envision water master terminology

7
Envision Water Master Terminology Available Stream Water ( (Reach discharge * 0.9) – Instream water rights ) IDU water demand (crop and/or municipal) Allocated/ Applied Water

Upload: giacomo-herrera

Post on 30-Dec-2015

31 views

Category:

Documents


0 download

DESCRIPTION

Envision Water Master Terminology. Available Stream Water ( (Reach discharge * 0.9) – Instream water rights ). IDU water demand (crop and/or municipal). Allocated/Applied Water. Envision Water Master Terminology. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Envision Water Master Terminology

Envision Water Master Terminology

Available Stream Water ( (Reach discharge * 0.9) – Instream water rights )

IDU water demand (crop and/or municipal)

Allocated/Applied Water

Page 2: Envision Water Master Terminology

Envision Water Master Terminology

IDU water demand (crop and/or municipal)

Allocated/Applied Water

Appropriated POD rate (PODRATE * percent OWRD POU intersecting IDU)Unexercised Water Right

Available Stream Water ( (Reach discharge * 0.9) – In-stream water rights )

Page 3: Envision Water Master Terminology

Envision Water Master Terminology

IDU water demand (crop and/or municipal)

Allocated/Applied Water

Unsatisfied demandAvailable Stream Water ( (Reach discharge * 0.9) – In-stream water rights )

Page 4: Envision Water Master Terminology

Envision Water Master Terminology

IDU water demand (crop and/or municipal)

Allocated/Applied Water

If Available stream water is less than one half of demand, then POD is in “conflict”

Available Stream Water ( (Reach discharge * 0.9) – In-stream water rights )

Unsatisfied demand

Page 5: Envision Water Master Terminology

Envision Water Master Terminology

IDU water demand (crop and/or municipal)

Allocated/Applied Water

Maximum diversion IDU rate (1/80 per area)

Wasted Water Right

Page 6: Envision Water Master Terminology

Envision Water Master Terminology

IDU water demand (crop and/or municipal)

Allocated/Applied Water

Maximum diversion POD rate (1/80 per acre)

Excess

Page 7: Envision Water Master Terminology

Water right (WR) conflict and shut-offs(measured in number of WRs, areas, and diversion rates)

Sunday Monday Tuesday Wednesday Thursday Friday Saturday

X – is defined in HBV.xml

X

Level 1 Conflict

Sunday Monday Tuesday Wednesday Thursday Friday Saturday

X

Level 2 Conflict (consecutive days)

X

Or (consecutive weeks)

Sunday Monday Tuesday Wednesday Thursday Friday Saturday

X X

Sunday Monday Tuesday Wednesday Thursday Friday Saturday

Water Right shut-off

If a WR experiences X consecutive days of shut-off, then the WR is shut-off for remainder of the calendar year