Environmental Monitoring Report Semestral Report Project Number: 41614-023 July 2013 Period: January – June 2013
IND: Assam Power Sector Enhancement Investment
Program – Tranche 1
Prepared by Assam Power Distribution Company Limited (APDCL) for the Asian Development
Bank.
This environmental monitoring report is a document of the borrower. The views expressed
herein do not necessarily represent those of ADB's Board of Directors, Management, or staff,
and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
This environmental safeguard monitoring report is a document of the borrower and made publicly available in accordance with ADB’s Public Communications Policy 2011 and the Safeguard Policy Statement 2009. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff.
Environmental Safeguard Monitoring Report
Reporting Period: From January 2013 to June 2013
Loan No. 2592- Tranche I
Assam Power Sector Enhancement Investment Program
Prepared by the Assam Power Distribution Company Limited for the Asian Development Bank
2
TABLE OF CONTENTS
SL. NO. ITEMS PAGE Abbreviations
Executive Summary 1.0 Introduction 4 1.1 Brief Project Description 4 1.2 Project Progress Status and Implementation Schedule 5
A. Progress Status 5
B. Implementation Schedule for Tranche I Sub projects 8
2.0 Compliance to National Regulations 10 3.0 Compliance to Environmental Covenants from the ADB Loan
Agreement 11
4.0 Compliance to Safeguards Management Plan 12 5.0 Safeguards Monitoring Results and Unanticipated Impacts 17
A. Environmental Monitoring Schedule: 17
B. Environmental Monitoring Parameters 17
C. Air Quality Parameters 18 D. Water Air Quality Parameters 18
E. Ambient Noise Levels 19
6.0 Implementation of Grievance Redress Mechanism and Complaints Received from Stakeholders
19
7.0 Conclusion and Recommendations 20 ANNEXURE - 1 Summary Ambient Air Quality Results 21
ANNEXURE - 2 National Ambient Air Quality Standards, CPCB 2009 25
ANNEXURE - 3.1 Details of Water Quality Monitoring Locations (Along T/Ls) 27 ANNEXURE - 3.2 Summary of Water Quality Results (Along Transmission Lines) 30 ANNEXURE - 4 Water Quality Standards 36 ANNEXURE - 5 Summary Noise Level Results 38 ANNEXURE - 6 National Ambient Noise Standards 41
ANNEXURE - 7 Air, Water and Noise Monitoring Location Maps 42
LIST OF TABLES
TABLE NO. ITEMS PAGE 1.0 Sub-Projects under Tranche I 4
2.0 Status of Environment activities in Tranche I Substations 5 2.1 Status of Environment activities in Tranche I Transmission Lines 7 3.0 Implementation Schedule for Tranche I 9
4.0 Applicable Acts and Legislations to the project 10 5.0 Environmental Covenants 11 6.0 Compliance Status on Environmental Issues in Tranche I
Subprojects: 13
7.0 Environment Monitoring Schedule for Tranche I 17 8.0 Environmental Monitoring Parameters 18
ABBREVIATIONS
ADB Asian Development Bank
AEGCL Assam Electricity Grid Corporation Ltd. APCB Assam Pollution Control Board ASEB Assam State Electricity Board
ASI Archeological Survey of India CPCB Central Pollution Control Board D.C. District Collector dB Decibels EARF Environmental Assessment and Review Framework EIA Environmental Impact Assessment EMA Environment Monitoring Agency EMP Environmental Management Plan
ESMC Environment and Social Management Cell ESMU Environmental and Social Management Unit GHG Greenhouse Gas GOA Government Of Assam
GOI Government Of India
GRM Grievance Redressal Mechanism IA Implementing Agency IEE Initial Environmental Examination
IS Indian Standard Ltd. Limited LAA Land Acquisition Act MFF Multi-Tranche Financing Facility
NO2 Nitrogen dioxide PAP Project Affected Persons PM10 Particulate Matter (Size less than 10 µm) PM2.5 Particulate Matter (Size less than 2.5 µm) PMU Project Management Unit PPE Personal Protective Equipment ROW Right of Way S/S Sub Station SEIA Summary Environmental Impact Assessment SIEE Summary Initial Environmental Examination SO2 Sulphur dioxide T&D Transmission and Distribution
Electrical Terminology
V Volt Unit of Voltage kV Kilovolt 1000 volts W Watt Unit of active power kW Kilowatt 1000 watts MW Megawatt 1000 kW MWh Megawatt hour Unit of energy VA Volt ampere Unit of apparent power MVA Million volt ampere 10
6 VA
Transmission System 400kV, 220kV, 132kV and/or 66kV lines supplying (incoming & outgoing feeder) grid substations (Substation) with primary voltage of 400kV, 220kV, 132kV, or 66kV
LILO Line – in – Line - Out
4
Executive Summary 1.0 Introduction: The Government of India and Government of Assam have requested ADB to provide $200 loan funding via a multi-tranche financing facility (MFF) to support continued investment in the state power sector. GOA and ASEB are the Executing Agencies for the MFF. As a part of the reforms program GoA has unbundled ASEB into three companies viz. Assam Power Generation Corporation Limited (APGCL), Assam Electricity Grid Corporation Ltd. (AEGCL) and Assam Power Distribution Company Ltd. (APDCL). AEGCL, the successor company of unbundled ASEB is the Implementing Agency (IA) for Tranche-I & II of MFF. The power sector investments are necessary to support continued investment in the state power sector, which is necessary for economic growth and poverty reduction. The MFF will partly finance the expansion and augmentation of the transmission and distribution (T&D) networks. The proposed investments are necessary to: (i) facilitate increased power transfers to accommodate increased demand and economic growth; (ii) improve supply-side energy efficiency by system de-bottlenecking and reducing technical losses; (iii) reduce the intensity of greenhouse gas (GHG) and other emissions via improved system efficiency; (iv) support expanded private sector participation in distribution system operations and other energy services; and (v) facilitate poverty reduction via improved electricity services and economic growth. 1.1 Brief Project Description The proposed Assam Power Sector Enhancement Investment Program of Assam State Electricity Board (ASEB) which is being processed under ADB’s Multi-tranche Financing Facility (MFF) would have the following components in Tranche I, namely:
Part A: 220/132/33kV Sub-stations Part B: 132/33kV Sub-stations Part C: 220kV Transmission lines Part D: 132kV Transmission line Part E: Augmentation, Extension and refurbishment of existing sub-stations and reactive power
compensation Part F: Communication system Part G: Capacity Development Program The details of Sub-Projects under Tranche I are given below in Table No. 1.0:
Table No.1.0: Sub-Projects under Tranche I
Sl.No.
Name of the Sub-Project
Part A: 220/132 kV sub-stations MVA 1 2x100 MVA 220/132 kV Sub Station at Rangia 200 Total 200 MVA Part B: 132/33 kV sub-stations 1 2x40 MVA 132/33 kV Kamalpur grid Sub Station 80 2 2x25 MVA 132/33 kV Nagaon grid Sub Station 50
5
3 2x25 MVA 132/33 kV Sonari grid Sub Station 50 4 2x40 MVA 132/33 kV Bihiating grid Sub Station 80 5 2x25 MVA 132/33 kV Rupai grid Sub Station 50 Total 310 MVA Part C: 220 kV transmission lines Length (Km)
1 220 kV Double Circuit Transmission line Salakati (BTPS) - Rangia
163.187
Total 163.187 Km Part D: 132 kV transmission lines Length (Km)
1 132 kV Single Circuit Samaguri – Nagaon on Double Circuit Towers
41.923
2 132 kV Double Circuit LILO at Rupai from 132 kV Double Circuit Tinsukia – Margherita line
29.647
3 132 kV Double Circuit LILO at Kamalpur from 132 kV Double Circuit Rangia – Kahilipara / Sishugram line
0.500
4 132 kV Double Circuit LILO at Bihiating LILO from 132 kV Dibrugarh – Moran line
0.642
5 132 kV Double Circuit LILO at Sonari from 132 kV Lakwa – Namrup line
4.00
Total 76.712 km Part E: Augmentation, Extension and refurbishment of existing sub-stations and reactive power compensation 1 220/132 kV Salakati grid Sub Station – Construction of 220 kV line bays 2 220/132/33 kV Samaguri grid Sub Station – Construction of 132 kV line bays The activities that are being carried out are:- Augmentation of transformer capacity and Extension of line bay. Both the activities are being carried out on existing substation where there is no land acquisition, hence, no environmental or social issues are envisaged. Part F: Communication system Part G: Capacity Development Program Training programmes to enhance the capacity building for EA/IA between July to December, 2014.
1.2 Project Progress Status and Implementation Schedule:
A. Progress Status The progress status of Environment activities for the Substations and Transmission Lines from January 2013 to June 2013 under Tranche I are given below in Table 2.0 and Table 2.1 respectively:
Table No. 2.0: Status of Environment activities in Tranche I Substations Sl. No.
Name of Sub-Project
Status
Construction of new 220/132 kV Sub Stations. (Contractor: M/S ABB Ltd.)
1
Rangia Sub-Station (3.33 ha of AEGCL
Earth filling and the Approach road for the S/S completed and boundary wall is completed up to fencing level.
Control room works is completed. No trees felling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land
6
Sl. No.
Name of Sub-Project
Status
barren land acquired) No major adverse environmental issues identified Labour camp exists but no sanitary facilities being provided and
Contractor advised to comply during site visit on 14.02.2013. No water sprinkling to control dust. Contractor advised to comply during
site visit on 14.02.2013. 2
Construction of new 132/33 kV Sub Stations. (Contractor: M/S Techno Electric & Engineering Co. Ltd.)
A.
Kamalpur grid Sub Station. (1.93 ha of Private barren land acquired)
Earth filling completed. Approach road and Boundary wall work is in progress.
No trees felling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified Labour camp exists but no sanitary facilities being provided and
Contractor advised to comply during site visit on 02.05.2013.
B.
Nagaon grid Sub Station. (3.06 ha of Govt. barren land acquired)
Earth filling completed. Approach road and Boundary wall work is in progress.
In 132 kV Switch Yard, civil works is completed. 33 kV Switch Yard works is in progress. Control room works is in progress. No trees felling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified Labour camp exists but no sanitary facilities being provided and
Contractor advised to comply during site visit on 14.05.2013. No water sprinkling to control dust. Contractor advised to comply during
site visit on 14.05.2013.
C.
Sonari grid Sub Station. (3.33 ha of Govt. barren land acquired)
Control room works is in progress. 132 & 33 kV Switch Yard works is in progress. No trees felling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified Labour camp exists but no sanitary facilities being provided and
Contractor advised to comply during site visit on 16.05.2013.
D.
Bihiating grid Sub Station. (6.8 ha of Private barren land acquired)
Boundary wall works completed. 96% of the control room work is completed. 132 & 33 kV Switch Yard is works is in progress. No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified Labour camp exists but no sanitary facilities being provided and
Contractor advised to comply during site visit on 15.05.2013.
E.
Rupai grid Sub Station. (5.33 ha of ASEB barren land
Environmental checklist prepared and finalized. 132 & 33 kV Switch Yard is works is in progress. Control room work is in progress.
7
Sl. No.
Name of Sub-Project
Status
acquired)
No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified Labour camp exists but no sanitary facilities being provided and
Contractor advised to comply during site visit on 15.05.2013.
Table No. 2.1: Status of Environment activities in Tranche I Transmission Lines Status of Social & Environment in Tranche - 1 as on June'13
Sl. No.
Name of Sub-Project Status
3
220 kV Double Circuit Transmission line Salakati (BTPS) - Rangia – Approx. Length 163.187 km.
Environmental checklist for pre-construction stage completed. Route Survey is completed. Based on the field survey it is found that about 48816 nos. of trees mainly private trees are falling within ROW. The predominant tree species found are Kadam (Anthoeephalus chinensis), Jack fruit (Arto carpusus), Arjun (Terminalia arjuna), Imli (Tamarindus indica), Mango (Mangifera indica), Neem (Aladirachta indica), etc. All the tree species are local species. None of the tree species found belongs to endangered or threatened species that falls under IUCN Red list category.
Ambient air quality monitoring conducted at 29 locations. Noise level monitoring conducted at 29 locations. Water quality monitoring done for 26 groundwater samples and
13 surface water samples. 4
Construction of new 132 kV Transmission lines. (Contractor: M/S ECI Engineering and Construction Company Ltd.)
A.
132 kV Single Circuit Samaguri – Nagaon on Double Circuit Towers – Approx. Length 41.923 kms.
Environmental checklist for pre construction stage completed. Route Survey is completed. Based on the field survey it is found
that majority of the trees are private trees. 702 nos. of trees including bamboo are falling within ROW.
B.
132 kV Double Circuit LILO at Rupai from 132 kV Double Circuit Tinsukia – Margherita line – Approx. Length 29.647 kms.
Environmental checklist for pre construction stage completed. No major Social and Environmental impacts identified within the
ROW. Route Survey is completed. Based on the field survey it is found
that majority of the trees are private trees.1362 nos. of trees including bamboo are falling within ROW.
Ambient air quality monitoring conducted at 4 locations. Noise level monitoring conducted at 4 locations. Water quality monitoring done for 10 groundwater samples and 5
surface water samples.
C.
132 kV Double Circuit LILO at Kamalpur from 132 kV Double Circuit Rangia – Kahilipara / Sishugram line – Approx. Length 0.500 kms.
Environmental checklist for pre construction stage completed. Route Survey is completed. Final assessment of trees is yet to
be finalized. No major Social and Environmental impacts identified within the
ROW. Ambient air quality monitoring conducted at 1 locations. Noise level monitoring conducted at 1 location.
8
Water quality monitoring done for 1 groundwater samples and 1 surface water samples
D.
132 kV Double Circuit LILO at Bihiating LILO from 132 kV Dibrugarh – Moran line – Approx. Length 0.642 kms.
Environmental checklist for pre construction stage completed. Route Survey is completed. Final assessment of trees is yet to
be finalized. No major Social and Environmental impacts identified within the
ROW. Ambient air quality monitoring conducted at 1 location. Noise level monitoring conducted at 1 location. Water quality monitoring done for 1 groundwater samples.
E.
132 kV Double Circuit LILO at Sonari from 132 kV Lakwa – Namrup line – Approx. Length 4.00 kms.
Environmental checklist for pre construction stage completed. Route Survey is completed. Final assessment of trees is yet to
be finalized. No major Social and Environmental impacts identified within the
ROW. Ambient air quality monitoring conducted at 1 location. Noise level monitoring conducted at 1 location. Water quality monitoring done for 1 groundwater samples and 1
surface water samples. 5 Extension, Augmentation and Refurbishment of existing grid Sub Stations.
A.
220/132 kV Salakati grid Sub Station – Construction of 220 kV line bays.
The activities that are being carried out are:- Augmentation of transformer capacity and Extension of line bay. Both the activities are being carried out on existing substation where there is no land acquisition, hence, no environmental or social issues are envisaged.
B.
220/132/33 kV Samaguri grid Sub Station – Construction of 132 kV line bays.
The activities that are being carried out are:- Augmentation of transformer capacity and Extension of line bay. Both the activities are being carried out on existing substation where there is no land acquisition, hence, no environmental or social issues are envisaged.
B. Implementation Schedule for Tranche I Sub projects: The implementation schedule for Tranche I sub project is given below in Table No.3.0.
9
Table No. 3.0: Implementation Schedule for Tranche I
Subproject Activates 2011 2012 2013 2014
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Route Selection Route selection for S/S completed in 2011 and for Transmission lines completed in 4th
Quarter, 2012
Community Consultations X X X X X X X X P P P P P P
Identification of Environmental
sensitive areas X X X X
Route Alignment and identification of Environmental
sensitive areas finalized.
Top Soil Conservation X X X X X X X X X
Water Sprinkling (Dust Control) X X X X X X X X X
Solid Waste / Construction Waste Mgt X X X X X X X X X
EMP Compliance during Pre-
Construction X X X X X
Pre Construction activities completed as
finalization of route alignment
EMP Compliance during Construction) X X X X X X X X X P P P P P P
EMP Compliance during Post
Construction
Activity yet to start
Ambient Air Quality Monitoring for the
Subprojects X X X X X X P P P P P P
Water Quality Monitoring for the
Subprojects X X X X X X P P P P P P
Ambient Noise Monitoring for the
Subprojects X X X X X X P P P P P P
Activities of GRC X X X P P P
External Monitoring Evaluation To be decided after discussion with ADB Counterpart
Activities Completed Activities performed during reporting periods Activities Planned
Q: Quarter; X: Completed Activity; P: Planned Activity
10
2.0 Compliance to National Regulations: The relevant applicable Acts and Legislations to the project is given in the Table No.4.0
Table No. 4.0: Applicable Acts and Legislations to the project
Act/Rule/Notification Year Objectives Compliance
Status
The Environment (Protection) Act The Environment (Protection) Rules
1986
1986
To protect and improve the overall environment.
Complied
Indian Forest Act
Forest (Conservation) Act
Forest (Conservation) Rules
Forest Conservation Rules (Notification)
1927
1980
1981
2003
To consolidate the laws related to forest, the transit of forest produce and the duty liveable on timber and other forest produce. Conservation of Forests, Judicious use of forestland for non-forestry purposes; and to replenish the loss of forest cover by Compensatory Afforestation on degraded forestland and non-forest land. Procedure for submission of the proposals seeking approval for Central Government for diversion of forestland to non-forest purposes.
Not Applicable
No Forest
Land is involved in the project.
Wild Life (Protection) Act
The Wild Life (Protection) Amendment Act
1972
2002
To protect wildlife in general and National Parks and Sanctuaries in particulars. To protect wild animals, birds and plants with a view to ensure the ecological and environmental security of the country
Not Applicable
No Wild Life Protected
area is involved in the project.
The Water (Prevention and Control of Pollution) Act
1974 To control water pollution by controlling discharge of pollutants as per prescribed standards
Complied
The Air (Prevention and Control of Pollution) Act
1981 To control air pollution by controlling emission of air pollutants as per prescribed standards
Complied
The Noise Pollution (Regulation and Control) Rules The Noise Pollution (Regulation and Control) Amendment Rules
2000
2006
To regulate and control noise producing and generating sources with the objective of maintaining the ambient air quality standards in respect of noise
Complied
The Ancient Monuments and Archaeological Sites and Remain Act
1958
To provide for the preservation of ancient and historical monuments and archaeological sites and remains of national importance and
Not Applicable No ASI site identified so
11
Act/Rule/Notification Year Objectives Compliance
Status
protection sculptures, carvings and other like objects.
far
The Electricity Act 2003
Although the Act does not explicitly deal with environmental implications of activities related to power generation, transmission and distribution. However, ASEB integrates environment protection as a part of its project activities.
Complied
3.0 Compliance to Environmental Covenants from the ADB Loan Agreement:
The Table 5.0 shows the applicable Environmental Covenants from the ADB Loan Agreement
Table No.5.0: Environmental Covenants
Product Schedule
Para No.
Description Remarks/Issues
Loan 2592
5 18
--The State through ASEB shall ensure that the Subprojects under the Project are undertaken and that all Project facilities are designed, implemented, operated and maintained in accordance with all applicable laws, and regulations of the Borrower, the State, and ADB's Environment Policy 2002, and the EARF. The State shall ensure that all associated projects will be constructed and commissioned in compliance with the laws and regulations of the Borrower.
It is being complied as per ADB's Environment Policy (2002), as set out in the EARF. The EMP is being implemented in accordance with applicable laws and regulations of GOI, GOA, and the ADB guidelines. Further an Environment monitoring agency has been placed to carry out the regular environmental monitoring as set out in the EMP. The environmental monitoring has been planned and is being carried out in all three phases i.e. pre- construction, during construction and post construction phase.
12
Product Schedule
Para No.
Description Remarks/Issues
Loan 2592
5 19
--For each Subproject, ASEB shall cause the IA to prepare and implement the necessary IEE/EIA as applicable, and EMP (with budget) in accordance with the EARF. For Subprojects, the environmental categorization and assessment procedures defined in the EARF shall be followed. For any environment category A or B sensitive Subproject, a SEIA/SIEE as applicable shall be prepared and made available to the public 120 days before the Subproject is submitted to ADB for approval. ASEB through the IA shall monitor, audit, and report to ADB twice a year on the implementation of the EMPs for each Subproject.
It is being complied. The project falls under category B and IEE for the subprojects has been prepared accordingly. Consultant Supporting ESMU in PMU is internally monitoring the EMP implementation and submitting quarterly progress reports to PMU. Further an Environment monitoring agency is in place and is carrying out environmental monitoring regularly as set out in the EMP for all three phases i.e. pre- construction, during construction and post construction phase. Since subproject involves no major environmental issues, hence hiring of independent external monitoring agency is not felt by APDCL & AEGCL (EA).
4.0 Compliance to Safeguards Management Plan:
Based on the Environmental Management Plan the Compliance Status on Environmental Issues
in Tranche I Subprojects for construction stage has been prepared and presented in Table No.
6.0
13
Table No. 6.0: Compliance Status on Environmental Issues in Tranche I Subprojects:
Project Activity
Environmental Issues
Management / Mitigation Measures
Responsibility Compliance Status/ Remarks
Planning Implemen
tation Monitoring
Super Vision
Review Agency
Construction Stage
Equipment layout and installation
Noise and vibrations
Construction techniques and machinery selection to minimize noise and vibration. Noise to be limited to 70 dB(A) at site boundaries. Environmental and Social Management Cell (ESMC) of Project Management Unit (PMU) to conduct periodic spot checks to confirm compliance.
AEGCL Contractor
ESMC / EMA
ESMC / PMU
APCB
Environmental and Social Management Cell (ESMC) of Project Management Unit (PMU) conducted periodic spot check to confirm compliance. Being Complied. The parameters on noise & vibration are being examined by the environment monitoring consultant on regular basis.
Physical construction (manual labor)
Disturbance of farming activity
Construction activities on cropping land timed to avoid disturbance of field crops (within one month of harvest wherever possible).
AEGCL Contractor
ESMC ESMC / PMU
ADEF Contractors are advised to avoid disturbance of field crops
Mechanized construction
Noise, vibration, and operator safety, equipment wear and tear
Construction equipment to be maintained in accordance with GOI standards for noise exposure to workers. Equipment to be shut off when not in use.
AEGCL Contractor
ESMC / EMA
ESMC/ PMU
APCB
Being Complied. Noise and vibration exposure to workers in accordance with GOI standards are examined by the environment monitoring consultant on regular basis.
Substation site clearance
Removal of trees and other vegetation
Marking of trees / vegetation to be removed prior to clearance, and strict control on clearing activities to ensure minimal clearance.
AEGCL Contractor
ESMC ESMC / PMU
ADEF
Contractors are advised to marking of trees / vegetation to be removed prior to clearance, and strict control on clearing activities to ensure minimal clearance.
14
Project Activity
Environmental Issues
Management / Mitigation Measures
Responsibility Compliance Status/ Remarks
Planning Implemen
tation Monitoring
Super Vision
Review Agency
Trimming / cutting of trees within Right-of-Way (RoW)
Fire hazards Temporary loss of vegetation and permanent deforestation
Trees allowed growing up to a height within the RoW by maintaining adequate clearance between the top of tree and the conductor as per transmission design standards. Trees that can survive pruning to comply with vertical and horizontal separation requirements should be pruned instead of cleared. Felled trees and other cleared or pruned vegetation to be disposed of as authorized by ADEF
AEGCL Contractor
ESMC ESMC / PMU
ADEF
Provisions are made to clearance the growing up trees within the Right of Way (RoW) for maintenance the transmission line in future.
Wood / vegetation harvesting
Temporary loss of vegetation and permanent deforestation
Construction workers prohibited from harvesting wood in the project area (apart from locally employed staff continuing current legal activities).
AEGCL Contractor
ESMC ESMC/ PMU
ADEF
Non Compliance Contractors are advised to use gas or kerosene instead of wood for cooking.
Ambient air quality and noise level and Water quality
Dust, exhaust, and noiseemissions from construction equipment. Noise impacts on nearby communities and construction workers
Controlled construction activities and maintenance of machineries, timely scheduling of construction activities to avoid nuisance to nearby communities. Construction equipment to meet GOI emissions and noise control standards. Water sprays to be used for dust control as necessary.
AEGCL Contractor
ESMC / EMA
ESMC/
PMU APCB
Being Complied. Monitoring as per GOI standards on air, water and noise are examined by the environment monitoring consultant.
15
Project Activity
Environmental Issues
Management / Mitigation Measures
Responsibility Compliance Status/ Remarks
Planning Implemen
tation Monitoring
Super Vision
Review Agency
Storage of chemicals and any hazardous materials
Possible spills resulting in contamination land, water, and air
Fuel and any other hazardous materials will be securely stored to prevent spills. Contractors to provide spill response kit in accordance with Material Safety Data Sheets for chemicals and hazardous materials.
AEGCL Contractor
ESMC / EMA
ESMC / PMU
APCB
Not Compliance Contractors are advised to securely store the oils and fuels cemented floor to prevent spills and getting contaminated with surface and ground water and land.
Construction schedules
Noise nuisance to neighboring properties
Construction activities only undertaken during the day and local communities informed of the construction schedule.
AEGCL Contractor
ESMC / EMA
ESMC/PMU
APCB
Monitoring as per GOI standards on noise are examined by the environment monitoring consultant.
Health and safety
Injury and sickness of workers and members of the public
Contract provisions specifying minimum sanitation, health, and safety requirements for construction camps. Contractor to prepare and implement a health and safety plan including worker training and daily/weekly briefings.
AEGCL Contractor
ESMC ESMC / PMU
APCB & ADH
Contractors are advised to use Personnel Protective Equipments during construction time and First aid box and fire extinguisher should be kept at work site for safe.
Provision of Sanitary facilities for construction workers
Potential BOD and faecal coliform contamination
Construction workforce facilities to include proper sanitation, water supply, and waste disposal facilities, including primary treatment for domestic sewage and secure disposal of domestic solid wastes.
AEGCL Contractor
ESMC ESMC / PMU
APCB
Contractors are advised to provide sanitary and waste disposal facilities at construction camp.
16
Project Activity
Environmental Issues
Management / Mitigation Measures
Responsibility Compliance Status/ Remarks
Planning Implemen
tation Monitoring
Super Vision
Review Agency
Construction waste management
Air, soil, and water pollution due toinadequate management and control
Construction wastes to be managed in accordance with GOI standards and industry best practices. Waste lubricating oils to be disposed or recycled off-site by licensed service companies. Transformer oils to be returned to vendors via existing arrangements for transformer maintenance. Scrap steel and other salvaged materials to be auctioned and disposed / recycled off-site by licensed vendors.
AEGCL Contractor
ESMC / EMA
ESMC / PMU
APCB/ ADB Review Mission
Being Complied. Construction waste is being managed properly.
17
5.0 Safeguards Monitoring Results and Unanticipated Impacts:
A. Environmental Monitoring Schedule:
In order to comply to requirements of Environmental monitoring an external environmental monitoring agency has been hired by PMU to carry out the environmental monitoring with regards to air quality, water quality and noise levels during preconstruction, construction and post construction stage. The primary responsibility of the environmental monitoring agency are for testing, analyzing and reporting impact of transmission lines & substation projects on air, ground & surface water and noise levels. Although the civil construction works under the project are very meager, however, the environment monitoring for ambient air quality, water quality and noise levels during pre-construction period (Jan. to June,2013) are being monitored for Tranche I as per below schedule. (Refer Table 7.0)
Table No. 7.0: Environment Monitoring Schedule for Tranche I
Sl. No.
Parameters. Locations. Sample
Nos. Maximum Frequency
of Sampling. *Substations
1 Ambient Air quality monitoring
At the Sub Stations Nil Planned once during Construction Phase
2 Ambient Noise level monitoring
At the Sub Stations Nil
Planned once during Construction Phase
3
Water quality monitoring (both surface & ground water)
At the Sub Stations Nil
Planned once during Construction Phase
Transmission Lines
1 Ambient Air quality monitoring
Habitations throughout the transmission corridor, camp sites
75 Once during Pre-Construction Phase
2 Ambient Noise level monitoring
Habitations throughout the transmission corridor, camp
sites 75
Once during Pre-Construction Phase
3
Water quality monitoring (both surface & ground water)
Water bodies along the transmission-corridor, camp
sites 75
Once during Pre-Construction Phase
*Note: No Air & water quality and noise level monitoring planned for substations during pre-construction phase.
B. Environmental Monitoring Parameters
The details of parameters for Ambient Air, Water and Noise being monitored by Environmental Monitoring Agency are given below in Table 8.0.
18
Table No. 8.0: Environmental Monitoring Parameters
Sl.
No.
Environmental Parameters Analytical Parameters
1 Air Quality Monitoring PM10, PM2.5 ,SO2, NO2
2 Ground Water Quality Monitoring
pH, Turbidity (NTU), Specific Conductance (micro mhos/cm), Total Dissolved Solids (TDS), Total Alkalinity (as CaCO3), Total Hardness (as CaCO3), Calcium (as Ca), Magnesium (as Mg), Chlorides (as Cl), Sulphates (as SO4), Nitrates (as NO2), Fluoride (as F), Arsenic (as As), Selenium (as Se), Cadmium (as Cd), Copper (as Cu), Lead (as Pb), Zinc (as Zn).
3 Surface Water Quality Monitoring
Colour (Hazen Units), Dissolved Oxygen (DO), pH, Iron (as Fe), Chlorides (as Cl), Biological Oxygen Demand (BOD), Total Dissolved Solids (TDS), Copper (as Cu), Total Chromium (as Cr), Sulphate (as SO4), Nitrates (as NO3), Fluoride (as F), Total Coliform (MPN/100ml), Cadmium (as Cd), Selenium (as Se), Arsenic (as As), Lead (as Pb), Zinc (as Zn), Chromium (as Cr+6), Phenolic compounds (as C6,H5OH, Oil & Grease).
4 Noise Level Monitoring Day and Night time
C. Air Quality Parameters: Ambient air quality monitoring has been conducted on 24 hourly basis with respect to the
following parameters
1. Particulate matter (Size less than 10 µm) or PM10
2. Particulate matter (Size less than 2.5 µm) or PM2.5
3. Sulphur dioxide (SO2)
4. Nitrogen dioxide (NO2)
The summary of results of Ambient Air Quality of 36 locations of transmission lines are
presented in Annexure - 1. The results were compared with National Ambient Air Quality
Standards, 2009 as specified by CPCB (Ref. Annexure - 2). ). Air monitoring location maps are
provided in Annexure-7.
D. Water Quality Parameter: The details of monitoring of Surface/Ground Water Quality of 43 locations are presented in
Annexure – 3.1, while the summary of the results are presented in Annexure 3.2. The results of
ground water quality parameters were compared with Indian Standard IS: 10500 and the
surface water quality results were compared with Class C standards as per Indian Standard IS:
2296 (Ref. Annexure – 4). Water monitoring location maps are provided in Annexure-7.
19
E. Ambient Noise Levels:
In the study area of Tranche-I, locations were selected based on the sensitivity and habitations.
Noise monitoring were done at various proposed locations to identify the existing noise level
and to suggest mitigation measures or other control measure to reduce the impacts during the
construction period, though construction activities of transmission lines doesn’t create major
noise impacts at the surroundings. The monitoring of Noise Levels was undertaken at 36
locations. The frequency of monitoring was set at an interval of 30 seconds over a period of 10
minutes per hour for 24-hours.
The results of Noise Levels of 36 locations are presented in Annexure - 5. In India, the Noise
Pollution (Regulation and Control) Rules, 2000 have been framed under the Environment
(Protection) Act, 1986. These are a set of guidelines for regulation and control of noise. The
ambient levels of noise for different areas/zones specified in the rules are indicated in Annexure
- 6. Noise monitoring location maps are provided in Annexure-7.
6.0 Implementation of Grievance Redress Mechanism and Complaints Received from
Stakeholders There are 5 circles under AEGCL for substations and T/Ls. One Grievance Redressal Committee (GRC) cell at each circles level has been formed (i) to provide support to affected persons (AP’s) on problems arising from the environmental activities. (ii) record grievances of the AP’s and resolve them; and (iii) review grievances involving benefits like compensations for private tree loss and assistance to AP’s. A directive in this regard from Director (PMU), ASEB dated January 19, 2012 have been issued to AEGCL and APDCL, who are the Implementing Agencies of the MFF. GRC at circle levels are formed and Project Authorities are the Chairman of respective circles to comply the grievances in regard to environmental activities if any. The GRC constitutes representatives of
i. Concerned Project Authority (IA) Chairman of the committee
ii. One official from the o/o the concerned District Magistrate or SDM (Civil) Member
iii. Concerned Circle Officer or his representative Member iv. Concerned Project Manager (IA) Member v. Deputy General Manager (PMU), APDCL Member vi. AGM, Environment & Social Management Unit (ESMU) Member vii. Land Acquisition Officer (LAO), AEGCL Member viii. Affected Person(s)/Gaon Burha Member
Grievance Redress Committee (GRC) set up at circle level to monitor subproject implementation for each subproject affected area. The GRC will determine the merit of each grievance, and resolve grievances within an outer time limit of three months of receiving the complaint. The AP has the right to refer the grievances to appropriate courts of law if not satisfied with the redress at any stage of the process. The set up GRC has the system of records keeping, contact details of complainant, date of the complaint received, nature of grievance etc. if any for the ongoing project and taking the necessary action against the complaint.
20
During this reporting period no formal complaint or grievances from have been registered
7.0 Conclusion and Recommendations In order to have a sustainable development in the project the emphasis on the implementation of EMP has been given top most priority. The EMP prepared for the project was made part of the bid document and the contractor was made responsible for the implementation of EMP. The bid conditions require the contractor to adopt best construction practices which include most of the mitigation measures suggested in the EMP. Environment and Social Cell was constituted for closely monitoring of implementation of EMP by the contractor. A grievance redressal committee has been constituted with due representation to the people residing near to the project site. Complaints, if any, received will be recorded. The copy of the complaint together with the corrective action taken by the contractor will be placed before the committee immediately. The contractor will implement the decision taken by the committee. No complaint has been recorded during this period. Proper training on environmental issues during project implementation and EMP implementation is being organized for the staff and officers of the contractor and implementation agency. The Implementing Agency, AEGCL & APDCL, will give more attention towards the implementation of EMP and project will be implemented in compliance with environmental regulations of the country and environment covenant of Loan Agreement.
21
Annexure – 1
Summary Ambient Air Quality Results
Sl. No.
Location Name
Longitude (E)
Latitude (N)
Monitoring Date
Concentration µg/m3
Area Category Remarks/Reasons PM10 PM2.5 SO2 NO2
1. Construction of new 220 KV Double Circuit Transmission line Salakati (BTPS) – Rangia (163.187 km)
1 Goroimari
(A22) 90°48'31.1"
26°32'4.6"
6/1/2013 96.24 34.23 4.69 4.5 Residential
All the parameters are within permissible limits as per CPCB ambient air quality norms.
2 Patkata (A23)
90°49'57.8"
26°31'21.8"
6/1/2013 186.16 73.77 5 4.5 Residential
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring. Burning of wood in the fireplace of surrounding houses makes the sampling area with high PM10 and PM2.5 conc.
3 Bogriguri/ Peragaon
(A24)
90°51'44.7"
26°31'55.8"
8/1/2013 231.44 70.90 7 4.5 Residential
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring. High wind speed was recorded during sampling
time. This increase the particulate matter in the atmosphere.
4 Burikhamar
(A25) 90°52'36.0"
26°32'51.4"
7/1/2013 222.14 83.18 6 4.5 Rural
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring. Burning of waste nearby the sampling point which
contributes to the high concentration of particulate matter.
5 Golapara
(A26) 90°53'6.8"
26°32'53.9"
7/1/2013 139.10 51.87 11 6.29 Residential
The PM10 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring.
6 Barapeta
(A27) 90°57'10.0"
26°33'35.7"
8/2/2013 265.57 137.4 2 3.42
Rural
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring. Winds from the nearby dusty area increase the
particulate matter concentration at the sampling area and hence high concentration of PM10 and PM2.5 was observed.
7 Datora/Uttar Chafakamar
(A28)
90°59'7.6"
26°34'18.8"
9/2/2013 264.98 144.75 0.69 4.12 Rural
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring. Vehicular movement on the nearby road contributes
to the high particulate matter concentration.
8 Kalapani
(A29) 91°1'38.2"
26°35'1.2"
10/2/2013 262.25 133.49 1.63 6.51 Rural
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring. Sand storm was recorded which increase the
concentration of particulate matter
22
Sl. No.
Location Name
Longitude (E)
Latitude (N)
Monitoring Date
Concentration µg/m3
Area Category Remarks/Reasons PM10 PM2.5 SO2 NO2
9 Anand
Bazar (A30) 91°3'23.5" 26°35'16.6" 11/2/2013 185.22 82.36 6.12 12.58 Residential
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring. Burning of wood in the fireplace of surrounding
houses makes the area with high concentration PM10 and PM2.5.
10 Haripur (A31)
91°5'32.4"
26°35'14.7"
12/2/2013 99.77 26.2 2.79 7.55 Rural All the parameters are within permissible limits as per CPCB national ambient air quality standard limits
11 Paschim Hakatup
(A32)
91°8'9.7"
26°35'52.6"
13/2/2013 187.21 75.96 1.69 7.52 Residential
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring. Vehicular movement on the nearby the sampling
point contributes to the high concentration of particulate matter.
12 Maharani
(A33) 91°9'45.1"
26°35'51.8"
16/2/2013 193.33 81.44 6.3 16.16 Residential
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring. Various construction work was going on the
sampling area which contribute to the high particulate matter concentration.
13 Uluya (A34) 91°12'28.2"
26°34'40.2"
17/2/2013 167.62 76.3 5.16 14.12 Residential
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring.
14 Katanipara
(A35) 91°14'46.4"
26°36'0.2"
18/2/2013 177.44 71.93 9.06 23.25 Residential
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring.
15 Kotobar (A36)
91°17'35.5"
26°36'23.7"
19/2/2013 182.14 65.47 8.76 16.71 Rural The PM10, PM2.5 concentration is above the CPCB national ambient air standard limits due to Smog formation during time of monitoring.
16 Pamunapath
ar (A37) 91°18'2.7"
26°36'25.1"
20/2/2013 142.34 63.47 4.83 10.58 Residential
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring..
17 Galdinpara
(A38) 91°19'11.8"
26°35'50.0"
22/2/2013 161.76 86.46 13.01 25.02 Rural
The PM10, PM2.5 concentration is above the CPCB national ambient air standard limits due to Smog formation during time of monitoring.
18 Bernabari
(A39) 91°21'24.4"
26°35'48.3"
19/2/2013 37.36 31.22 4.73 12.45 Residential
All the parameters are within permissible limits as per CPCB national ambient air quality standard limits
19 Shilahuti
(A40) 91°23'32.6"
26°36'04.4"
18/2/2013 74.85 23.71 5.63 15.93 Residential
All the parameters are within permissible limits as per CPCB national ambient air quality standard limits due to
20 Hukuchiapar
a (A41) 91°25'36.9"
26°35'13.9"
17/2/2013 291.04 161.3 6.9 17.1 Residential
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring. Vehicular movement nearby the sampling area also
contributes to the high particulate matter concentration.
23
Sl. No.
Location Name
Longitude (E)
Latitude (N)
Monitoring Date
Concentration µg/m3
Area Category Remarks/Reasons PM10 PM2.5 SO2 NO2
21 Angardhowa
(A42) 91°27'51.0"
26°35'57.0"
16/2/2013 112.93 102.33 6.22 14.36 Residential
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring. Vehicular movement nearby the sampling area also
contributes to the high particulate matter concentration.
22 Horharia
(A43) 91°30'38.1"
26°35'57.0"
15/2/2013 149.73 49.97 3.96 9.25 Residential
The PM10, concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring.
23 Kallaipur
(A44) 91°29'11.9"
26°33'04.6"
14/2/2013 106.32 14.57 9.23 23.67 Residential
The PM10 concentration is above the CPCB national ambient air standard limits due to Smog formation during time of monitoring.
24 Bhadrabang
al (A45) 91°32'12.6"
26°32'13.2"
13/2/2013 128.63 95.79 7.19 16.13 Residential
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring.
25 Sunkuira
(A46) 91°32'23.1"
26°31'35.8"
12/2/2013 137.18 78.51 6.84 14.15 Residential
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring.
26 Ichhapur
(A47) 91°34'25.0"
26°30'25.6"
11/2/2013 124.97 91.03 8.24 12.52 Residential
The PM10, PM2.5 concentration is above the national ambient air quality standard limits due to Smog formation during time of monitoring. Vehicular movement contributes to the high
concentration of particulate matter.
27 Dhingitola
(A48) 91°35'48.7"
26°28'54.0"
10/2/2013 107.74 92.09 6.66 11.39 Residential
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring.
28 Near
Chenimara (A49)
91°37'34.0"
26°29'2.5”
9/2/2013 111.78 108.18 6.37 8.81 Residential The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring.
29 Near
Chirakundi (A50)
91°38'36.4"
26°27'11.4"
8/2/2013 106.76 67.56 3.96 12.45
Residential
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring.
2. 132 kV Double Circuit LILO at Kamalpur from 132 kV Double Circuit Rangia – Kahilipara / Sishugram line. (0.5 km)
1 Bonbari (A1) 91°42'45.7"
26°20'49.4"
7/2/2013 116.03 73.13 6.37 7.55 Residential
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring. Construction activities nearby.
3. 132 kV Double Circuit LILO at Sonari from 132 kV Lakwa – Namrup line (4.00 km)
1 Tiyak
Rajabari (A1)
95°3'10.9"
27°1'51.0"
9/1/2013 112 100 2 4.5 Rural The PM10, PM2.5 concentration is slightly above the CPCB national ambient air quality standard limits due to Smog formation during time of monitoring.
4. 132 kV Double Circuit LILO at Bihiating LILO from 132 kV Dibrugarh – Moran line (0.642 km)
1 Near
Mainabari TG (A1)
94°55'16.4"
27°25'20.6"
7/1/2013 83.38 58.30 2 4.5 Rural All the parameters are within permissible limits as per CPCB national ambient air quality standard limits
24
Sl. No.
Location Name
Longitude (E)
Latitude (N)
Monitoring Date
Concentration µg/m3
Area Category Remarks/Reasons PM10 PM2.5 SO2 NO2
5. 132 kV Double Circuit LILO at Rupai from 132 kV Double Circuit Tinsukia – Margherita line (29.647km)
1 Dhimukhia
TG (A7) 95°31'26.5"
27°36'4.8"
1/1/2013 172.00 120.23 2 4.5 Rural
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during the time of monitoring. Presence of the oil and natural gas fields increase
the PM10 and PM2.5 concentration in the area
2 Prabhat TG
(A8) 95°33'1.1"
27°36'35.3"
4/1/2013 194.00 126.52 2 13 Rural
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during the time of monitoring as
described above. Presence of the oil and natural gas fields increase
the PM10 and PM2.5 concentration in the area. Moreover, human activities as well as vehicular
movement on the nearby road increase the concentration of particulate matter at the location.
3 Tiphuk TG
(A9) 95°33'35.1"
27°36'50.0"
2/1/2013 162.00 110.0 2 4.5 Rural
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during the time of monitoring. Presence of the oil and natural gas fields increase
the PM10 and PM2.5 concentration in the area.
4 Near Rupai S/S (A10)
95°34'2.2"
27°35'50.0"
3/1/2013 125.00 92.13 2 4.5 Residential
The PM10, PM2.5 concentration is above the CPCB national ambient air quality standard limits due to Smog formation during the time of monitoring. Presence of the oil and natural gas fields increase
the PM10 and PM2.5 concentration in the area.
25
Annexure – 2
National Ambient Air Quality Standards, CPCB 2009
Concentration in Ambient Air
Pollutant Time
Weighted Average
Industrial, Residential, Rural and
Other Area
Ecologically Sensitive Area
(notified by Central
Government)
Method of Measurement
Sulphur Dioxide (SO2)
µg/m3
Annual* 50 20 Improved West and Geake Method Ultraviolet Fluorescence
24 hours** 80 80
Oxides of Nitrogen (NOx)
µg/m3
Annual* 40 30
Jacob & Hochheiser Modified (Na-Arsenite) Method Chemiluminescence
24 hours** 80 80 Gas Phase Chemiluminescence
Particulate Matter (Size less than 10 µm) or PM10
µg/m3
Annual* 60 60
Gravimetric TOEM Beta attenuation
24 hours** 100 100
Particulate Matter (Size less than 2.5 µm) or PM2.5
µg/m3
Annual* 40 40
Gravimetric TOEM Beta attenuation
24 hours** 60 60
Ozone (O3) µg/m3
8 hours** 100 100 UV Photometric Chemiluminescence Chemical Method
1 hour** 180 180
Lead (Pb) µg/m3
Annual* 0.5 0.5 ASS/ ICP Method after sampling on EPM 2000 or equivalent Filter paper ED – XRF using Teflon filter
24 hours** 1.0 1.0
Carbon Monoxide
(CO) mg/m3
8 hours** 02 02 Non Dispersive Infra Red
(NDIR) Spectroscopy 1 hour** 04 04
Ammonia (NH3) µg/m3
Annual* 100 100 Chemiluminescence Indophenol blue method 24 hours** 400 400
26
Concentration in Ambient Air
Pollutant Time
Weighted Average
Industrial, Residential, Rural and
Other Area
Ecologically Sensitive Area
(notified by Central
Government)
Method of Measurement
Benzene (C6H6) µg/m3
Annual* 05 05
Gas Chromatography based continuous analyzer Adsorption and Desorption followed by GC analysis
Benzo (a) pyrene (BaP) – Particulate phase only,
ng/m3
Annual* 01 01 Solvent extraction followed by HPLC/GC analysis
Arsenic (As) ng/m3
Annual* 06 06 AAS/ICP method after sampling on EPM 2000 or equivalent filter paper
Nickel (Ni) ng/m3
Annual* 20 20 AAS/ICP method after sampling on EPM 2000 or equivalent filter paper
*Annual Arithmetic mean of minimum 104 measurements in a year at a particular site taken twice a week 24 hourly at uniform interval. **24 hourly or 08 hourly or 01 hourly monitored values, as applicable, shall be complied with 98% of the time in a year. 2% of the time, they may exceed the limits but not on two consecutive days of monitoring.
27
Annexure – 3.1 Details of Water Quality Monitoring Locations (Along Transmission Lines)
Sl.
No.
Angle
Point
Location
Name
Longitude
(E)
Latitude
(N)
Monitoring
Date Water Type Source Remarks/Reasons
1. Construction of new 220 KV Double Circuit Transmission line Salakati (BTPS) – Rangia (163.187 km)
1 AP-61 Lahtipara 90°44'3.8" 26°33'2.9"
08.01.13
Ground water Tube well All the parameters were observed within permissible limit.
2 AP-64 Sonaikhola
(Bagorgaon) 90°45'54.4" 26°32'16.8"
08.01.13
Surface water Sonai River
Water sample were taken from Bagorgaon nearest to
Sonaikhola proposed location.
All the parameters are within the permissible limits
3 AP-68
Deotori
(Goraimari) 90°52'55.8" 22°1'19.1"
08.01.13
Ground water Tube well
Water sample were taken within buffer area at Goraimari.
Alkanity, Total Hardness and Fluoride were observed high at
this location as per IS:10500.
4 AP-70 Patkata
(Ujandubi) 90°49'56.8" 26°31'22.9"
08.01.13
Ground water Tara Pump
Water sample were taken at (Ujandubi) nearest location of
Patkata, located within buffer area of proposed sampling
location.
All the parameters were observed within the permissible limit
5 AP-76B Burikhamar 90°58'37.9" 26°32'55.9"
08.01.13
Ground water Tara Pump
Water sample were taken at Dakhin Barikhamar nearest
location of Burikhamar, located within buffer area of
proposed sampling location.
Total Alkanity and Total Hardness were observed high at
this location as per IS: 10500.
6 AP-77
Datora/
Surikhamar
(Golapara/
Kamargaon)
90°53'9.3" 26°32'56.8"
8.01.13
SW/GW Naljara River
Tube well
Water sample were taken at Golapara nearest to Datora/
Surikhamar located within buffer area of proposed sampling
location.
7 AP-85 Barapeta 90°57'10.0" 26°33'35.7" 23.02.13 Ground Water Tube well All the parameters were observed within permissible limit.
8 AP-89 Datora/Uttar
Chafakamar 90°59'7.6" 26°34'18.8" 23.02.13 Ground Water Tube well All the parameters were observed within permissible limit.
9 AP-95 Kalapani 91°1'38.2" 26°35'1.2" 23.02.13 Ground Water Tube well All the parameters were observed within permissible limit.
10 AP-99 Anand Bazar 91°3'12.1" 26°34'53.0" 23.02.13 Surface Water Pathla N All the parameters were observed within permissible limit.
11 AP-102 Haripur 91°5'2.6" 26°35'2.9" 23.02.13 Surface Water Stream All the parameters were observed within permissible limit.
12 AP-105 Paschim
Hakatup 91°8'9.7" 26°35'52.6" 23.02.13 Ground Water Tube well All the parameters were observed within permissible limit.
13 AP-109 Maharani 91°9'45.1" 26°35'51.8" 23.02.13 Ground Water Tube Well All the parameters were observed within permissible limit.
14 AP-113 Uluya 91°12'28.2" 26°34'40.2" 23.02.13 Ground Water Tube Well All the parameters were observed within permissible limit.
15 AP-117 Katanipara 91°14'46.4" 26°36'0.2" 23.02.13 Ground Water Tube Well All the parameters were observed within permissible limit.
16 AP-119 Kotobar 91°17'35.5" 26°36'23.7" 23.02.13 Ground Water Tube well All the parameters were observed within permissible limit.
17 AP-120A Pamunapathar 91°18'2.7" 26°36'25.1" 23.02.13 SW/GW Mora River/ All the parameters were observed within permissible limit.
28
Sl.
No.
Angle
Point
Location
Name
Longitude
(E)
Latitude
(N)
Monitoring
Date Water Type Source Remarks/Reasons
Tube Well
18 AP-121 Galdinpara 91°19'11.8" 26°35'50.0" 23.02.13 Surface Water Mora River All the parameters were observed within permissible limit.
19 AP-127 Bernabari 91°21'23.6" 26°35'48.2" 23.02.13 SW/ GW Mora River/
Tube Well All the parameters were observed within permissible limit.
20 AP-130 Shilahuti 91°23'32.5" 26°36'04.6" 21.02.13 SW/ GW Pagaldia
River/ All the parameters were observed within permissible limit.
21 AP-134 Dukuchiapara 91°25'36.4" 26°35'12.7" 21.02.13 SW/ GW
Lakhipar
River/Tube
Well
All the parameters were observed within permissible limit.
22 AP-137B Angardhowa 91°27'53.1" 26°36'57.1" 21.02.13 Ground Water Tube well All the parameters were observed within permissible limit.
23 AP-145 Horharia 91°29'11.8" 26°35'02.8" 21.02.13 SW/ GW
Chengai
River/ Tube
Well
All the parameters were observed within permissible limit.
24 AP-150 Kallaipur 91°30'37.8" 26°33'06.2" 21.02.13 SW/ GW
Pagaldia
River/ Tube
Well
All the parameters were observed within permissible limit.
25 AP-152B Bhadrabangal 91°32'11.9" 26°32'12.9" 21.02.13 Ground Water Tube Well All the parameters were observed within permissible limit.
26 AP-154 Sunkuira 91°32'22.5" 26°31'36.7" 21.02.13 Ground Water Tube Well All the parameters were observed within permissible limit.
27 AP-157 Ichhapur 91°34'25.9" 26°30'26.2" 21.02.13 SW/ GW Nona River/
Tube Well All the parameters were observed within permissible limit.
28 AP-163 Dhingitola 91°35'48.2" 26°28'55.4" 21.02.13 Ground Water Tube Well All the parameters were observed within permissible limit.
29 AP-166 Near
Chenimara 91°37'34.1" 26°29'04.0" 21.02.13 SW/ GW
Borolia
River/T well
All the parameters were observed within permissible limit.
30 AP-173 Near
Chirakundi 91°38'20.0" 26°27'00.7" 21.02.13 Ground Water Tube well All the parameters were observed within permissible limit.
2. 132 kV Double Circuit LILO at Kamalpur from 132 kV Double Circuit Rangia – Kahilipara / Sishugram line. (0.5 km)
1 X Bonbari 91°42'46.0" 26°20'48.4" 21/2/2013 SW/GW
Kalajan
River/Tube
well
All the parameters were observed within permissible limit
3. 132 kV Double Circuit LILO at Sonari from 132 kV Lakwa – Namrup line (4.00 km)
1 TWR-11
Tiyak
Rajabari
(Near Sonari
Substation)
95°3'1.8" 27°1'53.2" 10/01/2013
GW/SW
River/Tube
well
At this location it was observed that Turbidity is above the
permissible limit of as Indian standard (IS : 10500). Probable
reasons can be due to presence of inorganic particles (silt,
clay etc.)
4. 132 kV Double Circuit LILO at Bihiating LILO from 132 kV Dibrugarh – Moran line (0.642 km)
1 AP-1 Near
Mainabari TG 94°55'13.9" 27°25'16.8" 7/01/2013 Ground Water Tube Well
All the water quality parameters are within permissible limits
as per Indian drinking water (IS: 10500) standards.
29
Sl.
No.
Angle
Point
Location
Name
Longitude
(E)
Latitude
(N)
Monitoring
Date Water Type Source Remarks/Reasons
5. 132 kV Double Circuit LILO at Rupai from 132 kV Double Circuit Tinsukia – Margherita line (29.647km)
1 AP-1
Anandbari TG 95°29'20.7" 27°28'8.9" 6/01/2013 Ground Water Tube well All the parameters were observed within permissible limit.
2 AP-6 Bangali
Balijan No. 2 95°29'10.3" 27°28'37.8" 6/01/2013 Ground Water Tube well
At this location it was observed that Turbidity is above the
permissible limit as Indian standard (IS : 10500).
3 AP-9
Near Railway
Crossing
(Hapjan)
95°27'18.5" 27°29'46.7" 6/01/2013 Ground Water Tube well
All the parameters were observed within permissible limit.
4 AP-13 Amguri
(Hapjan) 95°27'15.3" 27°31'58.4" 6/01/2013 SW/GW
Hapjan
River/Tube
Well
At this location surface quality were found within the
permissible limit but Turbidity parameter of Ground water
quality were observed higher than the IS: 10500 standard of
drinking water quality. Probable reasons can be due to
presence of inorganic particles
5 AP-17 Hilika TG 95°28'47.9" 27°32'46.3"N 6/01/2013 Ground Water Tube well All the parameters were observed within permissible limit.
6 AP-19
Near
Pabhojan
(Deamooli)
95°28'38.1" 27°35'46.8" 6/01/2013 SW/GW
Dibru
River/Tube
well
All the parameters were observed within permissible limit.
7 AP-22 Dhimukhia TG 95°31'30.7" 27°35'46.9" 6/01/2013 SW/GW Tiphuk
jan/Tube well All the parameters were observed within permissible limit.
8 AP-25 Tiphuk TG
95°33'29.0" 27°37'34.0" 6/01/2013 SW/GW
Tiphuk
Jan/Tubewell All the parameters were observed within permissible limit.
9 AP-27
Railway
Crossing
(Prabhat TG)
95°32'22.7" 27°37'1.0" 6/01/2013 SW/GW Tiphuk
Jan/Tubewell All the parameters were observed within permissible limit.
10 AP-30 Near Rupai
S/S 95°27'33.2" 27°35'57.3" 6/01/2013 Ground Water Tubewell All the parameters were observed within permissible limit.
Note: GW denotes Ground Water and SW denotes Surface Water
30
Annexure – 3.2
Summary of Water Quality Results (Along Transmission Lines)
1. 220 KV Double Circuit Transmission line Salakati (BTPS) – Rangia (163.187 km)
Ground Water:
Locations
Para
mete
rs
pH
Tu
rbid
ity (
NT
U)
Sp
ecif
ic
Co
nd
ucta
nc
e
(µm
oh
s/c
m)
T.D
.S. (m
g/l
)
Ch
lori
de
(a
s C
l) (
mg
/l)
To
tal
Alk
alin
ity
as C
aC
O3 (
mg
/l)
To
tal
Hard
ne
ss
as C
aC
O3 (m
g/l
)
Calc
ium
as C
a (
mg
/l)
Su
lph
ate
as S
O4 (
mg
/l)
Ars
en
ic a
s A
s
Nit
rate
as N
O2
(mg
/l)
Mag
ne
siu
m
as M
g (
mg
/l)
Flu
ori
de
(as F
) (m
g/l
)
Sele
niu
m
(as S
e)
(mg
/l)
Cad
miu
m
(as C
d)
(mg
/l)
Co
pp
er
(a
s C
u)
( m
g/l)
Le
ad
(a
s P
b)
(mg
/l)
Zin
c
(as Z
n)
(mg
/l)
Standard IS: 10500
6.5-8.5 5 - 500 250 200 300 75 200 0.05 45 - 1 0.01 0.01 0.05 0.01 5
Lahoti Para (GW20) 5.95 3.6 100 40 16 84 28 0.78 5 BDL 0.1 1 0.4 <0.01 <0.01 <0.01 <0.01 0.07
Bagorgaon (GW21) 6 1 71 70 4 60 40 1.08 3.5 BDL 0.13 1.08 0.52 <0.01 <0.01 <0.01 <0.01 0.08
Deotori (Goraimari) (GW22)
7.19 1 570 390 14 320 380 9.31 24.5 BDL 0.92 15.63 1.21 <0.01 <0.01 <0.01 <0.01 0.08
Ujandubi (Patkata) (GW23)
7.2 20.4 490 350 8 300 76 3.43 5.5 BDL BDL 0.49 0.9 <0.01 <0.01 <0.01 <0.01 0.04
Pera gaon (GW24) 6.78 0.9 116 90 6 70 70 1.57 5.5 BDL 0.27 3.13 0.54 <0.01 <0.01 <0.01 <0.01 0.06
Dakhin Barikhamar (GW25)
7.13 0.6 460 330 4 290 330 8.82 31.5 BDL 0.02 12.34 0.04 <0.01 <0.01 <0.01 <0.01 0.02
Golapara (GW26) 6.61 0.5 85 60 4 60 200 1.96 6 BDL 0.31 13.16 <0.01 <0.01 <0.01 <0.01 <0.01 0.04
Borapeta (GW27) 5.78 0.3 210 140 4.0 130 76 2.25 1.5 BDL BDL 2.47 <0.01 <0.01 <0.01 <0.01 <0.01 0.04
Dotora (GW 28) 5.93 0.2 290 190 6.0 160 108 2.84 5.0 BDL BDL 4.11 0.41 <0.001 <0.001 <0.03 <0.01 <0.1
Kalapani (GW29) 5.93 0.3 210 130 4.0 120 80 2.06 7.0 BDL BDL 3.13 0.33 <0.001 <0.001 <0.03 <0.01 <0.1
Anand Bazer (GW30) 5.97 0.2 200 140 6.0 100 78 3.16 6.0 BDL BDL 2.80 0.34 <0.001 <0.001 <0.03 <0.001 <0.1
Haripur (GW31) 5.86 0.2 220 150 6.0 100 56 2.55 17.5 BDL BDL 0.33 0.42 <0.001 <0.001 <0.03 <0.001 <0.1
Pasehim Hakatup (GW32)
5.88 0.3 210 140 6.0 130 78 2.45 26.5 BDL BDL 2.30 0.17 <0.001 <0.001 <0.03 <0.001 0.14
31
Locations
Para
mete
rs
pH
Tu
rbid
ity (
NT
U)
Sp
ecif
ic
Co
nd
ucta
nc
e
(µm
oh
s/c
m)
T.D
.S. (m
g/l
)
Ch
lori
de
(a
s C
l) (
mg
/l)
To
tal
Alk
alin
ity
as C
aC
O3 (
mg
/l)
To
tal
Hard
ne
ss
as C
aC
O3 (m
g/l
)
Calc
ium
as C
a (
mg
/l)
Su
lph
ate
as S
O4 (
mg
/l)
Ars
en
ic a
s A
s
Nit
rate
as N
O2
(mg
/l)
Mag
ne
siu
m
as M
g (
mg
/l)
Flu
ori
de
(as F
) (m
g/l
)
Sele
niu
m
(as S
e)
(mg
/l)
Cad
miu
m
(as C
d)
(mg
/l)
Co
pp
er
(a
s C
u)
( m
g/l)
Le
ad
(a
s P
b)
(mg
/l)
Zin
c
(as Z
n)
(mg
/l)
Standard IS: 10500
6.5-8.5 5 - 500 250 200 300 75 200 0.05 45 - 1 0.01 0.01 0.05 0.01 5
Moharani (GW33) 5.73 0.3 210 150 8.0 120 88 2.25 21.5 BDL BDL 3.45 0.42 <0.001 <0.001 <0.03 <0.01 <0.1
Uluya Gaon (GW34) 5.82 0.3 210 150 6.0 140 72 2.16 31.5 BDL BDL 2.30 0.43 <0.001 <0.001 <0.03 <0.001 <0.1
Katanipara (GW35) 5.86 0.2 220 150 8.0 90 62 2.16 10.5 BDL BDL 3.13 0.44 <0.001 <0.001 <0.03 <0.001 <0.1
Kotabar (GW36) 6.07 0.2 220 150 6.0 120 126 2.45 19.0 BDL BDL 6.25 0.43 <0.001 <0.001 <0.03 <0.001 <0.1
Pamunapathar (GW37) 6.11 0.3 210 150 6.0 120 60 1.26 15.5 BDL BDL 1.32 0.41 <0.001 <0.001 <0.03 <0.01 <0.1
Galdinpara (GW38) 6.12 0.2 240 150 10.0 120 98 3.33 41.5 BDL BDL 2.48 0.41 <0.001 <0.001 <0.03 <0.001 <0.1
Bernabari (GW39) 5.6 0.2 150 90 2.0 80 44 1.1 5.0 BDL 0.02 1.81 0.15 0.05 <0.001 <0.001 <0.001 <0.1
Shitahuti (GW40) 5.64 0.2 250 150 6.0 140 98 3.23 4.0 BDL BDL 2.63 0.10 <0.001 <0.001 <0.03 <0.001 <0.1
Dukuchiapara (GW41) 5.62 0.3 250 150 6.0 130 86 2.74 15 BDL BDL 2.47 0.21 <0.001 <0.001 <0.03 <0.001 <0.1
Angardhowa (GW42)
5.55 0.2 190 120 8.0 100 66 1.57 1.5 BDL BDL 2.8 0.35 <0.001 <0.001 <0.03 <0.001 <0.1
Horharia (GW43) 5.56 0.3 290 180 2.94 150 104 2.94 2.5 BDL BDL 3.62 0.82 <0.001 <0.001 <0.03 <0.001 <0.1
Kallaiapara (GW44) 5.52 0.2 200 130 6.0 110 62 1.76 40 BDL BDL 2.14 0.57 <0.001 <0.001 <0.03 <0.001 <0.1
Bhadra Bangal(GW45) 5.5 0.2 130 100 8.0 70 66 2.94 12.5 BDL BDL 0.49 0.11 <0.001 <0.001 <0.03 <0.001 <0.1
Sunkuriha(GW46) 5.54 0.2 220 130 4.0 120 80 2.3 5.0 BDL BDL 2.63 0.33 <0.001 <0.001 <0.03 <0.001 <0.1
Icchapur(GW47) 5.51 0.3 240 150 2.0 140 94 2.94 BDL BDL BDL 2.80 0.31 <0.001 <0.001 <0.03 <0.001 <0.1
Dhingitala(GW48) 5.5 0.2 160 100 6.0 80 56 1.37 BDL BDL BDL 2.30 0.19 <0.001 <0.001 <0.03 <0.001 0.24
Chanimara (GW49) 5.48 0.6 300 160 4.0 130 82 2.35 13.5 BDL BDL 2.80 0.27 <0.001 <0.001 <0.03 <0.01 <0.1
Chirakundi (GW50) 5.38 0.2 380 220 8.0 190 150 4.12 3.0 BDL BDL 5.43 0.16 <0.001 <0.001 <0.03 <0.001 <0.1
32
Su
rfac
e W
ate
r:
Lo
catio
ns
Parameters
pH
Iron as (Fe) (mg/l)
D.O. (mg/l)
BOD (mg/l)
Sulphate as (SO4) (mg/l)
Nitrate as (NO3) (mg/l)
Arsenic (mg/l)
Phenol (mg/l)
Chloride (as Cl) (mg/l)
Oil & Grease (mg/l)
T.D.S. (mg/l)
Colour (Hazen Unit)
Copper (as Cu) (mg/l)
Total Chromium
(as Cr) (mg/l)
Fluoride (as F) (mg/l)
Total Coliform
(MPN/100ml)
Cadmium (as Cd) (mg/l)
Selenium (as Se) (mg/l)
Lead (as Pb) (mg/l)
Zinc (as Zn) (mg/l)
Chromium (as Cr+6)
(mg/l)
Bag
org
ao
n (S
W21)
3.2
4
0.1
4
6.4
2.7
13
BD
L
BD
L
Nil
6
Nil
260
5 a
ppare
nt
<0.0
1
<0.0
1
1.0
2
240
0
<0.0
1
<0.0
1
<0.0
1
0.0
9
<0.0
1
Go
lap
ara
(SW
26)
6.9
B
DL
6.9
3.2
14
0.1
3
BD
L
Nil
4
Nil
230
10
appare
nt
<0.0
1
<0.0
1
0.0
4
2900
<0.0
1
<0.0
1
<0.0
1
0.0
4
<0.0
1
2.
132 k
V D
ou
ble
Circ
uit L
ILO
at K
am
alp
ur fro
m 1
32 k
V D
ou
ble
Circ
uit R
an
gia
– K
ah
ilipa
ra / S
ish
ug
ram
line. (0
.5 k
m)
Gro
un
d W
ate
r
L
oc
atio
n
Parameters
pH
Turbidity (NTU)
Specific Conductance (µmohs/cm)
T.D.S. (mg/l)
Chloride (as Cl) (mg/l)
Total Alkalinity as CaCO3 (mg/l)
Total Hardness as CaCO3 (mg/l)
Calcium as Ca (mg/l)
Sulphate as SO4 (mg/l)
Arsenic as As
Nitrate as NO2 (mg/l)
Magnesium as Mg (mg/l)
Fluoride (as F) (mg/l)
Selenium (as Se) (mg/l)
Cadmium (as Cd) (mg/l)
Copper (as Cu) ( mg/l)
Lead (as Pb) (mg/l)
Zinc (as Zn) (mg/l)
Sta
nd
ard
IS
: 10500
6.5
-8.5
5
- 500
250
200
300
75
200
0.0
5
45
- 1
0.0
1
0.0
1
0.0
5
0.0
1
5
Bonbari
5.6
6
0.2
280
150
4.0
130
78
2.3
5
17.5
B
DL
BD
L
2.4
5
0.2
5
<0.0
01
<0.0
01
<0.0
3
<0.0
1
0.1
5
Su
rfac
e W
ate
r
Lo
catio
n
Parameters
pH
Iron as (Fe) (mg/l)
D.O. (mg/l)
BOD (mg/l)
Sulphate as (SO4) (mg/l)
Nitrate as (NO3) (mg/l)
Arsenic (mg/l)
Phenol (C6H5OH) (mg/l)
Chloride (as Cl) (mg/l)
Oil & Grease (mg/l)
T.D.S. (mg/l)
Colour (Hazen Unit)
Copper (as Cu) (mg/l)
Total Chromium (as Cr) (mg/l)
Fluoride (as F) (mg/l)
Total Coliform (MPN/100ml)
Cadmium (as Cd) (mg/l)
Selenium (as Se) (mg/l)
Lead (as Pb) (mg/l)
Zinc (as Zn) (mg/l)
Chromium (as Cr+6)) (mg/l)
Bo
nb
ari
6
0.1
8
7.1
0.3
17.5
B
DL
BD
L
Nil
150
N
il 150
5.0
Appa
rent
<0.0
3
<0.0
3
0.1
9
390
<
0.0
01
<0.0
01
<0.0
01
<
0.1
<
0.0
3
33
3.
132 k
V D
ou
ble
Circ
uit L
ILO
at S
on
ari fro
m 1
32 k
V L
akw
a –
Nam
rup
line (4
.00 k
m)
Gro
un
d W
ate
r
L
oc
atio
n
Parameters
pH
Turbidity (NTU)
Specific Conductance (µmohs/cm)
T.D.S. (mg/l)
Chloride (as Cl) (mg/l)
Total Alkalinity as CaCO3 (mg/l)
Total Hardness as CaCO3 (mg/l)
Calcium as Ca (mg/l)
Sulphate as SO4 (mg/l)
Arsenic as As (mg/l)
Nitrate as NO2 (mg/l)
Magnesium as Mg (mg/l)
Fluoride (as F) (mg/l)
Selenium (as Se) (mg/l)
Cadmium (as Cd) (mg/l)
Copper (as Cu) (mg/l)
Lead (as Pb) (mg/l)
Zinc (as Zn) (mg/l)
Sta
nd
ard
IS
: 10500
6.5
-8.5
5
- 500
250
200
300
75
200
0.0
5
45
- 1
0.0
1
0.0
1
0.0
5
0.0
1
5
Tiy
ak R
aja
ba
ri (G
W1)
6.6
4
17
220
150
2
140
118
1.8
6
11.5
B
DL
BD
L
6.5
8
0.2
8
<0.0
1
<0.0
1
<0.0
1
<0.0
1
0.0
5
Su
rfac
e W
ate
r
Lo
catio
n
Parameters
pH
Iron as Fe (mg/l)
D.O. (mg/l)
BOD (mg/l)
Sulphate as SO4 (mg/l)
Nitrate as NO3 (mg/l)
Arsenic as As (mg/l)
Phenolic Compounds
as C6H5OH (mg/l)
Chloride (as Cl) (mg/l)
Oil & Grease (mg/l)
T.D.S. (mg/l)
Colour (Hazen Unit)
Copper (as Cu) (mg/l)
Total Chromium (as Cr) (mg/l)
Fluoride (as F) (mg/l)
Total Coliform (MPN/100ml)
Cadmium (as Cd) (mg/l)
Selenium (as Se) (mg/l)
Lead (as Pb) (mg/l)
Zinc (as Zn) (mg/l)
Chromium (as Cr+6) (mg/l)
Tiy
ak R
aja
ba
ri (S
W1)
5.8
2
0.1
2
7.6
1.2
23.0
0.0
5
BD
L
Nil
8.0
N
il 20
5.0
appare
nt
<0.0
1
<0.0
1
<0.0
1
4600
<0.0
1
<0.0
1
<0.0
1
0.0
2
<0.0
1
34
4. 132 kV Double Circuit LILO at Bihiating LILO from 132 kV Dibrugarh – Moran line (0.642 km)
Ground Water
5. 132 kV Double Circuit LILO at Rupai from 132 kV Double Circuit Tinsukia – Margherita line, (29.647km) Ground Water
P
ara
mete
r
pH
Tu
rbid
ity (
NT
U)
Sp
ecif
ic C
on
du
cta
nc
e
(µm
oh
s/c
m)
T.D
.S. (m
g/l
)
Ch
lori
de
(a
s C
l) (
mg
/l)
To
tal
Alk
alin
ity
as C
aC
O3 (
mg
/l)
To
tal
Hard
ne
ss
as C
aC
O3 (m
g/l
)
Calc
ium
a
s C
a (
mg
/l)
Su
lph
ate
a
s S
O4 (
mg
/l)
Ars
en
ic
as A
s (
mg
/l)
Nit
rate
as N
O2 (
mg
/l)
Mag
ne
siu
m
as M
g (
mg
/l)
Flu
ori
de
(as F
) (m
g/l
)
Sele
niu
m
(as S
e)
(mg
/l)
Cad
miu
m
(as C
d)
(mg
/l)
Co
pp
er
(a
s C
u)
(mg
/l)
Le
ad
(a
s P
b)
(mg
/l)
Zin
c
(as Z
n)
(mg
/l)
Location Standard IS: 10500
6.5-8.5
5 - 500 250 200 300 75 200 0.05 45 - 1 0.01 0.01 0.05 0.01 5
Anandabag T.E (GW1) 5.89 1.9 117 70 8 50 5 1.08 8.5 BDL 0.04 2.3 0.06 <0.01 <0.01 <0.01 <0.01 0.04 Bangali Balijan (GW2) 6.29 29 145 100 8 60 68 1.76 17.5 BDL 0.005 2.63 <0.01 <0.01 <0.01 <0.01 <0.01 0.03
Hapjan T.E. (GW3) 6.03 11.4 110 70 8 60 50 1.27 3.5 BDL BDL 1.97 <0.01 <0.01 <0.01 <0.01 <0.01 0.05 Amguri,
Longsuwal (GW4) 6.03 1.1 133 90 10 70 50 1.37 3 BDL 0.24 1.81 <0.01 <0.01 <0.01 <0.01 <0.01 0.02
Hilika TG (GW5) 6.89 1.2 136 90 18 110 42 1.18 BDL BDL 0.38 1.48 <0.01 <0.01 <0.01 <0.01 <0.01 0.02 Deamoolia TG (GW6) 5.91 1.1 140 90 8 60 64 1.47 5.5 BDL 5.8 2.8 <0.01 <0.01 <0.01 <0.01 <0.01 0.04 Daimukhia TE (GW7) 5.93 10.4 102 60 4 40 52 1.27 1.5 BDL 0.4 2.14 0.17 <0.01 <0.01 <0.01 <0.01 0.05 Prabhat TG (GW8) 6.04 2.4 123 80 16 60 46 1 9 BDL BDL 2.14 0.16 <0.01 <0.01 <0.01 <0.01 0.06 Tiphuk TE (GW9) 5.93 1.2 81 60 10 30 42 1.18 10.5 BDL 0.85 1.48 0.02 <0.01 <0.01 <0.01 <0.01 0.04
Near Rupai SS (GW10) 5.91 2 136 80 4 60 54 1.27 8.5 BDL 0.2 2.3 0.19 <0.01 <0.01 <0.01 <0.01 0.02
Location
Para
mete
rs
pH
Tu
rbid
ity (
NT
U)
Sp
ecif
ic
Co
nd
ucta
nc
e
(µm
oh
s/c
m)
T.D
.S. (m
g/l
)
Ch
lori
de
(C
l) (
mg
/l)
To
tal
Alk
alin
ity
as C
aC
O3 (m
g/l
)
To
tal
Hard
ne
ss
CaC
O3 (
mg
/l)
Calc
ium
C
a (
mg
/l)
Su
lph
ate
S
O4 (m
g/l)
Ars
en
ic (
mg
/l)
Nit
rate
N
O2 (
mg
/l)
Mag
ne
siu
m
Mg
(m
g/l)
Flu
ori
de
(F
) (m
g/l)
Sele
niu
m
(Se)
(mg
/l)
Cad
miu
m
(as C
d)
(mg
/l)
Co
pp
er
(as C
u)
( m
g/l
)
Le
ad
(P
b)
(mg
/l)
Zin
c
(Zn
) (m
g/l
)
Standard IS: 10500
6.5-8.5 5 - 500 250 200 300 75 200 0.05 45 - 1 0.01 0.01 0.05 0.01 5
Mainabari TG (GW1) 6.47 0.4 130 90 6.0 90 60 1.47 6.5 BDL BDL 2.47 <0.01 <0.01 <0.01 <0.01 <0.01 0.02
35
Surface Water
P
ara
mete
rs
pH
Iro
n a
s (
Fe
) (
mg
/l)
D.O
. (
mg
/l)
BO
D (
mg
/l)
Su
lph
ate
as (
SO
4)
(m
g/l
)
Nit
rate
as (
NO
3)
(mg
/l)
Ars
en
ic
as (
As)
(mg
/l)
Ph
en
oli
c C
om
po
un
ds
as (
C6H
5O
H)
(mg
/l)
Ch
lori
de
(a
s C
l) (
mg
/l)
Oil &
Gre
ase (
mg
/l)
T.D
.S. (m
g/l
)
Co
lou
r
(Hazen
Un
it)
Co
pp
er
(a
s C
u)
(mg
/l)
To
tal
Ch
rom
ium
(a
s C
r) (
mg
/l)
Flu
ori
de
(as F
) (m
g/l
)
To
tal
Co
lifo
rm (
MP
N/1
00m
l)
Cad
miu
m
(as C
d)
(mg
/l)
Sele
niu
m
(as S
e)
(mg
/l)
Le
ad
(a
s P
b)
(mg
/l)
Zin
c
(as Z
n)
(mg
/l)
Ch
rom
ium
(a
s C
r+6)
(mg
/l)
Locations
Amguri,Longsuwal (SW4)
6 0.04 10 0.9 BDL BDL BDL Nil 4 Nil 80 10 apparent <0.01 <0.01 0.05 4600 <0.01 <0.01 <0.01 0.02 <0.0
1 Deamooli TG
(SW6) 6.12
0.03 7.5 1.4 BDL 2.6 BDL Nil 6 Nil 60 10.0
apparent <0.01 <0.01 0.44 2400 <0.01 <0.01 <0.01 0.05
<0.01
Daimukhia TE (SW7)
6.21
0.14 10.5 0.1 BDL 3.4 BDL Nil 8 Nil 80 10.0
apparent <0.01 <0.01 <0.01 1500 <0.01 <0.01 <0.01 0.02
<0.01
Prabhat TG (SW8)
6.12
0.03 9.8 0.2 BDL 6.3 BDL Nil 6 Nil 30 10 apparent <0.01 <0.01 0.39 1500 <0.01 <0.01 <0.01 0.02 <0.0
1 Tiphuk TE
(SW9) 6.24
0.06 10 1.8 BDL 0.44 BDL Nil 8 Nil 60 10 apparent <0.01 <0.01 0.02 3600 <0.01 <0.01 <0.01 0.02 <0.0
1
36
Annexure – 4
Water Quality Standards
Indian Standard IS: 10500:2012 Sl.
No
Parameter Unit Requirement
(Acceptable
Limit)
Permissible
limit in absence
of alternate
source
Test Method
1 pH - 6.5-8.5 No relaxation pH meter
2 Turbidity (NTU) NTU 1 5 Nephelometric
3 Specific Conductance µs/cm NS NS Wheatstone Bridge
4 TDS mg/l 500 2000 Gravimetric Method
5 Chloride (as Cl) mg/l 250 10000 Argentometric Method
6 Total Alkalinity
(as CaCO3) mg/l 200 600 Indicator Method
7 Total Hardness
(as CaCO3) mg/l 200 600
EDTA Titrimetric
Method
8 Calcium (as Ca) mg/l 75 200 EDTA Titrimetric
Method
9 Sulphate (as SO4) mg/l 200 400 Turbidity Method
10 Arsenic (as As) mg/l 0.01 0.05 Winkler Titrimetric
Method
11 Nitrate (as NO2) mg/l 45 No relaxation Chromotropic Acid
Method
12 Magnesium (as Mg) mg/l 30 100 EDTA Titrimetric
Method
13 Fluoride (as F) mg/l 1 1.5 APHA- 4500-D-F
14 Selenium (as Se) mg/l 0.01 No relaxation AAS/ICP
15 Cadmium (as Cd) mg/l 0.003 No relaxation IS: 3025 (Pt - 41) -
1991
16 Copper (as Cu) mg/l 0.05 1.5 AAS/ICP
17 Lead (as Pb) mg/l 0.01 No relaxation AAS/ICP
18 Zinc (as Zn) mg/l 5 15 IS: 3025 (Pt - 49)-
1991
Source: Indian Standard (IS: 10500:2012)
37
Indian Standard IS: 2296
Source: IS: 2296-1982
Note: Class A: Drinking water source without conventional treatment but after disinfection; Class B: outdoor bathing; Class C:
Drinking water source with conventional treatment followed by disinfection; Class D: Fish culture and wild life propagation; Class E:
Irrigation, industrial cooling or control waste disposal.
Sl.
No Parameter and Unit A B C D E
1 pH (max) (min : 6.5) 8.5 8.5 8.5 8.5 8.5
2 Colour (True) (Hazen unit) 10 300 300 - -
3 DO (mg/L) (minimum) 6 5 4 4 -
4 BOD (3d, 27oC) (mg/L) 2 3 3 - -
5 TDS (mg/L) 500 - 1500 2100
6 Total Coliforms (MPN/100 ml) 50 500 5000 - -
7 Oil and Grease (mg/L) - - 0.1 0.1 -
8 Chlorides (mg/L as Cl) 250 - 600 - 600
9 Sulfates (mg/L as SO4) 400 - 400 1000
10 Nitrates (mg/L as NO3) 20 - 50 - -
11 Fluorides (mg/L as F) 1.5 1.5 1.5 - -
12 Copper (mg/L) 1.5 - 1.5 - -
13 Iron (mg/L) 0.3 - 50 - -
14 Zinc (mg/L) 15 - 15 - -
15 Arsenic Total (mg/L) 0.05 0.2 0.2 - -
16 Lead (mg/L) 0.1 - 0.1 - -
17 Cadmium (mg/L) 0.01 - 0.01 - -
18 Chromium (VI) (mg/L) 0.05 0.05 0.05 - -
19 Selenium (mg/L) 0.01 0.05 - -
20 Total Chromium - - - - -
21 Phenols (mg/L) 0.002 0.005 0.005 -
38
Annexure – 5 Summary Noise Level Results
Sl. No.
Location Name Longitude
(E)
Latitude (N)
Date of Monitoring
Day Time Noise (Leq
dBA)
Night Time Noise
(Leq dBA)
Category of Area
Remarks/Reasons
1. Ambient Noise Result of new 220 KV Double Circuit Transmission line Salakati (BTPS) – Rangia (163.187 km)
1 Goroimari
(N22) 90° 48' 27.9"
26° 32' 4.5"
6/01/2013 59.2 48.55 Residential
Movement of Vehicles. Noise level crosses the prescribed limit during
both day and night time.
2
Patkata (ujandubr)
(N23)
90° 49' 57.4"
26° 31' 13.8"
6/01/2013 54.22 45.25 Residential Movement of Vehicles. Noise level was observed within the prescribed
limit.
3 Bogriguri/ Peragaon
(N24) 90° 51' 52.5"
26° 31' 59.1"
8/01/2013 56.33 44.23 Residential
Vehicular movement on the road. Noise level was observed high during day time only.
4 Burikhamar
(N25) 90° 53' 11.6"
26° 32' 53.0"
7/01/2013 46.51 40.87 Rural
Vehicular movement on road. Noise level is within the CPCB ambient noise
standards.
5 Golapara
(N26) 90° 53' 11.6"
26° 32' 53.0"
07/01/2013 48.42 41.18 Residential
Vehicular movement on road. Noise level is within the CPCB ambient noise
standards.
6 Barapeta
(N27) 90°57'10.0"
26°33'35.7"
8/02/2013 54.54 42.51 Rural
Noise level is within the CPCB ambient noise standards.
7 Datora/Uttar
Chafakamar(N28) 90° 59' 7.6"
26° 34' 18.8"
9/02/2013 53.75 46.37 Rural
Noise level is within the CPCB ambient noise standards.
8 Kalapani
(N29) 91° 1' 38.2"
26° 35' 1.2"
10/02/2013 46.95 42.59
Silence Zone (School)
Vehicular movement was observed on road near to the school.
The School is approximately 50 m away from the road.
Noise levels are within standard during both day and night.
9 Anand Bazar
(N30) 91° 3' 23.5"
26° 35' 16.6"
11/02/2013 57.54 41.26 Residential
Vehicular movement was observed on road. The road approximately 25 m away from the
road. Noise level was observed high during day time
only.
10 Haripur (N31)
91° 5' 32.4"
26° 35' 14.7
12/02/2013 56.35 48.22 Rural Vehicular movement was observed on road. Residential settlement exists. Noise level is within the prescribed limit.
11 Paschim Hakatup
(N32) 91° 8' 9.7"
26° 35' 52.6"
13/02/2013 52.48 41.05 Residential Noise level was observed within the prescribed
limit
39
Sl. No.
Location Name Longitude
(E)
Latitude (N)
Date of Monitoring
Day Time Noise (Leq
dBA)
Night Time Noise
(Leq dBA)
Category of Area
Remarks/Reasons
12 Maharani
(N33) 91° 9' 45.1"
26° 35' 51.8"
14/02/2013 58.36 43.29 Residential
Movement of vehicles was observed near to the residence.
Noise level exceeds the standard during day time.
13 Uluya (N34)
91° 12' 28.2"
26° 34' 40.2"
15/02/20113 42.84 34.51 Residential No such activities were observed at this location
which may create noise in that location.
14 Katanipara
(N35) 91° 14' 46.4"
26° 36' 0.2"
16/02/2013 59.36 47.48 Residential
Movement of earth cutting trucks was observed on the roads.
Noise level crosses the standard during day time only.
15 Kotobar (N36)
91° 17' 39.8"
26° 31' 31.3"
17/02/2013 56.31 49.19 Rural Vehicular movement on the road. Noise level during day time crosses the
standard but not significantly.
16 Pamunapathar
(N37) 91° 18' 27" 26° 36' 25.1" 19/02/2013 49.4 43.14 Residential Noise level was observed within the standards.
17 Galdinpara
(N38) 91° 19' 11.8"
26° 35' 50.0"
20/02/2013 52.95
43.56
Rural Movement of vehicles was observed on road. Noise level was observed within the standard.
18 Bernabari
(N39)
91° 21' 24.4"
26° 35' 48.3"
19/02/2013 50.1
42.55 Residential
No such construction or developmental activities were observed at this location.
Noise level was observed within the standard.
19 Shilahuti
(N40)
91° 23' 32.6"
26° 36' 04.4"
18/02/213 50.77 41.11 Residential
Construction activities were on progress at this location.
Movement of vehicles was observed on road. Noise level was observed within the standard
during both day and night time.
20 Dukuchiapara
(N41) 91° 25' 36.9" 26° 35' 13.9" 17/02/2013 53.11 45.69 Residential Noise level was observed within the standard.
21 Angardhowa
(N42) 91° 27' 51.0"
26° 35' 57.0"
16/02/2013
55.72
45.83 Residential
In front of the residential settlements one major road is passing through, where continuous vehicular movement was observed
At this location, noise level is within the standard significantly.
22 Horharia
(N43) 91° 29' 11.9"
26° 35' 02.4"
15/02/2013 58.78 39.4 Residential
Movement of heavy vehicles etc. on the road. Noise level was observed above the standards
at day time because of more vehicular movement, while during night time it was observed within the standard.
23 Kallaipur
(N44) 91° 30' 38.1" 26° 33' 04.6" 14/02/2013 40.53 37.96 Residential
Noise level was observed within the standard as no activities were observed.
24 Bhadrabangal 91° 32' 12.6" 13/02/2013 49.27 42.64 Residential Noise level was observed within the standard.
40
Sl. No.
Location Name Longitude
(E)
Latitude (N)
Date of Monitoring
Day Time Noise (Leq
dBA)
Night Time Noise
(Leq dBA)
Category of Area
Remarks/Reasons
(N45) 26° 32' 13.2"
No such developmental or other activities were observed surrounding the settlements.
25 Sunkuira
(Panimajkuchi) (N46)
91° 32' 23.1"
26° 31' 35.8"
12/02/2013 53.32 48.89 Residential Noise level was observed within the standard at
day time.
26 Ichhapur
(N47) 91° 34' 25.0"
26° 30' 25.6"
11/02/2013 54.63 43.25 Residential
Movement of vehicles on road near to the residence.
Noise level was observed within the standard during both day and night time.
27 Dhingitola
(N48) 91° 35' 48.7"
26° 28' 54.0"
10/02/2013 46.01 38.17 Residential
At this location noise level is within the standards.
28 Near Chenimara
(N49) 91° 37' 34.0"
26° 29' 02.5"
9/02/2013 54.11 41.91 Residential
At this location noise level is within the standards.
29 Near Chirakundi
(N50) 91° 38' 36.4"
26° 27' 11.4"
8/02/2013 57.85
40.17
Residential Movement of vehicles on the road. At day time noise level crosses the standard.
2. Ambient Noise Result of 132 kV Double Circuit LILO at Kamalpur from 132 kV Double Circuit Rangia – Kahilipara / Sishugram line. (0.5 km)
30 Bonbari
(N1) 91° 42' 45.7"
26° 20' 49.4"
7/02/2013 49.2 46.91 Residential
Residential settlements were observed near to the Construction site.
Noise level was observed within the standard during both day and night time.
3. Ambient Noise Result of 132 kV Double Circuit LILO at Sonari from 132 kV Lakwa – Namrup line (4.00 km)
31 Tiyak Rajabari
(N1) 95°3'10.9"
27°1'51.0"
9/01/2013 52.18 36.29 Rural
No such activities were observed at this location.
Noise level does not exceed the CPCB ambient noise standards.
4. Ambient Noise Result of 132 kV Double Circuit LILO at Bihiating LILO from 132 kV Dibrugarh – Moran line (0.642 km)
32 Near Mainabari TG
(N1) 94° 55' 16.4"
27° 25' 20.6"
7/01/2013 44.4 37.31 Rural Noise level does not exceed the CPCB ambient
noise standards.
5. Ambient Noise Result of 132 kV Double Circuit LILO at Rupai from 132 kV Double Circuit Tinsukia – Margherita line (29.647km)
33 Dhimukhia TG
(N7) 95° 31' 26.4"
27° 36' 4.8"
1/01/2013
41.71
38.96 Rural Noise level was observed within the permissible
limit.
34 Prabhat TG
(N8) 95° 33' 1.0"
27° 36' 35.3"
4/01/2013
46.06
37.11 Rural Noise level was observed within the permissible
limit.
35 Tiphuk TG
(N9) 95° 33' 35.1"
27° 36' 50.0"
2/01/2013 54.25 30.38 Rural
Noise level was observed within the permissible limit.
36 Near Rupai S/S
(N10) 95° 34' 2.2"
27° 35' 50.0" 3/01/2013
45.38
39.05 Residential Noise level was observed within the permissible
limit.
41
Annexure – 6
National Ambient Noise Standards
Sl.
No. Category of Area/ Zone
Limits in dB*
Day Time Night Time
1 Industrial Area 75 70
2 Commercial Area 65 55
3 Residential Area 55 45
4 Silence Zone 50 40
*The limit in dB denotes the time-weighted average of the level of sound in decibels on Scale A
which is relatable to human hearing.
*Day time duration is 6am to 10pm and Night time duration is 10 pm to 6 am.
Source: Environment (Protection) Act, 1986 as amended in 2002.
42
ANNEXURE 7
AIR, WATER AND NOISE MONITORING LOCATION MAPS
!
!
!
!
!
!
!
!
!
!
!
!
!! ! ! ! ! ! ! !
!! ! ! ! ! ! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!!
!
!!
!!
!!
!
! ! !!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!! ! !
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!!
!!
!!
!
!
!
!!
!
!
!
!!
!!
!!
!!
!!
!
!
!
!
!
!
! ! !
!
!
! !!
!!
!!
!!
!
!
!
!!
_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂
_̂
N1
A1A2
Machhua Balapara
Thuribari
Tilapara
Nayachara
Bil
Dalagaon
Bandarchara
Bara Kurshakati
Nigamkhora
Sitamari
Bandarchara
Goglapara
N2
A3N3
N4
A4
N5A5
A6
N6
Manglagaon
Dakshin
Kajalgaon
N7
MaigaonThuribari
Kathalguri
Shilguri
Bangaldoba
Bangaldoba
Ma
land
ubi N
.
Dabli
Dimarkumuri
Tilapara Kuj
ia N
.
Salguri
Kathalpara
Dapdoma
Ulubari
Amguri
Kanibhura N
.
Kamadanga
DIGDARI R F
Bhadragaon
Bhadeyaguri
Goglapara
Bijaygaon
Tilakgaon
Dur
amar
i N.
Ghilaguri
Nishinapara
Ferry
Naitamara
Bhutiyapara
BM 52.1
Basugaon
Kakragaon
Kakragaon(Bhatipara)
Dangtal
Phukagaon
Satbhendi RF
DagargaonRS
Nadangiti
A7
Kathalgur No2
PHUKAGAON R F
Bangalpara
Chhota Kuurshakati
Dense mixed jungle mainly sal
Open sal
IB(PWD)
PS
PORH
Banduguri
Dense mixed jungle mainly sal
Fairly dense sal
Nepalikuchi
Dispensary
Ferry
CH
AM
PA
MA
TI R
.
Sidli
N8
A8
Tangabari
Padmapur
Shulmari
Ta
ng
ai NPadmapur
A11
Bilaspur
Krishnapur
Nimagaon
Batabari
Dispensary
IB(PWD)BM 61.3
Nimagaon
Dholagaon
NimagaonSilpatta
PalashbariSundari
Sundari
Gosaingaon
Duligaon
Sonapur
Market(Sun)
Kajalgaon
Salijhora
Danga N
PakriguriManglagaon
AI R
IVE
R
A9N9
N10 A10
Tilin
g
B
Guab
Noapara
Noa
p
Ca
Jiling N
Chota Manaka
Malipara
(Thurs)Market
Choudhuripara
Samugaon
Open Scrub
Sanyaslguri
Samugaon Dolapara
Kathalguri
Khujarapguri
Grass 2 metres high
Open Scrub
PO
Dongpeta
MaliparaGumorgaon
Naoduba
Saurabari
Open Scrub
Rau
mari N
Dakhanagar
Grass 2 metres high
Khagrabari
Raumari
N11
Raumari
Canal
Anja
ni D
ong
PO
Open scrub
Dispensary
Palashguri
Hatipota
Dakshin Amguri
Canal
Open scrub
Simlabari
KatribariHabrubari
Shirangaon
Market(Wed & Sun)
Ujanbazar
Kanibhur N
Bhirangaon
Amguri
Hasraobari
Bher BheriDha
llga
on
Do
ng
Hatipota
Hatipota
N12
A12
Sathipur
Can
al
Kujia
N
ScrubDense
Santipara
Bilaspur
Hospital
Bilaspur
Leprosy
Sathipur
A13
Silphata
Banduguri
Lata
Dong
N13
A14
N14
A15
N15
A16
N16
N17
A17
2 No.Saurabari
Kalip
ur D
on
g
Puth
ima
ri Do
ng
BAY AP-A
AP-1
AP
-2
AP-3
AP-3AAP-4
AP-5
AP-6
AP-7
AP-8AP-9
AP-10
AP-10AAP-11
AP-11A
AP-11B
AP-14B
AP-14A
AP-15 AP-1
6
AP-17
AP-18
AP-19
AP-20
AP-21
AP-22
AP-23
AP-24
AP-25
AP-26
AP-27
AP-28
AP-28A
AP-28BAP-29
G1G2
AP
-31
AP-32 AP-33
AP-35 AP-36 AP-37
AP-38
AP-39
AP-40
AP-41
AP-43AP-45
AP-46
AP-47
AP-48
AP-50
AP-51
AP-52AP-52A
AP-52B
AP-53
Thermal Power Stationat SALAKATI
Map Showing Air & Noise Sampling Location Along Salakati(BTPS) - Rangia 220 KV Double Circuit Transmission Line & 220/132 KV S/S at Rangia.
(Pre Construction Stage)
-Sheet : 1 of 5
0 1 2 30.5
Kilometers
1:50,000
SCALE
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
Legend :
Unmetalled Road
Cart Track
Pack Track
Foot Path
Embankment
River
Stream
Canal
Water Body
Metalled Road
Final Route
Existing HT Line! !
Hut
Temple
Trees
Railway Line
2 Km. Buffer Area
1 Km. Buffer Area
Air
Pre-Construction
Stage Sampling :
_̂ Noise
_̂
_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂PO
Son
ai N
.
Market(Mon & Thurs)Sonaikhola
Deotari
SonaikholaDawaguriBagargaon Deotari
Goraimari
Veterinary Hospital
Dhubrichar
Kalpani Bil
Betbari
Manas R.
Alukhunda
Manakasha
Bhetema
Khudnabarigaon
Ahoinpathar Sukhanjani
Khudnabaripathar
Kamargaon
PO
Burikhamar
Surikhamar
Peragaon
Datora
Kumuria
Chuliakata
Hakua N
Mo
raH
akua
N
Bogriguripathar
Ultakhunda N
PoragaonSundra Bil
Unekuri
Barapet
Poragaon
Dhir or Ultakhunda River
Naljhara N
Patiladaha
Ferry Market(Mon & Fri)
Market(Wed & Sun)
Ferry(Oct to Mar)
Market(Tues & F
Ferry
Ferry
Ferry
Singhbhanga
Patkata
FerryManas R.
Similabari
Kusamari
Sonaikhola
Elengmari(Palanbari)
Bogriguri
Ferry
Larugaon
BatabariMarket(Tues)
Labdang N
.
Pura
N.
Larugaon
Jhakra N Kasibari
GuabariDewanpara
Lahtipara
Gundamara
Lahatipara
Khamarpara
No.2
Saragaon
PO
Market(Fri)
Bagargaon
Khamarpara
Canal
Monument
Gitali N
Bongajhora
Hatimara
Kaliagaon
Matlapara
Hatimara
Laugaon Gathaibari
Laugaon Bhatipara
Dangagaon
Pakhaja
n N
Sagunbari
Laugaon
PODispensary
Bar Laugaon
scrubOpen
KamargaonGargaon
Soari Khamarguri
Baripara
Soari Dolapara
Namjaipara
Barabazar
Khalpara
Market(Thurs)
DispensaryVet. Dispensary
RH (PWD)
PO
Bhalukmari
Bhalatol
Uttar Gargaon
Sibrubari
Marabari
Thuribari
Bhaltol
Subhai Jhar
Brahmaputra Bhalatu
Ambari
Gelasugaon
Katribari
Open Scrub
Tilin
g or
Basbari
Guabari
Noapara
Noa
para
Dong
ScrubOpen
Canal
Chota Manakasa
huripara
mugaon
b
A17
A18N18
A19
N19
A20
N20
A21N21
N22
A22
N23
A23
A24 N24
N25
A25
A26 N26
3 No.Goraimari
Ujandubi
Golapara
Jona
li R
AP-52B
AP-53
AP-54AP-55
AP-57
AP
-58
AP-60
AP-61
AP-61A
AP-62
AP-63
AP-64
AP-65AP-66
AP-68
AP-69AP-70
AP-70A
AP-71
AP-72
AP-73
AP-74
AP-74A AP-75
AP-76
AP-76A
AP-76B AP-76C
AP-77
AP-77A
AP-79
AP-80AP-80A
AP-81
Map Showing Air & Noise Sampling Location Along Salakati(BTPS) - Rangia 220 KV Double Circuit Transmission Line & 220/132 KV S/S at Rangia.
(Pre Construction Stage)
-Sheet : 2 of 5
0 1 2 30.5
Kilometers
1:50,000
SCALE
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
Legend :
Unmetalled Road
Cart Track
Pack Track
Foot Path
Embankment
River
Stream
Canal
Water Body
Metalled Road
Final Route
Existing HT Line! !
Hut
Temple
Trees
Railway Line
2 Km. Buffer Area
1 Km. Buffer Area
Air
Pre-Construction
Stage Sampling :
_̂ Noise
!
!!
!!
!!
!!
!!
!!
!! ! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! ! ! ! ! ! ! ! ! ! ! !
_̂
_̂
_̂
_̂_̂
_̂_̂
_̂
Pathl
a N
.
Darkinajani
Saudarbhita
Supahaljhar
Adirbagh Bil
Haripur
Potapathar Bil
Amaratari
Raumari
Kolbari
Pathlagaon
Openscrub
Ford(May to Jun)
Bhokuamari
Kalapani
Udagaon
Dalgaon
Dumruguri
Nimota
Sakala Bil
Bangsibari
Nalpara
Matanga
Dhekiajani
Khusarabari
Shonpara
Bunmaja
Anandmandali Bil
Sarangpara
KuribilFord (Mar to Jun)
Ford (Mar to Jun)
Maharani
Pub Kathalmuri
Bhotanta Mahitara
Sutpara
Ihumarpathar Bil
Bhalaguri
Market(Tues & Fri)
Lochima
Dolajani
HatkholaToll
Kolmari
Kachumari
Pathla Camp
Anand Bazar
PO
PO
Hattinapur
Katmati BilHukm
ana N
.
RaumariRaumari Bil
Open scrub
Kasitari
Dumruguri
Kanakura BilBar Kukra
Bar Kukra BilBagurirtari
NamsathariPashchim Hakartup
Besamari Bil
Hakartup
Dalimarbaita
Ford (Oct to May)
Singimari
Maharani Bholar Pam
Bangali Pam
Tengapakarirtal
Charaimari
Bhotanta Mahitara
Laogaon
Digjira N.
Goramari
Simalaguri
Damchi Bil Goramari Bil
Bamunkutuni Bil
Maharani
Maharani Bil
Bamunkatuni
Openscrub
Chh
Bar Saderi
Kurubaha
Kaharpara Pam
Daisingri
POAkaya
Uluya
Kurabaha
Pakha
Tuple Panbari
Gadgaon
POPahum
ara
N.
Path
la N
.
GamriguriGamriguri
Gobardhan
Uttar Chafakamar
Pashchim ChafakamarAksiguri
Chafakamar
Purab Chafakamar
Katajhar
Katajhar
Katajhar
Barapeta
Chafakamar
Barapeta
Bhetemaritup
igaon
Hakua N
Hak
ua N
PODisp
Barapeta
Barapeta
Poragaon
et & Fri)
Ferry(Oct to Mar)
Market(Tues & Fri)
(Wed & Sun)Market
Ford(Oct to Mar)
Market(Sat) PO
No.1
Ferry
Mo
ra M
an
as o
r B
eki R
iver
A27
N27
A28N28
A29N29
A30
N30 A31N31
A32
N32A33
N33
A34N34
AP-80A
AP-81
AP-82
AP-83
AP-84
AP-85 AP-86
AP-88 AP-89
AP-90
AP-113A
AP-113
AP-111
AP-110
AP-109
AP-108
AP-107
AP-105
AP-104
AP-103
AP-102AP-101AP-100
AP-99A
AP-99AP-97
AP-96AP-95
AP-94
Map Showing Air & Noise Sampling Location Along Salakati(BTPS) - Rangia 220 KV Double Circuit Transmission Line & 220/132 KV S/S at Rangia.
(Pre Construction Stage)
-Sheet : 3 of 5
0 1 2 30.5
Kilometers
1:50,000
SCALE
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
Legend :
Unmetalled Road
Cart Track
Pack Track
Foot Path
Embankment
River
Stream
Canal
Water Body
Metalled Road
Final Route
Existing HT Line! !
Hut
Temple
Trees
Railway Line
2 Km. Buffer Area
1 Km. Buffer Area
Air
Pre-Construction
Stage Sampling :
_̂ Noise
! ! ! ! !!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
!
!
!
!
!
!
!
!
!
!
!
!!
!!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!! ! ! ! ! ! ! ! !
!
!
!
!! ! ! !
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂
Gohaic
Kallaipar
Bherbheri
Ajirkhat
Kotaibari
Irtaluk
PO
PS
Kotibari
Chataibari
Khoruchi
Dhamdhama
Sital Pukhuri
(Wed & Sat)Market
Dhamdhama
Garbhitar
Garbhitar
Santipur
Santipur
Horharia
HarhariaGoabil
Nutan Pukhuri
Jartaluk
Pub
na
i N
Ghoramara
Che
ng
na
i N
Ghoramara
Nichlamari
Halapar
KadamrolaAngardhowa
Dhekibhanga
Bamunghat
PukhuriRajahua
Tokankata
Tokankata
Thanguri
La
khip
ar
N
Khanelapara
Amitapara
DhekibhaugaKhagrabari
Angardhowa
Angardhowa
PolokataLakhipar
Polokata
Tokankata
Thanguri
Lakhipar
Debacharia
Dukuchiapara
Debacharia
Anandpur
PO
Shilakuti
Pagladiya N
Bangalipara
Dongpar
Dangar MakhaBanbari
Tihu N
Faurabari Bari Makha
Shilakuti
Mor
a N
scurbOpen
Oralguri
Gal
din
N
Oralguri
Kalabarasapa
Sanbari
Shilakuti
Singrapara
Singrapara
ShilahutiShilakuti
Barjhar BennabariSaukuchi
HaurabariSaukuchi
Saukuchi
NakatiparaBernabari
Bennabari
Sin
gra
N
Bennabari
Hajiragaon
Nalbari
Murkuchiara
BangaliparaDalbari
Mora Tihu N
KajiragaonNakatipara
Saukuchi
Oralguri
Mora Deojara NSantabari
ChantaparaRampur Nimua
Rampur
Totlasopa
Deojara N Rampur
Sripur Deoghar
Mo
ra N
Kotobar
MadhupurC
an
al
Chhota Manikpur Chamthiapara
Kharabari
Nichlabari
Pamuapatha
PamuapatharBunbari
Chaukhuti
Kotobari
Kashsop
Galdinpara
Damalguri
Hatitari
KalbariBalatari
Bangaon Pam
Bar ManikpurChamthiapara
Chamthiapara
Chhota Mamkpur
Mora
c Deoja
ra N
Deo
jara
N
Katanipara
Athiabari
Chutiapara
Bamundoba
Bhalukdanga
UdhabariBagapara
Pub Pipla(Bangnabari)
Deojara N
.
PO
Saru Manikpur
Bar Manikpur
Chhaibari
PO
Pakha
ari
PO
Chem
tia N
.
Pipla
Piplagalangpara
Kopilimara Bil
Can
al
Chhaibari
Chemtia
A34N34
N35A35
N36A36A37
N37
A38N38
N39
A39
A40N40
N41
A41
N42A42
A43
N43
AP
AP-148
AP-147
AP-145
AP-144
AP-143
AP-142
AP-141
AP-140
AP-139
AP-138AAP-138
AP-137B
AP-137A
AP-137
AP-136
AP-135AP-134A
AP-134
AP-133
AP-132
AP-131
AP-130
AP-128
AP-127AP-126
AP-124A
AP-124AP-123
AP-122
AP-121
AP-120A
AP-120
AP-119
AP-118
AP-117
AP-115
AP-114AP-113A
Map Showing Air & Noise Sampling Location Along Salakati(BTPS) - Rangia 220 KV Double Circuit Transmission Line & 220/132 KV S/S at Rangia.
(Pre Construction Stage)
-Sheet : 4 of 5
0 1 2 30.5
Kilometers
1:50,000
SCALE
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
Legend :
Unmetalled Road
Cart Track
Pack Track
Foot Path
Embankment
River
Stream
Canal
Water Body
Metalled Road
Final Route
Existing HT Line! !
Hut
Temple
Trees
Railway Line
2 Km. Buffer Area
1 Km. Buffer Area
Air
Pre-Construction
Stage Sampling :
_̂ Noise
! ! ! ! ! ! ! ! !!
!!
!!
!
!
!
!
!
! _̂
_̂_̂
_̂
_̂
_̂
_̂
Kuhma N
Mud(Thurs & Sun)Market
Kahibari
Dhalkuchi
Chirakhundi
Gog Malacha
Chirakhundi
KuptidabaBihapara
KhandikarChenimara
DhepargaonLahapara
Non
a N
Rangia
Palangi
Bhatkuchi
Jamtala
Karara Garbhitar
Bishen Nalagaon
Bichennala
(July to Oct)Usually flooded
HalikuchiBichennala
TulsibariTarani
Baralia NDalaigaon
Balagaon
Hasantuk
DhingitolaKarara
Kakaimari
JayantipurHalikudhiBhithamahal
Bangaon
Kataimari
Bar Shiral
JuljaliKhabanikuchi
Ford (Jan to May)
Nona NPanimajkuchi
Sunkuira
Balipara
Khatikuchi
Kathalgaon
Bhadrabangal
Balasupa
Gohaichubri
Kallaipar
Bherbheri
Ajirkhat
Chapatal
Arara
Bhitamahal
lchhapur
KarunabariJayantipur
Kotaibari
Bar Shiral
Ferry
Ford
Pagladiya N
S
Kotibari
Chataibari
Khoruchi
Dhamdhama
Sital Pukhuri
(Wed & Sat)Market
Garbhitar
Garbhitar
N44A44
N45
A45
A46N46
A47N47
A48
N48
A49N49
A50
N50
AP-173AP-172
AP-171
AP-170AP-169
AP-168
AP-167AP-166A
AP-166
AP-165
AP-164B
AP-164A
AP-164
AP-163AP-162
AP-161
AP-160
AP-159A
AP-159AP-158A
AP-158
AP-157
AP-156
AP-155A
AP-155
AP-154
AP-153
AP-152B
AP-152A
AP-152
AP-150
AP-148
Proposed S/Sat RANGIA
Existing S/Sat RANGIA
Map Showing Air & Noise Sampling Location Along Salakati(BTPS) - Rangia 220 KV Double Circuit Transmission Line & 220/132 KV S/S at Rangia.
(Pre Construction Stage)
-Sheet : 5 of 5
0 1 2 30.5
Kilometers
1:50,000
SCALE
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
Legend :
Unmetalled Road
Cart Track
Pack Track
Foot Path
Embankment
River
Stream
Canal
Water Body
Metalled Road
Final Route
Existing HT Line! !
Hut
Temple
Trees
Railway Line
2 Km. Buffer Area
1 Km. Buffer Area
Air
Pre-Construction
Stage Sampling :
_̂ Noise
!!
!!
!!
!!
!!
!!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!!
!! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !!
!!
! ! !!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
Nowgong
Hemabari
Jalmahi
Bangtha
Gedarbari
Kurabahi
Saru Jamuguri
Bebejia
Bar Jamuguri
Lathabari
Gasainbari
Rahdhala
Khalaigaon
Ephaliabari
Barbari
Pub Salmara
Balisara
Kujarbari
Sataligaon
Bangtha
Dimau Bil
Dimau
Maheri Ati
Dimau Bil
Dimau
Bar Thal
Taranl Bil
Bebejia RSMarket (Tues)
Ghanhigaon(Birah Bebejia)
Sapkati Bil
Deodhargaon
Pakhimaria
Maukhatigaon
Gelai Pathari(Bar Pathari)
Bar PathariPanigaon
Mari Kalang Bil
Shlalmari Katayani
Mari Kalang(Dhepajan)
HatiparaMari Kalang
Juriagaon
Maj Pathari
Maj Pathari
Mahlor Bil
Mari Kalang
Mari Kalang(Barghat)
Nij Pathari
MahlorBhotaiati
Mahlor
Uriagaon
Gaengaon
Katanigaon
Chakarigaon
Bar Pathari Sutargaon(Tangondhara)
Bar Pathari Bhotaigaon
Bar Pathari Panigaon
Ujaragaon
Ujaragaon
Ranthali
Ghuriagaon
PO
Patari Thal
Na Bebejia
Elengi Sattra(Kalangpar)
Jaranigaon
Dakarghat
Dekagaon
Kumargaon
Birah BebejiaMara Kalang Bil
Bangaon
Birah Bebejia
KALANG R
Dimaruguri
Sialekhoa
PO
Naomati
Dispensary
Teliagaon
A1
Dispensary
PO
NH-37
33kV LINE
Kalang RN1
Patha
ri N
PO
PO
A2
Chakarigaon
Bhotaigaon
PO
N2N3
Vet. Hospital Hospital
Bajiyargaon No 1
Govt. Farm
A3
Market (Sun)
KALANG R
BhakutgaonDilikabasti
Bharaguri
Bharaguri
Hatigaon
Larubasti
Gendhati Kachari
KurabahiSamaguri RS
Shingiya Kumargaon
Maj Ati
PS
Samaguri
PTOBM 64.8
Bamuni TinaliMarket (Sun)
Tapatjuri TGDense Bamboo
Mikirgaon
TGBarhampur
Barhampur Grant
Dolaigoan Bamunigaon
Dhantula T G
Dhantula
Nedhargaon
Nan
ai N
(hogargaon)Barhampur
Dispensary
Bejerchuk Mud
PoBoprhampur
KatejugigoamChalchali Jalahar Chuk
Chalchali Jalahar Chuk
GomothagaonPotani
Singiya Potani Mangratup
Kamargaon
Ghogar Jalah
Chutiyagaon
Gomothagaon(gogoigaon)Harjmishra
Chalchali
Bherbheri
Kakharigaon
Deojharagaon
Puraniguda
RS
KALANG R
PTO
Domgaon
PO
Balijan Hanchara
Bajiyargaon No 2
Bheleguri
Dokkhinpat
Mud
Panigaon
Mikirgaon
Dispensary
A4N4
Phukanar Khat
Shingiya
Gonak Atl
Hatigaon
Hatigaon
Baruwa Chuck
Murhani
MahaparaMaura Chuk
N5A5
Murani
Chalchali BamungaonJaljeri Doloni
Dep
Hatigaon
Potani
Gra
velle
d
PO
ChalchallHalowagaon
ChalchaliChalchali
PODep
Hazarika Chuk
Market (Sat)
Maj potani
Potani N
Hatiyani Bheto
Dep
NH-37
N6
A6
A7
N7
N8
A8
N9A9
N10A10
A11N11
N12A12
AP
-56
AP-1
AP-2AP
-3
AP
-4
AP
-5
AP-6
AP-7 AP-8
AP-9
AP-10
AP-11
AP-12AP-13AP-14
AP-15
AP-16
AP
-17
AP
-18
AP
-19
AP-20
AP-21
AP-22
AP-23
AP-24
AP-25
AP
-26
AP-2
7
AP-28
AP-29
AP
-30
AP
-31
AP
-32
AP
-33
AP
-34
AP-35
AP-36AP-37
AP-38AP-39
AP-40
AP
-41
AP-42
AP-43AP-44
AP
-45
AP
-46
AP
-47
AP
-48
AP-49A
P-5
0
AP
-52
AP-53
AP-54
AP
-55
Exit. 220kV S/S at SAMAGURI
Proposed 132kV S/S at NAGAON
-0 1 2 30.5
Km.
1:50,000
SCALE
Map Showing Air & Noise Sampling Location Along 132KV Single Circuit Samaguri - Nagaon
On Double Circuit Towers & 132/33 KV S/S at Nagaon.(Pre Construction Stage)
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)
Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001
www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
Legend :
Final Route
District Boundary
National Highway
Metalled Road
Unmetalled Road
Cart Track
Pack Track
Embankment
Water Body
Stream
Hut
Existing HT Line! ! ! !
Railway Line
2 Km. Buffer Area
Trees
1 Km. Buffer Area
River
Pre-Construction
Stage Sampling :
Air
Noise_̂
_̂N
H-3
1
Nanara
NaogaonAgdala
(Junaru)
Kalaia
l N NH-52
To Rangia
To Mangoldoi
To C
hangsa
ri
NH-31 BaihataChariali
Piali Khata
N1 A1
KhelmahaTengabari
BM 48.7Madartala
Nij Madartala
POBM 51.2
GanakparaJalimura
Alagajari
Churibasa
Bonbari
Agdala(Junaru)
Proposed S/Sat KAMALPUR
-
Legend :
1 Km. Buffer Area
2 Km. Buffer Area
National Highway
Unmetalled Road
Cart Track
Foot Path
River
Stream
Hut
Trees, Grass,
Water Body
0 0.5 1 1.50.25
Kilometers
1:30,000
SCALE
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)
Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001
www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
Pre-Construction
Stage Sampling :
Air
_̂ Noise
Map Showing Air & Noise Sampling Location Along 132KV Double Circuit LILO at Kamalpur
from 132KV Double Circuit Rangia - Kahilipara / Sishugram Line.(Pre Construction Stage)
!
!
!
!
!
!
!
_̂
Mankata TG
Barpathar
Dighalagaon
Komargaon
PO
Trolley Line
Sesa N
Khanikar TG
Bhogpara TG
Khanikargaon
Duliagaon
NH
-37
Khanikar TG
DuliagaonNaharani Duliagaon
Duliagaon
BarbaruaTG
Dainijangaon
Sesa TG
Kochharibari
MainabariTG
Lekai
Lekai102
Mankata
Haumura
A1
N1
Khamtigaon
Rajabheta
Rajabheta TG
Factory
Mazdoor Line
Lekai
Mazdoor Lines
Factory
Dainijangaon
Gharamara
ChenglijanBrick Kiln
Brick Kiln(Disused)
Mantri Bil
BihiatingTG
Sesa
N
S/S at BIHIATING(KHANIKAR)
-Map Showing Air & Noise Sampling Location Along 132KV Double Circuit LILO at Bihiating LILO from
132KV Dibrugarh - Moran Line & 132/33 KV S/S at Bihiating.
(Pre Construction Stage)
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)
Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001
www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
1:40,000
SCALE
0 1 2 30.5
Kilometers
1 Km. Buffer Area
3 Km. Buffer Area
Legend :
Final Route
Metalled Road
Unmetalled Road
Cart Track
Pack Track
River
StreamExisting HT Line! !
Hut
Temple
Tree
National Highway
Pre-Construction
Stage Sampling :
Air
_̂ Noise
!!
!! !
!
!
!
!
!
!
!
!
!
! !
!!
!
!
!
!!
!! ! ! ! ! ! ! ! ! ! ! ! !
!
!
!
!!
!!
!! !
!!
!!
!!
!!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!!
!
!
!!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! ! ! ! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!!
!! ! ! ! ! !
!
!
!
!
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
scattered trees
Upper Dihing RF
Deamoli TG
Tiphuk TG
A1N1
N2A2
N3A3
N4A4
N5A5
N6A6
Noa Motopam
N7A7
Dihalkhaku
Hulutupu
HatiJan
Bangaligaon
Bet Jan
Barpathar
Hap Jan Tea Garden
N8
Chota Hap Jan
A8
A9
Amguri
Hap Jan
Hulutupur
Hukanguri TG
N9
Langsoal Tea Garden
Hosp
Hilika TG
Hosp.
A10N10
Hukanguri TG
scrubOpen
Hukanguri TG
Hap
Jan
Hosp.
TG
Pabhojan
Hosp.
Rupahi TG
high
2 metres Grass
132 kV D/C LINE(T-M)
NH-37
TengpaanigaonTengpaani TG
Disp.
RubberbarigaonKhar J
an
Tingrai N
Tingrai N
Mamorani
Anandabag TG
Garbasti
Mamorani
No 2Bangali Balijan
colonyChhota Hapjan
Naogaon
Haveda TG
Hapjan TGGangabari TG
No 1BalijanAssami
No 2
Bangali BalijanChhota Hapjan T G
Makum
RS
Shastrinagar
Dense scrub
scrubOpen
Open scrub
mainly bambooDense mixed jungle
scrubOpen
Dense scrub
BM 126.8
BM 123.9
RH(Forest)
Reservepati
ChikajanTG
Parbatia
Plywood FactoryPS
Brick kilnPakharijan
Disp
Disp
Parbatia
Hukanpukri
TINSUKIANao Pukhuri
Bhimpara
Patiapathar
Brick kiln
Dense scrub
BangaligaonHaveda
No 3Havedagaon
No 2Havedagaon
No 1Havedagaon
Khetojanbasti
Tingrai N
Tingrai Bangaligaon
jungleDense mixed
Tingrai Bangaligaon
TG
Hukanpulhuri
TGHukanpulhuri
Brick kiln
Open scrubOpen scrub
Brick kiln
Norsing gaon
Overhead tank
RS
Sewpur TG
Sewpur TGTG
Sewpur
Pakh
ari ja
n
Lohari Nepaligaon
KacharigaonLohari
Lohari Bangaligaon
Lohari Jan
Rice mill
Lohari Kacharigaon
Lohari Kacharigaon
BM 124.7
Sivdham TempleSteel FactoryTG
Hukanpulhuri
Ahukhat
Rangpuria
Bengmara Pukhuri
Bisdkup TG
Bisdkup TG
Mankhoa TG
Tiphuk TG
Tiphuk TG
Amguri Balijan
Rupai
Domukhra N
Dhaimukhia TG
Dhimukhia TG
Rupai TG
Hosp.
Rupai TG
Tiphuk janKachugaon
Nagoori
Pabhajan TG
Dibru R
Hosp.
Prabhat TG
Hosp.
Hosp.
Hosp.
Rangajan
Open scrub and
Ekthengiagaon
Ekhengiagaon
Sesabatgaon
Bisakupi
Trolley line
Dariabhiti
Garumaragaon
RS
Khar jan
Bhati Mamonigaon
AP-1
AP-2
AP-3
AP-4
AP-5
AP-6
AP-7
AP-8
AP-9AP-1
0AP-11
AP-12
AP-13
AP-14
AP-15
AP-16
AP-17
AP-18
AP-19
AP-20
AP
-21
AP
-22
AP
-23
AP
-24
AP-25
AP
-26
AP-27
AP-2
8
AP-2
9
AP-30
AP-31AP-32
AP
-33
AP
-34
AP-35AP-36
AP-37
Existing S/S at RUPAI
Existing S/S at TINSUKIA
-
0 1 2 30.5
Kilometers
1:50,000
SCALE
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
Map Showing Air & Noise Sampling Location Along 132KV Double Circuit LILO at Rupai from 132KV Double Circuit Tinsukia - Mergharita Line
& 132/33 KV S/S at Rupai.(Pre Construction Stage)
Legend :
1 Km. Buffer Area
2 Km. Buffer Area
! ! ! ! Existing HT Line
Forest Boundary
Metalled Road
Unmetalled Road
Cart Track
Pack Track
Railway Line
River
Stream
Water Body
Final Route
National Highway
Hut
Trees
Pre-Construction
Stage Sampling :
Air
_̂ Noise
!
!
!
!
!
_̂
Raidangiya Noakachari
Trolley line
Banphera Grant
Banphera TG
Khamlung Jabaka
Dakhin Sonari Habi
Hosp.
A1Dabaka TE
Sonari
(Sunday)Market
IB (PWD)
Rajabari Grant Noakacharigaon
Tiyakghat
Ratanpur
TG
PO
Hosp.
N1
Tiyak TG
Factory
Tiyak N
Tiyak Rajabari
BagriguriTiyak Bangaligaon
Factory
TiyakgaonBhoja RS
Bhojogaon
PO
Disang or Dilli R
TWR-17TWR-16
TWR-15
TWR-14TWR-13
TWR-12
TWR-11
TWR-10
TWR-9A
TWR
-6
TWR
-6TWR
-4TWR
-3
TWR-2
TWR-1
TWR-11
TWR-10
TW
R-9
TW
R-8
TW
R-7
TW
R-7
SONARI Sub-Station
-0 1 2 30.5
Km.
1:50,000
SCALE
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)
Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001
www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
Map Showing Air & Noise Sampling Location Along 132KV Double Circuit LILO at Sonari from
132KV Lakwa - Namrup Line & 132/33 KV S/S at Sonari.
(Pre Construction Stage)
Legend :
Route I
Route II
Route III! ! Existing HT Line
Metalled Road
Unmetalled Road
Cart Track
Pack Track
Foot Path
Embankment
River
Stream
Water Body
Hut
Trees
Railway Line
1 Km. Buffer Area
2 Km. Buffer Area
Pre-Construction
Stage Sampling :
Air
_̂ Noise
!
!
!
!
!
!
!
!
!
!
!
!
!! ! ! ! ! ! ! !
!! ! ! ! ! ! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!!
!
!!
!!
!!
!
! ! !!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!! ! !
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!!
!!
!!
!
!
!
!!
!
!
!
!!
!!
!!
!!
!!
!
!
!
!
!
!
! ! !
!
!
! !!
!!
!!
!!
!
!
!
!!
#*#*
#*#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
GW1
Machhua Balapara
Thuribari
Tilapara
Nayachara
Bil
Dalagaon
Bandarchara
Bara Kurshakati
Nigamkhora
Sitamari
Bandarchara
Goglapara
GW2
SW3
SW4
SW5
GW5
GW6
Manglagaon
Dakshin
Kajalgaon
SW7
MaigaonThuribari
Kathalguri
Shilguri
Bangaldoba
Bangaldoba
Ma
land
ubi N
.
Dabli
Dimarkumuri
Tilapara Kuj
ia N
.
Salguri
Kathalpara
Dapdoma
Ulubari
Amguri
Kanibhura N
.
Kamadanga
DIGDARI R F
Bhadragaon
Bhadeyaguri
Goglapara
Bijaygaon
Tilakgaon
Dur
amar
i N.
Ghilaguri
Nishinapara
Ferry
Naitamara
Bhutiyapara
BM 52.1
Basugaon
Kakragaon
Kakragaon(Bhatipara)
Dangtal
Phukagaon
Satbhendi RF
DagargaonRS
Nadangiti
GW7
Kathalgur No2
PHUKAGAON R F
Bangalpara
Chhota Kuurshakati
Dense mixed jungle mainly sal
Open sal
IB(PWD)
GW8
PS
PORH
Banduguri
Dense mixed jungle mainly sal
Fairly dense sal
Nepalikuchi
Dispensary
Ferry
CH
AM
PA
MA
TI R
.
Sidli
Tangabari
Padmapur
Shulmari
Ta
ng
ai NPadmapur
SW11
Bilaspur
Krishnapur
Nimagaon
Batabari
Dispensary
IB(PWD)BM 61.3
Nimagaon
Dholagaon
NimagaonSilpatta
PalashbariSundari
Sundari
Gosaingaon
Duligaon
Sonapur
Market(Sun)
Kajalgaon
Salijhora
Danga N
PakriguriManglagaon
AI R
IVE
R
SW9
SW10a
SW10
Tilin
g
B
Guab
Noapara
Noa
p
Ca
Jiling N
Chota Manaka
Malipara
(Thurs)Market
Choudhuripara
Samugaon
Open Scrub
Sanyaslguri
Samugaon Dolapara
Kathalguri
Khujarapguri
Grass 2 metres high
Open Scrub
PO
Dongpeta
MaliparaGumorgaon
Naoduba
Saurabari
Open Scrub
Rau
mari N
Dakhanagar
Grass 2 metres high
Khagrabari
Raumari
Raumari
Canal
Anja
ni D
ong
PO
Open scrub
Dispensary
Palashguri
Hatipota
Dakshin Amguri
Canal
Open scrub
Simlabari
KatribariHabrubari
Shirangaon
Market(Wed & Sun)
Ujanbazar
Kanibhur N
Bhirangaon
Amguri
Hasraobari
Bher Bheri
GW12
Dha
llga
on
Do
ng
Hatipota
Hatipota SW13
Sathipur
Can
al
Kujia
N
ScrubDense
Santipara
Bilaspur
Hospital
Bilaspur
Leprosy
Sathipur
Silphata
Banduguri
Lata
Dong
GW14
SW15
GW15
GW16
GW17
2 No.Saurabari
Kalip
ur D
on
g
Puth
ima
ri Do
ng
BAY AP-A
AP-1
AP
-2
AP-3
AP-3AAP-4
AP-5
AP-6
AP-7
AP-8AP-9
AP-10
AP-10AAP-11
AP-11A
AP-11B
AP-14B
AP-14A
AP-15 AP-1
6
AP-17
AP-18
AP-19
AP-20
AP-21
AP-22
AP-23
AP-24
AP-25
AP-26
AP-27
AP-28
AP-28A
AP-28BAP-29
G1G2
AP
-31
AP-32 AP-33
AP-35 AP-36 AP-37
AP-38
AP-39
AP-40
AP-41
AP-43AP-45
AP-46
AP-47
AP-48
AP-50
AP-51
AP-52AP-52A
AP-52B
AP-53
Thermal Power Stationat SALAKATI
Map Showing Ground Water & Surface Water Sampling Location Along Salakati(BTPS) - Rangia 220 KV Double Circuit Transmission Line & 220/132 KV S/S at Rangia.
(Pre Construction Stage)
-Sheet : 1 of 5
0 1 2 30.5
Kilometers
1:50,000
SCALE
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
Legend :
Unmetalled Road
Cart Track
Pack Track
Foot Path
Embankment
River
Stream
Canal
Water Body
Metalled Road
Final Route
Existing HT Line! !
Hut
Temple
Trees
Railway Line
2 Km. Buffer Area
1 Km. Buffer Area
#* Ground Water
#* Surface Water
Pre-Construction
Stage Sampling :
#*
#*
#*
#*#*
#*
#*
#*#*
#*
#*PO
Son
ai N
.
Market(Mon & Thurs)Sonaikhola
Deotari
SonaikholaDawaguriBagargaon Deotari
Goraimari
Veterinary Hospital
Dhubrichar
Kalpani Bil
Betbari
Manas R.
Alukhunda
Manakasha
Bhetema
Khudnabarigaon
Ahoinpathar Sukhanjani
Khudnabaripathar
Kamargaon
PO
Burikhamar
Surikhamar
Peragaon
Datora
Kumuria
Chuliakata
Hakua N
Mo
raH
akua
N
Bogriguripathar
Ultakhunda N
PoragaonSundra Bil
Unekuri
Barapet
Poragaon
Dhir or Ultakhunda River
Naljhara N
Patiladaha
Ferry Market(Mon & Fri)
Market(Wed & Sun)
Ferry(Oct to Mar)
Market(Tues & F
Ferry
Ferry
Ferry
Singhbhanga
Patkata
FerryManas R.
Similabari
Kusamari
Sonaikhola
Elengmari(Palanbari)
Bogriguri
Ferry
Larugaon
BatabariMarket(Tues)
Labdang N
.
Pura
N.
Larugaon
Jhakra N Kasibari
GuabariDewanpara
Lahtipara
Gundamara
Lahatipara
Khamarpara
No.2
Saragaon
PO
Market(Fri)
Bagargaon
Khamarpara
Canal
Monument
Gitali N
Bongajhora
Hatimara
Kaliagaon
Matlapara
Hatimara
Laugaon Gathaibari
Laugaon Bhatipara
Dangagaon
Pakhaja
n N
Sagunbari
Laugaon
PODispensary
Bar Laugaon
scrubOpen
KamargaonGargaon
Soari Khamarguri
Baripara
Soari Dolapara
Namjaipara
Barabazar
Khalpara
Market(Thurs)
DispensaryVet. Dispensary
RH (PWD)
PO
Bhalukmari
Bhalatol
Uttar Gargaon
Sibrubari
Marabari
Thuribari
Bhaltol
Subhai Jhar
Brahmaputra Bhalatu
Ambari
Gelasugaon
Katribari
Open Scrub
Tilin
g or
Basbari
Guabari
Noapara
Noa
para
Dong
ScrubOpen
Canal
Chota Manakasa
dhuripara
mugaon
ub
GW17
SW18
GW19
GW20
GW21
SW21
GW22
GW23
GW24
GW25
SW26
GW26
3 No.Goraimari
Ujandubi
Golapara
Jona
li R
AP-52B
AP-53
AP-54AP-55
AP-57
AP
-58
AP-60
AP-61
AP-61A
AP-62
AP-63
AP-64
AP-65AP-66
AP-68
AP-69
AP-70
AP-70A
AP-71
AP-72
AP-73
AP-74
AP-74A AP-75
AP-76
AP-76A
AP-76B AP-76C
AP-77
AP-77A
AP-79
AP-80AP-80A
AP-81
Map Showing Ground Water & Surface Water Sampling Location Along Salakati(BTPS) - Rangia 220 KV Double Circuit Transmission Line & 220/132 KV S/S at Rangia.
(Pre Construction Stage)
-Sheet : 2 of 5
0 1 2 30.5
Kilometers
1:50,000
SCALE
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
Legend :
Unmetalled Road
Cart Track
Pack Track
Foot Path
Embankment
River
Stream
Canal
Water Body
Metalled Road
Final Route
Existing HT Line! !
Hut
Temple
Trees
Railway Line
2 Km. Buffer Area
1 Km. Buffer Area
#* Ground Water
#* Surface Water
Pre-Construction
Stage Sampling :
!
!!
!!
!!
!!
!!
!!
!! ! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! ! ! ! ! ! ! ! ! ! ! !
#*
#*
#*
#*
#*
#*#*
#*
Pathl
a N
.
Darkinajani
Saudarbhita
Supahaljhar
Adirbagh Bil
Haripur
Potapathar Bil
Amaratari
Raumari
Kolbari
Pathlagaon
Openscrub
Ford(May to Jun)
Bhokuamari
Kalapani
Udagaon
Dalgaon
Dumruguri
Nimota
Sakala Bil
Bangsibari
Nalpara
Matanga
Dhekiajani
Khusarabari
Shonpara
Bunmaja
Anandmandali Bil
Sarangpara
KuribilFord (Mar to Jun)
Ford (Mar to Jun)
Maharani
Pub Kathalmuri
Bhotanta Mahitara
Sutpara
Ihumarpathar Bil
Bhalaguri
Market(Tues & Fri)
Lochima
Dolajani
HatkholaToll
Kolmari
Kachumari
Pathla Camp
Anand Bazar
PO
PO
Hattinapur
Katmati BilHukm
ana N
.
RaumariRaumari Bil
Open scrub
Kasitari
Dumruguri
Kanakura BilBar Kukra
Bar Kukra BilBagurirtari
NamsathariPashchim Hakartup
Besamari Bil
Hakartup
Dalimarbaita
Ford (Oct to May)
Singimari
Maharani Bholar Pam
Bangali Pam
Tengapakarirtal
Charaimari
Bhotanta Mahitara
Laogaon
Digjira N.
Goramari
Simalaguri
Damchi Bil Goramari Bil
Bamunkutuni Bil
Maharani
Maharani Bil
Bamunkatuni
Openscrub
Chha
Bar Saderi
Kurubaha
Kaharpara Pam
Daisingri
POAkaya
Uluya
Kurabaha
Pakha
Tuple Panbari
Gadgaon
POPahum
ara
N.
Path
la N
.
GamriguriGamriguri
Gobardhan
Uttar Chafakamar
Pashchim ChafakamarAksiguri
Chafakamar
Purab Chafakamar
Katajhar
Katajhar
Katajhar
Barapeta
Chafakamar
Barapeta
Bhetemaritup
igaon
Hakua N
Hak
ua N
PODisp
Barapeta
Barapeta
Poragaon
et& Fri)
Ferry(Oct to Mar)
Market(Tues & Fri)
(Wed & Sun)Market
Ford(Oct to Mar)
Market(Sat) PO
No.1
Ferry
Mo
ra M
an
as o
r B
eki R
iver
GW27
GW28
GW29
SW30
SW31
GW32 GW33
GW34
AP-80A
AP-81
AP-82
AP-83
AP-84
AP-85 AP-86
AP-88 AP-89
AP-90
AP-113A
AP-113
AP-111
AP-110
AP-109
AP-108
AP-107
AP-105
AP-104
AP-103
AP-102AP-101AP-100
AP-99A
AP-99AP-97
AP-96AP-95
AP-94
Map Showing Ground Water & Surface Water Sampling Location Along Salakati(BTPS) - Rangia 220 KV Double Circuit Transmission Line & 220/132 KV S/S at Rangia.
(Pre Construction Stage)
-Sheet : 3 of 5
0 1 2 30.5
Kilometers
1:50,000
SCALE
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
Legend :
Unmetalled Road
Cart Track
Pack Track
Foot Path
Embankment
River
Stream
Canal
Water Body
Metalled Road
Final Route
Existing HT Line! !
Hut
Temple
Trees
Railway Line
2 Km. Buffer Area
1 Km. Buffer Area
#* Ground Water
#* Surface Water
Pre-Construction
Stage Sampling :
! ! ! ! !!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
!
!
!
!
!
!
!
!
!
!
!
!!
!!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!! ! ! ! ! ! ! ! !
!
!
!
!! ! ! !
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
Gohaic
Kallaipar
Bherbheri
Ajirkhat
Kotaibari
Irtaluk
PO
PS
Kotibari
Chataibari
Khoruchi
Dhamdhama
Sital Pukhuri
(Wed & Sat)Market
Dhamdhama
Garbhitar
Garbhitar
Santipur
Santipur
Horharia
HarhariaGoabil
Nutan Pukhuri
Jartaluk
Pub
na
i N
Ghoramara
Che
ng
na
i N
Ghoramara
Nichlamari
Halapar
KadamrolaAngardhowa
Dhekibhanga
Bamunghat
PukhuriRajahua
Tokankata
Tokankata
Thanguri
La
khip
ar
N
Khanelapara
Amitapara
DhekibhaugaKhagrabari
Angardhowa
Angardhowa
PolokataLakhipar
Polokata
Tokankata
Thanguri
Lakhipar
Debacharia
Dukuchiapara
Debacharia
Anandpur
PO
Shilakuti
Pagladiya N
Bangalipara
Dongpar
Dangar MakhaBanbari
Tihu N
Faurabari Bari Makha
Shilakuti
Mor
a N
scurbOpen
Oralguri
Gal
din
N
Oralguri
Kalabarasapa
Sanbari
Shilakuti
Singrapara
Singrapara
ShilahutiShilakuti
Barjhar BennabariSaukuchi
HaurabariSaukuchi
Saukuchi
NakatiparaBernabari
Bennabari
Sin
gra
N
Bennabari
Hajiragaon
Nalbari
Murkuchiara
BangaliparaDalbari
Mora Tihu N
KajiragaonNakatipara
Saukuchi
Oralguri
Mora Deojara NSantabari
ChantaparaRampur Nimua
Rampur
Totlasopa
Deojara N Rampur
Sripur Deoghar
Mo
ra N
Kotobar
Madhupur
Can
al
Chhota Manikpur Chamthiapara
Kharabari
Nichlabari
Pamuapatha
PamuapatharBunbari
Chaukhuti
Kotobari
Kashsop
Galdinpara
Damalguri
Hatitari
KalbariBalatari
Bangaon Pam
Bar ManikpurChamthiapara
Chamthiapara
Chhota Mamkpur
Mora
c Deoja
ra N
Deo
jara
N
Katanipara
Athiabari
Chutiapara
Bamundoba
Bhalukdanga
UdhabariBagapara
Pub Pipla(Bangnabari)
Deojara N
.
PO
Saru Manikpur
Bar Manikpur
Chhaibari
PO
Pakha
ari
PO
Chem
tia N
.
Pipla
Piplagalangpara
Kopilimara Bil
Can
al
Chhaibari
Chemtia
GW35
SW36 GW37
SW38
SW39
GW39
SW40
GW40
GW41
SW41GW42
SW43GW43
AP
AP-148
AP-147
AP-145
AP-144
AP-143
AP-142
AP-141
AP-140
AP-139
AP-138AAP-138
AP-137B
AP-137A
AP-137
AP-136
AP-135AP-134A
AP-134
AP-133
AP-132
AP-131
AP-130
AP-128
AP-127AP-126
AP-124A
AP-124AP-123
AP-122
AP-121
AP-120A
AP-120
AP-119
AP-118
AP-117
AP-115
AP-114AP-113A
Map Showing Ground Water & Surface Water Sampling Location Along Salakati(BTPS) - Rangia 220 KV Double Circuit Transmission Line & 220/132 KV S/S at Rangia.
(Pre Construction Stage)
-Sheet : 4 of 5
0 1 2 30.5
Kilometers
1:50,000
SCALE
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
Legend :
Unmetalled Road
Cart Track
Pack Track
Foot Path
Embankment
River
Stream
Canal
Water Body
Metalled Road
Final Route
Existing HT Line! !
Hut
Temple
Trees
Railway Line
2 Km. Buffer Area
1 Km. Buffer Area
#* Ground Water
#* Surface Water
Pre-Construction
Stage Sampling :
! ! ! ! ! ! ! ! !!
!!
!!
!
!
!
!
!
!
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
Kuhma N
Mud(Thurs & Sun)Market
Kahibari
Dhalkuchi
Chirakhundi
Gog Malacha
Chirakhundi
KuptidabaBihapara
KhandikarChenimara
DhepargaonLahapara
Non
a N
Rangia
Palangi
Bhatkuchi
Jamtala
Karara Garbhitar
Bishen Nalagaon
Bichennala
(July to Oct)Usually flooded
HalikuchiBichennala
TulsibariTarani
Baralia NDalaigaon
Balagaon
Hasantuk
DhingitolaKarara
Kakaimari
JayantipurHalikudhiBhithamahal
Bangaon
Kataimari
Bar Shiral
JuljaliKhabanikuchi
Ford (Jan to May)
Nona NPanimajkuchi
Sunkuira
Balipara
Khatikuchi
Kathalgaon
Bhadrabangal
Balasupa
Gohaichubri
Kallaipar
Bherbheri
Ajirkhat
Chapatal
Arara
Bhitamahal
lchhapur
KarunabariJayantipur
Kotaibari
Bar Shiral
Ferry
Ford
Pagladiya N
Kotibari
Chataibari
Khoruchi
Dhamdhama
Sital Pukhuri
(Wed & Sat)Market
Garbhitar
Garbhitar
SW44
GW44
GW45
GW46
GW47
SW47
GW48
SW49
GW49
GW50
AP-173AP-172
AP-171
AP-170AP-169
AP-168
AP-167AP-166A
AP-166
AP-165
AP-164B
AP-164A
AP-164
AP-163AP-162
AP-161
AP-160
AP-159A
AP-159AP-158A
AP-158
AP-157
AP-156
AP-155A
AP-155
AP-154
AP-153
AP-152B
AP-152A
AP-152
AP-150
AP-148
Proposed S/Sat RANGIA
Existing S/Sat RANGIA
Map Showing Ground Water & Surface Water Sampling Location Along Salakati(BTPS) - Rangia 220 KV Double Circuit Transmission Line & 220/132 KV S/S at Rangia.
(Pre Construction Stage)
-Sheet : 5 of 5
0 1 2 30.5
Kilometers
1:50,000
SCALE
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
Legend :
Unmetalled Road
Cart Track
Pack Track
Foot Path
Embankment
River
Stream
Canal
Water Body
Metalled Road
Final Route
Existing HT Line! !
Hut
Temple
Trees
Railway Line
2 Km. Buffer Area
1 Km. Buffer Area
#* Ground Water
#* Surface Water
Pre-Construction
Stage Sampling :
!!
!!
!!
!!
!!
!!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!!
!! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !!
!!
! ! !!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
Nowgong
Hemabari
Jalmahi
Bangtha
Gedarbari
Kurabahi
Saru Jamuguri
Bebejia
Bar Jamuguri
Lathabari
Gasainbari
Rahdhala
Khalaigaon
Ephaliabari
Barbari
Pub Salmara
Balisara
Kujarbari
Sataligaon
Bangtha
Dimau Bil
Dimau
Maheri Ati
Dimau Bil
Dimau
Bar Thal
Taranl Bil
Bebejia RSMarket (Tues)
Ghanhigaon(Birah Bebejia)
Sapkati Bil
Deodhargaon
Pakhimaria
Maukhatigaon
Gelai Pathari(Bar Pathari)
Bar PathariPanigaon
Mari Kalang Bil
Shlalmari Katayani
Mari Kalang(Dhepajan)
HatiparaMari Kalang
Juriagaon
Maj Pathari
Maj Pathari
Mahlor Bil
Mari Kalang
Mari Kalang(Barghat)
Nij Pathari
MahlorBhotaiati
Mahlor
Uriagaon
Gaengaon
Katanigaon
Chakarigaon
Bar Pathari Sutargaon(Tangondhara)
Bar Pathari Bhotaigaon
Bar Pathari Panigaon
Ujaragaon
Ujaragaon
Ranthali
Ghuriagaon
PO
Patari Thal
Na Bebejia
Elengi Sattra(Kalangpar)
Jaranigaon
Dakarghat
Dekagaon
Kumargaon
Birah BebejiaMara Kalang Bil
Bangaon
Birah Bebejia
KALANG R
Dimaruguri
Sialekhoa
PO
Naomati
Dispensary
Teliagaon
GW1
Dispensary
PO
NH-37
33kV LINE
Kalang R
Patha
ri N
PO
PO
GW2
Chakarigaon
Bhotaigaon
PO
SW3
Vet. Hospital Hospital
Bajiyargaon No 1
Govt. Farm
Market (Sun)
KALANG R
BhakutgaonDilikabasti
Bharaguri
Bharaguri
Hatigaon
Larubasti
Gendhati Kachari
KurabahiSamaguri RS
Shingiya Kumargaon
Maj Ati
PS
SW4
Samaguri
PTOBM 64.8
Bamuni TinaliMarket (Sun)
Tapatjuri TGDense Bamboo
Mikirgaon
TGBarhampur
Barhampur Grant
Dolaigoan Bamunigaon
Dhantula T G
Dhantula
Nedhargaon
Nan
ai N
(hogargaon)Barhampur
Dispensary
Bejerchuk Mud
PoBoprhampur
KatejugigoamChalchali Jalahar Chuk
Chalchali Jalahar Chuk
GomothagaonPotani
Singiya Potani Mangratup
Kamargaon
Ghogar Jalah
Chutiyagaon
Gomothagaon(gogoigaon)Harjmishra
Chalchali
Bherbheri
Kakharigaon
Deojharagaon
Puraniguda
RS
KALANG R
PTO
Domgaon
PO
Balijan Hanchara
Bajiyargaon No 2
Bheleguri
Dokkhinpat
Mud
Panigaon
Mikirgaon
Dispensary
Phukanar Khat
Shingiya
Gonak Atl
Hatigaon
Hatigaon
Baruwa Chuck
Murhani
MahaparaMaura Chuk
SW5
Murani
Chalchali BamungaonJaljeri Doloni
Dep
Hatigaon
Potani
Gra
velle
d
PO
ChalchallHalowagaon
ChalchaliChalchali
PODep
Hazarika Chuk
Market (Sat)
Maj potani
Potani N
Hatiyani Bheto
Dep
NH-37
GW6
GW7
SW8
GW9
GW10
SW11
GW12
AP
-56
AP-1
AP-2AP
-3
AP
-4
AP
-5
AP-6
AP-7 AP-8
AP-9
AP-10
AP-11
AP-12AP-13AP-14
AP-15
AP-16
AP
-17
AP
-18
AP
-19
AP-20
AP-21
AP-22
AP-23
AP-24
AP-25
AP
-26
AP-2
7
AP-28
AP-29
AP
-30
AP
-31
AP
-32
AP
-33
AP
-34
AP-35
AP-36AP-37
AP-38AP-39
AP-40
AP
-41
AP-42
AP-43AP-44
AP
-45
AP
-46
AP
-47
AP
-48
AP-49A
P-5
0
AP
-52
AP-53
AP-54
AP
-55
Exit. 220kV S/S at SAMAGURI
Proposed 132kV S/S at NAGAON
-0 1 2 30.5
Km.
1:50,000
SCALE
Map Showing Ground Water & Surface Water Sampling Location Along 132KV Single Circuit Samaguri - Nagaon
On Double Circuit Towers & 132/33 KV S/S at Nagaon.(Pre Construction Stage)
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)
Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001
www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
Legend :
Final Route
District Boundary
National Highway
Metalled Road
Unmetalled Road
Cart Track
Pack Track
Embankment
Water Body
Stream
Hut
Existing HT Line! ! ! !
Railway Line
2 Km. Buffer Area
Trees
1 Km. Buffer Area
River
Pre-Construction
Stage Sampling :
#* Ground Water
Surface Water#*
#*
#*
NH
-31
Nanara
NaogaonAgdala
(Junaru)
Kalaia
l N NH-52
To Rangia
To Mangoldoi
To C
hangsa
ri
NH-31 BaihataChariali
Piali Khata
SW1
GW1
KhelmahaTengabari
BM 48.7Madartala
Nij Madartala
POBM 51.2
GanakparaJalimura
Alagajari
Churibasa
Bonbari
Agdala(Junaru)
Proposed S/Sat KAMALPUR
-
Legend :
1 Km. Buffer Area
2 Km. Buffer Area
National Highway
Unmetalled Road
Cart Track
Foot Path
River
Stream
Hut
Trees, Grass,
Water Body
0 0.5 1 1.50.25
Kilometers
1:30,000
SCALE
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)
Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001
www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
Pre-Construction
Stage Sampling :
#* Ground Water
#* Surface Water
Map Showing Ground Water & Surface Water Sampling Location Along 132KV Double Circuit LILO at Kamalpur
from 132KV Double Circuit Rangia - Kahilipara / Sishugram Line.(Pre Construction Stage)
!
!
!
!
!
!
!
#*
Mankata TG
Barpathar
Dighalagaon
Komargaon
PO
Trolley Line
Sesa N
Khanikar TG
Bhogpara TG
Khanikargaon
Duliagaon
NH
-37
Khanikar TG
DuliagaonNaharani Duliagaon
Duliagaon
BarbaruaTG
Dainijangaon
Sesa TG
Kochharibari
MainabariTG
Lekai
Lekai102
Mankata
Haumura
GW1
Khamtigaon
Rajabheta
Rajabheta TG
Factory
Mazdoor Line
Lekai
Mazdoor Lines
Factory
Dainijangaon
Gharamara
ChenglijanBrick Kiln
Brick Kiln(Disused)
Mantri Bil
BihiatingTG
Sesa
N
S/S at BIHIATING(KHANIKAR)
-Map Showing Ground Water & Surface Water Sampling Location Along
132KV Double Circuit LILO at Bihiating LILO from 132KV Dibrugarh - Moran Line & 132/33 KV S/S at Bihiating.
(Pre Construction Stage)
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)
Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001
www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
1:40,000
SCALE
0 1 2 30.5
Kilometers
1 Km. Buffer Area
3 Km. Buffer Area
Legend :
Final Route
Metalled Road
Unmetalled Road
Cart Track
Pack Track
River
StreamExisting HT Line! !
Hut
Temple
Tree
National Highway
Pre-Construction
Stage Sampling :
#* Ground Water
!!
!! !
!
!
!
!
!
!
!
!
!
! !
!!
!
!
!
!!
!! ! ! ! ! ! ! ! ! ! ! ! !
!
!
!
!!
!!
!! !
!!
!!
!!
!!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!!
!
!
!!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! ! ! ! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!!
!! ! ! ! ! !
!
!
!
!
#*
#*
#*
#*#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
scattered trees
Upper Dihing RF
Deamoli TG
Tiphuk TG
GW1
GW2
GW3
GW4SW4
GW5
GW6SW6
Noa Motopam
SW7
GW7
Dihalkhaku
Hulutupu
HatiJan
Bangaligaon
Bet Jan
Barpathar
Hap Jan Tea Garden
SW8
GW8
Chota Hap Jan
SW9
GW9
Amguri
Hap Jan
Hulutupur
Hukanguri TG
Langsoal Tea Garden
Hosp
Hilika TG
Hosp.
GW10
Hukanguri TG
scrubOpen
Hukanguri TG
Hap
Jan
Hosp.
TG
Pabhojan
Hosp.
Rupahi TG
high
2 metres Grass
132 kV D/C LINE(T-M)
NH-37
TengpaanigaonTengpaani TG
Disp.
RubberbarigaonKhar J
an
Tingrai N
Tingrai N
Mamorani
Anandabag TG
Garbasti
Mamorani
No 2Bangali Balijan
colonyChhota Hapjan
Naogaon
Haveda TG
Hapjan TGGangabari TG
No 1BalijanAssami
No 2
Bangali BalijanChhota Hapjan T G
Makum
RS
Shastrinagar
Dense scrub
scrubOpen
Open scrub
mainly bambooDense mixed jungle
scrubOpen
Dense scrub
BM 126.8
BM 123.9
RH(Forest)
Reservepati
ChikajanTG
Parbatia
Plywood FactoryPS
Brick kilnPakharijan
Disp
Disp
Parbatia
Hukanpukri
TINSUKIANao Pukhuri
Bhimpara
Patiapathar
Brick kiln
Dense scrub
BangaligaonHaveda
No 3Havedagaon
No 2Havedagaon
No 1Havedagaon
Khetojanbasti
Tingrai N
Tingrai Bangaligaon
jungleDense mixed
Tingrai Bangaligaon
TG
Hukanpulhuri
TGHukanpulhuri
Brick kiln
Open scrubOpen scrub
Brick kiln
Norsing gaon
Overhead tank
RS
Sewpur TG
Sewpur TGTG
Sewpur
Pakh
ari ja
n
Lohari Nepaligaon
KacharigaonLohari
Lohari Bangaligaon
Lohari Jan
Rice mill
Lohari Kacharigaon
Lohari Kacharigaon
BM 124.7
Sivdham TempleSteel FactoryTG
Hukanpulhuri
Ahukhat
Rangpuria
Bengmara Pukhuri
Bisdkup TG
Bisdkup TG
Mankhoa TG
Tiphuk TG
Tiphuk TG
Amguri Balijan
Rupai
Domukhra N
Dhaimukhia TG
Dhimukhia TG
Rupai TG
Hosp.
Rupai TG
Tiphuk janKachugaon
Nagoori
Pabhajan TG
Dibru R
Hosp.
Prabhat TG
Hosp.
Hosp.
Hosp.
Rangajan
Open scrub and
Ekthengiagaon
Ekhengiagaon
Sesabatgaon
Bisakupi
Trolley line
Dariabhiti
Garumaragaon
RS
Khar jan
Bhati Mamonigaon
AP-1
AP-2
AP-3
AP-4
AP-5
AP-6
AP-7
AP-8
AP-9AP-1
0AP-11
AP-12
AP-13
AP-14
AP-15
AP-16
AP-17
AP-18
AP-19
AP-20
AP
-21
AP
-22
AP
-23
AP
-24
AP-25
AP
-26
AP-27
AP-2
8
AP-2
9
AP-30
AP-31AP-32
AP
-33
AP
-34
AP-35AP-36
AP-37
Existing S/S at RUPAI
Existing S/S at TINSUKIA
-
0 1 2 30.5
Kilometers
1:50,000
SCALE
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
Map Showing Ground Water & Surface Water Sampling Location Along 132KV Double Circuit LILO at Rupai from 132KV Double Circuit Tinsukia - Mergharita Line
& 132/33 KV S/S at Rupai.(Pre Construction Stage)
Legend :
1 Km. Buffer Area
2 Km. Buffer Area
! ! ! ! Existing HT Line
Forest Boundary
Metalled Road
Unmetalled Road
Cart Track
Pack Track
Railway Line
River
Stream
Water Body
Final Route
National Highway
Hut
Trees
Pre-Construction
Stage Sampling :
#* Ground Water
#* Surface Water
!
!
!
!
!
#*
#*
Raidangiya Noakachari
Trolley line
Banphera Grant
Banphera TG
Khamlung Jabaka
Dakhin Sonari Habi
Hosp.
SW1
GW1Dabaka TE
Sonari
(Sunday)Market
IB (PWD)
Rajabari Grant Noakacharigaon
Tiyakghat
Ratanpur
TG
PO
Hosp.
Tiyak TG
Factory
Tiyak N
Tiyak Rajabari
BagriguriTiyak Bangaligaon
Factory
TiyakgaonBhoja RS
Bhojogaon
PO
Disang or Dilli R
TWR-17TWR-16
TWR-15
TWR-14TWR-13
TWR-12
TWR-11
TWR-10
TWR-9A
TWR
-6
TWR
-6TWR
-4TWR
-3
TWR-2
TWR-1
TWR-11
TWR-10
TW
R-9
TW
R-8
TW
R-7
TW
R-7
SONARI Sub-Station
-0 1 2 30.5
Km.
1:50,000
SCALE
PREPARED BY :En-Geo Consultancy & Research Centre (ENGECORC)
Recognized By : Department of Space, Government of India[ISO 9001-2008 Certified]71, Lamb Road, Ambari, Guwahati-781001
www.engecorc.com, e-mail: [email protected]: 91-361-2545165, Fax: 91-361-2515536
Map Showing Ground Water & Surface Water Sampling Location Along 132KV Double Circuit LILO at Sonari from
132KV Lakwa - Namrup Line & 132/33 KV S/S at Sonari.
(Pre Construction Stage)
Legend :
Route I
Route II
Route III! ! Existing HT Line
Metalled Road
Unmetalled Road
Cart Track
Pack Track
Foot Path
Embankment
River
Stream
Water Body
Hut
Trees
Railway Line
1 Km. Buffer Area
2 Km. Buffer Area
Pre-Construction
Stage Sampling :
#* Ground Water
#* Surface Water