environmental monitoring report vie: central mekong delta ... · bỏ những khu vực lục bình...
TRANSCRIPT
Environmental Monitoring Report Semi-Annual Environmental Monitoring Report No. 5 January-June 2016
VIE: Central Mekong Delta Region Connectivity
Project Part 2 Annexes (138-167)
Prepared by Detailed Design and Implementation Support: Joint Venture of CDM Smith, WSP Finland Limited and Yooshin Engineering Corporation for the Socialist Republic of Viet Nam and the Asian Development Bank.
NOTE
In this report, “$” refers to US dollars.
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area
CDI\IIth Sml
Cent ral Mekong Delta Connectivity Project - (CMDCP)
TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE
COM Smith- WSP -Yooshin Consultant JV Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Gao Lanh City, Dong Thap Province, Vietnam
WSP .... .. Tel: (84) 067-3881-255; Fax: (84) 067-3881-256
Ref. No. : DDIS/CW1 B/1 030
Date : 06 August 2015
To: Mr. Diao Peng Project Manager
Contractor's Representative
Project Site Office: Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam; Tel: (84) 067-3881-255; Fax: (84) 067-3881-256
Subject: Package CW1 B - Environmental inspection report on 04 Aug 2015
Dear Mr. Diao Peng,
After the inspection of CW1 B work package on 04th August 2015, we would like to highlight some
environmental issues on your site regarding unclean working environment as mentioned on the
environmental inspection report in the attachment. Please follow up our instructions/guidance in the
report to take quick action and give us your response for those issues by 12th August 2015.
By the way, we would like to mention to you some remaining issues from last ADB/DFAT mission
on March 2015 as follows:
There are no drainage system along access road. This problem was reminded to you in some
previous letters DDIS/CW1 B/0847 on 17 March 2015 and DDIS/CW1 B/0994 on 29th June
2015.
First aid kit should be available on office and worker accommodation.
The excavated soil disposing quantity should be recorded and reported to DDIS. However,
this report was not fully detailed by your submission; please request your staffs to fully fulfil
DDIS instruction and quickly submit to us before 12th August 2015.
Your quick actions on these issues is highly recommended.
Cc: - As above
Cao Lanh Bridge Project Manager, CIPM Site Construction Team, CIPM
File: DDIS Consultant JV Office
Page 1 of 1
Attachment: Environmental inspection report 04 Aug 2015
CDMth Sm1
DIJ' an Kilt n6i khu VIJ'C trung tam £>6ng song Cl.Pu Long - (CMDCP)
TA 7822-VIE, Khoan vay 3013-VIE, Khoan trQ' 0353-VIE
Li€m danh TLP van COM Smith- WSP -Yooshin
!-•WSP .. h.:.....
To 5, Ap Tan Tich , Xa Tinh Th&i, TP Cao Lanh, Tinh £>ong Thap, Vi$t Nam
£>T: (84) 067-3881-255; Fax: (84) 067-3881-256
so thll'
Ngay
: DDIS/CW1 B/1 030
: 06/08/2015
Gt)i den: Ong Diao Peng Giam Doc DLI' an
di$n thElU
VP Dl! an: T6 5, Ap Tan Tich , Xa Tjnh Th&i, TP Cao Lanh, Tinh Dong Thap, Vi$t Nam
8T: (84) 067.352.6868 Fax: (84) 067.352.6969
Chu G6i CW1 B - Bao cao tra moi trU'<Yng ngay 4/8/2015
Klnh gll'i 6ng Diao Peng,
Sau khi tra m6i trU'cmg goi CW1 B vao ngay 04/08/2015, chung t6i muon cho 6ng m(>t vai m6i trU'O>ng c6ng trU'O>ng 6ng lien quan m6i trU'O>ng lam kh6ng
nhU' da dU'Q'C trong bao cao dlnh kem tra m6i tmO>ng. Mong 6ng tuan thu thea nhCrng hU'&ng dan trong bao cao va nhanh chong hanh d(>ng va gll'i phan hoi cho chung toi vao ngay 12/08/2015.
Nhan chung t6i cung nh& 6ng m(>t vai m6i tmO>ng van con ton dong goi cua 6ng sau doan ADB/DFAT tham vao thang 03/2015 nhU' sau:
Kh6ng co thong thoat nU'&c doc dU'O>ng c6ng vt,J . nay da dU'Q'C nh& trong thU' tm&c nhU' DDIS/CW18/0847 vao ngay 17/03/2015 va DDIS/CW18/0994 va ngay
29/06/2015. 8(> dt,Jng Cl,l SO' ClfU y phai lu6n thU'Q>ng tntc van ph6ng va nO'i cY CUa c6ng nhan. Khoi IU'qng dao dU'Q'C d6 thai phai dU'Q'C bao cao chi len TU' Tuy nhien bao cao nay chU'a dU'Q'C ct,J sau trinh n(>p; mong 6ng yeu nhan vien (lien v&i dong chi LU'u - dO'n vi 12) hoan yeu d u TU' va nhanh chong trinh n(>p chung t6i trU'&c ngay 12/08/201 5.
Chung t6i khlch cac hanh d(>ng thl)'C thi ben 6ng m(>t each nhanh chong va tlch Cl)'C.
Tran trong,
{EJa kyJ
Gordon Belton
Giam doc Dl)' an
Cc: Nhll' trE'm Giam d6c dl,l' an C§u Cao Uinh, CIPM Nh6m quim ly cong tm&ng, CIPM LLI'u: Lien danh TVGS - DDIS
8inh kern: Bao cao kiem tra moi trll'&ng ngay 4/8/2015.
Trang 1/1
ENVIRONMENTAL MONITORING REPORT Period observation Location
Period (dd-mm-
yyyy)
Work Package Km from
3+800
Km to
6+200
Weather Observers
4th Aug 2015 CW1B Sunny Ms. Le Thi Phuong Loan – NES
Issues
GOOD practice: Contractor can reuse the fuel drum to store equipment and small tool to work on site.
Overspreading excavated soil on site without any proper storage. This soil must store in designated area
for disposal area. For reuse purpose, this soil should store in a temporary place with barricade and
notification broad.
Access road was dirty and full of dust during transport. To avoid dirty road affecting by construction
activity, Contractor must regularly spray water at least 6 times/day, this frequency might need to
increase for either the hot and sunny day or increase of transport activity.
Domestic waste was found on site and worker accommodation. Contractor must require cleaning activity
for these places and remind your worker to keep clean condition for their environment.
Metal waste was spread over on fabrication yard; this material should be stored in a designated area for
metal waste with barricade and (label) notification broad as reference.
Many old machines were broken and repaired on site which led to fuel leakage and contaminated soil
and ground. This contamination should be clean up by collecting contaminated soil to hazardous storage.
Contractor must provide secondary containments to use for emergency case (e.g. broken crane) to avoid
fuel leakage to ground.
Many chemicals/fuel on site are not labeled. It might be dangerous for workers and newcomer.
Contractor need to strictly require workers to label any can/drum/barrel of liquid materials.
There are many large bunches of water hyacinth stuck on the pipes of temporary bridge in both North
and South sides. These bunches will be waste storage on the river and cause difficulty for transportation.
Contractor must quickly remove and repeat this action with other stuck water hyacinth.
Both batching plants are dirty and full of concrete waste. Settling pond in batching plants in south side
are problematic since these area are always overfilled; the wastewater might run into the supply water
canal to agricultural field. Since settling pond was full, the wastewater run in shallow area nearby. This
issues had been reminded to contractor many times but there are no action and feedback. Contractor
need to clean these areas and remove all concrete waste as well solid waste under settling ponds as
soon as possible.
Photographs
Good practice: re-use fuel drum to tool/equipment
storage
The evavated soil is dumping on site without any permission
Dirty access road on South side Dirty access road on North side
Domestic waste on site and worker accommodation in
North side
Domestic waste on site and worker accommodation in
South side
No proper metal waste storage Materials stored in worker accomodation
Contaminated ground after repairing crane Fuel leakge from crane on the barge in the river
Chemical without label Contaminated ground near by South side batching
plant
Both settling ponds are full of wastewater
Concrete waste is spreading over the batching plant area
BÁO CÁO KIỂM TRA MÔI TRƯỜNG
Giai đoạn Địa điểm
(dd-mm-yyyy) Gói thầu (dd-mm-
yyyy)
Gói thầu (dd-mm-
yyyy)
Gói thầu
04/08/2015 CW1B Nắng bà Le Thi Phuong Loan – NES
Vấn đề
Thực hành TỐT: Nhà thầu tái sử dụ gàth gàđựng dầuàđể chứa máy móc và các dụng cụ nhỏ để làm việc
trê à gàtrường.
Đấtàđổ thảiàđổ tr àla àtrê à gàtrường không có mộtà ơià hứa phù hợp.àĐất này cần phảiàlưuàtrữ tại
khu vự àđ àđược bố tríà hoàđổ thải.àĐể cho mụ àđí hàt iàsử dụ g,àđất này cần phảiàđược chứa trong khu
vự àđổ thải tạm thờiàtrê à gàtrườ gàđượ à gă à ởi dảià gă à hàv à à ảng thông báo cho khu chứa
đấtàđổ thải tạm thời.
Đường công vụ bẩ àv àđầy bụi trong quá trình vận chuyể .àĐể tr hàđường bẩn do các hoạtàđộng thi
công, nhà thầu cần phảiàthườ gà u ê àphu àtưới nước it nhất 6 lần/ngày, tần xuấtàtưới cần phảiàtă gàtro gàtrường hợp trời nắng nóng hoặ àgiaàtă gàlưuàlượng vận chuyển.
R àđược nhận thấy ở khắpà gàtrường và khu nhà ở của công nhân. Nhà thầu cần yêu cầu dọn dẹp cho
những khu vực này và nhắc nhở công nh àđể dọn dẹp và giữ gìn vệ si hà hoà iàtrường của họ.
Rác kim loạiàđể lan tràn khu vự à iàđ àdầm; vật liệuà à ê àđượ àlưuàtrữ tại khu vự àđược thiết kế
cho rác kim loại với dảià gă à hàv à ảng thông báo.
Nhiềuà à à ũàđ àhưàv àsửa chữa trong côngàtrườ gàđ àdẫ àđến tràn dầuàv àđất nhiễm dầu. Khu vực
đất nhiễm dầu cần phảiàđược dọn dẹp bằ gà hàthugào àđất ô nhiễ àđến các khu chứa rác nguy hại.
Nhà thầu cần cung cấp khay chứaàđể sử dụ gàtro gàtrường hợp khẩn cấpà hưàhưà ẩu àđể tránh dò rỉ dầu và nhiên liệu xuố gàđất.
Nhiều chất hóa học/nhiên liệuàtrê à gàtrường không có dán nhãn. Những chất này có thể nguy hiểm
cho công nhân và nhữ gà gười mớiàđến. Nhà thầu cần yêu cầu công nhân tuân thủ nghiêm ngặt việc dán
nhãn cho các can và thùng chất lỏng.
Nhiều mảng lớn lục bình trôi bị kẹt giữa các cột trên cầu tạm cả hai bên bờ nam bắc. Những mảng lục
bình này sẽ l à ơià hứa rác thảiàv àg à ê àkh àkhă àtro gàvận chuyển. Nhà thầu cần nhanh chóng dỡ
bỏ những khu vực lục bình kẹt vào cầu tạm và liên tục lặp lại nếu gặpàtrường hợpàtươ gàtự,àtr hàđể lục
bình kẹt thanh mảng lớn.
Cả hai trạm trộ àđều rất bẩn và nhiều rác bê tông. Khu vực bể lắng của trạm trộn ở bờ Nam là có vấ àđề
khi toàn bộ khu vực này luôn trong trình trạng bị tr àđầ ;à ước thải có khả ă g chảy vào khu vực rạch
ước cho hoạtàđộng nông nghiệpàtrê àđồng. Vì bể lắ gàđầ ,à ước thải từ trạm trộ àđ à hảy vào khu vực
đất thấp xung quanh. Vấ àđề àđ àđược nhắc nhở đến nhà thầu nhiều lầ à hư gà h àthầuàđ àkh gàcó bất cứ h hàđộng gì và phản hồi lạiàTưàvấn. Nhà thầu cần phải dọn dẹp các khu vực này và dỡ bỏ tất
cẩ àr à êàt gà ũ gà hưà hất thải rắ àdưới bể lắng nhanh chóng.
Ảnh
Thực hành TỐT: tái sử dụng các thùng nhiên liệuàđể
đựng dụng cụ
Đấtàđổ thảiàđổ la àtr àtrê à gàtrường không có sự cho phép
Đường bẩn bụi bờ Nam Đường bẩn bụi bờ Bắc
R àt ê à ô gàt ường và khu ở công nhân ở bờ Bắc R àt ê à ô gàt ường và khu ở công nhân ở bờ Nam
Không có khu chứa rác kim loại phù hợp Các loại vật liệuàv à àđể trong khu vực nhà ở công
nhân
Đất nhiễm dầu sau khi sửa cẩu Dầu rò rỉ từ cẩuàđa gàhoạtàđộng trên sà lan trên sông
C à a àđựng hóa chất/nhiên liệu không có nhãn mác Đất nhiễm bẩn gần trạm trộn của khu vực bở Nam
Hai bể lắng ở bờ Na àđều ngập ước
R à êàtô gàđổ lan tràn khắpà ơiàxu gà ua hàkhuàvực trạm trộn
Dl! an n6i khu V'.J'C trung tam D6ng song CU.u Long - (CMDCP)
TA 7822-VIE, Khoan vay 3013-VIE, Khoan trg 0353-VIE
Lien danh TU' COM Smith - WSP -Yooshin T6 5, Ap Tan T ich, Xa Tinh Th&i, TP Cao Lanh, Tinh £>6ng Thap, Vi¢t Nam
S6 thll' : DDIS/CW1 B/1123
Ngay : 14/10/2015
GU>i Ong Diao Peng Giam dOc Dl! an 8c;1i di$n Nha th§u
£>T: (84) 067-3881 -255; Fax: (84) 067-3881-256
VP Dl! an: T6 5, Ap Tan Tich, Xa Tinh Th&i, TP Cao Lanh, Tfnh 86ng Thap, Vi$t Nam
8T: (84) 067.352.6868 Fax: (84) 067.352.6969
chu G6i CW18- Bao cao giam sat moi trU'i>'ng ngay 13/10/2015
Kinh gU>i 6ng Diao Peng,
Sau khi kiem tra m6i trll'O'ng tc;1i g6i th§u CW1 B vao ngay 13/1 0/2015, chung t6i mu6n mc;1nh cho 6ng m<)t vai moi trll'cmg tc;1i c6ng trll'O'ng lien quan m6i trll'O'ng lam vi$c kh6ng sc;1ch nhll' da dll'Q'C trong bao cao dinh kem kiem tra moi trll'O'ng. Mong 6ng c§n tuan thu theo nhCmg hll'&ng dan trong bao cao va nhanh chong hanh d<)ng va gU>i phan h6i lc;ii cho chung t6i vao ngay 20110/2015.
Tran trong,
{EJa kyJ
Victoriano L. Hamlig
Ky sll' Thll'O'ng tru
Cc: - Nhll' trem
- Giam doc dl)' an Cao Lanh, CIPM - Nh6m quc?m ly c6ng trli'<Yng, CIPM - Lll'u: Lien danh TVGS - DDIS
£>1nh kern: Bao cao kiem tra m6i trli'<Yng ngay 13/10/2015.
Trang 1/1
ENVIRONMENTAL MONITORING REPORT Period observation Location
Period (dd-mm-
yyyy)
Work Package Km from
3+800
Km to
6+200
Weather Observers
13rd Oct 2015 CW1B Sunny Ms. Le Thi Phuong Loan – NES
Issues
Burning waste in worker accommodation is forbidden. Please instruct your workers to strictly comply
with ADB environmental requirements which had been mentioned in the ADB-DFAT mission in Feb 2014.
There are still many unlabeled cans locating on site. These cans should be located in the materials
storage and label with name of chemicals.
Toilets in the worker accommodation were really dirty, smelly, and full of water spreading and wastes.
Contractor must request workers/cleaners often clean and remove waste to the proper storage (waste-
bin). Contractor also need to have environmental trainings for these workers living in the worker
accommodation. These trainings should be recorded and reported to DDIS.
We had observed that many wastes were not collected to waste-bin though this trash-bin locates next
to. This is problematic and missing cooperation from wo ke s’ attitude. Cont acto is e uested to
workers often collect wastes into waste-bin and also train workers for environmental understanding and
proactive attitude in the waste management. This environmental training should be recorded to DDIS.
Water in the concrete tank in the worker accommodation often use for washing and cleaning. These
water tanks were not regularly clean. DDIS request Contractor to assign cleaners/workers to quickly
remove and clean moss and algae in the bottom of concrete tank.
Temporary disposal area for excavated soil was not barricaded. Contractor should barricade this area
to separate this area to access way to fabrication yard.
Photographs
Burning waste is forbidden in the worker
accomodation
No labelled feul cans
Full of waste inside the toilet Flooding in the toilet access
Waste threw next to toilet Wastes was not collected in the wastebin
Unclean water in worker accommodation No barricade for temporary spoil storage
BÁO CÁO KIỂM TRA MÔI TRƯỜNG
Thời điểm Vị trí
Thời gian (dd-mm-
yyyy)
Gói thầu Km từ
3+800
Đến Km
6+200
Thời tiết Người quan sát
13rd Oct 2015 CW1B Nắng Ms. Le Thi Phuong Loan – NES
Vấn đề
Đốt rác trong khu ở của công nhân là hoàn toàn bị cấm trong dự .àMo gà gàh àhướng dẫn những
gười công nhân ở trong khu vực này tuyệtàđối tuân thủ với nhữ gà u àđị hà iàt ườ gàđ àđược nhắc
nhở từ thờiàđiể àđo àáDB-DFAT kiể àt aàv oàth gà à ă à 5. Vẫn có nhiềuà a àđựng nhiên liệu không có dán nhãn trên công t ường. Những can nhiên liệu này cần
phảiàđượ àđể trong khu vực kho chứa vật liệu nhiên liệuàv àđược dán nhãn tên loại hóa chất chứa bên
trong.
Các nhà vệ sinh trong khu ở của công nhân rất bẩn, mùi hôi và tràn ngậpà à ũ gà hưà ước ngập. Nhà
thầu cần phải yêu cầu công nhân hoặ à gười dọn dẹpàđể dọn sạch khu vực này và di chuyể à àđế à ơiàthug om (thùng rác). Nhà thầu cần phải yêu cầu công nhân dọn dẹpàthường xuyên và ũ gà ần phải tổ
chức các khóa họ à iàt ườ gàđ oàtạo cho công nhân sinh sống trong khu vực này. Những buổiàđ oàtạo
cần phảiàđược ghi lạiàv à oà oàl àTưàvấn.
Ch gàt iàđ à ua às tàđược nhiềuà àv àt ià àkh gàđược thu gom và bỏ vào thùng rác dù thùng rác
ngay gần bên cạ h.àĐấy là một vấ àđề về thiếu ý thức. Nhà thầu cần phải yêu cầu công nhân thu gom
àv oàđ gàvị t íàth gà àv àđ oàtạo công nhân về ý thứ àv à àth iàđộ chủ động trong quản lý rác.
Các buổiàđ oàtạo này cần phảiàđượ àghià h pàv à oà oàTưàvấn.
Nước trong bồ à ước tại khu ở củaà gà h àthường sử dụng cho mụ àđí hàtắm rửa. Tuy nhiên những
bồ à ướ à àkh gàthườ gà u àđược cọ rửaàđể mọ à o gà u.àTưàvấn yêu cầu nhà thầu cử công nhân
và nhân viên dọn dẹp sạch các rong rêu trong đ à ồ à ước.
Khu vực chứaàđấtàđổ thải tạ àt à gà gàt ườ gàkh gàđượ à gă à h.àNhà thầu cần phải dựng
rào chắ à gă à hàgiữaàkhuàđổ thải tạ àv àđườ gàđiàv oàkhuàthià gàđ àdầm.
Ảnh
Đốt rác là hoàn toàn cấm trong khu vực nhà ở công
nhân
Các can nhiên liệu không dán nhãn
Ngập rác trong nhà vệ sinh Ngập nước trong khu vực nhà vệ sinh
Rác bị ném vào bên trong khu vực nhà vệ sinh Rác không được thu gom vào thùng rác
Nguồn nước không sạch trong khu vực nhà ở công
nhân
Không có rào chắn tỏng khu vực đổ thải tạm của đất
đổ thải
CDMth Sml
Central Mekong Delta Connectivity Project- (CMDCP)
TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE
COM Smith- WSP -Yooshin Consultant JV Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam
h WSP Tel : (84) 067-3881-255; Fax: (84) 067-3881-256
Ref. No. : DDIS/CW1 B/1203
Date : 26 Dec 2015
To: Mr. Diao Peng
Project Manager Contractor's Representative
Project Site Office: Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam; Tel: (84) 067-3881-255; Fax: (84) 067-3881-256
Subject: Package CW1 8- Environmental Inspection Report 24 Dec 2015
Dear Mr. Diao Peng,
After ADB-DFAT observations, we have checked and re-inspected your work package. We noted
some improvement in your work, especially for hazardous waste storages. We are highly
appreciated your cooperation on this work.
We also noted some remain ing environmental issues in your site as follows:
1. The batching plants in South side: there are no proper settling ponds and drainage systems.
This problem must be corrected following DONRE comments and ADB-DFAT observations.
However, you did not take any action. Thus we recommend you to temporary stop of two
batching plants in South sides till the corrective actions will be fulfilled.
2. The Tuan Loc batching plant on the Tien River: there are no storage or containers for
concrete waste and wastewater. The discharge is directly to the river. Please explain us the
method you had been used for disposing of concrete waste and how you treat your
wastewater. You are requested to have corrective actions on this issue as soon as possible.
If we still discover your waste dumping directly to the river, the Tuan Loc floating batching
plant will be terminated for working.
3. After DONRE comments on the wastewater from worker accommodation in the South side,
there is no action of wastewater discharge till now. The DONRE comments had been noticed
by MOT via the reference letter Ref. No. 16145/BGTVT-MT dated 041h December 2015. If
there is no action taken for this issue, we would recommend to CIPM and ADB for your non-
compliance action.
Other environmental issues have been described in the Environmental Inspection Report 24 Dec
2015 in the attachment. You are requested to correct our findings by 2nd January 2016.
Page 1 of2
Your cooperation is highly recommended.
Cc: As above
Cao Lanh Bridge Project Manager, CIPM
Site Construction Team, CIPM
File: DO IS Consultant JV Office
Page 2 of2
Attachment: Environmental Inspection Report
24 Dec2015
CDI\IIth Sm1
Olf an n6i khu VlJ'C trung tam fl6ng song ClJ'u Long - (CMDCP)
TA 7822-VIE, Khoan vay 3013-VIE, Khoan trg 0353-VIE
Lien danh TU' van COM Smith- WSP -Yooshin To 5, Ap Tan Tich, Xa Tinh Th&i, TP Cao Lanh, Tinh Bong Thap, Nam
flT: (84) 067-3881-255; Fax: (84) 067-3881-256
s o thU'
Ngay
: OOIS/CW1B/1203
: 26/12/2015
G&i 6ng Oiao Peng
Giam Doc 01,1' an
di(ln Nha
VP 01,1' an: T6 5, Ap Tan Tjch, Xa Tinh Th&i, TP Cao Lanh, Tinh 8 6ng Thap, Vi(lt Nam
8T: (84) 067.352.6868 Fax: (84) 067.352.6969
Chu G6i CW1 8 - Bao cao giam sat m6i trlJ'cmg ngay 24/12/2015
Kinh gui ong Diao Peng,
Sau khi ADB-DFAT ki§m tra, chung toi da kiem tra va giam sat cong cua G6i cua ong.
Chung toi ghi c6 vai tien tri§n trong cong cua nha di;ic Ia bai chU>a rae thai d9c
Chung toi danh gia cao Sl,.l' hqp tac cua nha trong cong tac nay.
Chung toi cOng IU'u y m9t s6 con t6n dQng cong trll'ong nhU' sau:
1. tr9n bo Nam: khong c6 cac be lang phu hqp va th6ng thoat nU'&c. nay phai
dU'Q'C khac pht,Jc theo y kien cua DONRE va ADB-DFAT. Tuy nhiem, nha van chU'a c6
hanh d9ng gl. Vl the chung toi kien nghi nha ngCmg d9ng hai tr9n & bo
Nam cho den khi khac pht,Jc hoan toan.
2. tr9n L9c tren song khong c6 bai chU>a hoi;ic d6 chU>a be tong thll'a va nU'&c
thai. Chay tntc tiep xu6ng song. Vui long giai trlnh cho chung toi nha dung phap
gl d§ b6 trf be tong thll'a va nha XLY ly nU'&C thai nhU' the nao. Yeu nha hanh
d¢ng, khac pht,JC cac nay cang s&m cang t6t. Neu chung toi van nha thai
tntc tiep xu6ng song, tr¢n tren song cua L9c se bi dlft d¢ng.
3. Sau khi DONRE c6 y kien nU'&c thai tll' khu & cua cong nhfm bo Nam, den nay van
chU'a c6 hanh d¢ng gl thai bo nU'&c thai. Cac y kien cua DONRE da dU'Q'C 89 GTVT
ghi thong qua van ban s6 16145/BGTVT ngay 4/12/2015. Neu khong c6 hanh d9ng gl
cho nay, chung toi se bao cao CIPM va ADS khong tuan thu cua nha
Cac khac moi trU'ong aa dU'Q'C neu chi tiet trong bao cao giam sat moi trU'ong ngay
24/12/2015 trong ban dfnh kem. Ben ngay 2/1/2016 yeu nha khac pht,Jc xong.
Rat mong Sl,.l' hqp tac cua nha
Tran trQng,
{EJa kYJ
Victoriano L. Hamlig
Ky sU' ThU'ong tru
Cc: NhLY tren
- Giam doc dl! an Cau Cao Lanh, CIPM Nh6m quan ly c6ng trLYong, CIPM LLYu: Lien danh TVGS- DDIS
Trang 1 /1
Dinh kern: Bao cao giam sat moi trLYong ngay 24/12/22015
CDM.th Sm1
Central Mekong Delta Connectivity Project - (CMDCP)
TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE
COM Smith - WSP -Yooshin Consultant JV Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam
WSP ..... .. Tel: (84) 067-3881-255; Fax: (84) 067-3881-256 s-'oos/:..:.....
Ref. No. : DDIS/CW1 B/1123
Date : 14 October 2015
To: Mr. Diao Peng Project Manager
Contractor's Representative
Project Site Office: Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam; Tel : (84) 067-3881-255; Fax: (84) 067-3881-256
Subject: Package CW18- Environmental Inspection Report 13 Oct 2015
Dear Mr. Diao Peng,
After the inspection of CW1 8 work package on 13 October 2015, we would like to highlight some
environmental issues on your site regarding unclean working environment as mentioned on the
environmental inspection report in the attachment. Please follow up our instructions/guidance in the
report to take quick action and give us your response for those issues by 201h October 2015.
Cc: - As above
Cao Lanh Bridge Project Manager, CIPM Site Construction Team, CIPM
File: DDIS Consultant JV Office
E "'c.t: C rwi iW1 )·'l'U:w >i d'T> y) 0..(0 rJ-.
Page 1 ofl
ENVIRONMENTAL INSPECTION REPORT Period observation Location
Period (dd-mm-
yyyy)
Work Package Km from
3+800
Km to
6+200
Weather Observers
24th Dec 2015 CW1B Sunny Ms. Le Thi Phuong Loan – NES
Issues
The two settling ponds in two batching plants in South side are problematic. These settling ponds must
contain three separate ponds at least. These settling ponds should be re-designed and re-built to ensure
the effective treatment of wastewater from batching plant before discharge to public water body.
There are no effective drainage system in two batching plants in the South side. Therefore, the
wastewater from both batching plant spilled out of empty land and contaminated all empty land nearby
without any treatment. Contractor must create a good drainage system for both batching plants and this
wastewater must run into the settling pond instead of empty land surrounding. The wastewater in the
empty land must be transferred to settling ponds for treatment after these settling pond rebuilding. The
contaminated soil by wastewater must be removed to disposal area.
There are full of concrete waste from two batching plants. These concrete wastes must be collected and
removed to the approved disposal areas. This issues had been repeatedly reminded contractor.
The discharge of wastewater from Tuan Loc batching plant is to the river. Contractor must have the
collectors of the concrete waste and wastewater for casting activity of batching plant on river as
mentioned in the Batching plant environmental protection plant.
No plastic waste collection on site and no storage for metal waste. Contractor must collect all plastic
waste and store in the trash-bin or non-hazardous waste storage on site. The metal waste should be
located in the metal waste storage with roof and impermeable layer to avoid metal rust contamination
from weather effect.
Photographs
Wrong design of settling pond in the Noth side No effective drainage system led to overfill of
wastewater in the empty land nearby
Wrong design of settling pond in the Noth side Full of concrete waste surrounding batching plant
area
The discharge of wastewater from Tuan Loc
batching plant to the river
No plastic waste collection on site and no storage
for metal waste
CDIVIth Sm1
Central Mekong Delta Connectivity Project- (CMDCP)
TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE
COM Smith- WSP -Yooshin Consultant JV Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam
WSP Tel: (84) 067-3881-255; Fax: (84) 067-3881-256
Ref. No. : DDIS/CW1 B/11 01
Date : 28 September 2015
To: Mr. Diao Peng Project Manager Contractor's Representative
Project Site Office: Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam; Tel : (84) 067-3881-255; Fax: (84) 067-3881-256
Subject: Package CW1 8 - Response to EO request and Environmental Inspection Report on 23 Sept 2015
Dear Mr. Diao Peng,
Refer to your letter No. CW1 B/DDIS/0953 dated 281h August 2015, we would like to give you our
feedback as follows:
1. EO mobilization: As we had discussed with your Safety and Environment Manager, DDIS
would like to request you to designate an Environmental Officer (separate from Safety duty)
which had mentioned in the contract. The person in charge of environment should be
competent and qualified with environmental background and experiences. However, your
staff has no background in environment and few working experiences for this field (especially
report preparation and checking). Therefore, we would like to insist you to mobilize your EO
a part from Safety duties which fu lfil requirement qualification in Specification.
2. Excavated soil/spoil : this soil in the North side must store in the approved disposal areas.
However, your structural excavation work has mostly completed on site but there is no
approved disposal area to dump this material. Thus, we would strongly request you to quickly
propose the disposal area for local authority.
Additionally, we also checked your site recently and we noted that some problems still remain from
v
Cc: - As above
Cao Lanh Bridge Project Manager, CIPM Site Construction Team, CIPM
File: DDIS Consultant JV Office
Attachment:
Environmental monitoring report.
Page l ofl
ENVIRONMENTAL MONITORING REPORT Period observation Location
Period (dd-mm-
yyyy)
Work Package Km from
3+800
Km to
6+200
Weather Observers
23rd Sept 2015 CW1B Sunny Ms. Le Thi Phuong Loan – NES
Issues
Both batching plants are dirty and full of concrete waste. Settling pond in batching plants in south side
are problematic since these area are always overfilled. Since settling pond was full, the wastewater run
in shallow area nearby. The wastewater run into the supply water canal to agricultural field. This issues
had been reminded to contractor many times but there are no action and feedback. Contractor need to
clean these areas and remove all concrete waste as well solid waste under settling ponds as soon as
possible.
The cement chemicals had been leaking on the ground. The contractor need to clean this mess and stop
the leaking by replacing the containment.
Concrete pile heads locate on site. This concrete wastes should be stored in temporary storage and
completely removed to designated disposal area.
Fuel/oil leaking on the ground in the fabrication area. This contaminated materials/concrete must be
clean and collect to hazardous waste storage.
Metal waste was spread over on fabrication yard; this material should be stored in a designated area for
metal waste with barricade and (label) notification broad as reference.
Many chemicals/fuel on site are not labeled. It might be dangerous for workers and newcomer.
Contractor need to strictly require workers to label any can/drum/barrel of liquid materials.
Domestic waste was found on site and worker accommodation. Contractor must require cleaning activity
for these places and remind your worker to keep clean condition for their environment.
Photographs
Full of concrete sludge from settling pond and direct
flow of wastewater to water suply.
Leaking of batching plant chemials
Concrete pile heads on site Fuel leaking on fabrication yards
Disorganized metal waste No label cans on site
Domestic waste on site in North side Domestic waste in worker accommodation in North
side
Dự án Kết nối khu vực trung tâm Đồng bằng sông Cửu Long - (CMDCP)
TA 7822-VIE, Khoản vay 3013-VIE, Khoản viện trợ 0353-VIE
Liên danh Tư vấn CDM Smith - WSP –Yooshin Tổ 5, p Tân Tịch, Xã Tịnh Thới, TP Cao Lãnh, Tỉnh Đồng Tháp, Việt Nam
ĐT: (84) 067-3881-255; Fax: (84) 067-3881-256
__________________________________________________________
Trang 1 / 1
Số thư : DDIS/CW1B/1101
Ngày : 28/09/2015 Gửi đến: Ông Diao Peng
Giám Đốc Dự án Đại diện Nhà thầu
VP Dự án: Tổ 5, p Tân Tịch, Xã Tịnh Thới, TP Cao Lãnh, Tỉnh Đồng Tháp, Việt Nam
ĐT: (84) 067.352.6868 Fax: (84) 067.352.6969
Chủ đề: Gói CW1B – Cảnh cáo về việc chậm trễ trình bản vẽ thi công và biện pháp thi công cầu chính (lần 3)
Kính gửi ông Diao Peng,
Chiếu theo số thư No. CW1B/DDIS/0953 ngày 28/08/2015 của nhà thầu, chúng tôi xin ph n hồi như sau:
1. Huy động nhân viên môi trường: Như chúng tôi đã th o luận với người qu n lý môi trường và an toàn bên ông, Tư v n yêu cầu ông cần ph i huy động một nhân viên môi trường (không liên quan đến các nhiệm vụ an toàn) như đã yêu cầu trên hợp đồng. Người nhân viên này chịu trách nhiệm môi trường cần ph i đ m b o trình độ và năng lực với kiến thức và kinh nghiệm làm môi trường. Tuy nhiên, nhân viên của ông vẫn chưa có ai có nền t ng kiến thức về môi trường và ít kinh nghiệm làm việc trong lĩnh vực này (đặc biệt đối với việc chuẩn bị báo cáo và kiểm tra báo cáo). Vì vậy, chúng tôi vẫn yêu cầu ông huy động nhân viên môi trường riêng tách ra từ các nhiệm vụ về an toàn và đáp ứng đầy đủ các yêu cầu trong Chỉ dẫn kỹ thuật.
2. Về đ t đổ th i: Đ t đổ th i ở khu vực bờ Bắc yêu cầu cần chuyển đến khu vực được ch p thuận đổ th i. Tuy niên những công tác đào móng bệ trụ đã gần hoàn thành ông vẫn chưa có một khu vực nào đổ th i được ch p thuận cho khu vực này. Vì vậy chúng tôi yêu cầu ông cần nhanh chóng trình nộp b i đổ th i tới chính quyền địa phương.
Ngoài ra, chúng tôi đã kiểm tra công trường ông trong thời gian gần đây và lưu ý một số v n đề vẫn còn tồn đọng từ nhiều tháng trước (theo báo cáo kiểm tra môi trường như trong b n đính kèm). Mong ông cần ph i đưa ra các hành động thực thi về các v n đề đã được mô t và ph n hồi chúng tôi vào ngày 02/10/2015.
Trân trọng,
{Đã ký}
Victoriano L. Hamlig
Kỹ sư Thường trú
Cc: - Như trên - Giám đốc dự án Cầu Cao Lãnh, CIPM - Nhóm qu n lý công trường, CIPM - Lưu: Liên danh TVGS – DDIS
BÁO CÁO KIỂM TRA MÔI TRƯỜNG
Thời điểm Vị trí
Thời gian (dd-mm-
yyyy)
Gói thầu Km từ
3+800
Đến Km
6+200
Thời tiết Người quan sát
23/09/2015 CW1B Nắng Ms. Le Thi Phuong Loan – NES
Vấn đề
Cả hai trạm trộ àđều bẩn và tràn ngập các rác thải bê tông. Bể lắng của trạm trộn bên bờ Na àđãà àvấn
đề từ lâu vì bể lắng khu vực này luôn ngậpàđầy các bê tông lắng. Một khi bể lắ gàđãàđầ ,à ước thải
thường chảy vào khu vự àđất thấpà u gà ua h.àNước thải này sẽ được dẫn trực tiếpàđến khu vự àtưới
tiêu của các hoạtàđộng nông nghiệp. Vấ àđề àđãàđược nhắc nhở đến nhà thầu rất nhiều lầ à hư gànhà thầuàkh gà àh hàđộng thực thi hiệu quả. Nhà thầu cần phải dọn dẹp các khu vực này sạch sẽ và
chuyển toàn bộ à êàt gà ià ă gàdưà ũ gà hưà à àthải rắ àkh àđọ gàdưới bể lắ gàđià gà ha hàcàng tốt.
Các loại hóa chấtàd gà hoà ià ă gàđãà ị rò rỉ aà go ià ê àđất. Nhà thầu cần phải dọn dẹp khu vực này
v à gă à hặn các vết rò rỉ kia.
C àđầu cọc bê tông vẫ àđa gàđể t ê à gàt ường. Nhữ gàđầu cọc bê tông này cần vận chuyể àđến khu
chứa tạm thờiàt ê à gàt ường hoặc chuyể àđến khu vực tập kết bảiàđổ thảiàđãàđược phê duyệt.
Dầu tràn hoặc nhiên liệu tràn trên nền trong khu vự àđổ dầm. Các loại chấtà àđãà ị nhiễm dầu/nhiên
liệu cần phảiàđược dọn dẹp và thu gom vào khu vực để rác thải nguy hại.
Rác thải kim loạiàđể tràn lan trong khu vực ãiàđ àdầm; những tài liệu này cần phảiàđược dự trữ trong
khu vự àđược thiết kế cho vật liệu này vớiàđầ àđủ các cảnh báo, dây an toàn che chắn, bảng tên thông
báo.
Nhiều loại nhiên liệu/ ă g dầu không có nhãn mác. Các loại này có thể sẽ nguy hiể à hoà gười công
nhân hoặc nhữ gà gười mớiàđến. Nhà thầu cần phải nghiêm ngặt yêu cầu công nhân dán nhãn cho các
can, thùng vật liệu này.
Các loại rác thải sinh hoạtàđược tìm thấ àt ê à gàt ường và trong khu vực nhà ở của công nhân. Nhà
thầu cần yêu cầu các hoạtàđộng dọn dẹp cho những vị trí này và nhắc nhở công nhân giữ gìn vệ sinh.
Ảnh
Tràn ngập các loạià à êàt g/ ià ă gàtừ bể lắng và
trực tiếp dòng chả à ước thảiàđến nguồn cung cấp
ước cho nông nghiệp.
Rò rỉ các loại hóa chất nguyên liệu dùng cho trạm trộn
Đầu cọ à êàt gàt ê à gàt ường Dầu nhớt nhiên liệu tràn trên công t ường
Không sắp xếp các loại kim loại Các loại can nhiên liệu không nhãn mác
Rác sinh hoạt trên công trường ở bờ Bắc Rác sinh hoạt trong khu vực nhà ở công nhân ở bờ
Bắc
CDIVIth Sml
Central Mekong Delta Connectivity Proj ect - (CMDCP)
TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE
CDM Smith- WSP -Yooshin Consultant JV Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao lanh City, Dong Thap Province, Vietnam
Tel: (84) 067-3881-255 ; Fax: (84) 067-3881-256
Ref. No. : DDIS/CW1C/0313
Date : 22 December 2015
Tn· Mr NQttyAn H11nno Contractor's Representative
Contract Office: No.61-Provincial Road 848, Tan Trong Village, Tan My Commune, Lap Vo District, Dong Thap Province
Tel : (84) 043 7830856 ; Fax: (84) 043 7830859
Sul.Jit::c l. CW I C - Ct.m ullt:ll l!:. oil J.IUUi ADB-Df'AT cUtit::cliVI:! dl 1ll
Environmental Inspect ion Report 18 Dec 2015
Dear Mr. Huong,
Refer to your reference letter Ref. No. CW1 C/DDIS/0266 dated 071h December 2015, DDIS had
been re-inspected your corrective actions and site improvement on your CW1 C work package. We
observed many remaining issues which mentioned in the Environmental Inspection Report 18th Dec
2015 in the attachment.
We noted that many ADB-DFAT observation had not corrective yet.
No hazardous waste storage
Poor domestic garbage management with no proper solid waste storage
No action on concrete waste spillage from batching plant
We strongly request contractor to quickly take serious actions for ADB-DFAT observation and report
to us by 251h December 2015. Please review our Environmental Inspection Report 18th December
2015 to see remaining issues which we keep reminding for months. If no action is taken by the
deadline for batching plant and other relevant issues, we would take strong action to temporarily
stop work till ADB-DFAT and DDIS requirement is fulfilled.
Cc: As above Cao Lanh Bridge Project Manager, CIPM Site Construction Team, CIPM File: DDIS Consultant JV Office
Page 1 afl
Attachment : Environmental Inspection Report 18 Dec 2015
ENVIRONMENTAL INSPECTION REPORT
Work Package Km from Observers
6+200
• Overspreading of concrete sludge under batching and falling Silo areas. This issues have reminded to
Contractor many times. However, no action are taken. This sludge must be clean and removed to
di3po3al area.
• Metal waste was stored next to the office and worker accommodation without a proper storage. This
metal waste was reminded from months ago and no action is taken. Plus, some metal waste from
construction activity are dumped next to the river. This material should be stored in a designated area
for metal waste with barricade and (label) notification broad as reference. Without storage, the metal
waste must be removed as soon as possible to limit the metal leakage to soil/ground.
• The concrete pile head WliJ found on Jite without n proper Contl'llctor muJt collect hiJ concrete
pile head to disposal area as mehtlohed.
• There was overspreading excavated soil on site without any proper storage. This soil must store in
designated area for disposal area. For reuse purpose, this soil should store in a temporary place with
barricade and notification broad.
• Many empty Sika bags (materials for cement mixing process) are speeding over the site. These bags must
be collected and stored in hazardous waste stora .