Environmental Monitoring Report Semi-Annual Environmental Monitoring Report No. 5 January-June 2016 VIE: Central Mekong Delta Region Connectivity Project Part 2 Annexes (138-167) Prepared by Detailed Design and Implementation Support: Joint Venture of CDM Smith, WSP Finland Limited and Yooshin Engineering Corporation for the Socialist Republic of Viet Nam and the Asian Development Bank.

Upload: others

Post on 22-Nov-2019

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

Environmental Monitoring Report Semi-Annual Environmental Monitoring Report No. 5 January-June 2016

VIE: Central Mekong Delta Region Connectivity

Project Part 2 Annexes (138-167)

Prepared by Detailed Design and Implementation Support: Joint Venture of CDM Smith, WSP Finland Limited and Yooshin Engineering Corporation for the Socialist Republic of Viet Nam and the Asian Development Bank.

Page 2: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

NOTE

In this report, “$” refers to US dollars.

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area

Page 3: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

CDI\IIth Sml

Cent ral Mekong Delta Connectivity Project - (CMDCP)

TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE

COM Smith- WSP -Yooshin Consultant JV Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Gao Lanh City, Dong Thap Province, Vietnam

WSP .... .. Tel: (84) 067-3881-255; Fax: (84) 067-3881-256

Ref. No. : DDIS/CW1 B/1 030

Date : 06 August 2015

To: Mr. Diao Peng Project Manager

Contractor's Representative

Project Site Office: Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam; Tel: (84) 067-3881-255; Fax: (84) 067-3881-256

Subject: Package CW1 B - Environmental inspection report on 04 Aug 2015

Dear Mr. Diao Peng,

After the inspection of CW1 B work package on 04th August 2015, we would like to highlight some

environmental issues on your site regarding unclean working environment as mentioned on the

environmental inspection report in the attachment. Please follow up our instructions/guidance in the

report to take quick action and give us your response for those issues by 12th August 2015.

By the way, we would like to mention to you some remaining issues from last ADB/DFAT mission

on March 2015 as follows:

There are no drainage system along access road. This problem was reminded to you in some

previous letters DDIS/CW1 B/0847 on 17 March 2015 and DDIS/CW1 B/0994 on 29th June

2015.

First aid kit should be available on office and worker accommodation.

The excavated soil disposing quantity should be recorded and reported to DDIS. However,

this report was not fully detailed by your submission; please request your staffs to fully fulfil

DDIS instruction and quickly submit to us before 12th August 2015.

Your quick actions on these issues is highly recommended.

Cc: - As above

Cao Lanh Bridge Project Manager, CIPM Site Construction Team, CIPM

File: DDIS Consultant JV Office

Page 1 of 1

Attachment: Environmental inspection report 04 Aug 2015

Page 4: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

CDMth Sm1

DIJ' an Kilt n6i khu VIJ'C trung tam £>6ng song Cl.Pu Long - (CMDCP)

TA 7822-VIE, Khoan vay 3013-VIE, Khoan trQ' 0353-VIE

Li€m danh TLP van COM Smith- WSP -Yooshin

!-•WSP .. h.:.....

To 5, Ap Tan Tich , Xa Tinh Th&i, TP Cao Lanh, Tinh £>ong Thap, Vi$t Nam

£>T: (84) 067-3881-255; Fax: (84) 067-3881-256

so thll'

Ngay

: DDIS/CW1 B/1 030

: 06/08/2015

Gt)i den: Ong Diao Peng Giam Doc DLI' an

di$n thElU

VP Dl! an: T6 5, Ap Tan Tich , Xa Tjnh Th&i, TP Cao Lanh, Tinh Dong Thap, Vi$t Nam

8T: (84) 067.352.6868 Fax: (84) 067.352.6969

Chu G6i CW1 B - Bao cao tra moi trU'<Yng ngay 4/8/2015

Klnh gll'i 6ng Diao Peng,

Sau khi tra m6i trU'cmg goi CW1 B vao ngay 04/08/2015, chung t6i muon cho 6ng m(>t vai m6i trU'O>ng c6ng trU'O>ng 6ng lien quan m6i trU'O>ng lam kh6ng

nhU' da dU'Q'C trong bao cao dlnh kem tra m6i tmO>ng. Mong 6ng tuan thu thea nhCrng hU'&ng dan trong bao cao va nhanh chong hanh d(>ng va gll'i phan hoi cho chung toi vao ngay 12/08/2015.

Nhan chung t6i cung nh& 6ng m(>t vai m6i tmO>ng van con ton dong goi cua 6ng sau doan ADB/DFAT tham vao thang 03/2015 nhU' sau:

Kh6ng co thong thoat nU'&c doc dU'O>ng c6ng vt,J . nay da dU'Q'C nh& trong thU' tm&c nhU' DDIS/CW18/0847 vao ngay 17/03/2015 va DDIS/CW18/0994 va ngay

29/06/2015. 8(> dt,Jng Cl,l SO' ClfU y phai lu6n thU'Q>ng tntc van ph6ng va nO'i cY CUa c6ng nhan. Khoi IU'qng dao dU'Q'C d6 thai phai dU'Q'C bao cao chi len TU' Tuy nhien bao cao nay chU'a dU'Q'C ct,J sau trinh n(>p; mong 6ng yeu nhan vien (lien v&i dong chi LU'u - dO'n vi 12) hoan yeu d u TU' va nhanh chong trinh n(>p chung t6i trU'&c ngay 12/08/201 5.

Chung t6i khlch cac hanh d(>ng thl)'C thi ben 6ng m(>t each nhanh chong va tlch Cl)'C.

Tran trong,

{EJa kyJ

Gordon Belton

Giam doc Dl)' an

Cc: Nhll' trE'm Giam d6c dl,l' an C§u Cao Uinh, CIPM Nh6m quim ly cong tm&ng, CIPM LLI'u: Lien danh TVGS - DDIS

8inh kern: Bao cao kiem tra moi trll'&ng ngay 4/8/2015.

Trang 1/1

Page 5: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

ENVIRONMENTAL MONITORING REPORT Period observation Location

Period (dd-mm-

yyyy)

Work Package Km from

3+800

Km to

6+200

Weather Observers

4th Aug 2015 CW1B Sunny Ms. Le Thi Phuong Loan – NES

Issues

GOOD practice: Contractor can reuse the fuel drum to store equipment and small tool to work on site.

Overspreading excavated soil on site without any proper storage. This soil must store in designated area

for disposal area. For reuse purpose, this soil should store in a temporary place with barricade and

notification broad.

Access road was dirty and full of dust during transport. To avoid dirty road affecting by construction

activity, Contractor must regularly spray water at least 6 times/day, this frequency might need to

increase for either the hot and sunny day or increase of transport activity.

Domestic waste was found on site and worker accommodation. Contractor must require cleaning activity

for these places and remind your worker to keep clean condition for their environment.

Metal waste was spread over on fabrication yard; this material should be stored in a designated area for

metal waste with barricade and (label) notification broad as reference.

Many old machines were broken and repaired on site which led to fuel leakage and contaminated soil

and ground. This contamination should be clean up by collecting contaminated soil to hazardous storage.

Contractor must provide secondary containments to use for emergency case (e.g. broken crane) to avoid

fuel leakage to ground.

Many chemicals/fuel on site are not labeled. It might be dangerous for workers and newcomer.

Contractor need to strictly require workers to label any can/drum/barrel of liquid materials.

There are many large bunches of water hyacinth stuck on the pipes of temporary bridge in both North

and South sides. These bunches will be waste storage on the river and cause difficulty for transportation.

Contractor must quickly remove and repeat this action with other stuck water hyacinth.

Both batching plants are dirty and full of concrete waste. Settling pond in batching plants in south side

are problematic since these area are always overfilled; the wastewater might run into the supply water

canal to agricultural field. Since settling pond was full, the wastewater run in shallow area nearby. This

issues had been reminded to contractor many times but there are no action and feedback. Contractor

need to clean these areas and remove all concrete waste as well solid waste under settling ponds as

soon as possible.

Photographs

Good practice: re-use fuel drum to tool/equipment

storage

Page 6: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

The evavated soil is dumping on site without any permission

Dirty access road on South side Dirty access road on North side

Domestic waste on site and worker accommodation in

North side

Domestic waste on site and worker accommodation in

South side

Page 7: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

No proper metal waste storage Materials stored in worker accomodation

Contaminated ground after repairing crane Fuel leakge from crane on the barge in the river

Chemical without label Contaminated ground near by South side batching

plant

Page 8: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

Both settling ponds are full of wastewater

Concrete waste is spreading over the batching plant area

Page 9: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

BÁO CÁO KIỂM TRA MÔI TRƯỜNG

Giai đoạn Địa điểm

(dd-mm-yyyy) Gói thầu (dd-mm-

yyyy)

Gói thầu (dd-mm-

yyyy)

Gói thầu

04/08/2015 CW1B Nắng bà Le Thi Phuong Loan – NES

Vấn đề

Thực hành TỐT: Nhà thầu tái sử dụ gàth gàđựng dầuàđể chứa máy móc và các dụng cụ nhỏ để làm việc

trê à gàtrường.

Đấtàđổ thảiàđổ tr àla àtrê à gàtrường không có mộtà ơià hứa phù hợp.àĐất này cần phảiàlưuàtrữ tại

khu vự àđ àđược bố tríà hoàđổ thải.àĐể cho mụ àđí hàt iàsử dụ g,àđất này cần phảiàđược chứa trong khu

vự àđổ thải tạm thờiàtrê à gàtrườ gàđượ à gă à ởi dảià gă à hàv à à ảng thông báo cho khu chứa

đấtàđổ thải tạm thời.

Đường công vụ bẩ àv àđầy bụi trong quá trình vận chuyể .àĐể tr hàđường bẩn do các hoạtàđộng thi

công, nhà thầu cần phảiàthườ gà u ê àphu àtưới nước it nhất 6 lần/ngày, tần xuấtàtưới cần phảiàtă gàtro gàtrường hợp trời nắng nóng hoặ àgiaàtă gàlưuàlượng vận chuyển.

R àđược nhận thấy ở khắpà gàtrường và khu nhà ở của công nhân. Nhà thầu cần yêu cầu dọn dẹp cho

những khu vực này và nhắc nhở công nh àđể dọn dẹp và giữ gìn vệ si hà hoà iàtrường của họ.

Rác kim loạiàđể lan tràn khu vự à iàđ àdầm; vật liệuà à ê àđượ àlưuàtrữ tại khu vự àđược thiết kế

cho rác kim loại với dảià gă à hàv à ảng thông báo.

Nhiềuà à à ũàđ àhưàv àsửa chữa trong côngàtrườ gàđ àdẫ àđến tràn dầuàv àđất nhiễm dầu. Khu vực

đất nhiễm dầu cần phảiàđược dọn dẹp bằ gà hàthugào àđất ô nhiễ àđến các khu chứa rác nguy hại.

Nhà thầu cần cung cấp khay chứaàđể sử dụ gàtro gàtrường hợp khẩn cấpà hưàhưà ẩu àđể tránh dò rỉ dầu và nhiên liệu xuố gàđất.

Nhiều chất hóa học/nhiên liệuàtrê à gàtrường không có dán nhãn. Những chất này có thể nguy hiểm

cho công nhân và nhữ gà gười mớiàđến. Nhà thầu cần yêu cầu công nhân tuân thủ nghiêm ngặt việc dán

nhãn cho các can và thùng chất lỏng.

Nhiều mảng lớn lục bình trôi bị kẹt giữa các cột trên cầu tạm cả hai bên bờ nam bắc. Những mảng lục

bình này sẽ l à ơià hứa rác thảiàv àg à ê àkh àkhă àtro gàvận chuyển. Nhà thầu cần nhanh chóng dỡ

bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươ gàtự,àtr hàđể lục

bình kẹt thanh mảng lớn.

Cả hai trạm trộ àđều rất bẩn và nhiều rác bê tông. Khu vực bể lắng của trạm trộn ở bờ Nam là có vấ àđề

khi toàn bộ khu vực này luôn trong trình trạng bị tr àđầ ;à ước thải có khả ă g chảy vào khu vực rạch

ước cho hoạtàđộng nông nghiệpàtrê àđồng. Vì bể lắ gàđầ ,à ước thải từ trạm trộ àđ à hảy vào khu vực

đất thấp xung quanh. Vấ àđề àđ àđược nhắc nhở đến nhà thầu nhiều lầ à hư gà h àthầuàđ àkh gàcó bất cứ h hàđộng gì và phản hồi lạiàTưàvấn. Nhà thầu cần phải dọn dẹp các khu vực này và dỡ bỏ tất

cẩ àr à êàt gà ũ gà hưà hất thải rắ àdưới bể lắng nhanh chóng.

Ảnh

Thực hành TỐT: tái sử dụng các thùng nhiên liệuàđể

đựng dụng cụ

Page 10: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

Đấtàđổ thảiàđổ la àtr àtrê à gàtrường không có sự cho phép

Đường bẩn bụi bờ Nam Đường bẩn bụi bờ Bắc

R àt ê à ô gàt ường và khu ở công nhân ở bờ Bắc R àt ê à ô gàt ường và khu ở công nhân ở bờ Nam

Page 11: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

Không có khu chứa rác kim loại phù hợp Các loại vật liệuàv à àđể trong khu vực nhà ở công

nhân

Đất nhiễm dầu sau khi sửa cẩu Dầu rò rỉ từ cẩuàđa gàhoạtàđộng trên sà lan trên sông

C à a àđựng hóa chất/nhiên liệu không có nhãn mác Đất nhiễm bẩn gần trạm trộn của khu vực bở Nam

Page 12: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

Hai bể lắng ở bờ Na àđều ngập ước

R à êàtô gàđổ lan tràn khắpà ơiàxu gà ua hàkhuàvực trạm trộn

Page 13: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

Dl! an n6i khu V'.J'C trung tam D6ng song CU.u Long - (CMDCP)

TA 7822-VIE, Khoan vay 3013-VIE, Khoan trg 0353-VIE

Lien danh TU' COM Smith - WSP -Yooshin T6 5, Ap Tan T ich, Xa Tinh Th&i, TP Cao Lanh, Tinh £>6ng Thap, Vi¢t Nam

S6 thll' : DDIS/CW1 B/1123

Ngay : 14/10/2015

GU>i Ong Diao Peng Giam dOc Dl! an 8c;1i di$n Nha th§u

£>T: (84) 067-3881 -255; Fax: (84) 067-3881-256

VP Dl! an: T6 5, Ap Tan Tich, Xa Tinh Th&i, TP Cao Lanh, Tfnh 86ng Thap, Vi$t Nam

8T: (84) 067.352.6868 Fax: (84) 067.352.6969

chu G6i CW18- Bao cao giam sat moi trU'i>'ng ngay 13/10/2015

Kinh gU>i 6ng Diao Peng,

Sau khi kiem tra m6i trll'O'ng tc;1i g6i th§u CW1 B vao ngay 13/1 0/2015, chung t6i mu6n mc;1nh cho 6ng m<)t vai moi trll'cmg tc;1i c6ng trll'O'ng lien quan m6i trll'O'ng lam vi$c kh6ng sc;1ch nhll' da dll'Q'C trong bao cao dinh kem kiem tra moi trll'O'ng. Mong 6ng c§n tuan thu theo nhCmg hll'&ng dan trong bao cao va nhanh chong hanh d<)ng va gU>i phan h6i lc;ii cho chung t6i vao ngay 20110/2015.

Tran trong,

{EJa kyJ

Victoriano L. Hamlig

Ky sll' Thll'O'ng tru

Cc: - Nhll' trem

- Giam doc dl)' an Cao Lanh, CIPM - Nh6m quc?m ly c6ng trli'<Yng, CIPM - Lll'u: Lien danh TVGS - DDIS

£>1nh kern: Bao cao kiem tra m6i trli'<Yng ngay 13/10/2015.

Trang 1/1

Page 14: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

ENVIRONMENTAL MONITORING REPORT Period observation Location

Period (dd-mm-

yyyy)

Work Package Km from

3+800

Km to

6+200

Weather Observers

13rd Oct 2015 CW1B Sunny Ms. Le Thi Phuong Loan – NES

Issues

Burning waste in worker accommodation is forbidden. Please instruct your workers to strictly comply

with ADB environmental requirements which had been mentioned in the ADB-DFAT mission in Feb 2014.

There are still many unlabeled cans locating on site. These cans should be located in the materials

storage and label with name of chemicals.

Toilets in the worker accommodation were really dirty, smelly, and full of water spreading and wastes.

Contractor must request workers/cleaners often clean and remove waste to the proper storage (waste-

bin). Contractor also need to have environmental trainings for these workers living in the worker

accommodation. These trainings should be recorded and reported to DDIS.

We had observed that many wastes were not collected to waste-bin though this trash-bin locates next

to. This is problematic and missing cooperation from wo ke s’ attitude. Cont acto is e uested to

workers often collect wastes into waste-bin and also train workers for environmental understanding and

proactive attitude in the waste management. This environmental training should be recorded to DDIS.

Water in the concrete tank in the worker accommodation often use for washing and cleaning. These

water tanks were not regularly clean. DDIS request Contractor to assign cleaners/workers to quickly

remove and clean moss and algae in the bottom of concrete tank.

Temporary disposal area for excavated soil was not barricaded. Contractor should barricade this area

to separate this area to access way to fabrication yard.

Photographs

Burning waste is forbidden in the worker

accomodation

No labelled feul cans

Page 15: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

Full of waste inside the toilet Flooding in the toilet access

Waste threw next to toilet Wastes was not collected in the wastebin

Unclean water in worker accommodation No barricade for temporary spoil storage

Page 16: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

BÁO CÁO KIỂM TRA MÔI TRƯỜNG

Thời điểm Vị trí

Thời gian (dd-mm-

yyyy)

Gói thầu Km từ

3+800

Đến Km

6+200

Thời tiết Người quan sát

13rd Oct 2015 CW1B Nắng Ms. Le Thi Phuong Loan – NES

Vấn đề

Đốt rác trong khu ở của công nhân là hoàn toàn bị cấm trong dự .àMo gà gàh àhướng dẫn những

gười công nhân ở trong khu vực này tuyệtàđối tuân thủ với nhữ gà u àđị hà iàt ườ gàđ àđược nhắc

nhở từ thờiàđiể àđo àáDB-DFAT kiể àt aàv oàth gà à ă à 5. Vẫn có nhiềuà a àđựng nhiên liệu không có dán nhãn trên công t ường. Những can nhiên liệu này cần

phảiàđượ àđể trong khu vực kho chứa vật liệu nhiên liệuàv àđược dán nhãn tên loại hóa chất chứa bên

trong.

Các nhà vệ sinh trong khu ở của công nhân rất bẩn, mùi hôi và tràn ngậpà à ũ gà hưà ước ngập. Nhà

thầu cần phải yêu cầu công nhân hoặ à gười dọn dẹpàđể dọn sạch khu vực này và di chuyể à àđế à ơiàthug om (thùng rác). Nhà thầu cần phải yêu cầu công nhân dọn dẹpàthường xuyên và ũ gà ần phải tổ

chức các khóa họ à iàt ườ gàđ oàtạo cho công nhân sinh sống trong khu vực này. Những buổiàđ oàtạo

cần phảiàđược ghi lạiàv à oà oàl àTưàvấn.

Ch gàt iàđ à ua às tàđược nhiềuà àv àt ià àkh gàđược thu gom và bỏ vào thùng rác dù thùng rác

ngay gần bên cạ h.àĐấy là một vấ àđề về thiếu ý thức. Nhà thầu cần phải yêu cầu công nhân thu gom

àv oàđ gàvị t íàth gà àv àđ oàtạo công nhân về ý thứ àv à àth iàđộ chủ động trong quản lý rác.

Các buổiàđ oàtạo này cần phảiàđượ àghià h pàv à oà oàTưàvấn.

Nước trong bồ à ước tại khu ở củaà gà h àthường sử dụng cho mụ àđí hàtắm rửa. Tuy nhiên những

bồ à ướ à àkh gàthườ gà u àđược cọ rửaàđể mọ à o gà u.àTưàvấn yêu cầu nhà thầu cử công nhân

và nhân viên dọn dẹp sạch các rong rêu trong đ à ồ à ước.

Khu vực chứaàđấtàđổ thải tạ àt à gà gàt ườ gàkh gàđượ à gă à h.àNhà thầu cần phải dựng

rào chắ à gă à hàgiữaàkhuàđổ thải tạ àv àđườ gàđiàv oàkhuàthià gàđ àdầm.

Ảnh

Đốt rác là hoàn toàn cấm trong khu vực nhà ở công

nhân

Các can nhiên liệu không dán nhãn

Page 17: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

Ngập rác trong nhà vệ sinh Ngập nước trong khu vực nhà vệ sinh

Rác bị ném vào bên trong khu vực nhà vệ sinh Rác không được thu gom vào thùng rác

Nguồn nước không sạch trong khu vực nhà ở công

nhân

Không có rào chắn tỏng khu vực đổ thải tạm của đất

đổ thải

Page 18: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

CDMth Sml

Central Mekong Delta Connectivity Project- (CMDCP)

TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE

COM Smith- WSP -Yooshin Consultant JV Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam

h WSP Tel : (84) 067-3881-255; Fax: (84) 067-3881-256

Ref. No. : DDIS/CW1 B/1203

Date : 26 Dec 2015

To: Mr. Diao Peng

Project Manager Contractor's Representative

Project Site Office: Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam; Tel: (84) 067-3881-255; Fax: (84) 067-3881-256

Subject: Package CW1 8- Environmental Inspection Report 24 Dec 2015

Dear Mr. Diao Peng,

After ADB-DFAT observations, we have checked and re-inspected your work package. We noted

some improvement in your work, especially for hazardous waste storages. We are highly

appreciated your cooperation on this work.

We also noted some remain ing environmental issues in your site as follows:

1. The batching plants in South side: there are no proper settling ponds and drainage systems.

This problem must be corrected following DONRE comments and ADB-DFAT observations.

However, you did not take any action. Thus we recommend you to temporary stop of two

batching plants in South sides till the corrective actions will be fulfilled.

2. The Tuan Loc batching plant on the Tien River: there are no storage or containers for

concrete waste and wastewater. The discharge is directly to the river. Please explain us the

method you had been used for disposing of concrete waste and how you treat your

wastewater. You are requested to have corrective actions on this issue as soon as possible.

If we still discover your waste dumping directly to the river, the Tuan Loc floating batching

plant will be terminated for working.

3. After DONRE comments on the wastewater from worker accommodation in the South side,

there is no action of wastewater discharge till now. The DONRE comments had been noticed

by MOT via the reference letter Ref. No. 16145/BGTVT-MT dated 041h December 2015. If

there is no action taken for this issue, we would recommend to CIPM and ADB for your non-

compliance action.

Other environmental issues have been described in the Environmental Inspection Report 24 Dec

2015 in the attachment. You are requested to correct our findings by 2nd January 2016.

Page 1 of2

Page 19: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

Your cooperation is highly recommended.

Cc: As above

Cao Lanh Bridge Project Manager, CIPM

Site Construction Team, CIPM

File: DO IS Consultant JV Office

Page 2 of2

Attachment: Environmental Inspection Report

24 Dec2015

Page 20: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

CDI\IIth Sm1

Olf an n6i khu VlJ'C trung tam fl6ng song ClJ'u Long - (CMDCP)

TA 7822-VIE, Khoan vay 3013-VIE, Khoan trg 0353-VIE

Lien danh TU' van COM Smith- WSP -Yooshin To 5, Ap Tan Tich, Xa Tinh Th&i, TP Cao Lanh, Tinh Bong Thap, Nam

flT: (84) 067-3881-255; Fax: (84) 067-3881-256

s o thU'

Ngay

: OOIS/CW1B/1203

: 26/12/2015

G&i 6ng Oiao Peng

Giam Doc 01,1' an

di(ln Nha

VP 01,1' an: T6 5, Ap Tan Tjch, Xa Tinh Th&i, TP Cao Lanh, Tinh 8 6ng Thap, Vi(lt Nam

8T: (84) 067.352.6868 Fax: (84) 067.352.6969

Chu G6i CW1 8 - Bao cao giam sat m6i trlJ'cmg ngay 24/12/2015

Kinh gui ong Diao Peng,

Sau khi ADB-DFAT ki§m tra, chung toi da kiem tra va giam sat cong cua G6i cua ong.

Chung toi ghi c6 vai tien tri§n trong cong cua nha di;ic Ia bai chU>a rae thai d9c

Chung toi danh gia cao Sl,.l' hqp tac cua nha trong cong tac nay.

Chung toi cOng IU'u y m9t s6 con t6n dQng cong trll'ong nhU' sau:

1. tr9n bo Nam: khong c6 cac be lang phu hqp va th6ng thoat nU'&c. nay phai

dU'Q'C khac pht,Jc theo y kien cua DONRE va ADB-DFAT. Tuy nhiem, nha van chU'a c6

hanh d9ng gl. Vl the chung toi kien nghi nha ngCmg d9ng hai tr9n & bo

Nam cho den khi khac pht,Jc hoan toan.

2. tr9n L9c tren song khong c6 bai chU>a hoi;ic d6 chU>a be tong thll'a va nU'&c

thai. Chay tntc tiep xu6ng song. Vui long giai trlnh cho chung toi nha dung phap

gl d§ b6 trf be tong thll'a va nha XLY ly nU'&C thai nhU' the nao. Yeu nha hanh

d¢ng, khac pht,JC cac nay cang s&m cang t6t. Neu chung toi van nha thai

tntc tiep xu6ng song, tr¢n tren song cua L9c se bi dlft d¢ng.

3. Sau khi DONRE c6 y kien nU'&c thai tll' khu & cua cong nhfm bo Nam, den nay van

chU'a c6 hanh d¢ng gl thai bo nU'&c thai. Cac y kien cua DONRE da dU'Q'C 89 GTVT

ghi thong qua van ban s6 16145/BGTVT ngay 4/12/2015. Neu khong c6 hanh d9ng gl

cho nay, chung toi se bao cao CIPM va ADS khong tuan thu cua nha

Cac khac moi trU'ong aa dU'Q'C neu chi tiet trong bao cao giam sat moi trU'ong ngay

24/12/2015 trong ban dfnh kem. Ben ngay 2/1/2016 yeu nha khac pht,Jc xong.

Rat mong Sl,.l' hqp tac cua nha

Tran trQng,

{EJa kYJ

Victoriano L. Hamlig

Ky sU' ThU'ong tru

Cc: NhLY tren

- Giam doc dl! an Cau Cao Lanh, CIPM Nh6m quan ly c6ng trLYong, CIPM LLYu: Lien danh TVGS- DDIS

Trang 1 /1

Dinh kern: Bao cao giam sat moi trLYong ngay 24/12/22015

Page 21: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

CDM.th Sm1

Central Mekong Delta Connectivity Project - (CMDCP)

TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE

COM Smith - WSP -Yooshin Consultant JV Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam

WSP ..... .. Tel: (84) 067-3881-255; Fax: (84) 067-3881-256 s-'oos/:..:.....

Ref. No. : DDIS/CW1 B/1123

Date : 14 October 2015

To: Mr. Diao Peng Project Manager

Contractor's Representative

Project Site Office: Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam; Tel : (84) 067-3881-255; Fax: (84) 067-3881-256

Subject: Package CW18- Environmental Inspection Report 13 Oct 2015

Dear Mr. Diao Peng,

After the inspection of CW1 8 work package on 13 October 2015, we would like to highlight some

environmental issues on your site regarding unclean working environment as mentioned on the

environmental inspection report in the attachment. Please follow up our instructions/guidance in the

report to take quick action and give us your response for those issues by 201h October 2015.

Cc: - As above

Cao Lanh Bridge Project Manager, CIPM Site Construction Team, CIPM

File: DDIS Consultant JV Office

E "'c.t: C rwi iW1 )·'l'U:w >i d'T> y) 0..(0 rJ-.

Page 1 ofl

Page 22: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

ENVIRONMENTAL INSPECTION REPORT Period observation Location

Period (dd-mm-

yyyy)

Work Package Km from

3+800

Km to

6+200

Weather Observers

24th Dec 2015 CW1B Sunny Ms. Le Thi Phuong Loan – NES

Issues

The two settling ponds in two batching plants in South side are problematic. These settling ponds must

contain three separate ponds at least. These settling ponds should be re-designed and re-built to ensure

the effective treatment of wastewater from batching plant before discharge to public water body.

There are no effective drainage system in two batching plants in the South side. Therefore, the

wastewater from both batching plant spilled out of empty land and contaminated all empty land nearby

without any treatment. Contractor must create a good drainage system for both batching plants and this

wastewater must run into the settling pond instead of empty land surrounding. The wastewater in the

empty land must be transferred to settling ponds for treatment after these settling pond rebuilding. The

contaminated soil by wastewater must be removed to disposal area.

There are full of concrete waste from two batching plants. These concrete wastes must be collected and

removed to the approved disposal areas. This issues had been repeatedly reminded contractor.

The discharge of wastewater from Tuan Loc batching plant is to the river. Contractor must have the

collectors of the concrete waste and wastewater for casting activity of batching plant on river as

mentioned in the Batching plant environmental protection plant.

No plastic waste collection on site and no storage for metal waste. Contractor must collect all plastic

waste and store in the trash-bin or non-hazardous waste storage on site. The metal waste should be

located in the metal waste storage with roof and impermeable layer to avoid metal rust contamination

from weather effect.

Photographs

Wrong design of settling pond in the Noth side No effective drainage system led to overfill of

wastewater in the empty land nearby

Page 23: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

Wrong design of settling pond in the Noth side Full of concrete waste surrounding batching plant

area

The discharge of wastewater from Tuan Loc

batching plant to the river

No plastic waste collection on site and no storage

for metal waste

Page 24: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

CDIVIth Sm1

Central Mekong Delta Connectivity Project- (CMDCP)

TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE

COM Smith- WSP -Yooshin Consultant JV Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam

WSP Tel: (84) 067-3881-255; Fax: (84) 067-3881-256

Ref. No. : DDIS/CW1 B/11 01

Date : 28 September 2015

To: Mr. Diao Peng Project Manager Contractor's Representative

Project Site Office: Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam; Tel : (84) 067-3881-255; Fax: (84) 067-3881-256

Subject: Package CW1 8 - Response to EO request and Environmental Inspection Report on 23 Sept 2015

Dear Mr. Diao Peng,

Refer to your letter No. CW1 B/DDIS/0953 dated 281h August 2015, we would like to give you our

feedback as follows:

1. EO mobilization: As we had discussed with your Safety and Environment Manager, DDIS

would like to request you to designate an Environmental Officer (separate from Safety duty)

which had mentioned in the contract. The person in charge of environment should be

competent and qualified with environmental background and experiences. However, your

staff has no background in environment and few working experiences for this field (especially

report preparation and checking). Therefore, we would like to insist you to mobilize your EO

a part from Safety duties which fu lfil requirement qualification in Specification.

2. Excavated soil/spoil : this soil in the North side must store in the approved disposal areas.

However, your structural excavation work has mostly completed on site but there is no

approved disposal area to dump this material. Thus, we would strongly request you to quickly

propose the disposal area for local authority.

Additionally, we also checked your site recently and we noted that some problems still remain from

v

Cc: - As above

Cao Lanh Bridge Project Manager, CIPM Site Construction Team, CIPM

File: DDIS Consultant JV Office

Attachment:

Environmental monitoring report.

Page l ofl

Page 25: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

ENVIRONMENTAL MONITORING REPORT Period observation Location

Period (dd-mm-

yyyy)

Work Package Km from

3+800

Km to

6+200

Weather Observers

23rd Sept 2015 CW1B Sunny Ms. Le Thi Phuong Loan – NES

Issues

Both batching plants are dirty and full of concrete waste. Settling pond in batching plants in south side

are problematic since these area are always overfilled. Since settling pond was full, the wastewater run

in shallow area nearby. The wastewater run into the supply water canal to agricultural field. This issues

had been reminded to contractor many times but there are no action and feedback. Contractor need to

clean these areas and remove all concrete waste as well solid waste under settling ponds as soon as

possible.

The cement chemicals had been leaking on the ground. The contractor need to clean this mess and stop

the leaking by replacing the containment.

Concrete pile heads locate on site. This concrete wastes should be stored in temporary storage and

completely removed to designated disposal area.

Fuel/oil leaking on the ground in the fabrication area. This contaminated materials/concrete must be

clean and collect to hazardous waste storage.

Metal waste was spread over on fabrication yard; this material should be stored in a designated area for

metal waste with barricade and (label) notification broad as reference.

Many chemicals/fuel on site are not labeled. It might be dangerous for workers and newcomer.

Contractor need to strictly require workers to label any can/drum/barrel of liquid materials.

Domestic waste was found on site and worker accommodation. Contractor must require cleaning activity

for these places and remind your worker to keep clean condition for their environment.

Photographs

Full of concrete sludge from settling pond and direct

flow of wastewater to water suply.

Leaking of batching plant chemials

Page 26: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

Concrete pile heads on site Fuel leaking on fabrication yards

Disorganized metal waste No label cans on site

Domestic waste on site in North side Domestic waste in worker accommodation in North

side

Page 27: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

Dự án Kết nối khu vực trung tâm Đồng bằng sông Cửu Long - (CMDCP)

TA 7822-VIE, Khoản vay 3013-VIE, Khoản viện trợ 0353-VIE

Liên danh Tư vấn CDM Smith - WSP –Yooshin Tổ 5, p Tân Tịch, Xã Tịnh Thới, TP Cao Lãnh, Tỉnh Đồng Tháp, Việt Nam

ĐT: (84) 067-3881-255; Fax: (84) 067-3881-256

__________________________________________________________

Trang 1 / 1

Số thư : DDIS/CW1B/1101

Ngày : 28/09/2015 Gửi đến: Ông Diao Peng

Giám Đốc Dự án Đại diện Nhà thầu

VP Dự án: Tổ 5, p Tân Tịch, Xã Tịnh Thới, TP Cao Lãnh, Tỉnh Đồng Tháp, Việt Nam

ĐT: (84) 067.352.6868 Fax: (84) 067.352.6969

Chủ đề: Gói CW1B – Cảnh cáo về việc chậm trễ trình bản vẽ thi công và biện pháp thi công cầu chính (lần 3)

Kính gửi ông Diao Peng,

Chiếu theo số thư No. CW1B/DDIS/0953 ngày 28/08/2015 của nhà thầu, chúng tôi xin ph n hồi như sau:

1. Huy động nhân viên môi trường: Như chúng tôi đã th o luận với người qu n lý môi trường và an toàn bên ông, Tư v n yêu cầu ông cần ph i huy động một nhân viên môi trường (không liên quan đến các nhiệm vụ an toàn) như đã yêu cầu trên hợp đồng. Người nhân viên này chịu trách nhiệm môi trường cần ph i đ m b o trình độ và năng lực với kiến thức và kinh nghiệm làm môi trường. Tuy nhiên, nhân viên của ông vẫn chưa có ai có nền t ng kiến thức về môi trường và ít kinh nghiệm làm việc trong lĩnh vực này (đặc biệt đối với việc chuẩn bị báo cáo và kiểm tra báo cáo). Vì vậy, chúng tôi vẫn yêu cầu ông huy động nhân viên môi trường riêng tách ra từ các nhiệm vụ về an toàn và đáp ứng đầy đủ các yêu cầu trong Chỉ dẫn kỹ thuật.

2. Về đ t đổ th i: Đ t đổ th i ở khu vực bờ Bắc yêu cầu cần chuyển đến khu vực được ch p thuận đổ th i. Tuy niên những công tác đào móng bệ trụ đã gần hoàn thành ông vẫn chưa có một khu vực nào đổ th i được ch p thuận cho khu vực này. Vì vậy chúng tôi yêu cầu ông cần nhanh chóng trình nộp b i đổ th i tới chính quyền địa phương.

Ngoài ra, chúng tôi đã kiểm tra công trường ông trong thời gian gần đây và lưu ý một số v n đề vẫn còn tồn đọng từ nhiều tháng trước (theo báo cáo kiểm tra môi trường như trong b n đính kèm). Mong ông cần ph i đưa ra các hành động thực thi về các v n đề đã được mô t và ph n hồi chúng tôi vào ngày 02/10/2015.

Trân trọng,

{Đã ký}

Victoriano L. Hamlig

Kỹ sư Thường trú

Cc: - Như trên - Giám đốc dự án Cầu Cao Lãnh, CIPM - Nhóm qu n lý công trường, CIPM - Lưu: Liên danh TVGS – DDIS

Page 28: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

BÁO CÁO KIỂM TRA MÔI TRƯỜNG

Thời điểm Vị trí

Thời gian (dd-mm-

yyyy)

Gói thầu Km từ

3+800

Đến Km

6+200

Thời tiết Người quan sát

23/09/2015 CW1B Nắng Ms. Le Thi Phuong Loan – NES

Vấn đề

Cả hai trạm trộ àđều bẩn và tràn ngập các rác thải bê tông. Bể lắng của trạm trộn bên bờ Na àđãà àvấn

đề từ lâu vì bể lắng khu vực này luôn ngậpàđầy các bê tông lắng. Một khi bể lắ gàđãàđầ ,à ước thải

thường chảy vào khu vự àđất thấpà u gà ua h.àNước thải này sẽ được dẫn trực tiếpàđến khu vự àtưới

tiêu của các hoạtàđộng nông nghiệp. Vấ àđề àđãàđược nhắc nhở đến nhà thầu rất nhiều lầ à hư gànhà thầuàkh gà àh hàđộng thực thi hiệu quả. Nhà thầu cần phải dọn dẹp các khu vực này sạch sẽ và

chuyển toàn bộ à êàt gà ià ă gàdưà ũ gà hưà à àthải rắ àkh àđọ gàdưới bể lắ gàđià gà ha hàcàng tốt.

Các loại hóa chấtàd gà hoà ià ă gàđãà ị rò rỉ aà go ià ê àđất. Nhà thầu cần phải dọn dẹp khu vực này

v à gă à hặn các vết rò rỉ kia.

C àđầu cọc bê tông vẫ àđa gàđể t ê à gàt ường. Nhữ gàđầu cọc bê tông này cần vận chuyể àđến khu

chứa tạm thờiàt ê à gàt ường hoặc chuyể àđến khu vực tập kết bảiàđổ thảiàđãàđược phê duyệt.

Dầu tràn hoặc nhiên liệu tràn trên nền trong khu vự àđổ dầm. Các loại chấtà àđãà ị nhiễm dầu/nhiên

liệu cần phảiàđược dọn dẹp và thu gom vào khu vực để rác thải nguy hại.

Rác thải kim loạiàđể tràn lan trong khu vực ãiàđ àdầm; những tài liệu này cần phảiàđược dự trữ trong

khu vự àđược thiết kế cho vật liệu này vớiàđầ àđủ các cảnh báo, dây an toàn che chắn, bảng tên thông

báo.

Nhiều loại nhiên liệu/ ă g dầu không có nhãn mác. Các loại này có thể sẽ nguy hiể à hoà gười công

nhân hoặc nhữ gà gười mớiàđến. Nhà thầu cần phải nghiêm ngặt yêu cầu công nhân dán nhãn cho các

can, thùng vật liệu này.

Các loại rác thải sinh hoạtàđược tìm thấ àt ê à gàt ường và trong khu vực nhà ở của công nhân. Nhà

thầu cần yêu cầu các hoạtàđộng dọn dẹp cho những vị trí này và nhắc nhở công nhân giữ gìn vệ sinh.

Ảnh

Tràn ngập các loạià à êàt g/ ià ă gàtừ bể lắng và

trực tiếp dòng chả à ước thảiàđến nguồn cung cấp

ước cho nông nghiệp.

Rò rỉ các loại hóa chất nguyên liệu dùng cho trạm trộn

Page 29: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

Đầu cọ à êàt gàt ê à gàt ường Dầu nhớt nhiên liệu tràn trên công t ường

Không sắp xếp các loại kim loại Các loại can nhiên liệu không nhãn mác

Rác sinh hoạt trên công trường ở bờ Bắc Rác sinh hoạt trong khu vực nhà ở công nhân ở bờ

Bắc

Page 30: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

CDIVIth Sml

Central Mekong Delta Connectivity Proj ect - (CMDCP)

TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE

CDM Smith- WSP -Yooshin Consultant JV Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao lanh City, Dong Thap Province, Vietnam

Tel: (84) 067-3881-255 ; Fax: (84) 067-3881-256

Ref. No. : DDIS/CW1C/0313

Date : 22 December 2015

Tn· Mr NQttyAn H11nno Contractor's Representative

Contract Office: No.61-Provincial Road 848, Tan Trong Village, Tan My Commune, Lap Vo District, Dong Thap Province

Tel : (84) 043 7830856 ; Fax: (84) 043 7830859

Sul.Jit::c l. CW I C - Ct.m ullt:ll l!:. oil J.IUUi ADB-Df'AT cUtit::cliVI:! dl 1ll

Environmental Inspect ion Report 18 Dec 2015

Dear Mr. Huong,

Refer to your reference letter Ref. No. CW1 C/DDIS/0266 dated 071h December 2015, DDIS had

been re-inspected your corrective actions and site improvement on your CW1 C work package. We

observed many remaining issues which mentioned in the Environmental Inspection Report 18th Dec

2015 in the attachment.

We noted that many ADB-DFAT observation had not corrective yet.

No hazardous waste storage

Poor domestic garbage management with no proper solid waste storage

No action on concrete waste spillage from batching plant

We strongly request contractor to quickly take serious actions for ADB-DFAT observation and report

to us by 251h December 2015. Please review our Environmental Inspection Report 18th December

2015 to see remaining issues which we keep reminding for months. If no action is taken by the

deadline for batching plant and other relevant issues, we would take strong action to temporarily

stop work till ADB-DFAT and DDIS requirement is fulfilled.

Cc: As above Cao Lanh Bridge Project Manager, CIPM Site Construction Team, CIPM File: DDIS Consultant JV Office

Page 1 afl

Attachment : Environmental Inspection Report 18 Dec 2015

Page 31: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể

ENVIRONMENTAL INSPECTION REPORT

Work Package Km from Observers

6+200

• Overspreading of concrete sludge under batching and falling Silo areas. This issues have reminded to

Contractor many times. However, no action are taken. This sludge must be clean and removed to

di3po3al area.

• Metal waste was stored next to the office and worker accommodation without a proper storage. This

metal waste was reminded from months ago and no action is taken. Plus, some metal waste from

construction activity are dumped next to the river. This material should be stored in a designated area

for metal waste with barricade and (label) notification broad as reference. Without storage, the metal

waste must be removed as soon as possible to limit the metal leakage to soil/ground.

• The concrete pile head WliJ found on Jite without n proper Contl'llctor muJt collect hiJ concrete

pile head to disposal area as mehtlohed.

• There was overspreading excavated soil on site without any proper storage. This soil must store in

designated area for disposal area. For reuse purpose, this soil should store in a temporary place with

barricade and notification broad.

• Many empty Sika bags (materials for cement mixing process) are speeding over the site. These bags must

be collected and stored in hazardous waste stora .

Page 32: Environmental Monitoring Report VIE: Central Mekong Delta ... · bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươgàtự,àtrhàđể