Environmental Representative Monthly Report 12 - August 2018 Eden Breakwater Wharf Extension 7 September 2018
Level 17, 141 Walker St North Sydney NSW 2060Australia
301311-13734-EN-REP-0036
www.advisian.com
NSW Department of Industry Environmental Representative Monthly Report 12 - August 2018Eden Breakwater Wharf Extension
Synopsis
The Environmental Representative Report has been prepared to provide details of the actions and decisions on matters for which the Environmental Representative was responsible under the terms of the State Significant Infrastructure (SSI) Approval granted under the Environmental Planning & Assessment Act 1979 for the Eden Breakwater Wharf Extension (the Project).
Specifically, this Report has been prepared to address the requirements in Conditions A16(l) of the Infrastructure Approval (SSI 7734).
Disclaimer Advisian operates as an independent business line of the WorleyParsons Group. This report hasbeen prepared on behalf of and for the exclusive use of NSW Department of Industry, and is subject to and issued in accordance with the agreement between NSW Department of Industry andWorleyParsons.
Advisian accepts no liability or responsibility whatsoever for it in respect of any use of or reliance upon this report by any third party.
Copying this report without the permission of NSW Department of Industry and Advisian is not permitted.
Project No: 301311-13734-EN-REP-0036 – Environmental Representative Monthly Report 12 - August 2018: Eden Breakwater Wharf Extension
Advisian Rev Description Author Review Approval Date
Rev 0 Issued for review
G Thomson S Mason-Jones
7 Sep 18
S Wakefield /S Mason-Jones
Advisian ii
NSW Department of Industry Environmental Representative Monthly Report 12 - August 2018Eden Breakwater Wharf Extension
Table of Contents 1 Introduction............................................................................................................................... 1
1.1 Purpose and Content of this Report ................................................................. 1
1.2 Project Description ................................................................................................... 1
1.3 Project Status.............................................................................................................. 2
2 Review and Amendments to the CEMP or Approvals .............................................. 4
2.1 CEMP amendments .................................................................................................. 4
2.2 Infrastructure Approval Amendments .............................................................. 4
3 Environmental Performance ............................................................................................... 5
3.1 Environmental Issues ............................................................................................... 5
3.1.1 Minor Hydraulic Oil Leak.................................................................................... 5
3.1.2 Use of Cordless Hammer Drill .......................................................................... 5
3.2 Weekly Observations ............................................................................................... 6
4 Environmental Monitoring Summary .............................................................................. 7
4.1 Noise and Vibration Monitoring ......................................................................... 7
5 Environmental Incidents / Complaints ........................................................................... 8
Tables Table 3-1: Weekly Environmental Observations ........................................................................................................ 6
Figures Figure 1-1: Piling progress ................................................................................................................................................. 3
Appendices Appendix A: Whale Register ............................................................................................................................................. 9
Appendix B: Piling Construction Noise Monitoring Report (ERM, 2018) .................................................... 10
Advisian iii
NSW Department of Industry Environmental Representative Monthly Report 12 - August 2018Eden Breakwater Wharf Extension
Acronyms and Terms Acronym/Term
BVSC
Definition Bega Valley Shire Council
CEMP Construction Environmental Management Plan Consistency assessment An assessment of whether a proposed activity for the purpose of
the SSI is consistent with the terms of approval
Construction
Includes all physical work required to construct the SSI, otherthan the following low impact work:
a. Survey works including carrying out general alignment survey, installing survey controls (including installation of global positioning system (GPS)), installing repeater stations, carrying out survey of existing and future utilities and building and road dilapidation surveys, and hydrographic survey;
b. Background and/or baseline monitoring works; c. Investigations including investigative drilling and
excavation; d. Establishment of ancillary facilities in approved locations
or in locations meeting the criteria identified in Conditions A9 and Condition A11 of the approvalincluding constructing ancillary facility access roads and providing utilities to the facility;
e. Operation of ancillary facilities if the ER has determined the operational activities will have minimal impact on the environment and community;
f. Minor clearing and relocation of native vegetation, as identified in the EIS/Submissions Report;
g. Installation of mitigation measures including erosion and sediment controls, temporary exclusion fencing forsensitive areas and acoustic treatments;
h. Relocation and connection of utilities where the relocation or connection does not present a significantrisk to the environment as determined by the ER;
i. Archaeological testing under the Code of practice for archaeological investigation of Aboriginal objects in NSW (DECCW 2010) or archaeological monitoring undertaken in association with [a]-[i] above to ensure that there is no impact on heritage items;
j. Other activities determined by the ER to have minimal environmental impact which may include construction of minor access roads, temporary relocation of pedestrian and cycle paths and the provision of property access; and
Advisian iv
NSW Department of Industry Environmental Representative Monthly Report 12 - August 2018Eden Breakwater Wharf Extension
Acronym/Term Definition k. Maintenance of existing buildings and structures
required to facilitate the carrying out of the SSI. However, where heritage items, or threatened species, populations or ecological communities (within the meaning of the EP&A Act) are affected or potentially affected by any low impact work, that work is construction, unless otherwise determined by the Secretary in consultation with OEH or DPI Fisheries (in the case of impact upon fish, aquatic invertebrates or marine vegetation). The low impact work described in this definition becomes construction with the approval of a Construction Environmental Management Plan.
DoEE Commonwealth Department of the Environment and Energy DP&E NSW Department of Planning and Environment DPI – Fisheries NSW Department of Primary Industries – Fisheries
Dumping Activities
Defined in the Sea Dumping Permit Variation as: means all activities associated with the dumping permitted under this permit, including:
(i) the loading for the purpose of dumping of dredged material;
(ii) the dumping of the material at the prescribed disposal site
ER The Environmental Representative for the SSI IMC Intermediate Bulk Container
Incident
An occurrence or set of circumstances that: Causes, or threatens to cause, material harm to the
environment, community or any member of the community,being actual or potential harm to the health or safety of human beings or to threatened species, endangered ecological communities or ecosystems that is not trivial; or
Results in non-compliance with the approval. Note: this meaning of “material harm” applies for the purpose of the approval only
Marine Species Means all whales, dolphins and marine turtles listed under the Environment Protection and Biodiversity Conservation Act 1999
MMO Marine Mammal Observer Monitoring zone
The area within a 300 metre radius of the (dredging disposal) vessel
Observation zone During September, October and November a horizontal
radius determined from the piling equipment of 2.2 kilometres
Advisian v
NSW Department of Industry Environmental Representative Monthly Report 12 - August 2018Eden Breakwater Wharf Extension
Acronym/Term Definition During January, February, March, April, May, June, July
August and December a horizontal radius determined from the piling equipment of 1.5 kilometres
Proponent The person identified as such in Schedule 1 of the SSI approvaland any other person carrying out any part of the SSI from time to time
Sea Dumping PermitVariation
Sea Dumping Permit (SD2015/3102) Variation issued by DoEE under the Environment Protection (Sea Dumping) Act 1981, dated 27 April 2017
Secretary Secretary of the NSW Department of Planning and Environment(or nominee, whether nominated before or after the date in which the SSI approval was granted)
Sensitive receivers
Includes residences, educational institutions (includingpreschools, schools, universities, TAFE colleges), health carefacilities (including nursing homes, hospitals), religious facilities (including churches), child care centres, passive recreation areas (including outdoor grounds used for teaching), active recreation areas (including parks and sports grounds), commercial premises(including film and television studios, research facilities ,entertainment spaces, temporary accommodation such as caravan parks and camping grounds, restaurants, office premises, retail spaces and industrial premises), and others asidentified by the Secretary
Shut-down zone
During September, October and November a horizontal radius determined from the piling equipment of 1.3 kilometres
During January, February, March, April, May, June, JulyAugust and December a horizontal radius determined from the piling equipment of 1 kilometre
SSI The State Significant Infrastructure, as generally described inSchedule 1 (SSE 7734), the carrying out of which is approved under the terms of the approval
Whales Species listed under the Environment Protection Biodiversity Conservation Act 1999 (EPBC Act)
Advisian vi
NSW Department of Industry Environmental Representative Monthly Report 12 - August 2018Eden Breakwater Wharf Extension
1 Introduction The Eden Breakwater Wharf Extension Project (the Project) includes the extension of the existing Eden Breakwater Wharf and associated dredging.
The Infrastructure Approval (SSI Approval No. 7734) was granted for the Project by the Executive Director, Priority Projects Assessment (as delegate of the Minister for Planning) on 5 July 2017.
The Construction Environmental Management Plan (CEMP) and CEMP Sub-plans have been prepared, approved by the Secretary of the Department of Planning and Environment (the DP&E) on the 22 August2017, and implemented. Revised CEMP and CEMP Sub-plans relevant to Stage 21 of the Project were updated and subsequently approved by DP&E on 28 February 2018.
This Environmental Representative (ER) Report (Report) addresses Condition A16(l) of the Infrastructure Approval. This Report provides an update on the environmental and social performance of the Project’s construction.
1.1 Purpose and Content of this Report
Condition A16(l) of the Infrastructure Approval requires an ER Report to be prepared and submitted to the Secretary for information each month. This will be submitted within seven days following the end of eachmonth for the duration of Construction of the Project or as otherwise negotiated with the Secretary. The report details the actions and decisions on matters for which the ER was responsible in the preceding month.
Further, Condition C16 requires the results of the Construction Monitoring Programs be submitted to the Secretary and relevant regulatory agencies, for information at the frequency identified in the relevant Construction Monitoring Program. As these reports will be monthly, relevant information will be contained and submitted along with this report.
Construction of Stage 1 commenced on 4 September 2017, as marked by the arrival of the tugs, split-hopper barges and the dredge. Construction of Stage 2 commenced on 13 April 2018, as marked by the commencement of survey for scour protection removal in anticipation of pile installation. This report covers construction activities from 1 August 2018 to 31 August 2018.
1.2 Project Description The Project is located in Snug Cove, Eden, New South Wales and comprises the extension of the existing Eden Breakwater Wharf and dredging of the approach channel and berth pocket with offshore disposal, to accommodate the berthing of cruise ships of up to 325m in length.
1 Stage 2 is outlined in the Project Staging Report (Advisian 2017, as submitted to the Secretary 24 July 2017 in accordance with Condition A37 of the Infrastructure Approval)
NSW Department of Industry Environmental Representative Monthly Report 12 - August 2018Eden Breakwater Wharf Extension
Key features of the Project include:
Extension of the existing wharf by approximately 95m, including 78 piles to support the extension
Installation of three mooring dolphins and two berthing dolphins, including 30 piles Installation of new landside bollards to restrain the ship’s bow, including 18 piles Dredging of 210,148m³ of in-situ material (including over-dredging allowance) Transport and placement of the dredge material at an offshore disposal site
Installation of minor services (lighting, power, potable water and emergency water) Installation of navigational aids.
1.3 Project Status During the period covered by this report (1 August 2018 to 31 August 2018), the following key activities wereundertaken and milestones achieved relating to the Project:
On-site noise monitoring is ongoing
Piling works are ongoing (refer to Figure 1-1), 78 wharf piles (56 complete and 22 partially complete) and nine onshore bollard piles have been completed
Dolphin topside fabrication is ongoing (off-site fabrication) Precast concrete deck plank fabrication is complete and Silane treatment commenced Precast concrete headstock troughs fabrication is ongoing, 18 have been poured One headstock installed on the wharf Temporary works have commenced for transition wharf Trimming piles is ongoing
Removal of rock amour and pile gate poured for navigational aid/tower.
Advisian 2
NSW Department of Industry Environmental Representative Monthly Report 12 - August 2018Eden Breakwater Wharf Extension
Note: Red flagged piles are complete. However 22 piles are still to be “drilled and driven” or “rock socketed”.
Figure 1-1: Piling progress
Advisian 3
NSW Department of Industry Environmental Representative Monthly Report 12 - August 2018Eden Breakwater Wharf Extension
2 Review and Amendments to the CEMP or Approvals
2.1 CEMP amendments The CEMP and CEMP Sub-plans for Stage 1 of the Project were formally approved by the Secretary on 22 August 2017.
The CEMP and CEMP Sub-plans for Stage 2 of the Project were prepared and submitted to DP&E for approval. The CEMP and CEMP Sub-plans were approved by the Secretary on 28 February 2018.
During the period covered by this report, there were no reviews or minor amendments made to the CEMP and/or CEMP Sub-plans.
2.2 Infrastructure Approval Amendments Consultation is ongoing with DP&E and the Community Consultation Committee (CCC) regarding a potential modification to operational conditions concerning the environmental management of noise amenity and airquality (E17, E18, E20, and E22). Written comments have been received regarding the potential amendments, some comments support the changes and some comments raise concerns.
A Modification Request was formally submitted to DP&E on the 04 July 2018. The DP&E placed themodification request on public exhibition from 13 July to Friday 27 July 2018.
On the 03 August 2018, the DP&E provided a letter requesting a response to the issues raised in submissionsand requested additional information to support the proposed modifications. The Department received a total of 18 submissions on the Modification Request, including:
Five regulatory agencies (NSW Office of Environment and Heritage, NSW Environment Protection Authority, NSW Department of Industry, Transport for NSW and Bega Valley Shire Council)
Four organisations (Cat Balou Cruises, Bega Valley Shire Residents and Ratepayers Association Inc, Eden Tourism Incorporated and Sapphire Coast Buslines)
Nine private stakeholders. Of the 18 submissions, only one objected to the Modification Request related to the proposed modification of Conditions E20 and E22 (related to air quality). A Response to Submissions Report was submitted to the Department on the 03 September 2018 for assessment and a decision
Advisian 4
NSW Department of Industry Environmental Representative Monthly Report 12 - August 2018Eden Breakwater Wharf Extension
3 Environmental Performance Environmental performance was measured through observation of construction activities and identification of continual improvement opportunities.
3.1 Environmental Issues For this reporting period, two environmental performance issues occurred on-site.
3.1.1 Minor Hydraulic Oil Leak On 23 August 2018, the Pilequip ICE 44B Vibro Hammer was laid on the wharf, with the hydraulic hose lines secured and capped, awaiting repair of a coupling seal failure on the main hose. On 24 August 2018 it was relocated on the wharf for space utilisation and production reasons. While stored on the wharf, a leak developed and oil spilled on the ground. The spill was noticed on arrival on site and walk around on 27 August 2018, after the weekend. Spill pads were deployed and the hammer elevated to stop the spill. Indiscussion with the hydraulic fitter it was found that the Pilequip ICE 44B Vibro Hammer is required to bestored on an angle to prevent the hydraulic sump stored fluid level from covering the Thermo Relief valve opening. Once the issue was identified the hammer was repositioned to clean up the spill. The hammer was stored on an incline to ensure the free fluid in the sump did not cover the valve. No further spill has occurred.
An incident report was prepared and it was noted that there was no impact to the environment and the report was closed out. An upright storage frame will be implemented to prevent a reoccurrence.
3.1.2 Use of Cordless Hammer Drill On 29 August 2018, the Proponent advised that the preparation of the surface profile on the fender headstocks currently on the barge, were not prepped to the correct profile, as per the specification andrequested approval from the ER to scabble the pockets on the barge using a Milwaukee cordless hammer drill. The contractor provided an outline of the required works, environmental control and monitoring measures, the duration and timing of works and community engagement activities.
On 29 August 2018 and having reviewed to the CEMP, the description of required works and environmental control measures, the ER advised that the works required to be carried out are generally in accordance withthe Infrastructure Approval terms and intent of the CEMP. Their impact is also consistent with the existingenvironmental risk assessment for this stage.
The work was carried out on 31 August 2018. For the remainder of construction, green cutting of the construction joints will be carried out in accordance with the CEMP.
Advisian 5
NSW Department of Industry Environmental Representative Monthly Report 12 - August 2018Eden Breakwater Wharf Extension
3.2 Weekly Observations
Table 3-1 provides a list of actions and close out from the weekly observations inspections and daily site visits.
Table 3-1: Weekly Environmental Observations
Date raised Action identified Action undertaken Date closed
2-Aug-18
2-Aug-18
30-Aug-18
Hazardous waste bund to be pumped out
Subcontractor PFD's to be included on WWC register
Repairs to concrete washout area
Pumped out organisedand undertaken during site inspection
Sub contractors that do not currently have aninternal register have been included on the WWC register
Sighted during dailyinspection
02-Aug-18
02-Aug-18
01-Sep-18
30-Aug-18 Reinstate the timber sign on bin Sighted during daily inspection
01-Sep-18
30-Aug-18 Concrete spills at rear of wharf to be cleaned up and investigated
30-Aug-18 Firefighting equipment to be made more accessible at the front of the elevated platform for welders undertaking work on the fender section of the headstock
Advisian 6
NSW Department of Industry Environmental Representative Monthly Report 12 - August 2018Eden Breakwater Wharf Extension
4 Environmental Monitoring Summary Monitoring for Stage 2 activities included observations on aquatic ecology, water quality and air quality, and site-based monitoring for noise amenity and vibration. No observations have identified any adverse environmental impacts due to the Project.
Marine Mammal Observer (MMO) trained personnel were onsite conducting observations during piling works in line with the requirements of the EPBC Act Referral Decision Notice conditions. The following was noted during this reporting period:
No incidents involving marine mammals have occurred
Whales have been sighted within Twofold Bay, with one observed in the Observation Zone during the reporting period. To date there have been no sightings of whales within the shut-down zone (refer to Appendix A for the Whale Register.
The Observation and Shut down zones were increased on the 30 August to 2.2km and 1.3km (respectively) to cater for the whale migration and as prescribed in the EPBC referral (EPBC2016/7828).
4.1 Noise and Vibration Monitoring Noise and vibration monitoring equipment was installed on the 27 April 2018 prior to the commencement of piling on the 28 April 2018. The vibration monitoring equipment was in place for two weeks and has now been removed, and noise monitoring equipment will remain in place for during of piling to monitor any adverse impacts. No noise or vibrations incidents or non-conformances have been raised during this reporting period.
A Piling Construction Noise Monitoring report dated 06 September 2018, has been developed by ERM and is attached at Appendix B. This report has been prepared in accordance with the Noise and Vibration CEMP Sub-plan and outlines the results for the continuous monitoring period from 01 – 31 August 2018. Weeklystatistics are provided in the reports since the commencement of piling.
The results of the monitoring were compared to the predicted noise levels outlined in the EIS and the Noise and Vibration CEMP Sub-plan for the Project. Based on continuous monitoring and identified periods of piling activity, it is evident that while site activities are audible and contribute to the noise environment at the identified sensitive receivers, noise impacts are below Approved Noise Levels during identified periods of piling activities. Noise levels at both logging locations were found to be heavily influenced by prevailing wind conditions.
The report recommended that ongoing noise monitoring be maintained as per the program, and noise impacts be reviewed where any significant changes to piling equipment or operation occurs, particularly once dolphin piling works commence.
Advisian 7
NSW Department of Industry Environmental Representative Monthly Report 12 - August 2018Eden Breakwater Wharf Extension
5 Environmental Incidents / Complaints Zero environmental incidents occurred on the Project.
Zero community complaints have been received regarding the Project.
Advisian 8
NSW Department of Industry Environmental Representative Monthly Report 12 - August 2018Eden Breakwater Wharf Extension
Appendix A: Whale Register
Advisian 9
WHALE REGISTER Date Time Location Action undertaken Species Number Comments
1/05/2018 16:16 Observation zone Nil - continued piling as softstart already underway and mammal did not enter shutdown zone
Whale 1
25/05/2018 8:55 Outside Observation Zone Piling delayed for >1.5hrs Whale 2 Whale in observation zone between 8:55 and 9:25. Piling
commenced at 11:07.
15/06/2018 12:00 Outside Observation Zone Nil Whale 3
9/07/2018 12:05 Observation zone Nil Whale 1 Whale in observation zone between 12:05 and 12:15 - during barge relocation and pile setup. Pre piling observations were undertaken from 13:15 to 13:45. Piling commenced at 13:45.
24/07/2018 - Outside Observation Zone Nil Whale 1
26/07/2018 8:10 Outside Observation Zone Nil Whale 2 Located 300m - 400m from yellow buoys
2/08/2018 8:15 Outside Observation Zone Nil Whale 1 Inbetween Nth and Sth Head appro. 2-3kms off obser. Zone
2/08/2018 9:12 Outside Observation Zone Nil Whale 4 1km south of Nth Head
2/08/2018 10:50 Outside Observation Zone Nil Whale 6 or 7 Travelling from Nth Head to Sth Head
8/08/2018 9:43 Observation zone Nil - no piling being undertaken Whale 1 Sighted at location 2 heading south - last sighted at 9:47
24/08/2018 - Outside Observation Zone Nil - no piling being undertaken Whale 1 Sighted near Navy Wharf
NSW Department of Industry Environmental Representative Monthly Report 12 - August 2018Eden Breakwater Wharf Extension
Appendix B: Piling Construction Noise Monitoring Report (ERM, 2018)
Advisian 10
Robert Davis
Project Manager
Waterway Constructions Pty Ltd
6 September 2018
Dear Robert,
Port of Eden Project – Piling Construction Noise Monitoring – Continuous Monitoring 1st to 31st August 2018
ERM was engaged by Waterway Constructions Pty Ltd (Waterway) to complete ongoing noise
monitoring as part of Stage 2 of the Eden Breakwater Wharf Extension. Noise monitoring is
required as part of the Noise and Vibration CEMP Sub-plan for the works, and as a requirement
of Infrastructure Approval (SSI 7734, July 2017), stated by the Department of Planning and
Environment (DP&E).
The attached document is an assessment of noise impacts from piling for the period 1st to 31st
August 2018.
Please contact ERM if you require any further information.
Yours sincerely
Aaron McKenzie
Principle Consultant
Enclosure
ERM Sydney ABN: 86 127 101 642
Level 15, 309 Kent Street www.erm.com
Sydney NSW 2000 Ph: +61 2 8584 8888
1 Introduction
The monitoring scope included long term unattended monitoring at two locations after the
commencement of piling activities. This report outlines the results for the period 1st to 31st August
2018. Weekly statistics have been presented for Weeks 15 to 19 in this report, being the weeks
since the commencement of piling and monitoring.
This document references the following documents:
Noise and Vibration CEMP Sub-plan Eden Breakwater Wharf Extension - Stage 2 (Advisian,
February 2018).
Port of Eden Air Quality and Noise Assessment (Pacific Environment 2016).
This monitoring report has been prepared with reference to the following policy and guidance:
Interim Construction Noise Guideline (DECCW 2009);
Construction Noise Strategy (TfNSW 2012);
Australian Standard AS1055.1:1997: Description and Measurement of Environmental Noise.
A glossary of the acoustic terms used in this report are presented in Attachment A.
2 Monitoring Locations and Approved Noise Levels
2.1 Sensitive Receivers and Monitoring Locations
Individual receiver locations and addresses are indicated in the Air Quality and Noise
Assessment (PEL 2016a), and reproduced in Attachment B. Monitoring locations are presented in
Attachment B and Figure 2-1.
Location L1 was required for monitoring as part of Stage 1 of the Eden Breakwater Extension, but
is not required as part of Stage 2, however naming has been maintained for the remaining sites
for consistency with previous reports.
ERM Sydney www.erm.com 2 Level 15, 309 Kent Street Ph: +61 2 8584 8888
Sydney NSW 2000
Table 2.1: Noise Monitoring Locations, MGA Zone 55
Location ID NCA Address Suburb Easting (m) Northing (m)
L3 1 17 Victoria Terrace Eden 758415 5893428
L2 2 8 By St Eden 758733 5892986
Source: Air Quality and Noise Assessment (Pacific Environment, 2016)
Figure 2-1: Site Location, Noise Catchment Areas and Noise Monitoring Locations
ERM Sydney www.erm.com 3 Level 15, 309 Kent Street Ph: +61 2 8584 8888
Sydney NSW 2000
2.2 Approved Noise Management Levels
The noise limits for the project are stated in the CEMP and are based on noise predictions from
the Air Quality and Noise Assessment (Pacific Environment, 2016). Model Scenario 3 includes
impact piling at the port, and a situation where piling equipment is relocated to the wave
attenuator. Noise levels have been presented at the receivers adjacent the noise loggers, being
SR43 at By Street (L2) and SR21 Victoria Terrace (L3). These are reproduced in Table 2-3.
Noise levels have been presented with the magnitude of noise exceedances as per Table 2.2,
with the results applied in subsequent table. Red background indicates noise levels in
exceedance of the highly noise affected criteria.
Table 2.2: Presentation of Results and Exceedances
Description Exceedance above
Criteria, dB(A)
Predicted noise level,
dB(A)
Colour scheme
Noticeable 0 – 10 dB(A) -
Clearly audible 10 – 20 dB(A) -
Moderately intrusive 20 – 30 dB(A) -
Highly intrusive > 30 dB(A) -
Highly Noise Affected - > 75 dB(A)
Source: PEL 2016.
Table 2-3: Predicted Construction Noise from Piling
Predicted Noise Level LAeq,15min dB(A)
Criteria LAeq,15min Scenario 3
Receiver ID NCA Day Eve Night Day/Port Day Atten
SR21 NCA 1 43 37 37 75 77
77 72SR43 NCA 2 47 40 40
Source: PEL 2016.
ERM Sydney www.erm.com 4 Level 15, 309 Kent Street Ph: +61 2 8584 8888
Sydney NSW 2000
3 Noise Monitoring
3.1 Equipment Failure
Due to ongoing issues with the noise monitors modems failing to consistently connect to the mobile
phone network, and subsequent data loss, replacement monitors were swapped over to allow for
testing by the equipment manufacturer. The following instruments were in place:
Location L2, By Street – swapped to logger serial number 8780A2 on 31st of July, and
subsequently a replacement battery installed on the 7th of August.
Location L3 Victoria Terrace swapped to logger serial number 8780A3 on 8th of August.
3.2 Monitoring Methodology
Continuous unattended noise monitoring was completed with Class 1 noise loggers with reference
to AS1055.1:1997. Instrumentation calibrated by a NATA testing laboratory with in field checks of
instrument calibration. Noise loggers were set to record A-weighted noise levels every 15 minutes
and set to ‘fast’ response time. Calibration was checked monthly with no significant drift observed.
All logging equipment carry current NATA calibration certificates (Attachment D).
Noise logging graphs and daily summaries for location L2 and L3 between the 1st and 31st August
2018 are summarised in Attachment C. The existing noise environment was influenced by
prevailing wind conditions and sea swell.
With regard to the approved noise levels (Table 2-3), piling noise levels are to comply with
77 dB(A) at L2 and 75 dB(A) at L3. It is noted that these levels are based on 15 minute
assessment periods.
The instantaneous maximum piling noise impact can generally be approximated from the
maximum noise levels recorded in the daily logger graphs (Attachment C) when piling is being
undertaken.
Weekly statistics for location L2 and L3 are discussed in the following sections for the period of
continuous data collection.
4 Results
4.1 Week 15 – 1st to 31st August 2018
During Week 15, piling only occurred on 1st August 2018 between 07:30 and 12:46; on 2nd August
2018 between 08:23 and 16:55; and on 7th August 2018 between 09:17 and 17:11.
ERM Sydney www.erm.com 5 Level 15, 309 Kent Street Ph: +61 2 8584 8888
Sydney NSW 2000
4.1.1 Location L2, 8 By Street Due to equipment error, data was not captured for 6th and 7th August 2018 at Location L2.
Average noise level (LAeq) varied from 39 dB(A) to 64 dB(A) during the day time period. The
maximum noise levels (LMax) ranged from 52 dB(A) to 85 dB(A) during the day time period.
During Week 15, piling LAeq noise levels were measured from 46 to 64 dB(A). Lmax levels during
these periods ranged between 55 to 80 dB(A). Lmax peaks were typically between 70 to 77 dB(A),
with a single peak event of 80 dB(A) recorded on 2nd August.
LAeq 15 minute average noise levels during the day time period did not exceed 77 dB(A).
4.1.2 Location L3, 17 Victoria Terrace Due to equipment error, data was not captured at Location L3 for Week 15 of the monitoring
program.
4.2 Week 16 – 8th to 14th August 2018
During Week 16, piling was undertaken on 8th August 2018 between 08:03 to 17:04; on 9th August
2018 between 08:15 to 15:07; and on 10th August 2018 between 08:37 and 11:30.
4.2.1 Location L2, 8 By Street The average noise level (LAeq) varied from 38 dB(A) to 66 dB(A) during the day time period. The
maximum noise level (LMax) varied from 50 dB(A) to 86dB(A) during the day time period.
During Week 16, piling LAeq noise levels were measured from 40 to 63 dB(A). Lmax levels during
these periods ranged between 57 to 77 dB(A). Lmax peaks were typically between 65 to 75 dB(A).
LAeq 15 minute average noise levels during the day time period did not exceed 77 dB(A), except on
8th August where the measurements were influenced by equipment calibration checks and
maintenance activity, occurring between 16:30 and 17:00.
4.2.2 Location L3, 17 Victoria Terrace The average noise level (LAeq) varied from 36 dB(A) to 68 dB(A) during the day time period. The
maximum noise levels (LMax) ranged from 52 dB(A) to 87 dB(A) during the day time period.
At L3, piling LAeq noise levels were measured from 44 to 68 dB(A). Lmax levels during these periods
ranged between 60 to 80 dB(A). Lmax peaks were typically between 60 to 77 dB(A).
LAeq 15 minute average noise levels during the day time period did not exceed 75 dB(A).
4.3 Week 17 - 15th to 21st August 2018
No piling was undertaken during Week 17.
ERM Sydney www.erm.com 6 Level 15, 309 Kent Street Ph: +61 2 8584 8888
Sydney NSW 2000
4.3.1 Location L2, 8 By Street The average noise level (LAeq) varied from 37 to 65 dB(A) during the day time period. The maximum
noise level (LMax) varied from 52 dB(A) to 89 dB(A) during the day time period.
LAeq 15 minute average noise levels during the day time period did not exceed 77 dB(A).
4.3.2 Location L3, 17 Victoria Terrace The average noise level (LAeq) varied from 36 to 61 dB(A) during the day time period. The maximum
noise levels (LMax) ranged from 53 dB(A) to 85 dB(A) during the day time period.
At L3 during Week 17, noise levels were measured between 50 to 65 dB(A). As no piling was
undertaken during Week 12, recorded noise levels can be attributed to existing environmental
noise.
LAeq 15 minute average noise levels during the day time period did not exceed 75 dB(A).
4.4 Week 18 – 22nd to 28th August 2018
No piling was undertaken during Week 18.
4.4.1 Location L2, 8 By Street The average noise level (LAeq) varied from 39 dB(A) to 68 dB(A) during the day time period. The
maximum noise level (LMax) varied from 53 to 89 dB(A) during the day time period. As no piling was
undertaken during Week 18, recorded noise levels can be attributed to existing environmental
noise.
4.4.2 Location L3, 17 Victoria Terrace The average noise level (LAeq) varied from 40 dB(A) to 62 dB(A) during the day time period. The
maximum noise levels (LMax) ranged from 57 dB(A) to 85 dB(A) during the day time period. As no
piling was undertaken during Week 12, recorded noise levels can be attributed to existing
environmental noise.
4.5 Week 19 – 29th to 31st August 2018
During Week 19, piling was undertaken on 30th August between 07:30 to 14:15.
4.5.1 Location L2, 8 By Street The average noise level (LAeq) varied from 42 dB(A) to 66 dB(A) during the day time period. The
maximum noise level (LMax) varied from 49 to 96 dB(A) during the day time period.
ERM Sydney www.erm.com 7 Level 15, 309 Kent Street Ph: +61 2 8584 8888
Sydney NSW 2000
During Week 19, piling LAeq noise levels were measured from 46 to 56 dB(A). Lmax levels during
these periods ranged between 66 to 82 dB(A). Lmax peaks were typically between 75 to 80 dB(A).
LAeq 15 minute average noise levels during the day time of the period 29th to 31st August did not
exceed 77 dB(A).
4.5.2 Location L3, 17 Victoria Terrace The average noise level (LAeq) varied from 40 to 60 dB(A) during the day time period. The maximum
noise levels (LMax) ranged from 56 dB(A) to 84 dB(A).
At L3, piling LAeq noise levels were measured from 44 to 59 dB(A). Lmax levels during these periods
ranged between 59 to 78 dB(A). Lmax peaks were typically between 70 to 75 dB(A).
LAeq 15 minute average noise levels during the day time of the period 29th to 31st August did not
exceed 75 dB(A).
4.6 Statement of Compliance
Based on continuous monitoring and identified periods of piling activity, it is evident that while site
activities are audible and contribute to the noise environment at the identified sensitive receivers,
noise impacts are below Approved Noise Levels during identified periods of piling activities.
For weeks 15 to 19, measured LAeq average noise levels during the daytime period at location L2
(By St) did not exceed 77 dB(A).
For Weeks 15 to 19, LAeq average noise level noise levels during the daytime at location L3 (Victoria
Terrace) did not exceed 75 dB(A).
At both monitoring locations, instantaneous maximum noise levels were estimated at being above
70 dB(A) at several short interval events throughout the monitoring period, however these levels
were not sustained and did not result in exceedance of the approved LAeq 15minute noise levels.
Noise levels were found to be impacted by prevailing wind conditions. As noted during previous
attended monitoring campaigns, winds tend to be elevated during the daytime period, which
results in increased noise levels received at the logging locations.
5 Conclusion
ERM has completed ongoing noise monitoring as part of Stage 2 of the Eden Breakwater Wharf
Extension. Noise monitoring is required as part of the Noise and Vibration CEMP Sub-plan for the
works, and as a requirement of Infrastructure Approval (SSI 7734, July 2017), stated by the
Department of Planning and Environment (DP&E).
This report presents noise impacts from piling for the period 1st to 31st August 2018 for Weeks 15
to 19 of the monitoring schedule.
ERM Sydney www.erm.com 8 Level 15, 309 Kent Street Ph: +61 2 8584 8888
Sydney NSW 2000
The results of monitoring were compared to the Project Approval limits. Measured noise levels
have been below the Approval limits referred to in the Infrastructure Approval. Noise levels at
both logging locations were found to be heavily influenced by prevailing wind conditions.
It is recommended that ongoing noise monitoring be maintained as per the program, and noise
impacts be reviewed where any significant changes to piling equipment or operation occurs,
particularly once dolphin piling works commence.
References
Advisian, February 2018. Noise and Vibration CEMP Sub-plan Eden Breakwater Wharf Extension
- Stage 2.
Australian Standard (AS) 1055.1:1997 Description and Measurement of Environmental Noise.
British Standards Institute (2008). BS 6472-1:2008 Guide to evaluation of human exposure to
DECC (2009). NSW Interim Construction Noise Guidelines (ICNG).
Department of Planning and Environment (DP&E) (2017). Infrastructure Approval (SSI 7734, July
2017).
Pacific Environment (2016a). 20910 RHDHV Eden Air Quality and Noise Assessment D3.
TfNSW (2012). Construction Noise Strategy 7TP-ST-157/2.0
Attachment A – Glossary of terms
Attachment B – Sensitive Receivers
Attachment C - Daily Logger Graphs
Attachment D – Instrument Calibration Certificates
ERM Sydney www.erm.com 9 Level 15, 309 Kent Street Ph: +61 2 8584 8888
Sydney NSW 2000
Attachment A: Glossary of Terms
Term Description
Weather conditions that affect noise measurements (wind, rain and temperature inversions) that occur at a particular site for a significant period of time. The
Adverse weather maximum wind speed allowed during acoustics measurements is 5m/s. No rain is allowed.
The all-encompassing noise environment at a given location, comprising sources in Ambient noise
the near and far field.
Assessment The period in a day over which assessments are made.
period
Adjustment made to a noise level based on international standards. Approximates a A-weighting
human’s hearing response to frequency at lower sound levels.
Background noise is the term used to describe the underlying level of noise present in an area, measured in the absence of any extraneous noise. Typically when
Background noise measured with a sound level meter is measured statistically as the A-weighted noise level exceeded for ninety percent of a sample period (LA90,T).
dB Decibel, the logarithmic ratio of a given sound pressure to a reference pressure.
dB(A) A-weighted decibels.
Free-field A sound field where the effects of reflection are negligible in the region of interest.
The number of cycles per unit of time. It is measured with cycles per second (cps) or Frequency the interchangeable Hertz (Hz). Frequency can be associated as a synonymous to
pitch.
Level that drops to the background noise level several times during the period of Intermittent noise
observation.
LA1,T The noise level exceeded for 1% of the time period, T.
LA10,T The noise level exceeded for 10% of the time period, T.
The noise level exceeded for 90% of the time period, T. Commonly referred to as the LA90,T background noise level.
The equivalent average noise level of the time period, T. It represents in a single LAeq,T number, the energy of the actual fluctuating noise level over the period.
LAmax,T The maximum noise level measured during the period, T.
Rating Background Level. The background noise level as defined by the NSW RBL Industrial Noise Policy (EPA, 2000). It is calculated by the taking the median value of
the lowest 10th percentile LA90 measurements in any day, evening or night period.
Is the difference between the pressure produced by a sound wave and the Sound Pressure
barometric (ambient) pressure at the same point in space. Typically expressed in Level (SPL)
decibels, as measured by a standard sound level meter with a microphone.
ERM Sydney www.erm.com 10 Level 15, 309 Kent Street Ph: +61 2 8584 8888
Sydney NSW 2000
Attachment B: Sensitive Receivers
ERM Sydney www.erm.com 11 Level 15, 309 Kent Street Ph: +61 2 8584 8888
Sydney NSW 2000
Figure B1: Noise sensitive receivers immediately adjacent to Snug Cove (Source: PEL 2016a)
ERM Sydney ABN: 86 127 101 642
Level 15, 309 Kent Street www.erm.com
Sydney NSW 2000 Ph: +61 2 8584 8888
Attachment C: Continuous Monitoring Graphs
ERM Sydney ABN: 86 127 101 642
Level 15, 309 Kent Street www.erm.com
Sydney NSW 2000 Ph: +61 2 8584 8888
Attachment C: Continuous Monitoring Graphs
Unattended Noise Monitoring Graphs
1st to 31st August 2018
s
ERM Sydney www.erm.com 15 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
- -
1st – 31st August 2018
Table 1: L2 - By Street Daily Statistics – Week 15
Location ID Ambient Noise Level, Leq(period)
Day Maximum Noise Levels, Lmax
Day
Ave Min Max Ave Min Max
Wednesday
01/08/2018 56 42 64 70 58 80
Thursday
02/08/2018 54 44 62 67 56 80
Friday
03/08/2018 52 44 60 67 57 85
Saturday
04/08/2018 49 39 54 67 52 83
Sunday
05/08/2018 46 40 54 65 52 81
Monday
06/08/2018 - - - - - -
Tuesday
07/08/2018 - - - - - -
ERM Sydney www.erm.com 16 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
- -
Table 2: L3– Victoria Terrace Daily Statistics – Week 15
Location ID Ambient Noise Level, Leq(period)
Day Maximum Noise Levels, Lmax
Day
Ave Min Max Ave Min Max
Wednesday
01/08/2018 - - - - - -
Thursday
02/08/2018 - - - - - -
Friday
03/08/2018 - - - - - -
Saturday
04/08/2018 - - - - - -
Sunday
05/08/2018 - - - - - -
Monday
06/08/2018 - - - - - -
Tuesday
07/08/2018 - - - - - -
ERM Sydney www.erm.com 17 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 - By St – 1st August 2018
L3 – Victoria Terrace - 1st August 2018
No data available on this day.
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 18 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 2nd August 2018
L3 – Victoria Tce - 2nd August 2018
No data available on this day.
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 19 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 3rd August 2018
L3 –Victoria Tce – 3rd August 2018
No data available on this day.
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 20 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 4th August 2018
L3 – Victoria Tce – 4th August 2018
No data available on this day.
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 21 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 5th August 2018
L3 – Victoria Tce – 5th August 2018
No data available on this day.
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 22 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 6th August 2018
No data available on this day.
L3 – Victoria Tce – 6th August 2018
No data available on this day.
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 23 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 7th August 2018
No data available on this day.
L3 – Victoria Tce – 7th August 2018
No data available on this day.
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 24 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
- -
8th to 14th August 2018
Table 3: L2 - By Street Daily Statistics – Week 16
Location ID Ambient Noise Level, Leq(period)
Day Maximum Noise Levels, Lmax
Day
Ave Min Max Ave Min Max
Wednesday
08/08/2018 71 41 79 77 50 103
Thursday
09/08/2018 53 40 63 69 57 86
Friday
10/08/2018 52 45 59 69 53 81
Saturday
11/08/2018 54 46 58 68 60 79
Sunday
12/08/2018 51 38 58 66 53 79
Monday
13/08/2018 56 39 66 68 53 84
Tuesday
14/08/2018 50 41 57 67 58 82
Note: 1. Peak affected by instrument calibration.
ERM Sydney www.erm.com 25 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
- -
Table 4: L3 – Victoria Terrace Daily Statistics – Week 16
Location ID Ambient Noise Level, Leq(period)
Day Maximum Noise Levels, Lmax
Day
Ave Min Max Ave Min Max
Wednesday
08/08/2018 48 40 51 68 56 82
Thursday
09/08/2018 57 38 68 70 60 87
Friday
10/08/2018 55 39 65 68 57 81
Saturday
11/08/2018 48 43 52 64 52 78
Sunday
12/08/2018 49 36 53 65 54 76
Monday
13/08/2018 53 37 63 68 53 82
Tuesday
14/08/2018 49 39 53 69 60 80
ERM Sydney www.erm.com 26 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 8th August 2018
L3 – Victoria Terrace – 8th August 2018
1 Note: Data valid from 17:30 only on this date.
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 27 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 9th August 2018
L3 - Victoria Terrace – 9th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 28 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 10th August 2018
L3 - Victoria Terrace – 10th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 29 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St– 11th August 2018
L3 – Victoria Terrace – 11th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 30 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 12th August 2018
L3 - Victoria Terrace– 12th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 31 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 13th August 2018
L3 - Victoria Terrace– 13th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 32 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 14th August 2018
L3 – Victoria Terrace – 14th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 33 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
- -
15th to 21st August 2018
Table 5: L2 - By Street Daily Statistics – Week 17
Location ID Ambient Noise Level, Leq(period)
Day Maximum Noise Levels, Lmax
Day
Ave Min Max Ave Min Max
Wednesday
15/08/2018 57 40 65 70 55 82
Thursday
16/08/2018 51 41 55 68 57 80
Friday
17/08/2018 50 41 59 67 52 89
Saturday
18/08/2018 52 37 65 68 53 86
Sunday
19/08/2018 58 46 65 68 56 80
Monday
20/08/2018 52 41 59 67 55 82
Tuesday
21/08/2018 55 41 64 69 54 82
Note: 1. Peak affected by instrument calibration
ERM Sydney www.erm.com 34 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
- -
Table 6: L3 – Victoria Terrace Daily Statistics – Week 17
Location ID Ambient Noise Level, Leq(period)
Day Maximum Noise Levels, Lmax
Day
Ave Min Max Ave Min Max
Wednesday
15/08/2018 53 36 61 66 56 83
Thursday
16/08/2018 49 39 54 67 57 77
Friday
17/08/2018 49 36 60 66 57 80
Saturday
18/08/2018 49 41 57 65 53 76
Sunday
19/08/2018 55 45 60 68 58 85
Monday
20/08/2018 51 42 57 67 60 73
Tuesday
21/08/2018 51 40 55 68 59 75
ERM Sydney www.erm.com 35 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 15th August 2018
L3 - Victoria Terrace – 15th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 36 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 16th August 2018
L3 - Victoria Terrace – 16th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 37 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 17th August 2018
L3 - Victoria Terrace – 17th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 38 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 18th August 2018
L3 - Victoria Terrace – 18th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 39 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 19th August 2018
L3 - Victoria Terrace – 19th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 40 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 20th August 2018
L3 - Victoria Terrace - 20th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 41 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 21st August 2018
L3 - Victoria Terrace – 21st August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 42 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
- -
22nd to 28th August 2018
Table 7: L2 - By Street Daily Statistics – Week 18
Location ID Ambient Noise Level, Leq(period)
Day Maximum Noise Levels, Lmax
Day
Ave Min Max Ave Min Max
Wednesday
22/08/2018 52 41 61 69 58 88
Thursday
23/08/2018 51 42 57 69 60 89
Friday
24/08/2018 50 43 59 68 54 84
Saturday
25/08/2018 51 43 62 66 53 84
Sunday
26/08/2018 46 39 54 68 53 80
Monday
27/08/2018 57 44 66 71 59 80
Tuesday
28/08/2018 58 43 68 69 59 81
ERM Sydney www.erm.com 43 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
- -
Table 8: L3 – Victoria Terrace Daily Statistics – Week 18
Location ID Ambient Noise Level, Leq(period)
Day Maximum Noise Levels, Lmax
Day
Ave Min Max Ave Min Max
Wednesday
22/08/2018 50 45 53 67 57 77
Thursday
23/08/2018 50 44 54 68 59 81
Friday
24/08/2018 51 40 62 68 61 84
Saturday
25/08/2018 49 44 55 69 61 81
Sunday
26/08/2018 48 42 55 68 58 85
Monday
27/08/2018 53 45 60 67 60 76
Tuesday
28/08/2018 53 43 58 66 60 74
ERM Sydney www.erm.com 44 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 22nd August 2018
L3 - Victoria Terrace – 22nd August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 45 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 23rd August 2018
L3 - Victoria Terrace – 23rd August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 46 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 24th August 2018
L3 - Victoria Terrace – 24th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 47 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 25th August 2018
L3 - Victoria Terrace – 25th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 48 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 26th August 2018
L3 - Victoria Terrace – 26th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 49 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 27th August 2018
L3 - Victoria Terrace – 27th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 50 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 28th August 2018
L3 - Victoria Terrace – 28th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 51 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
- -
- -
29th to 31st August 2018
Table 9: L2 - By Street Daily Statistics – Week 19
Location ID Ambient Noise Level, Leq(period)
Day Maximum Noise Levels, Lmax
Day
Ave Min Max Ave Min Max
Wednesday
29/08/2018 59 47 66 72 62 83
Thursday
30/08/2018 51 42 56 69 49 82
Friday
31/08/2018 58 42 65 71 60 96
Table 10: L3 – Victoria Terrace Daily Statistics – Week 19
Location ID Ambient Noise Level, Leq(period)
Day Maximum Noise Levels, Lmax
Day
Ave Min Max Ave Min Max
Wednesday
29/08/2018 55 47 59 66 62 76
Thursday
30/08/2018 50 40 59 66 56 78
Friday
31/08/2018 50 42 60 67 56 84
ERM Sydney www.erm.com 52 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 29th August 2018
L3 - Victoria Terrace – 29th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 53 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 30th August 2018
L3 – Victoria Terrace – 30th August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 54 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
L2 – By St – 31st August 2018
L3 – Victoria Terrace – 31st August 2018
Key Leq Lmax L95 L90 L50 L10 L5 Battery Temperature Overload
ERM Sydney www.erm.com 55 Level 15 | 309 Kent Street | Ph: +61 2 8584 8888
Sydney NSW 2000
Attachment D: Calibration Certificates
ERM Sydney www.erm.com
Level 15, 309 Kent Street Ph: +61 2 8584 8888
Sydney NSW 2000