environmental statement in form-veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf ·...

34
ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 6 (GROUP OF MINES) Sodepur Area Eastern Coalfields Limited Prepared at Regional Institute – I Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) G. T. Road (West End) Asansol - 713 304 CMPDI ISO 9001:2008 Company

Upload: lydat

Post on 29-Jun-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

ENVIRONMENTAL STATEMENT

IN

FORM-V (Under Rule-14, Environmental protection Rules, 1986)

(2015-2016)

FOR

CLUSTER NO. – 6 (GROUP OF MINES)

Sodepur Area

Eastern Coalfields Limited

Prepared at

Regional Institute – I

Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.)

G. T. Road (West End) Asansol - 713 304

CMPDI

ISO 9001:2008 Company

Page 2: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

1

ENVIRONMENTAL STATEMENT FORM – V

Environmental statement for the financial year ending 31st March, 2016

Cluster No. – 6

FOR THE YEAR: 2015-16

CONTENTS

SL.NO. CHAPTER PARTICULARS PAGE NO.

1 CHAPTER-I INTRODUCTION 2-6

2 CHAPTER-II ENVIRONMENTAL STATEMENT FORM-V (PART A TO I ) 7-16

LIST OF ANNEXURES

ANNEXURE NO. PARTICULARS PAGE NO.

I AMBIENT AIR QUALITY 17-20

II NOISE LEVEL REPORT 21-24

III WATER QUALITY REPORT – MINE WATER QUALITY

AND GROUND WATER QUALITY

25-30

IV WELL WATER LEVEL REPORT 31

PLATES

I LOCATION PLAN

II PLAN SHOWING LOCATION OF MONITORING STATIONS

Page 3: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

2

CHAPTER – I

INTRODUCTION 1.1 GENESIS:

The Gazette Notification vide G.S.R No. 329 (E) dated 13th March, 1992 and subsequently renamed to ‘Environmental Statement’ vide Ministry of Environment & Forests (MOEF), Govt. of India gazette notification No. G.S.R No. 386 (E) Dtd. 22nd April’93 reads as follows. “Every person carrying on an industry, operation or process requiring consent under section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued under the Environmental Protection Act, 1986 shall submit an Environmental Audit Report for the year ending 31st March in Form V to the concerned State Pollution Control Board on or before the 30th day of September every year.” In compliance with the above and in fulfillment of condition laid out in the Environment Clearance granted by MoEF&CC, the work of Environmental Statement for Cluster No. 6 was entrusted to CMPDI by GM (Environment), Eastern Coalfields Limited.

1.2 DESCRIPTION OF THE MINES CLUSTER:

Prior to 2014 – 15, a large number of taken over mines from pre – nationalization period, mostly underground mines, in the old coalfields of Raniganj and Jharia did not have environmental clearance from the MoEF&CC and were operating on the basis of “Consents’ received from the respective PCBs. It was felt that if these mines could be brought under the ambit of EC, several measures for environmental protection and pollution control could be put in place. However, the work of obtaining EC for such mines, individually, would have taken a lot of time. To circumvent the problem, it was mooted that since the environmental problems being faced were of regional nature and not confined to individual mines alone, cluster/groups of such mines could be identified for preparing cluster-wise integrated EIA & EMPs, addressing such environmental concerns comprehensively and ensuring effective co-ordination of environmental control measures within each cluster. 13 such clusters were identified in the Raniganj Coalfield of ECL and EC has been obtained on the cluster approach for 12 such clusters. Cluster of Mines No. 6 is one of the clusters for which EC has been granted vide letter no. J-11015/385/2010-IA-II.(M) dated 16th January, 2015 for a combined peak capacity of 2.25 MTY and within a ML area of 4775 Ha. Cluster No. 6 is located in the western part of Raniganj Coalfield between latitudes 230 38” to 230 43” and longitudes 860 48’’ to 860 58’’ in the Burdwan district of West Bengal. The mines within the cluster are situated towards west of Asansol Township and IISCO, Burnpur. Eastern Railway grand chord line and G.T. Road run along the cluster boundary on the north east side. Damodar River forms the boundary of the cluster on the south-west. The mines are administratively under Sodepur Area of ECL. Location of cluster – 6 is shown in plate no. – 1.

Page 4: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

3

The composition of the cluster is tabulated as under:

Sl No.

Name of the Mine Lease Area

(Ha)

Normative Production

Capacity (MTY)

Peak Production

Capacity (MTY)

Mine Life

(Years)

1 Dhemomain UG 1623 0.155 0.21 > 50

2 Sodepur UG 808 0.12 0.15 > 10

Sodepur OC Patch (10 Ha) 0.12 0.15 2

3 Narsamuda UG 265 0.148 0.19 > 10

4 Patmohana UG 544 0.12 0.12 > 40

Patmohana OC Patch (7.5

Ha)

0.10 0.10 1

5 Chinakuri-I UG 414 0.06 0.08 > 50

6 Chinakuri-III UG 216 0.15 0.20 > 25

Chinakuri-III OC Patch (7.2) 0.10 0.10 1

7 Bejdih UG 242 0.04 0.10 > 20

8 Methani UG 348 0.10 0.20 > 20

Methani OC Patch (10.5 Ha) 0.12 0.15 11/2

9 Sheetalpur UG 315 0.12 0.50 > 30

Total 4775.0 1.453 2.25

1. Dhemomain UG At Dhemomain incline one, bord & pillar development district is being run with 2 nos. of SDL. Fallen coal from old working is being loaded by U/G loaders. One depillaring dist is about to be started. At Dhemomain Pit, one bord & pillar development district is running with manual loading. 2. Sodepur UG & OC At present depillaring operation is going on in Hatnal seam (R-III). Out of the three working panels stowing is being done in two panels. Shovel-dumper combination will be used for the proposed OC patch. 3. Narsamuda UG The mine is being worked by Bord & Pillar method with manual loading. Two no. depillaring panels are running; one with caving method and another with limited span method. One Development section is also running. 4. Patmohana UG & OC At present only one depillaring district at West side is being run with caving method. Shovel-dumper combination will be used for the proposed OC patch. 5. Chinakuri – I UG One development district is running with CCM. In another panel depillaring is being done by Longwall retreating method with hydraulic stowing. Average depth of the mine is 600m. 6. Chinakuri – III UG & OC At present, Barachak seam is being worked in this mine. Previous depillaring has been done by caving method but at present working goaf pillar method is being followed in one district.

Page 5: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

4

Another depillaring district is being worked with hydraulic sand stowing. One development section in the east of Main dip section is being worked with SDL. Shovel-dumper combination will be used for the proposed OC patch. 7. Bejdih UG The peak capacity of the mine will be 0.10 MTY which may be achieved occasionally by better utilization of resources and favourable geo-mining condition.

Seam Thickness (m)

Outlet Grade Method of Work

Mechanisation with no. of

SDL/LHD

1. Sripur (R-VI) 1.70 Incline 1 & 2 “C” Development Manual

2. Raghunath purbati

(R-VA) & Baradhemo (R-V) Comb.)

1.60 Pit No. 1 “C” Exhausted Nil

8. Methani UG & OC The peak capacity of the mine will be 0.20 MTY which may be achieved occasionally by better utilization of resources and favourable geo-mining condition. The normative target production of the OCP patch with a life of 1 & ½ years will be 0.12 MTY. However, the peak capacity of the OCP patch will be 0.15 MTY which may be achieved occasionally by better utilization of resources and favourable geo-mining condition.

Seam Thickne

ss (m)

Outlet Grade Method of

Work

Mechanisation with

no. of SDL/LHDLW

set/CM

1. B.D.Seam

( R-V)

2.79 Pit.1 “B” Dep. with

L.S. Method

Manual

Shovel-dumper combination will be used for the proposed OC patch. 9. Sheetalpur UG This mine is presently closed.

1.3 ENVIRONMENTAL SCENARIO:

CMPDI has been engaged to carry out routine Environmental monitoring of the clusters. The monitoring is carried out every fortnight by collecting 24 – hour samples for ambient air at 8 all - weather stations, 3 pre-monsoon stations and 1 post-monsoon station (based on local meteorology) and compared with NAAQS, 2009 for quality. Samples of mine water are also collected and analysed every fortnight and compared with the MoEF Schedule – VI for discharge of effluents into land / streams. A complete analysis of the mine discharge samples which includes heavy metals and salts is carried out once every year during December. Noise level is recorded at 9 locations. Groundwater level in the cluster area is monitored by taking measurements at 8 earmarked dugwells in the months of January, May, August and November every year. Samples of groundwater from these wells, which are also utilized by the local population for drinking and other domestic purposes, are analysed once in a year during May and compared with the IS 10500: 2012 standards for drinking water quality. For the year 2015 – 16, the monitoring could be started only from the second fortnight of May, 2015 owing to certain delays in fixation of monitoring stations subsequent to the grant of EC.

Page 6: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

5

Location of the monitoring stations of air, noise & water are shown in Plate- II. The environmental monitoring results for 21 fortnights ending 31st March, 2016 are appended as Annexures – I, II, III & IV. The environmental monitoring results for the year 2015-16 are summarized below:

AMBIENT AIR QUALITY The PM10 concentration was found in the range of 57.1 to 242.6 µg/m3 and exceeded the NAAQS, 2009 on 38 occasions while it is in limit as per GSR 742 (E) dated 25.09.2000. The PM2.5 concentration was found in the range of 10.2 to 136.3 µg/m3 and exceeded the NAAQS, 2009 on 26 occasions. The SO2 concentration remained below 10.0 µg/m3 and NOX concentration was in the range of 8.2 to 23.4 µg/m3 and was thus quite well within NAAQS, 2009. ENVIRONMENTAL STANDARDS:

(I) Environmental standard for Raniganj Coalfield vide MOEF, Govt. of India, Gazette

Notification No.GSR 742 (E) dated 25.09.2000 for 24 hourly samples at 500 meters from

dust generating point:

Station Category

Pollutant Concentration (µg/m3)

TSPM PM10 SO2 NOx

Industrial 700.0 300.0 120.0 120.0

Residential 200.0 100.0 80.0 80.0

Station

Category

Limits for noise (Leq) dB(A)

Day Time

(6am-10pm)

Night Time

(10pm-6am)

Industrial 75.0 70.0

Residential 55.0 45.0

(II) National Ambient Air Quality Standards (NAAQS), 2009 for residential, industrial

and rural areas for 24 hourly samples:

Pollutant PM10 PM2.5 SO2 NOX

Concentration (µg/m3) 100.0 60.0 80.0 80.0

Limits for noise

(Leq) dB(A)

Day Time (6am-9pm) Night Time (9pm-6am)

55.0 45.0

WATER UTILISATION, QUALITY & GROUNDWATER LEVEL Ground water percolates into working area from the surrounding aquifers which have been exposed due to opencast mining. The mine is dewatered regularly to maintain dry working conditions. This mine discharge water is partly utilized for dust suppression by sprinkling at coal faces and on haul roads and the remainder is discharged onto adjoining cultivable lands for irrigation purposes. Part-B of the Environmental Statement proforma contains the detailed break-up of water consumption. The analysis results for the mine discharge water reveal that most of the parameters are within permissible limits prescribed by MoEF&CC as General Standards Schedule – VI for

Page 7: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

6

Class-‘A’ effluent (Effluent discharged into inland surface water) and IS 10500 for groundwater standards. In order to assess the impact of mining on the groundwater level, a network of 8 dugwells has been identified for monitoring of groundwater level in the months of January, May, August and November every year. Samples from these wells are collected and analysed during May every year and compared with IS 10500 standards for drinking water. Mine water and ground water analysis results are given in Annexure-III. Well water level results are given in Annexure – IV.

NOISE LEVEL The day time noise level was found in the range of 54 to 71.4 dB(A). The noise level recorded is within the permissible limits prescribed by MoEF&CC.

Page 8: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

7

CHAPTER - II ENVIRONMENTAL STATEMENT FORM– V

Environmental statement for the financial year ending March, 2016

PART – A

SL. NO. HEADING PARTICULARS

(I) NAME AND ADDRESS OF THE PROJECT

i Dhemomain UG Agent, Dhemomain UG, Dist. – Burdwan, W.B.

ii Sodepur UG & OC Agent, Sodepur UG, Dist. – Burdwan, W.B.

iii Narsamuda UG Agent, Narsamuda UG, Dist. – Burdwan, W.B.

iv Patmohana UG & OC Agent, Patmohana UG, Dist. – Burdwan, W.B.

v Chinakuri – I UG Agent, Chinakuri I & III UG, Dist. – Burdwan, W.B.

vi Chinakuri – III UG & OC

vii Bejdih UG Agent, Bejdih UG, Dist. – Burdwan, W.B.

viii Methani UG & OC Agent, Methani UG, Dist. – Burdwan, W.B.

ix Sheetalpur UG Agent, Sheetalpur UG, Dist. – Burdwan, W.B.

(II) INDUSTRY CATEGORY All mines in the cluster falls in red category

(III) PRODUCTION CAPACITY 2.25 MTY

(IV) YEAR OF ESTABLISHMENT All the UG mines in the cluster are taken over mines from pre-

nationalization period. OC patches are yet to start production.

(V) DATE OF THE LAST

ENVIRONMENTAL STATEMENT SUBMITTED

The Environment Statement is being submitted for the first

time for the financial year 2015 – 16 after the grant of EC on 16th January, 2015.

PART – B WATER AND RAW MATERIAL CONSUMPTION

(I) WATER CONSUMPTION (Cu.m/day) 1. Dhemomain UG

2014-15 2015-16

A. MINING

i Dust suppression Nil Nil

ii Fire fighting

iii Others (service building etc.)

B. COOLING

(in radiators of trucks/HEMM)

C. DOMESTIC

i Colony 620 620

ii Community Supply for domestic purposes 87 87

TOTAL 707 707

2. Sodepur UG & OC

2014-15 2015-16

A. MINING

i Dust suppression Nil Nil

ii Fire fighting

iii Others (service building etc.)

Page 9: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

8

B. COOLING

(in radiators of trucks/HEMM)

C. DOMESTIC

i Colony 386 386

TOTAL 386 386

3. Narsamuda UG

2014-15 2015-16

A. MINING

i Dust suppression Nil Nil

ii Fire fighting

iii Others (service building etc.)

B. COOLING

(in radiators of trucks/HEMM)

C. DOMESTIC

i Colony 46 46

ii Community Supply for domestic purposes 180 180

TOTAL 226 226

4. Patmohana UG & OC

2014-15 2015-16

A. MINING

i Dust suppression Nil Nil

ii Fire fighting

iii Others (service building etc.)

B. COOLING (in radiators of trucks/HEMM)

C. DOMESTIC

i Colony 189 189

ii Community Supply for domestic purposes 88 88

TOTAL 277 277

5. Chinakuri – I UG

2014-15 2015-16

A. MINING

i Dust suppression Nil Nil

ii Fire fighting

iii Others (service building etc.)

B. COOLING

(in radiators of trucks/HEMM)

C. DOMESTIC

i Colony 969 969

ii Community Supply for domestic purposes 119 122

TOTAL 1088 1091

Page 10: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

9

6. Chinakuri – III UG & OC 2014-15 2015-16

A. MINING

i Dust suppression Nil Nil

ii Fire fighting

iii Others (service building etc.)

B. COOLING (in radiators of trucks/HEMM)

C. DOMESTIC

i Colony 388 387

ii Community Supply for domestic purposes 104 104

TOTAL 492 491

7. Bejdih UG

2014-15 2015-16

A. MINING

i Dust suppression Nil Nil

ii Fire fighting

iii Others (service building etc.)

B. COOLING

(in radiators of trucks/HEMM)

C. DOMESTIC

i Colony 35 35

ii Community Supply for domestic purposes 48 48

TOTAL 83 83

8. Methani UG & OC

2014-15 2015-16

A. MINING

i Dust suppression Nil Nil

ii Fire fighting

iii Others (service building etc.)

B. COOLING (in radiators of trucks/HEMM)

C. DOMESTIC

i Colony 144 144

ii Community Supply for domestic purposes 22 22

TOTAL 166 166

9. Sheetalpur UG – It is a closed mine

2014-15 2015-16

A. MINING Nil Nil

i Dust suppression

ii Fire fighting

iii Others (service building etc.)

B. COOLING

(in radiators of trucks/HEMM)

C. DOMESTIC

i Colony

TOTAL Nil Nil

Page 11: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

10

(II) RAW MATERIAL CONSUMPTION : 1. Dhemomain UG

Name of raw

material

Name of

products

Consumption of raw material

(per unit of product output)

During previous financial year

(2014-15)

During current financial year

(2015-16)

1. Explosive Coal 0.444 kg/te 0.452 kg/te

2. Diesel 0.002 l/te 0.002 l/te

3. Lubricants 0.002 l/te 0.002 l/te

2. Sodepur UG & OC

Name of raw

material

Name of

products

Consumption of raw material

(per unit of product output)

During previous financial year

(2014-15)

During current financial year

(2015-16)

1. Explosive Coal 0.227 kg/te 0.355 kg/te

2. Diesel* 60 litres 60 litres

3. Lubricants* 40 litres 40 litres

*consumption for the whole year is given

3. Narsamuda UG Name of raw

material

Name of

products

Consumption of raw material

(per unit of product output)

During previous

financial year (2014-15)

During current

financial year (2015-16)

1. Explosive Coal 0.490 kg/te 0.541 kg/te

2. Diesel 0.002 l/te 0.002 l/te

3. Lubricants* 40 litres 40 litres

*consumption for the whole year is given

4. Patmohana UG & OC Name of raw

material

Name of

products

Consumption of raw material

(per unit of product output)

During previous financial year

(2014-15)

During current financial year

(2015-16)

1. Explosive Coal 0.286 kg/te 0.190 kg/te

2. Diesel 0.003 l/te 0.003 l/te

3. Lubricants* 70 litres 65 litres

*consumption for the whole year is given

Page 12: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

11

5. Chinakuri – I UG Name of raw material

Name of products

Consumption of raw material (per unit of product output)

During previous

financial year (2014-15)

During current

financial year (2015-16)

1. Explosive Coal Nil Nil

2. Diesel 0.028 l/te -

3. Lubricants - -

6. Chinakuri – III UG & OC

Name of raw material

Name of products

Consumption of raw material (per unit of product output)

During previous

financial year (2014-15)

During current

financial year (2015-16)

1. Explosive Coal 0.230 kg/te 0.216 kg/te

2. Diesel Nil Nil

3. Lubricants Nil Nil

7. Bejdih UG

Name of raw material

Name of products

Consumption of raw material (per unit of product output)

During previous

financial year (2014-15)

During current

financial year (2015-16)

1. Explosive Coal 0.453 kg/te 0.539 kg/te

2. Diesel* 50 litres 50 litres

3. Lubricants* 45 litres 40 litres

*consumption for the whole year is given

8. Methani UG & OC

Name of raw

material

Name of

products

Consumption of raw material

(per unit of product output)

During previous financial year

(2014-15)

During current financial year

(2015-16)

1. Explosive Coal 0.588 kg/te 0.558 kg/te

2. Diesel* 50 litres 50 litres

3. Lubricants* 30 litres 40 litres

*consumption for the whole year is given

9. Sheetalpur UG – It is a closed mine

Name of raw material

Name of products

Consumption of raw material (per unit of product output)

During previous

financial year (2014-15)

During current

financial year (2015-16)

1. Explosive Coal Nil Nil

2. Diesel

3. Lubricants

Page 13: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

12

PART – C POLLUTION GENERATED

Pollutio

n

Quantity of pollution generated Percentage variation from prescribed standards with

reasons

WATER Mine water discharge Analysis results

are given in Annexure-II.

The analysis results reveal that most of the parameters are

below permissible limits prescribed by MOEF as General

Standards for class ‘A’ effluent (Effluent discharged into inland surface water.)

AIR The main air pollutant is suspended

PM10 and PM2.5. The air quality results are appended as Annexure-I.

Ambient air quality results show that the values of SO2 and

NOx are within the prescribed standards barring few times at few sampling stations. The concentration level of PM10 has

exceeded limits on 38 occasions and that of PM2.5 has exceeded limits on 26 occasions as per NAAQS, 2009.

PART – D HAZARDOUS WASTE

(As specified under Hazardous Waste (Management and Handling) Rules, 1989)

1. Dhemomain UG Hazardous waste Total quantity

During Previous

financial year

(2014-15)

During current

financial year

(2015-16)

Disposal

method

A) From process

i)Used oil

ii)Lead-Acid Batteries** a. Automobile batteries

b. Cap-lamp batteries iii) Used Cotton waste

iv) Metal Scrap

litres

Nos

Nos Kg

Kg

litres

Nil

Nos Kg

Kg

2. Sodepur UG & OC

Hazardous waste Total quantity

During Previous

financial year

(2014-15)

During current

financial year

(2015-16)

Disposal method

A) From process

i)Used oil

ii)Lead-Acid Batteries** a. Automobile batteries

b. Cap-lamp batteries iii) Used Cotton waste

iv) Metal Scrap

litres

Nos

Nos Kg

Kg

litres

Nil

Nos Kg

Kg

Page 14: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

13

3. Narsamuda UG Hazardous waste Total quantity

During Previous financial year

(2014-15)

During current financial year

(2015-16)

Disposal method

A) From process

i)Used oil

ii)Lead-Acid Batteries** a. Automobile batteries

b. Cap-lamp batteries iii) Used Cotton waste

iv) Metal Scrap

litres

Nos

Nos Kg

Kg

litres

Nil

Nos Kg

Kg

4. Patmohana UG & OC

Hazardous waste Total quantity

During Previous

financial year (2014-15)

During current

financial year (2015-16)

Disposal

method

A) From process i)Used oil

ii)Lead-Acid Batteries**

a. Automobile batteries b. Cap-lamp batteries

iii) Used Cotton waste iv) Metal Scrap

litres

Nos Nos

Kg Kg

litres

Nil Nos

2Kg Kg

5. Chinakuri – I UG

Hazardous waste Total quantity

During Previous

financial year

(2014-15)

During current

financial year

(2015-16)

Disposal

method

A) From process

i)Used oil ii)Lead-Acid Batteries**

a. Automobile batteries

b. Cap-lamp batteries iii) Used Cotton waste

iv) Metal Scrap

litres

Nos

Nos Kg

Kg

litres

Nil

Nos Nil

Kg

6. Chinakuri – III UG & OC

Hazardous waste Total quantity

During Previous financial year

(2014-15)

During current financial year

(2015-16)

Disposal method

A) From process i)Used oil

ii)Lead-Acid Batteries** a. Automobile batteries

b. Cap-lamp batteries

iii) Used Cotton waste iv) Metal Scrap

litres

Nos

Nos

Kg Kg

litres

Nil

Nos

Kg Kg

Page 15: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

14

7. Bejdih UG Hazardous waste Total quantity

During Previous financial year

(2014-15)

During current financial year

(2015-16)

Disposal method

A) From process

i)Used oil

ii)Lead-Acid Batteries** a. Automobile batteries

b. Cap-lamp batteries iii) Used Cotton waste

iv) Metal Scrap

litres

Nos

Nos Kg

Kg

litres

Nil

Nos Kg

Kg

8. Methani UG & OC

Hazardous waste Total quantity

During Previous

financial year (2014-15)

During current

financial year (2015-16)

Disposal

method

A) From process i)Used oil

ii)Lead-Acid Batteries**

a. Automobile batteries b. Cap-lamp batteries

iii) Used Cotton waste iv) Metal Scrap

litres

Nos Nos

Kg Kg

litres

Nil Nos

Kg Kg

9. Sheetalpur UG

Hazardous waste Total quantity

During Previous

financial year

(2014-15)

During current

financial year

(2015-16)

Disposal

method

A) From process

i)Used oil ii)Lead-Acid Batteries**

a. Automobile batteries

b. Cap-lamp batteries iii) Used Cotton waste

iv) Metal Scrap

Nil Nil

Approximate values may be given where actual values are not available. **It has been dealt in Part – F. Note: a) The detail of used oil is to be given to concerned Pollution Control Board in Form-13 as per time mentioned in HW (M & H), Amendment Rules, 2003. b) The detail of disposal of Lead Acid batteries is to be given to concerned State Pollution Control Board in Form-VIII as per time mentioned in Batteries (M&H) Rules, 2001.

Page 16: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

15

PART – E SOLID WASTE

Particulars Name of Mine Total quantity (In Million Cu.m)

During previous

financial year (2014-15)

During current

financial year (2015-16)

a) From process (Mining)

Sodepur OC

OC patches are yet to start production

Patmohana OC

Chinakuri – III OC

Methani OC

b) From pollution control

facilities

Sodepur OC

Patmohana OC

Chinakuri – III OC

Methani OC

c) Quantity recycled or

reutilized back filled

Sodepur OC

Patmohana OC

Chinakuri – III OC

Methani OC

PART – F

PLEASE SPECIFY THE CHARACTERISTICS (IN TERMS OF

CONCENTRATION AND QUANTUM) OF HAZARDOUS AS WELL AS SOLID

WASTE AND INDICATE THE DISPOSAL PRACTICE ADOPTED FOR BOTH

THESE CATEGORIES OF WASTE.

Hazardous waste generated is given in the table PART-D which has been deposited at area store disposal stock yard. **During financial year 2015 – 16, total no. of CAD lamp batteries replaced were 1297 for the entire Sodepur area as compared to 2000 batteries during 2014 – 15. Cap lamp batteries are received from HQ Central Stores and stored in Area Store. From Area Store they are supplied to unit cap lamp room as per allocation by technical HOD of Area. At unit cap lamp room they are stored in racks with cap lamp number. **During financial year 2015 – 16, total no. of HEMM / automobile batteries replaced were nil for the entire Sodepur area as compared to 4 during 2014 – 15. HEMM batteries are stored in Area stores. Metal scraps are declared and report is sent to HQ. The scraps are then auctioned and sold through HQ.

PART – G IMPACT OF POLLUTION CONTROL MEASURES ON CONSERVATION OF NATURAL RESOURCES AND CONSEQUENTLY ON COST OF PRODUCTION. In order to carry out mining in an eco-friendly manner following pollution control measures have been implemented.

1.0 AIR POLLUTION CONTROL MEASURES:

Surfacing of all service roads/permanent roads by asphalt. The un-metalled roads is kept free of ruts, potholes, etc.

Page 17: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

16

Regular maintenance of HEMM engines to limit emission of harmful exhaust fumes. Physical removal of dust from the roads. Greenbelts around quarry, industrial sites, service building area besides avenue

plantation along roads.

Plantation have been done on 2 Ha for entire Sodepur area during 2015 – 16 with local species like Mango, Guava, Jam, Lemon and Jackfruit etc. having survival rate of around 60%.

2.0 WATER POLLUTION CONTROL MEASURES:

(for Mine/CHP/Workshop/Colony discharge water) There is no treatment facility for domestic effluent water in the mines of cluster – 6. There is no workshop in the mines. 1 no. of sedimentation tank is available for entire Sodepur area.

1 no. of slow sand filter is present in Dhemomain UG having capacity of 9504 m3/day.

1 no. of slow sand filter is present in Patmohana UG having capacity of 7200 m3/day.

3.0 NOISE POLLUTION CONTROL MEASURES: Regular maintenance of machines and other equipment at Bunker and workshop

including mine fan.

Providing green belt around core activity area, along road side in colony and in other vacant space.

All HEMM & light vehicles are provided with silencers.

Noise monitoring is being carried out regularly.

4.0 LAND RESOURCE MANAGEMENT:

OC patches have yet to start production and as such there was no OB generation during 2015 – 16.

PART – H ADDITIONAL INVESTMENT PROPOSAL FOR ENVIRONMENTAL PROTECTION INCLUDING ABATEMENT OF POLLUTION. The following are the additional investment proposals for environmental protection:

The Environmental monitoring of the project will be continued fortnightly as per the guidelines of Ministry of Environment and Forest (MOEF).

The Environmental Statement report will be submitted for each financial year ending 31st March.

Necessary Consent for discharge may be taken from Competent Authority. PART – I

ANY OTHER PARTICULAR IN RESPECTOF ENVIRONMENTAL PROTECTION AND ABATMENT OF POLLUTION. The Environmental Monitoring is carried out fortnightly for the project by CMPDI, RI-I as per the guideline of Ministry of Environment and Forest (MOEF) and based on the result thereof; colliery takes necessary action if needed.

Page 18: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

17

Annexure – I AMBIENT AIR QUALITY

Station No Station Name Month Fortnight Date of Sampling PM10 PM2.5 SO2 NOx

6A1 In Chhottadhemo village near railway line

May Second 25-May-15 84.7 24.6 <10.0 10.7

6A1 June First 10-Jun-15 80.4 20.6 <10.0 12.2

6A1 June Second 25-Jun-15 74.3 17.7 <10.0 10.7

6A1 July First 03-Jul-15 76.5 19.9 <10.0 12.8

6A1 July Second 23-Jul-15 69.2 15.3 <10.0 10.6

6A1 August First 10-Aug-15 67.3 14.2 <10.0 10.8

6A1 August Second 21-Aug-15 65.2 13.6 <10.0 9.6

6A1 September First 07-Sep-15 59.4 10.8 <10.0 9.0

6A1 September Second 23-Sep-15 61.6 11.6 <10.0 10.2

6A1 October First 12-Oct-15 62.5 12.4 <10.0 10.6

6A1 October Second 28-Oct-15 63.4 13.2 <10.0 10.8

6A1 November First 04-Nov-15 64.6 14.6 <10.0 11.4

6A1 November Second 27-Nov-15 68.6 17.4 <10.0 14.8

6A1 December First 04-Dec-15 72.4 22.6 <10.0 15.3

6A1 December Second 28-Dec-15 71.6 23.4 <10.0 15.8

6A1 January First 07-Jan-16 73.2 23.5 <10.0 15.4

6A1 January Second 21-Jan-16 73.0 22.4 <10.0 15.2

6A1 February First 02-Feb-16 118.5 53.6 <10.0 16.8

6A1 February Second 29-Feb-16 121.2 55.7 <10.0 16.6

6A1 March First 02-Mar-16 120.3 56.4 <10.0 16.6

6A1 March Second 31-Mar-16 121.4 57.9 <10.0 17.2

6A10 In Marichkota Village

May Second 27-May-15 76.3 19.7 <10.0 8.2

6A10 June First 15-Jun-15 74.1 18.4 <10.0 9.5

6A10 June Second 29-Jun-15 69.2 17.4 <10.0 10.8

6A10 July First 14-Jul-15 67.2 23.8 <10.0 9.5

6A10 July Second 23-Jul-15 64.9 15.1 <10.0 11.0

6A10 August First 06-Aug-15 63.8 14.9 <10.0 11.6

6A10 August Second 25-Aug-15 60.5 13.2 <10.0 10.2

6A10 September First 04-Sep-15 57.1 10.2 <10.0 9.4

6A10 September Second 29-Sep-15 58.4 11.6 <10.0 10.2

6A11 Chinakuri pit no.1 & 2 near railway

siding

January First 11-Jan-16 96.4 34.5 <10.0 20.6

6A11 January Second 27-Jan-16 95.3 35.1 <10.0 18.6

6A11 February First 06-Feb-16 200.2 102.6 <10.0 18.4

6A11 February Second 19-Feb-16 196.1 100.2 <10.0 19.2

6A11 March First 07-Mar-16 204.8 101.6 <10.0 18.8

6A11 March Second 26-Mar-16 202.1 100.5 <10.0 18.9

6A12 Chinakuri pit no.3 near railway

siding

January First 12-Jan-16 198.5 103.4 <10.0 19.0

6A12 January Second 27-Jan-16 216.4 105.2 <10.0 22.6

6A12 February First 12-Feb-16 238.9 136.3 <10.0 22.4

6A12 February Second 20-Feb-16 236.5 132.6 <10.0 22.2

6A12 March First 08-Mar-16 240.5 130.3 <10.0 23.4

6A12 March Second 26-Mar-16 242.6 134.5 <10.0 23.2

6A2 In Chinakuri

Village

May Second 26-May-15 94.3 26.3 <10.0 12.1

6A2 June First 05-Jun-15 89.9 22.9 <10.0 14.8

6A2 June Second 24-Jun-15 82.8 21.4 <10.0 12.9

6A2 July First 06-Jul-15 80.2 20.5 <10.0 14.0

6A2 July Second 24-Jul-15 74.6 16.8 <10.0 12.6

6A2 August First 10-Aug-15 71.4 15.5 <10.0 12.2

6A2 August Second 26-Aug-15 69.6 15.0 <10.0 11.9

6A2 September First 09-Sep-15 63.8 13.4 <10.0 11.5

6A2 September Second 23-Sep-15 64.6 14.2 <10.0 12.0

6A2 October First 13-Oct-15 65.2 14.0 <10.0 12.8

6A2 October Second 28-Oct-15 66.1 14.6 <10.0 13.2

Page 19: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

18

Station No Station Name Month Fortnight Date of Sampling PM10 PM2.5 SO2 NOx

6A2 November First 04-Nov-15 65.4 15.2 <10.0 13.8

6A2 November Second 19-Nov-15 67.2 16.5 <10.0 14.6

6A2 December First 08-Dec-15 70.8 19.4 <10.0 14.2

6A2 December Second 21-Dec-15 72.4 18.5 <10.0 14.0

6A2 January First 07-Jan-16 71.6 20.3 <10.0 14.4

6A2 January Second 21-Jan-16 72.8 21.6 <10.0 14.8

6A2 February First 01-Feb-16 136.3 70.4 <10.0 16.0

6A2 February Second 18-Feb-16 134.8 71.2 <10.0 16.2

6A2 March First 07-Mar-16 135.8 71.4 <10.0 17.0

6A2 March Second 22-Mar-16 134.8 71.6 <10.0 17.1

6A3 In Mithani Village May Second 26-May-15 82.2 22.1 <10.0 14.6

6A3 June First 05-Jun-15 86.3 20.2 <10.0 16.5

6A3 June Second 24-Jun-15 80.2 22.3 <10.0 14.7

6A3 July First 06-Jul-15 82.6 22.7 <10.0 16.4

6A3 July Second 24-Jul-15 73.1 16.2 <10.0 14.0

6A3 August First 11-Aug-15 69.2 15.4 <10.0 13.8

6A3 August Second 27-Aug-15 67.3 14.2 <10.0 13.0

6A3 September First 09-Sep-15 62.0 13.1 <10.0 11.0

6A3 September Second 23-Sep-15 62.8 13.6 <10.0 11.5

6A3 October First 13-Oct-15 61.8 13.2 <10.0 11.8

6A3 October Second 28-Oct-15 62.4 13.0 <10.0 11.4

6A3 November First 04-Nov-15 63.1 13.6 <10.0 12.2

6A3 November Second 27-Nov-15 69.4 14.4 <10.0 15.6

6A3 December First 10-Dec-15 73.9 18.6 <10.0 15.2

6A3 December Second 22-Dec-15 73.6 19.2 <10.0 14.8

6A3 January First 15-Jan-16 74.2 20.4 <10.0 15.2

6A3 January Second 27-Jan-16 75.2 22.3 <10.0 15.9

6A3 February First 06-Feb-16 128.5 63.7 <10.0 16.4

6A3 February Second 19-Feb-16 128.9 64.5 <10.0 16.6

6A3 March First 02-Mar-16 130.4 65.0 <10.0 16.9

6A3 March Second 22-Mar-16 131.2 66.3 <10.0 16.8

6A4 In Shanrmara Village

May Second 26-May-15 84.9 20.4 <10.0 16.8

6A4 June First 05-Jun-15 90.7 26.8 <10.0 14.8

6A4 June Second 24-Jun-15 84.3 24.5 <10.0 12.2

6A4 July First 08-Jul-15 86.2 24.3 <10.0 10.8

6A4 July Second 27-Jul-15 75.2 17.0 <10.0 13.2

6A4 August First 11-Aug-15 71.6 16.2 <10.0 14.4

6A4 August Second 26-Aug-15 68.0 16.3 <10.0 13.4

6A4 September First 10-Sep-15 64.2 13.4 <10.0 12.2

6A4 September Second 22-Sep-15 66.8 14.2 <10.0 12.8

6A4 October First 12-Oct-15 64.7 13.6 <10.0 13.2

6A4 October Second 30-Oct-15 63.4 12.8 <10.0 12.6

6A4 November First 05-Nov-15 64.2 13.4 <10.0 13.8

6A4 November Second 26-Nov-15 67.8 15.8 <10.0 14.8

6A4 December First 09-Dec-15 71.8 18.8 <10.0 14.4

6A4 December Second 30-Dec-15 71.0 17.6 <10.0 14.6

6A4 January First 13-Jan-16 72.0 19.8 <10.0 14.8

6A4 January Second 27-Jan-16 73.1 20.2 <10.0 14.6

6A4 February First 09-Feb-16 116.3 54.8 <10.0 15.5

6A4 February Second 19-Feb-16 118.4 55.8 <10.0 15.6

6A4 March First 02-Mar-16 117.8 56.2 <10.0 16.0

6A4 March Second 22-Mar-16 118.3 58.9 <10.0 16.2

6A5 In Barachak Village

May Second 27-May-15 80.2 24.6 <10.0 12.4

6A5 June First 03-Jun-15 76.3 22.9 <10.0 10.1

6A5 June Second 18-Jun-15 70.8 19.2 <10.0 12.8

Page 20: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

19

Station No Station Name Month Fortnight Date of Sampling PM10 PM2.5 SO2 NOx

6A5 July First 03-Jul-15 68.4 17.8 <10.0 14.3

6A5 July Second 28-Jul-15 66.0 15.8 <10.0 13.0

6A5 August First 12-Aug-15 64.8 14.6 <10.0 13.2

6A5 August Second 27-Aug-15 62.4 14.1 <10.0 12.0

6A5 September First 08-Sep-15 58.7 12.8 <10.0 11.4

6A5 September Second 28-Sep-15 60.6 13.4 <10.0 11.2

6A5 October First 12-Oct-15 61.4 13.0 <10.0 11.4

6A5 October Second 30-Oct-15 62.5 13.6 <10.0 11.2

6A5 November First 05-Nov-15 61.9 13.0 <10.0 13.4

6A5 November Second 20-Nov-15 64.6 14.6 <10.0 13.4

6A5 December First 10-Dec-15 70.2 17.9 <10.0 13.6

6A5 December Second 23-Dec-15 70.6 17.4 <10.0 14.0

6A5 January First 14-Jan-16 71.3 19.6 <10.0 14.2

6A5 January Second 28-Jan-16 70.3 19.2 <10.0 14.4

6A5 February First 15-Feb-16 128.4 60.3 <10.0 15.0

6A5 February Second 26-Feb-16 129.6 61.4 <10.0 15.2

6A5 March First 14-Mar-16 126.8 60.4 <10.0 16.2

6A5 March Second 26-Mar-16 127.2 60.1 <10.0 16.0

6A6 In Parbelia village October First 13-Oct-15 65.8 13.9 <10.0 13.2

6A6 October Second 29-Oct-15 66.4 14.2 <10.0 13.8

6A6 November First 11-Nov-15 65.8 14.0 <10.0 13.4

6A6 November Second 26-Nov-15 66.9 16.3 <10.0 15.6

6A6 December First 09-Dec-15 74.3 20.8 <10.0 14.4

6A6 December Second 29-Dec-15 73.4 21.6 <10.0 14.8

6A6 January First 12-Jan-16 86.8 26.9 <10.0 15.5

6A6 January Second 29-Jan-16 87.8 27.4 <10.0 16.8

6A6 February First 05-Feb-16 216.6 106.5 <10.0 17.4

6A6 February Second 20-Feb-16 209.8 106.5 <10.0 17.6

6A6 March First 09-Mar-16 208.5 104.8 <10.0 17.8

6A6 March Second 25-Mar-16 206.3 101.5 <10.0 17.9

6A7 In Suryanagar villaage

October First 15-Oct-15 64.6 13.2 <10.0 12.6

6A7 October Second 29-Oct-15 64.2 13.6 <10.0 12.8

6A7 November First 11-Nov-15 64.0 13.1 <10.0 12.2

6A7 November Second 30-Nov-15 65.7 15.4 <10.0 13.8

6A7 December First 07-Dec-15 70.0 18.6 <10.0 13.6

6A7 December Second 22-Dec-15 70.3 18.4 <10.0 14.2

6A7 January First 14-Jan-16 70.8 19.2 <10.0 14.0

6A7 January Second 28-Jan-16 70.3 19.0 <10.0 14.2

6A7 February First 09-Feb-16 112.4 50.2 <10.0 15.2

6A7 February Second 27-Feb-16 113.4 51.6 <10.0 15.4

6A7 March First 08-Mar-16 116.5 54.6 <10.0 16.2

6A7 March Second 31-Mar-16 115.4 53.2 <10.0 16.0

6A8 In Kurargaria Village

May Second 27-May-15 84.3 26.8 <10.0 16.1

6A8 June First 03-Jun-15 80.7 21.3 <10.0 18.5

6A8 June Second 18-Jun-15 78.2 18.7 <10.0 16.7

6A8 July First 03-Jul-15 74.6 19.2 <10.0 17.1

6A8 July Second 28-Jul-15 69.3 16.4 <10.0 15.2

6A8 August First 10-Aug-15 66.2 15.8 <10.0 14.8

6A8 August Second 26-Aug-15 63.9 15.2 <10.0 14.4

6A8 September First 08-Sep-15 59.5 13.6 <10.0 10.8

6A8 September Second 28-Sep-15 61.2 13.2 <10.0 11.2

6A9 In Sitarampur Village

May Second 27-May-15 78.1 20.1 <10.0 10.4

6A9 June First 03-Jun-15 74.7 19.5 <10.0 12.2

6A9 June Second 18-Jun-15 70.4 16.3 <10.0 12.3

6A9 July First 03-Jul-15 68.1 21.4 <10.0 14.8

Page 21: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

20

Station No Station Name Month Fortnight Date of Sampling PM10 PM2.5 SO2 NOx

6A9 July Second 24-Jul-15 65.5 15.2 <10.0 13.4

6A9 August First 10-Aug-15 64.9 14.5 <10.0 13.0

6A9 August Second 25-Aug-15 61.8 13.0 <10.0 11.2

6A9 September First 07-Sep-15 58.0 11.6 <10.0 10.6

6A9 September Second 29-Sep-15 59.8 12.8 <10.0 10.4

HEAVY METAL ANALYSIS IN AIR Station

No Station Name

Month Fortnight

Date of Sampling

Arsenic Cadmium

Chromium

Mercury Nickel Lead

6A1 In Chhottadhemo

village near railway line

September First 07-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.04

6A1 March First 02-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

6A10 In Marichkota Village

September First 04-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.03

6A11 Chinakuri pit no.1 & 2 near railway siding

March First 07-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

6A12 Chinakuri pit no.3 near

railway siding

March First 08-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

6A2 In Chinakuri Village

September First 09-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.04

6A2 March First 07-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

6A3 In Mithani Village

September First 09-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.06

6A3 March First 02-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

6A4 In Shanrmara Village

September First 10-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.04

6A4 March First 02-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

6A5 In Barachak Village

September First 08-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.07

6A5 March First 14-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

6A6 In Parbelia village

March First 09-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

6A7 In Suryanagar villaage

March First 08-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

6A8 In Kurargaria Village

September First 08-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.07

6A9 In Sitarampur Village

September First 07-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.04

Page 22: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

21

Annexure – II

NOISE LEVEL

Station No

Station Name Month Fortnight Date of Sampling

Noise Level dB(A)

6N1 Pit-top Dhemomain UG June Second 25-Jun-15 58.3

6N1 Pit-top Dhemomain UG July First 03-Jul-15 57.9

6N1 Pit-top Dhemomain UG June First 03-Jun-15 62.2

6N1 Pit-top Dhemomain UG September Second 28-Sep-15 64.1

6N1 Pit-top Dhemomain UG August First 10-Aug-15 69.1

6N1 Pit-top Dhemomain UG August Second 21-Aug-15 62.7

6N1 Pit-top Dhemomain UG September First 10-Sep-15 62.4

6N1 Pit-top Dhemomain UG October First 12-Oct-15 67.1

6N1 Pit-top Dhemomain UG October Second 28-Oct-15 69.9

6N1 Pit-top Dhemomain UG November First 04-Nov-15 68.3

6N1 Pit-top Dhemomain UG November Second 27-Nov-15 71.0

6N1 Pit-top Dhemomain UG December First 14-Dec-15 66

6N1 Pit-top Dhemomain UG December Second 18-Dec-15 60

6N1 Pit-top Dhemomain UG January First 04-Jan-16 64

6N1 Pit-top Dhemomain UG January Second 27-Jan-16 64

6N1 Pit-top Dhemomain UG February First 02-Feb-16 69

6N1 Pit-top Dhemomain UG February Second 29-Feb-16 59

6N1 Pit-top Dhemomain UG March First 02-Mar-16 63

6N1 Pit-top Dhemomain UG March Second 31-Mar-16 67

6N2 Pit-top Sodepur UG June Second 24-Jun-15 62.1

6N2 Pit-top Sodepur UG July First 03-Jul-15 58.4

6N2 Pit-top Sodepur UG June First 03-Jun-15 59.2

6N2 Pit-top Sodepur UG September Second 28-Sep-15 66.0

6N2 Pit-top Sodepur UG August First 10-Aug-15 70.2

6N2 Pit-top Sodepur UG August Second 21-Aug-15 67.3

6N2 Pit-top Sodepur UG September First 10-Sep-15 64.7

6N2 Pit-top Sodepur UG October First 13-Oct-15 68.4

6N2 Pit-top Sodepur UG October Second 28-Oct-15 70.5

6N2 Pit-top Sodepur UG November First 04-Nov-15 70.9

6N2 Pit-top Sodepur UG November Second 27-Nov-15 70.3

6N2 Pit-top Sodepur UG December First 14-Dec-15 63

6N2 Pit-top Sodepur UG December Second 18-Dec-15 63

6N2 Pit-top Sodepur UG January First 04-Jan-16 69

6N2 Pit-top Sodepur UG January Second 27-Jan-16 62

6N2 Pit-top Sodepur UG February First 02-Feb-16 68

6N2 Pit-top Sodepur UG February Second 29-Feb-16 54

6N2 Pit-top Sodepur UG March First 02-Mar-16 66

6N2 Pit-top Sodepur UG March Second 31-Mar-16 64

6N3 Pit-top Narsamuda UG June Second 18-Jun-15 61.4

6N3 Pit-top Narsamuda UG July First 06-Jul-15 58.7

6N3 Pit-top Narsamuda UG June First 15-Jun-15 59.8

6N3 Pit-top Narsamuda UG September Second 29-Sep-15 63.8

6N3 Pit-top Narsamuda UG August First 10-Aug-15 67.0

6N3 Pit-top Narsamuda UG August Second 21-Aug-15 64.5

6N3 Pit-top Narsamuda UG September First 10-Sep-15 68.2

6N3 Pit-top Narsamuda UG October First 13-Oct-15 65.0

6N3 Pit-top Narsamuda UG October Second 28-Oct-15 67.2

6N3 Pit-top Narsamuda UG November First 04-Nov-15 66.7

6N3 Pit-top Narsamuda UG November Second 27-Nov-15 68.5

6N3 Pit-top Narsamuda UG December First 14-Dec-15 64

6N3 Pit-top Narsamuda UG December Second 21-Dec-15 67

Page 23: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

22

Station

No

Station Name Month Fortnight Date of

Sampling

Noise Level

dB(A)

6N3 Pit-top Narsamuda UG January First 04-Jan-16 65

6N3 Pit-top Narsamuda UG January Second 27-Jan-16 63

6N3 Pit-top Narsamuda UG February First 06-Feb-16 57

6N3 Pit-top Narsamuda UG February Second 29-Feb-16 62

6N3 Pit-top Narsamuda UG March First 02-Mar-16 62

6N3 Pit-top Narsamuda UG March Second 31-Mar-16 70

6N4 Pit-top Patmohana UG June Second 29-Jun-15 58.3

6N4 Pit-top Patmohana UG July First 06-Jul-15 62.5

6N4 Pit-top Patmohana UG June First 10-Jun-15 59.2

6N4 Pit-top Patmohana UG September Second 28-Sep-15 67.5

6N4 Pit-top Patmohana UG August First 11-Aug-15 69.8

6N4 Pit-top Patmohana UG August Second 26-Aug-15 66.2

6N4 Pit-top Patmohana UG September First 07-Sep-15 59.8

6N4 Pit-top Patmohana UG October First 15-Oct-15 68.1

6N4 Pit-top Patmohana UG October Second 30-Oct-15 69.4

6N4 Pit-top Patmohana UG November First 04-Nov-15 64.4

6N4 Pit-top Patmohana UG November Second 27-Nov-15 66.7

6N4 Pit-top Patmohana UG December First 14-Dec-15 70

6N4 Pit-top Patmohana UG December Second 21-Dec-15 68

6N4 Pit-top Patmohana UG January First 04-Jan-16 63

6N4 Pit-top Patmohana UG January Second 27-Jan-16 69

6N4 Pit-top Patmohana UG February First 06-Feb-16 69

6N4 Pit-top Patmohana UG February Second 19-Feb-16 64

6N4 Pit-top Patmohana UG March First 07-Mar-16 67

6N4 Pit-top Patmohana UG March Second 31-Mar-16 54

6N5 Pit-top Chinakuri I UG June Second 24-Jun-15 59.7

6N5 Pit-top Chinakuri I UG July First 14-Jul-15 61.3

6N5 Pit-top Chinakuri I UG June First 03-Jun-15 54.8

6N5 Pit-top Chinakuri I UG September Second 29-Sep-15 70.7

6N5 Pit-top Chinakuri I UG August First 11-Aug-15 63.7

6N5 Pit-top Chinakuri I UG August Second 26-Aug-15 61.8

6N5 Pit-top Chinakuri I UG September First 07-Sep-15 67.1

6N5 Pit-top Chinakuri I UG October First 12-Oct-15 69.8

6N5 Pit-top Chinakuri I UG October Second 30-Oct-15 68.7

6N5 Pit-top Chinakuri I UG November First 05-Nov-15 69.2

6N5 Pit-top Chinakuri I UG November Second 20-Nov-15 68.1

6N5 Pit-top Chinakuri I UG December First 14-Dec-15 70

6N5 Pit-top Chinakuri I UG December Second 21-Dec-15 62

6N5 Pit-top Chinakuri I UG January First 04-Jan-16 61

6N5 Pit-top Chinakuri I UG January Second 27-Jan-16 64

6N5 Pit-top Chinakuri I UG February First 09-Feb-16 64

6N5 Pit-top Chinakuri I UG February Second 19-Feb-16 70

6N5 Pit-top Chinakuri I UG March First 07-Mar-16 62

6N5 Pit-top Chinakuri I UG March Second 26-Mar-16 59

6N6 Pit-top Chinakuri III UG June Second 18-Jun-15 59.8

6N6 Pit-top Chinakuri III UG July First 06-Jul-15 69.4

6N6 Pit-top Chinakuri III UG June First 03-Jun-15 62.1

6N6 Pit-top Chinakuri III UG September Second 29-Sep-15 71.4

6N6 Pit-top Chinakuri III UG August First 12-Aug-15 68.9

6N6 Pit-top Chinakuri III UG August Second 26-Aug-15 67.0

6N6 Pit-top Chinakuri III UG September First 07-Sep-15 70.3

6N6 Pit-top Chinakuri III UG October First 12-Oct-15 70.5

6N6 Pit-top Chinakuri III UG October Second 29-Oct-15 71.4

6N6 Pit-top Chinakuri III UG November First 05-Nov-15 70.6

Page 24: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

23

Station

No

Station Name Month Fortnight Date of

Sampling

Noise Level

dB(A)

6N6 Pit-top Chinakuri III UG November Second 20-Nov-15 69.9

6N6 Pit-top Chinakuri III UG December First 14-Dec-15 64

6N6 Pit-top Chinakuri III UG December Second 21-Dec-15 64

6N6 Pit-top Chinakuri III UG January First 04-Jan-16 66

6N6 Pit-top Chinakuri III UG January Second 27-Jan-16 60

6N6 Pit-top Chinakuri III UG February First 09-Feb-16 70

6N6 Pit-top Chinakuri III UG February Second 19-Feb-16 66

6N6 Pit-top Chinakuri III UG March First 07-Mar-16 59

6N6 Pit-top Chinakuri III UG March Second 26-Mar-16 62

6N7 Pit-top Bejdih UG June Second 18-Jun-15 60.1

6N7 Pit-top Bejdih UG July First 08-Jul-15 59.4

6N7 Pit-top Bejdih UG June First 10-Jun-15 58.7

6N7 Pit-top Bejdih UG September Second 28-Sep-15 63.9

6N7 Pit-top Bejdih UG August First 12-Aug-15 64.5

6N7 Pit-top Bejdih UG August Second 25-Aug-15 64.3

6N7 Pit-top Bejdih UG September First 08-Sep-15 65.7

6N7 Pit-top Bejdih UG October First 15-Oct-15 71.2

6N7 Pit-top Bejdih UG October Second 29-Oct-15 70.8

6N7 Pit-top Bejdih UG November First 05-Nov-15 68.3

6N7 Pit-top Bejdih UG November Second 20-Nov-15 67.5

6N7 Pit-top Bejdih UG December First 15-Dec-15 63

6N7 Pit-top Bejdih UG December Second 23-Dec-15 65

6N7 Pit-top Bejdih UG January First 05-Jan-16 67

6N7 Pit-top Bejdih UG January Second 28-Jan-16 61

6N7 Pit-top Bejdih UG February First 15-Feb-16 62

6N7 Pit-top Bejdih UG February Second 19-Feb-16 58

6N7 Pit-top Bejdih UG March First 14-Mar-16 54

6N7 Pit-top Bejdih UG March Second 26-Mar-16 70

6N8 Pit-top Methani UG June Second 24-Jun-15 64.2

6N8 Pit-top Methani UG July First 08-Jul-15 60.5

6N8 Pit-top Methani UG June First 10-Jun-15 62.7

6N8 Pit-top Methani UG September Second 29-Sep-15 68.2

6N8 Pit-top Methani UG August First 06-Aug-15 70.5

6N8 Pit-top Methani UG August Second 25-Aug-15 69.4

6N8 Pit-top Methani UG September First 08-Sep-15 68.3

6N8 Pit-top Methani UG October First 12-Oct-15 64.7

6N8 Pit-top Methani UG October Second 29-Oct-15 67.6

6N8 Pit-top Methani UG November First 05-Nov-15 68.7

6N8 Pit-top Methani UG November Second 26-Nov-15 68.7

6N8 Pit-top Methani UG December First 15-Dec-15 65

6N8 Pit-top Methani UG December Second 23-Dec-15 66

6N8 Pit-top Methani UG January First 05-Jan-16 69

6N8 Pit-top Methani UG January Second 28-Jan-16 65

6N8 Pit-top Methani UG February First 15-Feb-16 56

6N8 Pit-top Methani UG February Second 27-Feb-16 59

6N8 Pit-top Methani UG March First 14-Mar-16 58

6N8 Pit-top Methani UG March Second 25-Mar-16 68

6N9 Pit-top Sheetalpur UG June Second 29-Jun-15 59.8

6N9 Pit-top Sheetalpur UG July First 14-Jul-15 61.3

6N9 Pit-top Sheetalpur UG June First 05-Jun-15 62.9

6N9 Pit-top Sheetalpur UG September Second 29-Sep-15 69.5

6N9 Pit-top Sheetalpur UG August First 06-Aug-15 67.5

6N9 Pit-top Sheetalpur UG August Second 25-Aug-15 68.6

6N9 Pit-top Sheetalpur UG September First 08-Sep-15 60.7

Page 25: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

24

Station

No

Station Name Month Fortnight Date of

Sampling

Noise Level

dB(A)

6N9 Pit-top Sheetalpur UG October First 13-Oct-15 68.0

6N9 Pit-top Sheetalpur UG October Second 29-Oct-15 69.2

6N9 Pit-top Sheetalpur UG November First 05-Nov-15 69.5

6N9 Pit-top Sheetalpur UG November Second 26-Nov-15 71.1

6N9 Pit-top Sheetalpur UG December First 15-Dec-15 67

6N9 Pit-top Sheetalpur UG December Second 23-Dec-15 69

6N9 Pit-top Sheetalpur UG January First 05-Jan-16 70

6N9 Pit-top Sheetalpur UG January Second 28-Jan-16 66

6N9 Pit-top Sheetalpur UG February First 12-Feb-16 54

6N9 Pit-top Sheetalpur UG February Second 27-Feb-16 64

6N9 Pit-top Sheetalpur UG March First 14-Mar-16 57

6N9 Pit-top Sheetalpur UG March Second 22-Mar-16 69

Page 26: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

25

Annexure – III

Effluent Water Quality for 5 parameters

Station No

Station Name Month Fortnight Date of Sampling

pH TSS TDS O&G COD

6MW1 Dhemomain UG May Second 16-May-15 7.49 32 1033 <2.0 16

6MW1 Dhemomain UG June Second 24-Jun-15 7.92 <25.0 1084 <2.0 16

6MW1 Dhemomain UG July First 03-Jul-15 8.09 26 1076 <2.0 16

6MW1 Dhemomain UG August First 10-Aug-15 8.20 28 1078 <2.0 20

6MW1 Dhemomain UG July Second 24-Jul-15 8.24 <25.0 1044 <2.0 08

6MW1 Dhemomain UG August Second 21-Aug-15 8.16 32 1092 <2.0 20

6MW1 Dhemomain UG September First 07-Sep-15 8.14 <25.0 1041 <2.0 28

6MW1 Dhemomain UG June First 12-Jun-15 8.38 26 1063 <2.0 16

6MW1 Dhemomain UG September Second 23-Sep-15 8.09 8 524 <2.0 08

6MW1 Dhemomain UG October First 12-Oct-15 7.87 12 420 <2.0 20

6MW1 Dhemomain UG October Second 28-Oct-15 8.14 9 476 <2.0 16

6MW1 Dhemomain UG November First 06-Nov-15 7.84 8 492 <2.0 12

6MW1 Dhemomain UG November Second 19-Nov-15 7.86 5 484 <2.0 08

6MW1 Dhemomain UG December Second 22-Dec-15 7.86 8 445 <2.0 16

6MW1 Dhemomain UG January First 15-Jan-16 7.91 10 439 <2.0 32

6MW1 Dhemomain UG January Second 21-Jan-16 7.93 10 448 <2.0 32

6MW1 Dhemomain UG February First 02-Feb-16 7.50 7 842 <2.0 24

6MW1 Dhemomain UG February Second 18-Feb-16 7.44 16 855 <2.0 28

6MW1 Dhemomain UG March First 02-Mar-16 7.79 20 850 <2.0 20

6MW1 Dhemomain UG March Second 25-Mar-16 7.79 7 850 <2.0 16

6MW10 Sheetalpur UG May Second 16-May-15 7.71 40 386 <2.0 44

6MW10 Sheetalpur UG June Second 24-Jun-15 7.88 32 372 <2.0 28

6MW10 Sheetalpur UG July First 03-Jul-15 7.92 28 378 <2.0 36

6MW10 Sheetalpur UG August First 11-Aug-15 8.18 28 382 <2.0 30

6MW10 Sheetalpur UG July Second 27-Jul-15 8.22 <25.0 360 <2.0 16

6MW10 Sheetalpur UG August Second 26-Aug-15 8.22 32 411 <2.0 32

6MW10 Sheetalpur UG September First 10-Sep-15 8.26 <25.0 402 <2.0 34

6MW10 Sheetalpur UG June First 10-Jun-15 7.79 36 377 <2.0 48

6MW10 Sheetalpur UG September Second 28-Sep-15 8.24 8 412 <2.0 20

6MW10 Sheetalpur UG October First 13-Oct-15 7.84 12 484 <2.0 28

6MW10 Sheetalpur UG October Second 29-Oct-15 8.12 12 490 <2.0 32

6MW10 Sheetalpur UG November First 11-Nov-15 7.62 16 506 <2.0 28

6MW10 Sheetalpur UG November Second 26-Nov-15 8.12 9 538 <2.0 24

6MW10 Sheetalpur UG December Second 28-Dec-15 7.90 7 499 <2.0 16

6MW10 Sheetalpur UG January First 14-Jan-16 7.93 14 498 <2.0 32

6MW10 Sheetalpur UG January Second 27-Jan-16 7.77 10 501 <2.0 32

6MW10 Sheetalpur UG February First 12-Feb-16 7.97 20 498 <2.0 32

6MW10 Sheetalpur UG February Second 20-Feb-16 7.90 8 498 <2.0 28

6MW10 Sheetalpur UG March First 09-Mar-16 8.11 8 527 <2.0 24

6MW10 Sheetalpur UG March Second 31-Mar-16 8.09 12 479 <2.0 20

6MW2 Sodepur UG May Second 16-May-15 8.20 30 497 <2.0 24

6MW2 Sodepur UG June Second 24-Jun-15 7.82 26 502 <2.0 24

6MW2 Sodepur UG July First 03-Jul-15 8.16 28 512 <2.0 16

6MW2 Sodepur UG August First 10-Aug-15 8.52 26 495 <2.0 20

6MW2 Sodepur UG July Second 24-Jul-15 8.64 <25.0 488 <2.0 16

6MW2 Sodepur UG August Second 21-Aug-15 8.49 28 507 <2.0 20

6MW2 Sodepur UG September First 07-Sep-15 8.52 <25.0 502 <2.0 24

6MW2 Sodepur UG June First 12-Jun-15 8.27 28 496 <2.0 16

6MW2 Sodepur UG September Second 23-Sep-15 8.12 6 478 <2.0 08

6MW2 Sodepur UG October First 12-Oct-15 8.26 8 448 <2.0 16

6MW2 Sodepur UG October Second 28-Oct-15 7.94 5 512 <2.0 08

Page 27: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

26

Station

No

Station Name Month Fortnight Date of

Sampling

pH TSS TDS O&G COD

6MW2 Sodepur UG November First 06-Nov-15 7.96 7 490 <2.0 40

6MW2 Sodepur UG November Second 19-Nov-15 7.88 14 476 <2.0 32

6MW2 Sodepur UG December Second 22-Dec-15 7.87 7 459 <2.0 32

6MW2 Sodepur UG January First 15-Jan-16 7.82 7 469 <2.0 24

6MW2 Sodepur UG January Second 21-Jan-16 8.78 7 475 <2.0 08

6MW2 Sodepur UG February First 02-Feb-16 8.73 6 546 <2.0 16

6MW2 Sodepur UG February Second 18-Feb-16 8.51 8 571 <2.0 32

6MW2 Sodepur UG March First 02-Mar-16 8.45 9 570 <2.0 36

6MW2 Sodepur UG March Second 26-Mar-16 8.56 12 556 <2.0 24

6MW3 Narsamuda UG May Second 16-May-15 8.03 28 480 <2.0 24

6MW3 Narsamuda UG June Second 24-Jun-15 7.64 <25.0 448 <2.0 20

6MW3 Narsamuda UG July First 03-Jul-15 8.17 26 452 <2.0 24

6MW3 Narsamuda UG August First 11-Aug-15 8.15 <25.0 436 <2.0 16

6MW3 Narsamuda UG July Second 24-Jul-15 8.11 <25.0 440 <2.0 16

6MW3 Narsamuda UG August Second 21-Aug-15 8.08 26 455 <2.0 14

6MW3 Narsamuda UG September First 07-Sep-15 8.12 26 451 <2.0 16

6MW3 Narsamuda UG June First 11-Jun-15 8.16 26 439 <2.0 24

6MW3 Narsamuda UG September Second 23-Sep-15 7.98 10 424 <2.0 16

6MW3 Narsamuda UG October First 12-Oct-15 8.32 9 490 <2.0 24

6MW3 Narsamuda UG October Second 28-Oct-15 8.35 8 536 <2.0 12

6MW3 Narsamuda UG November First 11-Nov-15 7.84 6 528 <2.0 16

6MW3 Narsamuda UG November Second 20-Nov-15 7.64 8 472 <2.0 12

6MW3 Narsamuda UG December Second 23-Dec-15 7.56 10 508 <2.0 24

6MW3 Narsamuda UG January First 13-Jan-16 7.59 9 517 <2.0 16

6MW3 Narsamuda UG January Second 21-Jan-16 7.69 10 523 <2.0 16

6MW3 Narsamuda UG February First 06-Feb-16 8.19 12 493 <2.0 32

6MW3 Narsamuda UG February Second 18-Feb-16 8.41 7 463 <2.0 24

6MW3 Narsamuda UG March First 02-Mar-16 8.01 8 509 <2.0 24

6MW3 Narsamuda UG March Second 26-Mar-16 8.31 14 513 <2.0 32

6MW4 Patmohana UG May Second 16-May-15 7.57 <25.0 558 <2.0 16

6MW4 Patmohana UG June Second 24-Jun-15 7.91 28 578 <2.0 24

6MW4 Patmohana UG July First 03-Jul-15 8.12 <25.0 566 <2.0 16

6MW4 Patmohana UG August First 10-Aug-15 8.28 <25.0 544 <2.0 30

6MW4 Patmohana UG July Second 23-Jul-15 8.20 <25.0 565 <2.0 24

6MW4 Patmohana UG August Second 26-Aug-15 8.21 <25.0 556 <2.0 32

6MW4 Patmohana UG September First 07-Sep-15 8.26 28 564 <2.0 38

6MW4 Patmohana UG June First 12-Jun-15 8.02 30 586 <2.0 24

6MW4 Patmohana UG September Second 23-Sep-15 8.16 7 498 <2.0 12

6MW4 Patmohana UG October First 12-Oct-15 8.46 10 482 <2.0 16

6MW4 Patmohana UG October Second 28-Oct-15 7.98 8 486 <2.0 16

6MW4 Patmohana UG November First 11-Nov-15 8.16 5 494 <2.0 20

6MW4 Patmohana UG November Second 20-Nov-15 7.78 8 468 <2.0 16

6MW4 Patmohana UG December Second 23-Dec-15 7.70 14 511 <2.0 48

6MW4 Patmohana UG January First 13-Jan-16 7.65 13 520 <2.0 24

6MW4 Patmohana UG January Second 21-Jan-16 7.63 12 521 <2.0 32

6MW4 Patmohana UG February First 09-Feb-16 8.17 14 717 <2.0 40

6MW4 Patmohana UG February Second 18-Feb-16 8.02 6 699 <2.0 32

6MW4 Patmohana UG March First 07-Mar-16 8.17 7 743 <2.0 32

6MW4 Patmohana UG March Second 26-Mar-16 8.26 16 729 <2.0 28

6MW5 Chinakuri I UG May Second 16-May-15 8.10 26 185 <2.0 16

6MW5 Chinakuri I UG June Second 24-Jun-15 7.93 30 192 <2.0 24

6MW5 Chinakuri I UG July First 03-Jul-15 8.17 26 184 <2.0 24

6MW5 Chinakuri I UG August First 12-Aug-15 8.09 <25.0 181 <2.0 30

6MW5 Chinakuri I UG July Second 24-Jul-15 8.24 <25.0 188 <2.0 24

Page 28: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

27

Station

No

Station Name Month Fortnight Date of

Sampling

pH TSS TDS O&G COD

6MW5 Chinakuri I UG August Second 00-Jan-00 8.13 <25.0 197 <2.0 32

6MW5 Chinakuri I UG September First 07-Sep-15 8.10 30 230 <2.0 38

6MW5 Chinakuri I UG June First 11-Jun-15 8.15 32 190 <2.0 32

6MW5 Chinakuri I UG September Second 22-Sep-15 8.12 8 312 <2.0 16

6MW5 Chinakuri I UG October First 12-Oct-15 7.68 6 524 <2.0 12

6MW5 Chinakuri I UG October Second 29-Oct-15 8.52 7 528 <2.0 20

6MW5 Chinakuri I UG November First 05-Nov-15 7.92 7 484 <2.0 28

6MW5 Chinakuri I UG November Second 21-Nov-15 7.72 12 472 <2.0 24

6MW5 Chinakuri I UG December Second 23-Dec-15 7.52 12 549 <2.0 16

6MW5 Chinakuri I UG January First 12-Jan-16 7.55 16 541 <2.0 32

6MW5 Chinakuri I UG January Second 21-Jan-16 7.59 14 557 <2.0 40

6MW5 Chinakuri I UG February First 09-Feb-16 8.15 16 829 <2.0 48

6MW5 Chinakuri I UG February Second 19-Feb-16 8.29 10 824 <2.0 56

6MW5 Chinakuri I UG March First 07-Mar-16 8.32 6 835 <2.0 48

6MW5 Chinakuri I UG March Second 26-Mar-16 8.00 13 849 <2.0 48

6MW6 Chinakuri III UG May Second 16-May-15 8.44 <25.0 627 <2.0 8

6MW6 Chinakuri III UG June Second 24-Jun-15 7.86 24 640 <2.0 16

6MW6 Chinakuri III UG July First 03-Jul-15 8.24 <25.0 636 <2.0 16

6MW6 Chinakuri III UG August First 11-Aug-15 8.70 <25.0 627 <2.0 40

6MW6 Chinakuri III UG July Second 24-Jul-15 8.46 <25.0 633 <2.0 24

6MW6 Chinakuri III UG August Second 26-Aug-15 8.85 <25.0 633 <2.0 44

6MW6 Chinakuri III UG September First 10-Sep-15 8.80 32 647 <2.0 40

6MW6 Chinakuri III UG June First 11-Jun-15 8.52 28 627 <2.0 16

6MW6 Chinakuri III UG September Second 22-Sep-15 8.38 9 436 <2.0 16

6MW6 Chinakuri III UG October First 13-Oct-15 7.48 7 428 <2.0 16

6MW6 Chinakuri III UG October Second 29-Oct-15 8.68 6 482 <2.0 16

6MW6 Chinakuri III UG November First 05-Nov-15 7.78 8 482 <2.0 24

6MW6 Chinakuri III UG November Second 21-Nov-15 8.36 8 522 <2.0 16

6MW6 Chinakuri III UG December Second 23-Dec-15 8.31 16 424 <2.0 24

6MW6 Chinakuri III UG January First 12-Jan-16 8.28 17 438 <2.0 24

6MW6 Chinakuri III UG January Second 27-Jan-16 8.36 5 442 <2.0 40

6MW6 Chinakuri III UG February First 09-Feb-16 8.30 18 643 <2.0 48

6MW6 Chinakuri III UG February Second 20-Feb-16 8.53 11 672 <2.0 48

6MW6 Chinakuri III UG March First 07-Mar-16 8.60 12 659 <2.0 48

6MW6 Chinakuri III UG March Second 22-Mar-16 8.65 14 659 <2.0 40

6MW7 Mauthdihi UG May Second 27-May-15 7.52 30 475 <2.0 32

6MW7 Mauthdihi UG June Second 24-Jun-15 7.87 <25.0 456 <2.0 16

6MW7 Mauthdihi UG July First 03-Jul-15 7.95 <25.0 460 <2.0 16

6MW7 Mauthdihi UG August First 11-Aug-15 8.16 <25.0 443 <2.0 32

6MW7 Mauthdihi UG July Second 23-Jul-15 8.10 <25.0 450 <2.0 16

6MW7 Mauthdihi UG August Second 21-Aug-15 7.80 <25.0 456 <2.0 38

6MW7 Mauthdihi UG September First 10-Sep-15 7.96 28 462 <2.0 36

6MW7 Mauthdihi UG June First 12-Jun-15 7.80 26 446 <2.0 24

6MW7 Mauthdihi UG September Second 22-Sep-15 8.07 10 452 <2.0 24

6MW7 Mauthdihi UG October First 13-Oct-15 7.75 8 438 <2.0 20

6MW7 Mauthdihi UG October Second 29-Oct-15 8.64 5 478 <2.0 16

6MW7 Mauthdihi UG November First 12-Nov-15 7.84 10 476 <2.0 28

6MW7 Mauthdihi UG November Second 21-Nov-15 8.32 10 508 <2.0 20

6MW7 Mauthdihi UG December Second 23-Dec-15 8.40 8 524 <2.0 16

6MW7 Mauthdihi UG January First 11-Jan-16 8.41 14 528 <2.0 32

6MW7 Mauthdihi UG January Second 27-Jan-16 8.49 13 540 <2.0 32

6MW7 Mauthdihi UG February First 09-Feb-16 8.82 20 580 <2.0 32

6MW7 Mauthdihi UG February Second 20-Feb-16 7.82 12 539 <2.0 36

6MW7 Mauthdihi UG March First 14-Mar-16 8.82 14 581 <2.0 36

Page 29: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

28

Station

No

Station Name Month Fortnight Date of

Sampling

pH TSS TDS O&G COD

6MW7 Mauthdihi UG March Second 22-Mar-16 8.75 12 594 <2.0 32

6MW8 Bejdih UG May Second 16-May-15 7.59 34 487 <2.0 32

6MW8 Bejdih UG June Second 24-Jun-15 7.94 <25.0 494 <2.0 32

6MW8 Bejdih UG July First 03-Jul-15 7.84 28 501 <2.0 24

6MW8 Bejdih UG August First 10-Aug-15 8.52 <25.0 524 <2.0 40

6MW8 Bejdih UG July Second 27-Jul-15 8.68 26 510 <2.0 32

6MW8 Bejdih UG August Second 21-Aug-15 8.19 26 531 <2.0 36

6MW8 Bejdih UG September First 10-Sep-15 8.22 26 530 <2.0 36

6MW8 Bejdih UG June First 12-Jun-15 7.59 30 487 <2.0 24

6MW8 Bejdih UG September Second 28-Sep-15 8.43 8 478 <2.0 16

6MW8 Bejdih UG October First 13-Oct-15 7.69 9 478 <2.0 24

6MW8 Bejdih UG October Second 29-Oct-15 8.72 6 464 <2.0 12

6MW8 Bejdih UG November First 12-Nov-15 7.82 12 472 <2.0 12

6MW8 Bejdih UG November Second 19-Nov-15 8.28 12 506 <2.0 24

6MW8 Bejdih UG December Second 28-Dec-15 8.24 10 478 <2.0 16

6MW8 Bejdih UG January First 14-Jan-16 8.22 11 478 <2.0 16

6MW8 Bejdih UG January Second 27-Jan-16 8.19 10 520 <2.0 16

6MW8 Bejdih UG February First 09-Feb-16 7.49 16 519 <2.0 24

6MW8 Bejdih UG February Second 20-Feb-16 7.75 8 478 <2.0 28

6MW8 Bejdih UG March First 14-Mar-16 7.90 16 548 <2.0 28

6MW8 Bejdih UG March Second 22-Mar-16 7.60 16 539 <2.0 24

6MW9 Methani UG May Second 16-May-15 7.71 36 477 <2.0 40

6MW9 Methani UG June Second 24-Jun-15 7.95 30 466 <2.0 24

6MW9 Methani UG July First 03-Jul-15 7.74 32 472 <2.0 28

6MW9 Methani UG August First 10-Aug-15 7.76 26 464 <2.0 34

6MW9 Methani UG July Second 27-Jul-15 7.88 <25.0 447 <2.0 24

6MW9 Methani UG August Second 25-Aug-15 8.45 30 480 <2.0 30

6MW9 Methani UG September First 08-Sep-15 8.56 <25.0 477 <2.0 28

6MW9 Methani UG June First 11-Jun-15 7.67 34 459 <2.0 40

6MW9 Methani UG September Second 28-Sep-15 7.98 7 454 <2.0 24

6MW9 Methani UG October First 13-Oct-15 7.98 10 498 <2.0 32

6MW9 Methani UG October Second 29-Oct-15 8.35 10 452 <2.0 20

6MW9 Methani UG November First 12-Nov-15 7.68 14 468 <2.0 40

6MW9 Methani UG November Second 26-Nov-15 8.24 14 504 <2.0 32

6MW9 Methani UG December Second 30-Dec-15 8.12 9 515 <2.0 24

6MW9 Methani UG January First 14-Jan-16 8.09 9 511 <2.0 24

6MW9 Methani UG January Second 27-Jan-16 8.02 8 515 <2.0 16

6MW9 Methani UG February First 09-Feb-16 7.62 14 637 <2.0 40

6MW9 Methani UG February Second 20-Feb-16 7.61 6 605 <2.0 32

6MW9 Methani UG March First 14-Mar-16 7.61 9 656 <2.0 36

6MW9 Methani UG March Second 31-Mar-16 7.67 18 649 <2.0 32

Effluent Water Quality Standards (MoEF Schedule – VI Standards)

Parameters pH TSS TDS Oil & Grease COD

Limit 5.5-9.0 100 Not Specified 10 250

Page 30: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

29

Annexure – III

Effluent Water Quality for full parameters (29 parameters) Cluster 6 6 6 6 6 6 6 6 6 6 Effluen

t Water (MOEF Schedule-VI

Standard)

Station No 6MW1 6MW2 6MW3 6MW4 6MW5 6MW6 6MW7 6MW8 6MW9 6MW10

Station Name Dhemomain UG

Sodepur UG

Narsamuda UG

Patmohana UG

Chinakuri I UG

Chinakuri III UG

Mauthdihi UG

Bejdih UG Methani UG

Sheetalpur UG

Month December

December

December

December

December

December

December

December December December

Fortnight First First First First First First First First First First

Date of Sampling

08-Dec-15

08-Dec-15

09-Dec-15

09-Dec-15

10-Dec-15

10-Dec-15

10-Dec-15

09-Dec-15 09-Dec-15

10-Dec-15

Colour 4 3 4 3 3 4 3 4 3 3 Unobjectionable

Odour Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

TSS 5 8 9 12 8 9 10 12 6 5 100.0

pH 8.20 8.11 8.0 7.95 8.03 8.10 8.07 8.11 7.97 8.05 5.5-9.0

Temperature(Deg C)

21.9 21.8 21.9 22.0 21.3 21.6 21.9 22.02 22.05 21.7 Shall not exceed

50C above the

receiving water temp

Oil & Grease <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 10.0

Total Residual Chlorine

<0.02 <0.02 0.03 0.04 <0.02 <0.02 <0.02 <0.02 <0.02 0.03 1.0

Ammonical Nitrogen

0.72 0.45 0.68 0.56 0.48 0.58 0.62 0.48 0.56 0.52 50.0

Total Kjeldahi Nitrogen

1.26 1.24 1.47 1.52 1.62 1.58 1.72 1.58 1.69 1.38 100.0

Free Amonia <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 5.0

BOD 3 3 3 2 4 3 3 4 3 3 30.0

COD 08 24 32 40 08 08 16 32 32 24 250.0

Arsenic <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.2

Lead <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.1

Hexavalent Chromium

0.04 0.04 0.02 0.03 0.03 0.02 0.04 0.03 0.02 0.04 0.1

Total Chromium 0.06 0.05 0.03 0.05 0.04 0.03 0.05 0.05 0.04 0.06 2.0

Copper 0.04 0.03 0.03 0.04 0.03 0.03 0.03 0.03 0.03 0.04 3.0

Zinc 0.06 0.04 0.03 0.06 0.04 0.03 0.04 0.04 0.03 0.06 5.0

Selenium <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.05

Nickel <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 3.0

Fluoride 0.39 0.46 0.54 0.30 0.59 0.32 0.51 0.43 0.35 0.67 2.0

Dissolved Phosphate

1.62 1.79 1.45 1.58 1.72 1.64 1.78 1.58 1.62 1.46 5.0

Sulphide 0.008 0.009 0.007 0.006 0.006 0.007 0.008 0.009 0.007 0.006 2.0

Phenolics <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 1.0

Manganese 0.22 0.22 0.24 0.20 0.26 0.24 0.22 0.22 0.20 0.22 2.0

Iron 0.13 0.11 0.14 0.10 0.12 0.10 0.11 0.12 0.14 0.14 3.0

Nitrate Nitrogen 3.8 2.9 2.8 2.6 3.2 3.4 2.9 2.7 3.8 3.4 10.0

Cadmium <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 0.003

Total Dissolved Solids

439 449 496 493 537 432 524 469 521 490 Not Specifie

d

Page 31: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

30

Annexure – III

GROUNDWATER QUALITY Cluster No 6 6 6 6 6 6 6 6

Indian Drinking Water Standard (IS-10500)

Station No 6GW1 6GW2 6GW3 6GW4 6GW5 6GW6 6GW7 6GW8

Station Name Dugwell atchhotta dhemo village near

Kamala

Dugwell near

Chinakuri village

Dugwell at upper Dhawra Mithani colliery

Dugwell near

Mazumder

Industries in

Sarmara village

Dugwell at Kartick Banerjee house in Parbelia village

Dugwell near

Sodepur village health centre

Dugwell at

D.G.M.S office

near Staff recreation

club, Sitaramp

ur

Dugwell at Marich

Kota village near

durgamandir

Month May'15 May'15 May'15 May'15 May'15 May'15 May'15 May'15

Fortnight Second Second Second Second Second Second Second Second

Date of sampling

14-May-15

14-May-15

15-May-15

15-May-15

15-May-15

14-May-15

13-May-15

14-May-15

Colour,Hazen unit Max

4 5 3 4 3 4 3 4 5

Odour Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Taste Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable

Turbidity,NTU Max

3.6 4.0 3.6 4.1 2.8 2.7 3.4 4.0 5

pH 7.83 7.25 7.65 7.36 7.62 7.84 7.36 7.44 6.5-8.5

Total Hardness

296 448 500 524 136 292 336 164 300.0

Iron <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 0.30

Chlorides 52 137 19 14 31 65 47 62 250.0

Res Free chlorine

<0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 0.20

Dissolved Solids

428 710 102.2 83.2 245 354 241 184 500.0

Calcium 65.6 104 110.4 129.6 32 92.8 91.2 88 75.0

Copper <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 0.05

Manganese <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 0.10

Sulphate 48 56 58 62 64 69 71 84 200.0

Nitrate 3.99 4.43 3.10 2.66 1.77 8.86 4.43 3.10 45.0

Fluoride 0.64 0.48 0.46 0.38 0.52 0.64 0.48 0.42 1.0

Selenium <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.05

Arsenic <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.05

Lead <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.05

Zinc <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 5.00

Hex Chromium

<0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 0.05

Boron <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 1.00

Coliforms (MPN)

Nil Nil Nil Nil Nil Nil Nil Nil Nil

Phenolics <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 0.001

Alkalinity 260 136 228 208 248 288 164 188 200.0

Page 32: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Environmental Statement (Form-V) 2015-16 for Cluster No. 6 (Group of Mines in Raniganj Coalfield)

31

Annexure – IV

Groundwater Level

Station No

Station Name Month Fortnight Date of Sampling

Ground Water Level BGL (mtr)

6GWL1 Dugwell atchhotta dhemo village near Kamala May Second 14-May-15 11.00

6GWL1 Dugwell atchhotta dhemo village near Kamala November Second 28-Nov-15 3.55

6GWL1 Dugwell atchhotta dhemo village near Kamala January Second 28-Jan-16 4.55

6GWL1 Dugwell atchhotta dhemo village near Kamala August Second 26-Aug-15 3.10

6GWL2 Dugwell near Chinakuri village May Second 14-May-15 6.10

6GWL2 Dugwell near Chinakuri village November First 12-Nov-15 5.05

6GWL2 Dugwell near Chinakuri village January Second 20-Jan-16 5.20

6GWL2 Dugwell near Chinakuri village August Second 24-Aug-15 4.10

6GWL3 Dugwell at upper Dhawra Mithani colliery May Second 15-May-15 8.50

6GWL3 Dugwell at upper Dhawra Mithani colliery November Second 19-Nov-15 4.20

6GWL3 Dugwell at upper Dhawra Mithani colliery January Second 29-Jan-16 6.00

6GWL3 Dugwell at upper Dhawra Mithani colliery August Second 22-Aug-15 1.70

6GWL4 Dugwell near Mazumder Industries in Sarmara village

May Second 15-May-15 6.20

6GWL4 Dugwell near Mazumder Industries in Sarmara village

November Second 28-Nov-15 3.80

6GWL4 Dugwell near Mazumder Industries in Sarmara village

January Second 29-Jan-16 5.70

6GWL4 Dugwell near Mazumder Industries in Sarmara village

August Second 26-Aug-15 0.10

6GWL5 Dugwell at Kartick Banerjee house in Parbelia village

May Second 15-May-15 4.20

6GWL5 Dugwell at Kartick Banerjee house in Parbelia village

November Second 28-Nov-15 2.90

6GWL5 Dugwell at Kartick Banerjee house in Parbelia village

January Second 22-Jan-16 2.90

6GWL5 Dugwell at Kartick Banerjee house in Parbelia village

August Second 26-Aug-15 1.05

6GWL6 Dugwell near Sodepur village health centre May Second 15-May-15 6.80

6GWL6 Dugwell near Sodepur village health centre November Second 28-Nov-15 4.95

6GWL6 Dugwell near Sodepur village health centre January Second 28-Jan-16 5.70

6GWL6 Dugwell near Sodepur village health centre August Second 25-Aug-15 0.95

6GWL7 Dugwell at D.G.M.S office near Staff recreation club, Sitarampur

May Second 15-May-15 22.00

6GWL7 Dugwell at D.G.M.S office near Staff recreation club, Sitarampur

November Second 27-Nov-15 18.25

6GWL7 Dugwell at D.G.M.S office near Staff recreation club, Sitarampur

January Second 19-Jan-16 21.60

6GWL7 Dugwell at D.G.M.S office near Staff recreation club, Sitarampur

August Second 22-Aug-15 10.50

6GWL8 Dugwell at Marich Kota village near durgamandir May Second 15-May-15 0.55

6GWL8 Dugwell at Marich Kota village near durgamandir November Second 27-Nov-15 0.55

6GWL8 Dugwell at Marich Kota village near durgamandir January Second 19-Jan-16 0.55

6GWL8 Dugwell at Marich Kota village near durgamandir August First 14-Aug-15 0.40

Page 33: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

Location Map : Plate – 1

Outline of Cluster no. 6 shown on the map of Asansol Subdivision

Page 34: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130sodepur2.pdf · 2016-12-22 · ENVIRONMENTAL STATEMENT IN FORM-V ... CMPDI ISO 9001:2008 ... ENVIRONMENTAL

23°40'

23°35'

TO KOLKATA

K

O

L

K

A

T

A

TO DHANBAD

G.T.ROAD

NH-2

RS

RS

RS

Jamuria

RS

Ikra

N

u

n

i

a

K

h

a

l

P

u

n

t

a

K

h

a

l

86°45'

Barakar River

M

a

i

n

L

i

n

e

E

.

R

a

i

l

w

a

y

S.E. Railway Chaurashi Br.

Radhanagar

RS

S

.

E

.

R

a

i

l

w

a

y

M

a

i

n

L

i

n

e

S

.

E

.

R

a

i

l

w

a

y

Sanctoria Coal Branch

S.E. Railway

M

a

i

n

L

i

n

e

G

r

a

n

d

C

h

o

r

d

E

a

s

t

e

r

n

R

a

i

l

w

a

y

E

a

s

t

e

r

n

R

l

y

.

C

h

a

n

c

h

B

r

.

T

o

D

h

a

n

b

a

dT

o

S

a

l

a

n

p

u

r

E

.

R

.

I

k

r

a

B

r

a

n

c

h

E

.

R

l

y

.

M

a

i

n

l

i

n

e

Nonia Khal

C

h

i

n

c

h

u

r

i

a

R

S

E

.

R

l

y

.

I

k

r

a

b

r

a

n

c

h

E.Rly.Toposi-Baraboni Chord

N

u

n

i

a

K

h

a

l

87°05'

87°00'

86°55'

86°50'

23°45'N

23°40'N

Damoda

Patharchur

Sankhari

Kumardiha

Bakulia

Searsol

Amritnagar

East Nimcha

Harabhanga

Tirat

Babladanga

Chelad

Belebathan

Jamari

Chalbalpur

Jaykaynagar

Bogra

Chapui

Saora

Ratibati

Kashinathpur

Kumardiha

Ghusick

Ashtadanga

Damra

Jamdobe

Mallackpara

Kalipahari

Katagoria

Ranisayer

Bijpur

Mithapur

Satgram

Berala

Mondalpur

Banali

Joba

Kendulia

Joba

Chanda

Shivdanga

Kurtidanga

Ushagram

Ningha

Keshabganj

Murgachori

Nischantapur

Kankhaya

Bonbishnupur

Satpukhuria

Khalrui

Gomaria

Bagrasola

Majiara

Bhanora

Charanpur

Pariharpur

Kaithi

Sripur

Baijantipur

Akhalpur

Damodarpur

Sekpur

Ikra

Hormadanga

Nandi

Jambad

Taltore

Layekdanga

Shibpur

Jhiladanga

Shyamsunderpur

Faridpur

Taradanga

DomohaniBaraboni

Bijaynagar

Jamsol

Hijalgora Chak Tulsi

Natundih

Jhapradhura

Shitadhura

Katanidangal

Kelejora

Puchra

Beldanga

Gopalbad

Khayerbad

Madantanr

Barira

Ramdih

Shirishbero

Barabal

Haldar Colony

Kalyaneswari

Lalbazar

Victoria

Ramnagar

Tentuljhora

Mahespur

Nekrajuria

Debipur

Damagaria

Duburdih

Kadhhito

Purandih

Hadlo

Dendua

Chanptaria

Damagaria

Sabanpur

Digari

Shrirampur

Dhanudih

Kaladabar

Nandal

Baradanga

Mahanpur

Shrirampur

Mahishmura

Muktarchandi

Phulberia

Lachmanpur

Balaram Chak

Khudka

Dhundabad

Banbirdih

Basudebpur

Benjimari

Jemari

Patol

Alkusha

JanardansayerThekedanga

Balkunda

Madhai Chak

Sadhna

Radhaballabpur

LahatShyamdih

Lalganj

Pahargora

Parbatpur

Maniddanga

Karrabdih

Paniphala

Palasban

Sidabari

Baradanga

Ashanboni

Rebatijubati

Taldanga

Baradanga

Itapara

Raghunath Chak

Baliapur

Amdiha

Raniganja

Amtala

Achhra

Kusumkanali

Benagari

Jemariget

Alladih

Amdanga

Harishdih

Keshurdih

Chayanpur

Kansanko

Dabar

Manhara

Dharaspur

Paharpur

Khayerbandh

Kijo

Pachurlo

Chhotkara

Alipur

Jasaidi

Belachak

Niamatpur

Ganyutia

Jagannathdih

Junut

Asanboni

Pothiara

Tiltoriya

Nadiha

Barsiodih

Harayanpur

Panchet

Baghmara

Chalmara

Jamuidanga

Mahishnadih

Chakaltabari

Palnudih

Bahardardih

Paharpur

Puapur

Lalpur

Gusaidanga

Kalyasota

Khedadanga

Banra Dhangajore

Goaldih

Rangdih

Gangpur

Harmadih

Jashpur

Muradi

RS

Dhuluri

Madandih

Radhamadhabpur

Eriyakusum

Paharibera

Parbatpur

Chourashi

Bhaskaeriakusum

Gopalganj

Inganpur

Bartoria

Bindidih

Murulia

Anandpur

Madhubanpur

Saonthalmotha

Bagalgaria

Baliara

Sultandih

Pathardih

Hijuli

Dishergarh

Benipur

Heddih

Ranipur

Bhagabatidih

Manpura

Gopalpur

Sarbari

Nimdanga

Dubeswari

Deliya

Sialdanga

Saltore

Rakta

Narayanchak

Hatinal

Debidanga

Bhamaria

Kumradanga

Baruipara

Parbelia

Asanboni

Alkusha

Hirakhun

Shitalpur

Chhottadhemo

Patra

Harbala

Sanctoria

Chinakuri

Chapa Dhawra

Sodepur

Apisgram

Narsingbandh

Burnpur

Dumdumi

Sanuri

upadihi

Shyamdihi

Madandihi

Kiradih

Saldanga

Suryanagar

Mithani

Baradhemo

Bidyanandapur

Aluthia

Bakulia

Deolia

Bhaladiha

Chaprad

Mankeswar

karanbera

Bejdih

Radhanagar

Shitaldhawra

Pathmohona

Ranisar

Hakmanbag

Aldih

Bangram

Rangapara

Bandangal

Kuilapur

Jorpara

Damodar

Purushottampur

Dharampur

Hirapur

Barachak

Gopalpur

Bartoria

Shanrmara

Bara Dighari

Jagatdih

Phatepur

Narsamuda

Santa

Burungdanga

Santalgaon

Kalajhoria

Dhanua

Danga Mohosila

Talkunri

Dipopara

Mohisila Colony

ASANSOL

Ismail

Gurgurpara

Nabaghanti

Baradanga

Barathol

Shyambandh

Rahamatnagar

Nathundih

Mahujuri

Shitala

Dhadka

Petuasalani

Jamdob

Mohisila

Kalla

Manberia

Boldih

Chunga

Begunia

Barira

Kurargaria

Azadnagar

Patharkhad

Ramchandra Dangal

Kendua

Shipur

Syaldanga

Lalbazar

Naktikanyapur

Kalikapur

Sitarampur

Sitarampur

Kultora

Dedi

Chalbalpur

Lachipur

Kumardiha

Melekola

Ramjibanpur

Sudi

Raghunathbati

Ethora

Sarakdih

Marichkota

Angaria

Sitakanyapur

Napara

Madanpur

Bansarakdih

Monoharbahal

Panchgachia

Palashdiha

Nuni

Jayramdanga

Baropukuria

Saragdih

Haripur

Mucchadanga

Sitadanga

Chinchuria

Dhadka

Barakar

Colony

(Running)

Mohonpur O.C.P.

Running

Bonjemehari

Inc.

6

Dighit

Bagjata

Kukbrakuri

Anandapur

Kesharkund

E

A

S

T

E

R

N

R

A

I

L

W

A

Y

M

a

i

n

Panchkot(Panchet) Hill

RESERVED FOREST

DANDAHIT PF

Nimcha

Maithan Colony

Chakarbathan

Paradih

Barajor

Beliyad

Kalimati

Rajpura Colony

Mahatadih

Tiltoriya

Bakardangal

Kesharkural

Chhaterkonali

Sayepara

Kalakandi

Shirpurnama

Beliapur

Poradiha

Chandurdih

Beljhupa

Jodadih

Makura

Tilur

Ektira

Batka

Manpur

Dandahit

Dhanasdih

Binadpur

Lediam

Bhaluka

Ituri

Ghatkul

Bhurkundabari

Tantlai

Bathanba

L

i

n

e

(

E

l

e

c

t

r

i

f

i

e

d

)

Majiyara

Narandhaura

Aradanga

Bandarchua

Chhatabar

Gopinathpur

Churuinala

SanolapurPatlabari

Santarkuli

Bengagoriya

Patlabar

Dahibari

Baraban

Kethardih

BeldangaTalberiya

Ledaharia

Guliardih

Luchibad

Nutangaon

Dumarkanda

Jogira

Lakhdih

Jhukundar

Chanch

Garphalbari

Kumardubi

Panchmahali

Dudhapani

Chirkunda

Gusainpara

Jaldanga

Kewra

Satyanarayan Colony

Bhalka

Bijra

Kastabad

Raghunathpur

Banda

Sonabad

PF

DAMODAR RIVER

Saltore

Jirdanga

NH-2

Gagna

PF

PF

PF

Gopalpur

Alladih

Chandbad

23°45'

23°50'

23°30'

Kachcha Road

Protected Forest

Reserved Forest

SAND

Built Up

Road (ECL/NH)

Water Bodies

(River, Nala, Dam)

River/Nalah

EASTERN COALFIELDS LIMITED

Buffer & Core Zone

JOB NO

CMPDIISO 9001 Company

R I NE V XXX X 21

1 OF 1

0

OF CLUSTER NO. 6

EIA & EMP FOR CLUSTER NO. 6

111255

2 KMS

PLATE NO 10

N

Permanent Air Station

Pre - monsoon

Post - monsoon

Predominant Wind Direction

during October - March (Post - Monsoon)

Predominant Wind Direction

during April - September

(Pre - Monsoon & Monsoon Period)

6A6

6A7

6A8

6A9

6A10

6A3

6A1

6A5

6A2

6A4

Station Code Type of Station Name of StationAIR QUALITY MONITORING STATIONS

6A1 Permanent Air Station In Chhotodhemo Village near rly. line6A2 In Chinakuri Village6A3 In Mithani Village6A4 In Shanrmara Village6A5 In Barachak Village6A6 In Parbelia Village6A7 In Suryanagar Village

Post monsoon Air StationPost monsoon Air Station

Pre monsoon Air StationPre monsoon Air Station

Station Code Name of Station (Workplace)NOISE SAMPLING STATIONS

6N1 Dhemomain UG6N2 Sodepur UG6N3 Narsamuda UG

Station Code Mine/Effluent Water StationMINE/ EFFLUENT WATER STATIONS

6MW1 Dhemomain UG6MW2 Sodepur UG

Station Code Location of Dug WellGROUND WATER LEVEL

6GWL1 Dugwell Atchhotta dhemo village near Kamala6GWL2 Dugwell near Chinakuri village6GWL36GWL46GWL5 Dugwell at Kartik Banerjee house in Parbelia village

Dugwell at Upper Dhawrah Mithani Colly.Dugwell near Mazumdar Industries in Sarnmara village

Permanent Air StationPermanent Air StationPermanent Air StationPermanent Air Station

Pre monsoon Air Station6A86A96A10

In Kurargaria VillageIn Sitarampur VillageIn Marichkota Village

6N46N56N66N76N86N9

Patmohana UGChinakuri I UGChinakuri III UGBejdih UGMethani UGSheetalpur UG

6MW36MW46MW56MW66MW76MW86MW96MW10

Narsamuda UGPatmohana UGChinakuri I UGChinakuri III UGMouthdih UGBejdih UGMethani UGSheetalpurr UG

6GWL66GWL76GWL8

Dugwell near Sodepur village health centreDugwell at D.G.M.S. office near staff recreation club, SitarampurDugwell at Marichkota village near Durgamandir

6GWL8

6GWL7

6GWL6

6GWL5

6GWL4

6GWL3

6GWL2

6GWL1

6MW1

6MW9

6MW3

6MW4

6MW8

6MW2

6MW10

6MW5

6MW6

6N16N2

6N3

6N4

6N5

6N6

6N7 6N86N9

6MW7