the trash bin. Construction
workers are recruited local personnel, there is no cultural difference. Through the villages
along the pipe network, drinking water is the same as the local villagers, all of which are in
line with the drinking water standard.
-
31
4 Environmental Situation
4.1 General Introduction of Natural Environment
4.1.1 Geographic Location
4.1.1.1 Geographic Location of Shanxi Province
Located in the Loess Plateau in northern China, Shanxi Province is of a mountainous plateau
covered by loess in principle. Standing in the heart of the Yellow River basin, i