Environmental Opposition to Collaboration: Caltrain’s Los Gatos Creek Bridge Replacement Hilda Lafebre and Leo Tidd September 2019

Upload: others

Post on 13-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Environmental Opposition to Collaboration:

Caltrain’s Los Gatos Creek Bridge Replacement

Hilda Lafebre and Leo TiddSeptember 2019

Page 2: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Presentation Overview1. Caltrain System Overview2. Project Introduction 3. Areas of Concern/Opposition 4. Finding Collaboration 5. Conclusion6. Q&A

2

Page 3: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Caltrain System and Capital Program Overview

Page 4: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

System Overview• Peninsula Corridor Joint Powers Board

(JPB) operates commuter rail service along the Peninsula from San Francisco to San Jose and Gilroy

• JPB owns and operates 51 miles of right-of-way between San Francisco and south of Tamien, San Jose. Operates on additional 25 miles to Gilroy terminus.

• Railroad has been in service for over 150 years (JPB purchased ROW in 1991)

4

Page 5: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

System Map

5

Page 6: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

System Overview• Railroad Bridges: 74 • Stations: 31• Fleet: 29 diesel locomotives and 134

passenger cars • Service Frequency:

• Number of weekday trains: 92 • Number of weekday express trains: 22

Number of weekend trains: 68 • Number of weekend express trains: 8

6

Page 7: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Caltrain Modernization• Electrification

from San Francisco to Tamien by 2022

• Currently under construction

Page 8: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Capital Program Overview• FY2019 Capital Program Budget:

• Caltrain Modernization- $248 million • Other infrastructure improvements and

maintenance- $54 milliono State of good repairo Stations, signals, communicationso Bridge replacementso Grade separations

8

Page 9: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Los Gatos Creek Bridge Replacement Project

Overview

Page 10: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Project Location

10

Page 11: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Context• Active rail line,

south of Diridon hub

• Adjacent Residences

• Endangered Species work window

• Riparian Habitat

• Bike/ped trail

11

Page 12: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Pre-Construction Condition

12

Page 13: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

13

Page 14: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

14

Page 15: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Purpose and Need1. Replace the structurally deficient 1935

railroad bridge and meet current safety, seismic and engineering standards.

2. Improve operations at San Jose Diridonstation

15

Page 16: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

1935 Bridge Condition

16

Page 17: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Project Description• Demolish two-track 1935 bridge• Replace with three new single track bridges• Include tail track to maintain operations

throughout construction and improve operational flexibility post-construction

17

Page 18: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Project Description (cont’d)• Creek mitigation elements- riparian

restoration and in-channel enhancements • Construct project in one June- October in-

channel work window • Project cost- approximately $35 million • Construction cost- approximately $18

million

18

Page 19: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Area of Opposition #1Resource Agencies

• Threatened Central Califorina Coast Steelhead

• Concerns on effect of new bridge design on channel stability, erosion and water quality

• Lack of resource agency input opportunities in preliminary engineering

19

Page 20: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Area of Opposition #1- Solutions• Re-do 35% design with close input and collaboration of

resource agency stakeholders • Design for net environmental benefit to the creek and

habitat, wider channel with reduced velocity and scour

20

Page 21: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Area of Opposition #2Local Residents

• Construction noise and vibration impact• Nighttime and weekend construction • Change in views, tracks closer to homes

21

Page 22: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Area of Opposition #2- Solutions• Proactive communication on project

benefits to the neighborhood (including safety, aesthetics)

• Construction noise/vibration mitigations• Communication before and during

construction (website, tracking and response to complaints etc.)

22

Page 23: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Area of Opposition #3Local Government

• City sponsored trail extension project underneath the railroad bridge

• Requested JPB project be delayed or postponed to ensure compatibility

23

Page 24: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Area of Opposition #3- Solutions• Leadership to persevere – the bridge had to be replaced

for safety and could not be delayed.• Coordinated design to allow future trail (maintains

acceptable clearance etc.)

24

Page 25: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Construction Completed Jan. 2018

25

Page 26: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Fish Protection and Relocation Effort

26

Page 27: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Mitigation Implementation and Monitoring

27

Page 28: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM

Conclusion-Early identification of potential opposition :

• Regulatory agencies• Neighboring community• Political• City plans and projects

-Developing engagement strategies• Participation in the design phase• Site visits at different stages of the project• Board member constituencies

-Engineering and Construction Team Understanding of Environmental Challenges-Developing documents with emphasis on the benefits of the project (i.e., environmental, infrastructure safety and reliability, property value)

28