form - 1environmentclearance.nic.in/writereaddata/... · form-1 application for mines in cluster...

15
Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ====================================================================== ===================================================== 1 Prepared at CMPDI, RI-1, Asansol January, 2018 Job no. -111562 FORM - 1 (I) Basic Information 1 Name of the project Cluster No. 04 (Group of Mines) of M/s Eastern Coalfields Ltd. 2 S.No. in the schedule 1(a) 3 Proposed capacity / area / length / tonnage to be handled / command area / lease area / number ofwells to be drilled Total No. of Mines : 2 (Two) Coal Production Capacity : 7.71 MTY Cluster Area (Leasehold) : 2720.87 Ha 4 New / Expansion / Modernization This is an amendment proposal to the EC granted vide letter no. J-11015/106/2011-I(A).II(M) Dated 21.07.2015 Need for EC Amendment In view of the revised production targets set by CIL, a re- assessment of mine capacities has been carried out for the cluster while keeping the overall cluster capacity unchanged. One mine, Khoirabad UG & OC has been dropped from the revised proposal as the lease of this colliery has been transferred to other agency. Boundary readjustment has also been done in case of Itapara OCP by reducing the leasehold area from 1108.0 Ha to 855.87 Ha. Thus, the overall cluster area has reduced from 3353.0 Ha to 2720.87 Ha. This re- assessment / rationalization has been done based on present condition and capability of the mines for achieving optimum production levels. The re-organization of the mines has been planned with due regard to environment. The proposed changes are in line with the revised mining plan for the cluster, duly approved by the Board of Directors of ECL on 10.01.2018. The changes with reference to the approved EC have been shown in the following table Table Showing Existing EC and Revised Proposal for Amendment of EC Sl No. Name of the Mine Type Lease Area (Ha) EC Capacity (MTY) Life (Years) Sl. No. Proposed Change Lease Area (Ha) Proposed EC Capacity (MTY) Change in Capacity (MTY) Revised Life (Yrs) As per EC Revised Proposal for Amendment of EC 1 Khoirabad UG UG & OC 380.0 No UG potential. Coal at the in-crop is left which can be extracted by opencast only. The mining lease has been transferred to other agency. Hence, the project has been dropped in this report. 0.0 (-) 0.13 -

Upload: others

Post on 05-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FORM - 1environmentclearance.nic.in/writereaddata/... · Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ===== ===== 2 Prepared at CMPDI,

Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ======================================================================

=====================================================

1 Prepared at CMPDI, RI-1, Asansol January, 2018 Job no. -111562

FORM - 1

(I) Basic Information 1 Name of the project Cluster No. 04 (Group of Mines) of M/s Eastern Coalfields Ltd.

2 S.No. in the schedule 1(a)

3 Proposed capacity / area / length /

tonnage to be handled / command area /

lease area / number ofwells to be drilled

Total No. of Mines : 2 (Two)

Coal Production Capacity : 7.71 MTY

Cluster Area (Leasehold) : 2720.87 Ha

4 New / Expansion / Modernization This is an amendment proposal to the EC granted vide letter

no. J-11015/106/2011-I(A).II(M) Dated 21.07.2015

Need for EC Amendment

In view of the revised production targets set by CIL, a re-

assessment of mine capacities has been carried out for the

cluster while keeping the overall cluster capacity unchanged.

One mine, Khoirabad UG & OC has been dropped from the

revised proposal as the lease of this colliery has been

transferred to other agency. Boundary readjustment has also

been done in case of Itapara OCP by reducing the leasehold

area from 1108.0 Ha to 855.87 Ha. Thus, the overall cluster

area has reduced from 3353.0 Ha to 2720.87 Ha. This re-

assessment / rationalization has been done based on present

condition and capability of the mines for achieving optimum

production levels. The re-organization of the mines has been

planned with due regard to environment. The proposed

changes are in line with the revised mining plan for the cluster,

duly approved by the Board of Directors of ECL on

10.01.2018.

The changes with reference to the approved EC have been

shown in the following table –

Table Showing Existing EC and Revised Proposal for Amendment of EC

Sl

No.

Name of the

Mine Typ

e

Lease A

rea

(Ha)

EC

Cap

acit

y

(MT

Y)

Lif

e (

Yea

rs)

Sl.

No.

Pro

po

sed

Ch

an

ge

Lease A

rea

(Ha)

Pro

po

sed

EC

Cap

acit

y (

MT

Y)

Ch

an

ge in

Cap

acit

y (

MT

Y)

Revis

ed

Lif

e

(Yrs

)

As per EC Revised Proposal for Amendment of EC

1 Khoirabad

UG UG &

OC 380.0

No UG

potential. Coal

at the in-crop is

left which can

be extracted by

opencast only.

The mining lease has been

transferred to other agency. Hence,

the project has been dropped in this

report.

0.0 (-) 0.13 -

Page 2: FORM - 1environmentclearance.nic.in/writereaddata/... · Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ===== ===== 2 Prepared at CMPDI,

Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ======================================================================

=====================================================

2 Prepared at CMPDI, RI-1, Asansol January, 2018 Job no. -111562

Khoirabad

OC Patch

(new

proposal for

extracting

available

reserves in

about 10 Ha)

0.13 4

2

Gaurandih

UG

UG &

OC 1865.0

0.08 >

50

1

No further

underground

mining possible

in view of safety.

Developed

reserves to be

extracted by OC

method 1865.0

0.0 (-) 0.08 0

Gaurandih

Block – D

Phase – I

OC Patch

0.50 5 Amalgamated as

Gaurandih and

Gaurandih –

Begunia OC

4.21 (+)

1.71 15

Gaurandih-

Begunia

Phase – I OC

Patch

2.0 7

3 Itapara OC OC 1108.0 5.0 26 2 Capacity and

area reduced 855.87 3.50 (-) 1.50 26

Total

3353.0 7.71 -

No overall

change in

capacity.

Area of cluster

reduced.

2720.87 7.71

- -

(Source – Approved Mining Plan)

5 Existing Capacity/Area etc Existing EC capacity is 7.71 MTY and Cluster area is 3353.00

Ha. Approved vide EC letter no. J-11015/106/2011-I(A).II(M)

Dated 21.07.2015

6 Category of Project. i.e. ‘A’ or ‘B’ A

7 Does it attract the general condition? If

yes, Please specify

Yes, (Within 10 kms of interstate boundary between West

Bengal and Jharkhand)

8 Does it attract the specific condition? If

yes, Please specify

No

9 Location

Plot / Survey / Khasra No

Name of Unit Nationalised List No Mouza J L No PS

West Baraboni 705 Bila 23 Baraboni

Khas Baraboni 533 -do- 23 Baraboni Itapara 503 -do- 23 Baraboni

Page 3: FORM - 1environmentclearance.nic.in/writereaddata/... · Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ===== ===== 2 Prepared at CMPDI,

Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ======================================================================

=====================================================

3 Prepared at CMPDI, RI-1, Asansol January, 2018 Job no. -111562

Gourangdih 495 Panuria Kantapahari Jamgram Alipur

10 9 20 8

Baraboni

Khoirabad 535 Parulberia Kanskuli Chotkora Khorabad Alipur

1 2 4 5 6

Baraboni

Gourangdih Begunia 496 Rasunpur Andharia Saristali Madanpur Khusnagar Kapista Jamgram

-do- Jamuria Baraboni

-do-

Village Jamgram, Kapista, Khusnagar, Saristali, Andharia, Rasunpur,

Pultulia, Panuria, Bila, Itapara etc.

Tehsil Baraboni Block

District Pashchim Bardhaman

State West Bengal

10 Nearest railway station / airport along with

distance in kms.

Eastern Railway Main Line passes through the Cluster.

Nearest Rly Station – Rupnarayanpur. It is 12 km north of

Asansol and 25 km north-west of Raniganj.

Nearest airport is at Kolkata situated more than 200 kms

away.

11 Nearest Town, city, District Headquarters

along with distance in kms.

It is located 12 km north-west of Asansol and 25 km west of

Raniganj.

12 Village Panchayats Zilla Parishad

Municipal Corporation, Local body

(complete postal Addresses with

telephone nos. to be given)

Nearest municipal corporation is Asansol. Area falls under

Baraboni CD Block.

13 Name of the applicant Eastern Coalfields Ltd.

14 Registered Address PO : Sanctoria, Dist: Pashchim Bardhaman, West Bengal

15 Address for correspondence:

Name Shri B. N. Prasad

Designation (Owner / Partner / CEO General Manager (Environment)

Address Barachak House, PO: Sitarampur, Asansol, Dist: Pashchim

Bardhaman, West Bengal

Pin Code 713359

E-mail [email protected], [email protected]

Telephone No. 0341-2254510

Fax No. 0341-2254510

16 Details of Alternative Sites examined, if

any.

Location of these sites should be shown

Village- District-State (Not Applicable)

1.

2.

Page 4: FORM - 1environmentclearance.nic.in/writereaddata/... · Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ===== ===== 2 Prepared at CMPDI,

Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ======================================================================

=====================================================

4 Prepared at CMPDI, RI-1, Asansol January, 2018 Job no. -111562

on a toposheet 3.

17 Interlinked Projects None

18 Whether separate application of

interlinked

Project has been submitted

Not Applicable

19 If yes, date of submission Not Applicable

20 If no, reason Not Applicable

21 Whether proposal involves approval /

clearance under

1. The Forest (Conservation) Act, 1980 No

2. The Wildlife (Protection) Act, 1972 No

3. The CRZ Notification, 1991 No

22 Whether there is any Government Order/

Policy relevant/relating to the site

No

23 Forest land involved(hectares) NIL

24 Whether there is any litigation pending

against the project and/or land in which

the project is proposed to be set up?

(a) Name of the Court

(b) Case No.

(c) Orders / directions of the Court, if any,

and its relevance with the proposed

project

No

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions,

which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

S. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan)

Yes There will be permanent changes to land use due to opencast mining at all the mines within the cluster. Quarries and OB dumps will alter the surface topography and contours. Details are given in below table-

Table Showing Present, During and Post Mining Land Use Pattern S.No Type Land Use Present Mining

Land Use ( ha) Land Use during

Mining (ha) Post- mining Land Use

(ha)

1 Agricultural/Fallow 1470.0 643.10 643.10

2 Danga/Waste land 345.20 215.0 215.0

Page 5: FORM - 1environmentclearance.nic.in/writereaddata/... · Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ===== ===== 2 Prepared at CMPDI,

Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ======================================================================

=====================================================

5 Prepared at CMPDI, RI-1, Asansol January, 2018 Job no. -111562

S. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

3 Plantation/Vegetation 45.0 45.0 1002.58

105.0 105.0 105.0

4 Surface water bodies (River/Nallah/Pond)

92.76 92.76 92.76

5 Village/Basti 332.43 302.43 302.43

6 Others (Colony, office, D.B. Road, railway siding etc.)

259.33 382.14 360.0

7 Running/Exhausted Quarry

44.15 478.44 To be brought under plantation

8 External OB Dump 27.0 457.0 To be brought under plantation

Total 2720.87 2720.87 2720.87

(Source: Approved Mining Plan including Mine Closure Plan)

1.2 Clearance of existing land, vegetation and buildings?

Yes 1. As per the approved scheme of Gaurandih – Begunia OC Patch, three nos. of bustees, namely Jamgram (east), Kashidanga and Kolepara and a village namely, Sarisatali situated within/near the proposed OC patch are to be rehabilitated. A small settlement near the mine office also needs to be rehabilitated. Thus there will be clearance of vegetation and buildings for the above project. Details are given in below table:

Sl. No. Name of bustees / villages No. of households

1 Kashidanga 181

2 Kole Para 90

3 Jhamgram East 43

4 Sarisatali 194

5 Near Colliery office 64

Total 572

Although, the total no. of households according to census is 572, a higher figure of 800 PAFs has been taken in the approved scheme for estimating the R & R cost. 2. Eleven no. of villages were proposed to be rehabilitated as per the existing PR. However, the present proposal is to reduce the project area leaving out the property on the dip side as well as reduction of land requirement for external dumping. This reduction in project area would reduce the no. of villages required to be rehabilitated from 11 to 10 i.e., one village, namely, Bardang having 321 households would not be required to be rehabilitated. Moreover, a number of public and private establishments situated within the zone are also to be suitably compensated. One major public road connecting Asansol to Gourandi and another PWD road from Amdiha to Domohani pass through the proposed OCP area. These two roads along with two H.T power line have been envisaged to be diverted for the proposed OCP. Provision of land for above diversions has been kept beyond the safety zone of proposed quarry and dump area. 100m zone from quarry edge and 50m zone from external dump edge have provided for safety zone.

Page 6: FORM - 1environmentclearance.nic.in/writereaddata/... · Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ===== ===== 2 Prepared at CMPDI,

Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ======================================================================

=====================================================

6 Prepared at CMPDI, RI-1, Asansol January, 2018 Job no. -111562

S. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

Revised list of villages to be rehabilitated: Sl. No

Village

Total Population

Govt. Establishment & Private Property

1 Itapara 1724 Mandir-7,School-

4,Panchayet Office-1

2 Bila 676 Mandir-6,School-1,Health

Centre-1

3 Amdiha(Part) 240 Mandir-1,School-1,PHE

Tank-1+Water Filter Plant

4 Amlala(Part) 162 Mandir-2

5 Khoirabad 900 Mandir-1,School-1

6 Nandai+Talkanali 448 Mandir-2,School-1

7 Pakuria 88

8 Kenjia 350 Mandir-1,School-1,Health

Centre-1

9 Dangalpara(Kesardi) 142 Mandir-1,School-1

10 Majhi Bastee-2 200

TOTAL 4930

(Source – Area Authorities)

1.3 Creation of new land uses?

Yes New land-uses will be created due to opencast mining. The new land uses will generally be in the form of plantations over mined-out areas.

1.4 Pre-construction investigations e.g. bore houses, soil testing?

No Geological Block has already been explored by GSI, CMPDI, ECL &

MECL. No further investigation is required.

1.5 Construction works? Yes While infrastructure is already available for the existing Gaurandih – Begunia Colliery and new infrastructure will be needed for the proposed Itapara OCP.

1.6 Demolition works? Yes Buildings will be demolished for excavation works in both the OC mines.

1.7 Temporary sites used for construction works or housing of construction workers?

Yes Temporary constructions may be required for construction workers for Itapara OCP.

1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations

Yes Excavation works due to opencast mining.

1.9 Underground works including mining or tunneling?

No

No underground mining is being done in the cluster.

1.10 Reclamation works? Yes The proposed quarries at Amalgamated Gaurandih and Gaurandih –

Begunia OC will be backfilled completely and reclaimed. Reclamation

works are also proposed concurrently with mining at the proposed

Page 7: FORM - 1environmentclearance.nic.in/writereaddata/... · Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ===== ===== 2 Prepared at CMPDI,

Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ======================================================================

=====================================================

7 Prepared at CMPDI, RI-1, Asansol January, 2018 Job no. -111562

S. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

Itapara OCP.

1.11 Dredging? No Not applicable.

1.12 Offshore structures? No Not applicable.

1.13 Production and manufacturing processes?

Yes Mining of Coal

1.14 Facilities for storage of goods or materials?

Yes Coal is stored in hoppers or ground stockpiles before transport to Railway Sidings.

1.15 Facilities for treatment or disposal of solid waste or liquid effluents?

Yes Mine water discharged from the mines is allowed to settle in settling tanks. Most of this water is reused for dust suppression and part of it is used for domestic and community use. The remaining water is either discharged into local nallahs or is used for irrigation of agricultural land. The quarries also serve as water reservoirs for community uses like bathing, washing etc.

1.16 Facilities for long term housing of operational workers?

Yes Adequate housing facilities for workers have already been provided at all the existing mines. Residential quarters will be needed for the proposed Itapara OCP.

1.17 New road, rail or sea traffic during construction or operation?

Yes A 10 kms stretch of the Amdiha Damohani road passing through the cluster will be diverted for the purpose of opencast mining at Itapara OCP. Also, a new railway siding will be constructed for this mine to eliminate road transportation of coal from the proposed project.

1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc?

Yes Pl refer 1.17 above.

1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements?

Yes Pl refer 1.17 above.

1.20 New or diverted transmission lines or pipelines?

Yes Existing transmission line may be required to be shifted for establishing the Itapara OCP and the proposed infrastructure.

1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers?

Yes A seasonal nallah will be diverted for the purpose of mining at the

proposed Itapara OCP & amalgamated Gaurandih and Gaurandih – Begunia OC.

1.22 Stream crossings? Yes The Cluster has Ajay River flowing a few kilometers to the North. Ajay river with its tributaries control the drainage of the northern portion of the block. Nunia Nallah and its branches flow through the Cluster towards south and drains into Damodar River.

Page 8: FORM - 1environmentclearance.nic.in/writereaddata/... · Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ===== ===== 2 Prepared at CMPDI,

Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ======================================================================

=====================================================

8 Prepared at CMPDI, RI-1, Asansol January, 2018 Job no. -111562

S. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

1.23 Abstraction or transfers of water from ground or surface waters?

Yes Water accumulating in the mines is continuously pumped out. The quantity of pumping depends upon the make of water in the mine and varies from mine to mine. Maximum mine water removal is during the monsoons. No surface water is needed for mining process. Part of discharged mine water is used for plantation and dust-suppression. Mine water after filtration is also used for domestic purposes. Remainder is discharged into local nallahs near the mines or is used for irrigation, which recharges the ground-water. Thus, most of the mine discharge is gainfully utilized.

1.24 Changes in water bodies or the land surface affecting drainage or run-off?

Yes The area proposed for quarrying at the Itapara OCP has several worked quarries from pre-nationalisation period. These quarries have turned into water bodies and are catering to the water requirement of the area. All these quarries will be further excavated and will form part of the Itapara OCP. Also, OB dumping proposed will alter the landscape and affect surface drain-off. One seasonal nallah is also proposed to be diverted.

1.25 Transport of personnel or materials for construction, operation or decommissioning?

Yes There is movement of mining workers and other personnel between the mines and colonies. Coal from the mines is transported by road to Railway Sidings within

the Cluster and further transportation to consumers is also made by

Rail.

1.26 Long-term dismantling or decommissioning or restoration works?

Yes After cessation of underground mining activities, all the entries to the mines shall be effectively sealed off to avoid any accident. The service buildings where not needed any further shall be demolished. The quarries will be progressively backfilled and reclaimed with plantation.

1.27 Ongoing activity during decommissioning which could have an impact on the environment?

No

1.28 Influx of people to an area in either temporarily or permanently?

Yes Influx of people has taken place due to direct and indirect employment opportunities. There may be more employment and economic opportunities at the proposed Itapara OCP which may lead to further influx of people into the area.

1.29 Introduction of alien species?

No

1.30 Loss of native species or genetic diversity?

No

1.31 Any other actions? No

Page 9: FORM - 1environmentclearance.nic.in/writereaddata/... · Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ===== ===== 2 Prepared at CMPDI,

Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ======================================================================

=====================================================

9 Prepared at CMPDI, RI-1, Asansol January, 2018 Job no. -111562

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

S. No.

Information/checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

2.1 Land especially undeveloped or agricultural land (ha)

Yes 855.87 Ha of mostly tenancy land acquired for Itapara OCP. Land will also be acquired for quarrying at amalgamated

Gaurandih and Gaurandih – Begunia OC. These lands are

undeveloped tenancy land.

2.2 Water (expected source & competing users) unit: KLD

Yes The mine water discharged from the mines and water accumulated in the erstwhile quarries, now perennial water bodies, is the chief sources of water in the area and caters to the requirement of the entire community residing in the cluster. Mine discharge varies from 500 to 2000 KLD per mine depending on the extent and wateriness of the mine. Part of mine water is used for plantation, and dust-suppression. Mine water after filtration is also used for domestic purposes. Remainder is discharged into local nallah or is used for irrigation. There are no competing users of mine water. Potable water supply is met from water supplied by ECL tankers and also from filtration of the mine water in filtration plants.

2.3 Minerals (MT) No

2.4 Construction material , stone, aggregates and soil (expected source – MT)

Yes Buildings will be constructed for the proposed Itapara OCP for which construction material will be needed. Bricks, stone chips and sand is available locally

2.5 Forests and timber (source – MT)

No No

2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW)

Yes Power Supply from WB State Electricity Board. Fuel Requirement: Diesel is used for operating the dumpers and trucks.

2.7 Any other natural resources (use appropriate standard units)

No

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S. No.

Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies)

No Not Applicable

Page 10: FORM - 1environmentclearance.nic.in/writereaddata/... · Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ===== ===== 2 Prepared at CMPDI,

Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ======================================================================

=====================================================

10 Prepared at CMPDI, RI-1, Asansol January, 2018 Job no. -111562

3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases)

No Not Applicable

3.3 Affect the welfare of people e.g. by changing living conditions?

No Not Applicable

3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc.,

No Not Applicable

3.5 Any other causes No Not Applicable

4. Production of solid wastes during construction or operation or

decommissioning (MT/month):

S. No.

Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

4.1 Spoil, overburden or mine wastes

Yes Total OB generated from the 2 OC mines within the cluster will be around 586.40 Mm3, major portion of which would be backfilled concurrently.

4.2 Municipal waste (domestic and or commercial wastes)

Yes Small quantity of domestic waste is generated from the colonies which are regularly transported by the vehicles of municipality / corporation.

4.3 Hazardous wastes (as per Hazardous Waste Management Rules)

Yes Used engine oil, oil filters, batteries of automobiles and cap-lamps are generated.

4.4 Other industrial process wastes No

4.5 Surplus product No

4.6 Sewage sludge or other sludge from effluent treatment

Yes The mine water contains very less suspended solids since it is allowed to settle in mine sumps before being pumped out. Very insignificant quantity of clayey sludge from effluent settling is produced which is filled in low lying lands or opencast voids.

4.7 Construction or demolition wastes

Yes Solid waste will be generated from demolition of buildings and houses for R & R from both the OC mines. Residential quarters, service buildings and infrastructure will also be demolished after mine closure. The waste so generated will be used for filling low lying areas or quarries.

4.8 Redundant machinery or equipment

Yes Old equipment and machinery will become redundant during mine-life and will be surveyed off and sold as scrap.

4.9 Contaminated soils or other materials

No -

4.10 Agricultural wastes No -

4.11 Other solid wastes No -

Page 11: FORM - 1environmentclearance.nic.in/writereaddata/... · Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ===== ===== 2 Prepared at CMPDI,

Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ======================================================================

=====================================================

11 Prepared at CMPDI, RI-1, Asansol January, 2018 Job no. -111562

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S. No.

Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

5.1 Emissions from combustion of fossil fuels from stationary or mobile sources

Yes Diesel is burnt for coal transportation and operation of HEMM which releases SO2 and NOx.

5.2 Emissions from production processes

Yes Dust is produced in OC mining during drilling and blasting and during movement of HEMM and loaded trucks. Wet drilling is being practiced in the OC operations. The emissions at surface are from Coal handling at coal stockpile and coal transportation.

5.3 Emissions from materials handling including storage or transport

Yes Handling & transportation of coal & OB ; loading and unloading of coal & OB.

5.4 Emissions from construction activities including plant and equipment

Yes Fugitive dust and exhaust of vehicles engaged in construction activities at mine site

5.5 Dust or odors from handling of materials including construction materials, sewage and waste

Yes As above

5.6 Emissions from incineration of waste

No

5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris)

No

5.8 Emissions from any other sources

No

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S. No.

Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source of information data

6.1 From operation of equipment e.g. engines, ventilation plant, crushers

Yes Movement of HEMM in the opencast mine and operation of crushers along with coal & OB loading and unloading activities is likely to cause noise pollution. In OC mines, the noise due to controlled blasting will be confined to the OC area. Moreover, every blasting will be accompanied with prior warnings and will be done at fixed time between 14:00 to 16:00 hrs. Ambient noise level outside the lease area is not

Page 12: FORM - 1environmentclearance.nic.in/writereaddata/... · Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ===== ===== 2 Prepared at CMPDI,

Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ======================================================================

=====================================================

12 Prepared at CMPDI, RI-1, Asansol January, 2018 Job no. -111562

S. No.

Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source of information data

likely to exceed the permissible limit of 55 dB(A) during day-time and 45 dB(A) during night-time.

6.2 From industrial or similar processes

Yes Movement of HEMM. Operation of crushers, loading and unloading of coal and OB.

6.3 From construction or demolition Yes Noise may be produced at the time of construction of infrastructure and buildings for the proposed Itapara OCP. Demolition works under R&R may also produce noise.

6.4 From blasting or piling Yes Not appreciable in case of UG mines. In OC mines, controlled and delay blasting is done to reduce sound.

6.5 From construction or operational traffic

Yes Noise will be generated from coal and OB

transportation.

6.6 From lighting or cooling systems No Not applicable

6.7 From any other sources No Not applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S. No.

Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

7.1 From handling, storage, use or spillage of hazardous materials

No

7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge)

No

7.3 By deposition of pollutants emitted to air, into the land or into water

No

7.4 From any other sources No

7.5 Is there a risk of long term build up of pollutants in the environment from these sources?

No

Page 13: FORM - 1environmentclearance.nic.in/writereaddata/... · Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ===== ===== 2 Prepared at CMPDI,

Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ======================================================================

=====================================================

13 Prepared at CMPDI, RI-1, Asansol January, 2018 Job no. -111562

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment:

S. No.

Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances

Yes Storage, transportation & handling of explosive and POL may lead to explosions, spillages, fires etc. Safety measures stipulated by DGMS are followed.

8.2 From any other causes Yes 1) Mine inundation

2) Blasting

3) Explosion

4) Fire

Safety measures stipulated by DGMS are followed.

8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)?

No The cluster does not fall under seismically active zone or land slide prone area. Due safety measures are taken to prevent inundation. The mines are well equipped to deal with eventualities as enumerated in CMR 1957 and related DGMS circulars.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality:

S. No.

Information/Checklist confirmation Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data

9.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: • Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) • housing development • extractive industries • supply industries • other

Yes

Socio-economic growth in the block is closely associated with mining activity. Mining supports development of ancillaries and other related activities.

9.2 Lead to after-use of the site, which could have an impact on the environment

No

Page 14: FORM - 1environmentclearance.nic.in/writereaddata/... · Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ===== ===== 2 Prepared at CMPDI,

Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ======================================================================

=====================================================

14 Prepared at CMPDI, RI-1, Asansol January, 2018 Job no. -111562

S. No.

Information/Checklist confirmation Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data

9.3 Set a precedent for later developments Yes The proposed mine infrastructure may be used in future also by other future projects after

exhausition of the reserves in these mines. Socio-

economic benefits of the Project will accrue to local population also. As such, the likelihood of precedence for later developments cannot be ruled out.

9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects

Yes As coal occurs in continuous layers over large

distances, associated mining activity in future with

numerous closely located centres along with other

activities like power generation etc cannot be ruled

out. This could lead to cumulative impact on

environment.

(III) Environmental Sensitivity

S. No.

Areas Name/ Identity

Aerial distance (within 15 km.) Proposed project location boundary

1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value

None Not applicable

2 Areas which are important or sensitive for ecological reasons -Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests

None Not applicable

3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration

None Not applicable

4 Inland, coastal, marine or underground waters

None Not applicable

5 State, National boundaries Yes Within 10 kms from Jharkhand

6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas

None Not applicable

7 Defense installations None Not applicable

8 Densely populated or built-up area Yes Densely populated areas lie within the

leasehold properties of the mines.

Page 15: FORM - 1environmentclearance.nic.in/writereaddata/... · Form-1 Application for Mines in Cluster No. 4 for EC Amendment, Eastern Coalfields Limited ===== ===== 2 Prepared at CMPDI,