epc & general construction company · 2016-12-21 · *to be the leading engineering,...

59
Since Since Since Since 1977 1977 1977 1977 Since 1977 EPC & GENERAL CONSTRUCTION COMPANY

Upload: others

Post on 20-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Since Since Since Since

1977197719771977

Since 1977

EPC & GENERAL CONSTRUCTION COMPANY

Company information

License No. : CN1102582

Head office

P.O. Box : 15253

Al Ain,

United Arab Emirates

+971 3 7621400

+971 3 7630401

[email protected]

Branch office

License No. : CN-105889

P.O. Box : 2045

Abu Dhabi,

United Arab Emirates

+971 2 6776757

+971 2 6776449

[email protected]

www.nael.ae

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

About Us

Nael Energy & General Enterprises Establishment establishedin 1977, has grown into one of the most efficient andsuccessful contractor in the region. NEGE through years ofexperience, has built an engineering & Contracting Housewith local and international expertise capable of competingfor the most sophisticated and complex projects.

In addition NEGE is a member of the Nael & Bin HarmalGroup of Companies and plays a vital role in supporting theGroup ambitions for success and growth. Nael Energy &General Enterprises Establishment established in 1977, hasgrown into one of the most efficient and successful contractorin the region. NEGE through years of experience, has built anengineering & Contracting House with local andinternational expertise capable of competing for the mostsophisticated and complex projects.

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

Ensure Value added performance to our Clients.

Enhance our Clients satisfaction by providing value addedservices in a timely manner.

To attain total professionalism

To strive & sustain Integrated Management system(IMS).

To maintain & extend the list of fully satisfied clients with zerocomplaints.

Mission

* To be the leading Engineering, Procurement and Constructioncompany in the Middle East, for the infrastructure, industrial andenergy sectors

* To respond to the changing needs of clients

* To provide responsive and competent services to our Client with aconstructive contribution to the success of the projects, withintime and budget.

* To respect, recognize and fairly reward the employees throughappropriate compensation, training and development

* To provide significant returns to our stake holders.

* To carry out business activities in a manner that is consistent withInternational practices and providing Quality, Safe & Healthyworking environment

* To be socially responsible, optimizing the use of local human andcapital resources and by contributing to the development of theregion

VISION

* Environment Protection and sustainable construction

VALUES

Our VISION is supported by the following VALUES which we arecommitted to carryout out:* Ensure high standards of Quality, Health and Safety as

primary objective in all our activities.* Respect for our Code of Ethics.* Ensure accountability, transparency, and integrity in our

dealings.* Committed to social responsibility and obligations to the

environment

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

Our Strength

We have a team of experts with high caliber comprising of

Management, Engineers, Supervisors and skilled Technicians and

who are able to handle any types of jobs entrusted to them.

Each member of our team of professionals is fully committed for

providing thorough, accurate and cost effective services to our

valued clients

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

License

Head Office : Al Ain

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

License

Branch office : Abu Dhabi

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

License

Classification Certificate

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

Safety Health, Environment and Quality

Management

NAEL ENERGY is committed to the delivery ofquality workmanship, and therefore embarkedon the implementation of a Quality ManagementSystem on all our Projects.

We ensure that the highest standards of Healthand Safety arebeing upheld on all our Projects.

We are proud to announce our quality andSafety Certifications from world widerecognized management systems, ensuring thattop quality and Safety workmanship is deliveredon a constant basis.

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

Safety Health, Environment and Quality

Management

EHMS APPROVAL – DEPARTMENT

OF MUNICIPAL AFFAIRS

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

Quality and HSE certificates

ISO 9001 : 2008

ISO 14001:2004

ISO 18001:2001

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

Expertise

FLUID SYSTEMS DIVISION

Water Transmission Lines

Water Distribution Networks

Sewage and Drainage Networks

POWER TRANSMISSION &

DISTRIBUTION DIVISION

Power Transmission

Power Distribution

Oil and Gas Transmission Lines

Water Distribution Pumping Stations

Water Transmission Pumping Stations

Water Treatment Plants

Sewage Treatment Plants

Sewage Pumping stations

Storm water pumping stations

Irrigation Network and

Landscaping

Oil Separation & Treatment

Operation and Maintenance

Substation packages

Airport Lighting

External & Street lighting

INDUSTRIAL AUTOMATION

DIVISION

Automation for Pumping Stations

Automation for Industry & Manufacturing.

Automation for Telecommunication

Automation for Traffic control

SCADA Systems

Substation & Power Plant Controls

Irrigation Controllers

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

ENVIORNMENTAL BUILDING AND BUILDING

Expertise

ENVIORNMENTAL ENGINEERING

Solid Waste Management

Incineration

Emissions monitoring & Control

VOC Recovery

BUILDING AND BUILDINGTECHNOLOGIES DIVISION

Building Construction

Infrastructure Construction

Landscaping and Hardscaping

District Cooling plant

HVAC

Electrical Installation

Sanitary Engineering

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

Manpower

MANPOWER NOS.

Operations Manager1

Project Manager6

Civil Engineers12

Mechanical Engineers10

Electrical Engineers12

HVAC Engineer7

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

HVAC Engineer

Draftsman15

Administrative28

Land Surveyors5

Quantity Surveyors7

Skilled Labor422

Unskilled Labor450

Drivers (Heavy Duty)18

Masons30

Carpenters51

Steel Fixers30

Electricians40

Plant Operators10

Drivers (Light Duty)20

HSE 16

Equipments

EXCAVATION AND EARTH MOVING Description Quantity Total Types /Make /Model / Capacity

Excavators

Large

(>50 tons)

8

40

KOMATSU 800 / 75 TON

10 KOMATSU 650 / 70 TON

8 KOMATSU 600 / 55 TON

6 CAT 350 / 53 TON

8 CAT 350 / 63 TON

33 KOMATSU PC400 / 35 TON

20 TIRE EXCAVATORS CAT / 315,318

NBH GROUP

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

Normal

(<50 tons)148

30 KOMATSU / PC220

20 CAT / 330

22 EXCAVATORS CAT / 225,355,235

11 HYUNDAI / 290LC

12 HYUNDAI / 320LC

ROCK

TRENCHERS

12

TRENCOR / 1660 HD / 140 ton with 9m Boom

1 EXCAVATOR TRENCHER ATTACHMENT MOUNTED ON PC 400

DOZERS 31

281

CAT D8 / KOMATSU

ROCK

BREAKERS30 KRUPP

WHEEL

LOADERS62 CAT & KOMATSU

JCB

EXCAVATORS38 JCB & CAT

WATER

TANKERS120 Mercedes

Equipments

LIFTING

Description Quantity Total Make / Model / Capacity

Heavy (>50 Tons)

12

102

Hitachi Crawler Crane

18 Tadano / TR 50 M

Normal (<50 Tons)18 KATO / 30 ton

22 Tadano / 25 ton

Tower Cranes 32 20 ton

Description Quantity Total Make

ROAD WORKS

NBH GROUP

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

Description Quantity Total Make

Steel Single Drum Vib. Rollers (10 tons) 18

30

DYNAPAC

Dump Truck , Asphalt laying Machine 12 Volvo

Type of Vehicle Quantity Total Make

Buses 45

731

Nissan

Cars 180 Various

Car Cranes 42 IVECO / Mercedes

Flat Bed Trailers 18

Forklifts 30 Toyota

Generators 132 FG Wilson

Hydraulic Drill

Machines18

SUV Vehicles 65 Various

Transit Mixers 18 Mercedes

Tipper Trailers 22 SCANA, IVECO

TRANSPORTATION

Our Clients

..

1. Abu Dbahi Transmission & DespatchCompany (TRANSCO)

2. Abu Dhabi Water & ElectricityAuthority (ADWEA)

3. Abu Dhabi Distribution Company(ADDC)

4. Al Ain Distribution Company (AADC)

5. Federal Electricity &Water Authority(FEWA)

6. Municipality of Abu Dhabi

7. Municipality of Al Ain

8. National Central Cooling Co. PJSC(TABREED)

9. Abu Dhabi Refining Company

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

(TAKREER)

10. Abu Dhabi Gas Industries LTD.(GASCO)

11. Abu Dhabi National Oil Company(ADNOC)

12. Abu Dhabi Sewerage ServicesCompany (ADSSC).

13. Department of Military Works.

14. Telecommunication Corporations

Registration with Clients

ADWEA REGISTRATION

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

Registration with Clients

AADC REGISTRATION

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

Registration with Clients

ADNOC REGISTRATION

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

Registration with ClientsRegistration with ClientsRegistration with ClientsRegistration with Clients

TAKREER REGISTRATION

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

CLIENT PROJECT Contract Type

VALUE (AED) DATE OF

CMPL.

EPC PUMPING STATION AND PIPELINE PROJECTS

TRANSCO N6820 - Al Ain Water Distribution Network Pump Station at AARC.

Sub –

Contract

220,000,000.00 2014

ADWEA D6881 - Water Supply to ADCO-GASCO Facilities in ASAB.

Main

Contract

94,000,000.00 2009

ADWEA N2664 - Mussafah Al AinWater Transmission Scheme (MAWTS)

Sub –

Contract

40,000,000.00 2008

ADWEA D3116 - Water works in different locations in the Western Region.

Sub –

Contract

4,000,000.00 2007

ADWEA N1918 - Expansion and Maintenance of Taweelah to Al Ain Water

Sub –

Contract

80,000,000.00 2005

Recent and Completed Major Projects

Transmission system

SEWAGE AND DRAINAGE SYSTEM PROJECTS

ADSSC O1797 - Rehabilitation of Sewage Pumping Stations.

Main

Contract

88,000,000.00 2013

AL AIN MUNICIPALITY

Operation, Maintenance and updating of storm water network pumping station in Al Ain.

Sub-

Contract

24,999,000.00 2011

ABU DHABI MUNICIPALITY

186/2 - Refurbishments of Storm Water Pumping Stations

Main

Contract

22,000,000.00 2008

ADSSC M35 - Zakher Sewage Plant, Al Ain

Sub -

Contract

102,000,00.00 2008

AL AIN MUNICIPALITY

Al Khazna Sewage Plant, Al Ain

Sub –

Contract

6,000,000.00 2007

MEP, HVAC AND DISTRICT COOLING PLANT PROJECTS

AL AIN MUNICIPALITY

1/2013 -Electromechanical Maintenance.

Main

Contract

4,647974 2016

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

CLIENT PROJECT Contract Type

VALUE (AED) DATE OF

CMPL.

MEP, HVAC AND DISTRICT COOLING PLANT PROJECTS

TRANSCO N-11786 - Supply and Installation of new HVAC Equipments for different locations of S/S & P/S

Main

Contract

1,470,000.00 2015

NAEL

INVESTMENT

Grand Ayla Hotel, Al Ain Sub-

Contract

31,000,000.00 2014

AL AIN MUNICIPALITY

58/2010 Electromechanical maintenanace works in Al Ain Municipality.

Main

Contract

3,160,000.00 2014

ADNOC Project No. 6013 -Agreement 116013C1 -Ruwais Housing complex expansion phase III, Desing and

Sub –

Contract

30,000,000.00 2013

Recent and Completed Major Projects

constructin of RuwaisShopping mall package.

HH SHEIKH

SULTAN BIN

TAHNOON AL

NAHYAN.

Abu Dhabi Community Hall

Sub –

Contract

12,500,000.00 2012

HH Sheikh

Khalifa Office

Falcon Hacking Aviaries Sub -

Contract

8,200,000.00 2010

HOUSING

COMMITTEE

Al Hili Buildings (72 Buildings), Al Ain

Sub-

Contract

48,500,000.00 2009

NAEL

INVESTMENT

Bawadi Mall, Al Ain Sub-

Contract

260, 000,000.00 2008

MR.

MOHAMMAD

AL GERGAWI

Al Sufouh Mixed Use Development, Dubai

Sub –

Contract

41,000,000.00 2007

NAKHEEL Dubai Palm (MEP works) - 134 Villas, Frond-M

Sub –

Contract

12,000,000.00 2007

Solid Waste

Management

& Treatment

Solid Water Management & Treatment Solutions

Sub –

Contract

102,000,000.00 2006

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

CLIENT PROJECT Contract Type

VALUE (AED) DATE OF

CMPL.

MEP, HVAC AND DISTRICT COOLING PLANT PROJECTS

Al Ain Internl.

Airport

Expansion

Committee

Al Ain International Airport Freight and Catering Building Expansion.

Sub –

Contract

12,000,000.00 2003

SUB-STATION AND ELECTRICAL PROJECTS

AADC A-10481.2 - Installation of MV/LV Cables, Equipment and Digital Energy Meters.

Main

Contract

16,229,550.00 2015

AADC A-10886 - Supply, Installation, Testing & Commissioning of Broken Conductor Protection Relays in Exising 33/11KV Primay

Main

Contract

570,000.00 2014

Recent and Completed Major Projects

Exising 33/11KV PrimaySubstations 11KV Feeders.

ADDC Project No. D-102058 : Long rate agreement for Installation and supply underground cables, Electrical Distribution equipments, OHL & allied works in Abu Dhabi Eastern Region (Liwa & related Islands)

Main

Contract

12,000,000.00 2014

ADDC Project No. D-102060, Long rate agreement for Installation and supply underground cables and Electrical Distribution equipments, OHL & Allied works in Abu Dhabi Western Region (Maindat Zayed & Related Islands)

Main

Contract

7,000,000.00 2014

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

CLIENT PROJECT Contract Type

VALUE (AED) DATE OF

CMPL.

SUB-STATION AND ELECTRICAL PROJECTS

ADDC Project No. D-102050, Long rage agreement for Installation and supply underground Cables, Electrical Distribution Equipments, OHL & Allied works in Abu Dhabi cetral region (Abu Dhabi & Related Islands).

Main

Contract

7,000,000.00 2014

ADDC Project No. D-102056 : Long rate agreement for installation & supply underground cables, Electrical distribution equipments, OHL & Allied works in Abu Dhabi Eastern Region

Main

Contract

19,500,000.00 2014

Recent and Completed Major Projects

Dhabi Eastern Region (Mussafah & RelaedIslands).

AADC Contract No. A-10598 -Installation of 33KV, 11KV LV Cables & equipments Lot 1.

Main

Contract

16,885,000.00 2014

AADC Project No. A-10534 : Supply & Installation of new buld & domestic water connections, pipeline diversion and existing system improvement / modification works at different are in Al AinRegion.

Main

Contract

6,883,000.00 2013

BUILDING AND INFRASTRUCTURE PROJECTS

ADNOC 7007-Agreement No. 147007C1 Design and Construction of admin building for GlenelgSchool at Sas Al Nakhil

Main

Contractor

21,914,950.00 2015

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

CLIENT PROJECT Contract Type

VALUE (AED) DATE OF

CMPL.

BUILDING AND INFRASTRUCTURE PROJECTS

ARKAN Design, Construction Completion & Maintenance Of Phase II Auxiliary Building & External MEP Works

Main

Contractor

27,110,293.13 2014

ARKAN Supply & Installation of all Electromechanical works including all services, testing & Commissioning, handing over and maintenance to the Project for ACF main access road & transportation packages.

Sub –

Contractor

12,600,000.00 2014

Recent and Completed Major Projects

packages.

AL AIN MUNICIPALITY

UAE University main campus infrastructure works maintenance project.

Main

Contract

4,000,000.00 2014

ADNOC 1038-6 : Agreement EPD1109 Construction of Reg. building & additional facilities in existing services in Abu Dhabi, Al Ain & Ras Al Khaimah.

Main

Contract

14,815,400.00 2013

ADNOC Ruwais Housing complex expansion, Phase - 3 Landscaping works.

Main

Contractor

24,218,000.00 2012

ADNOC P-6035 : RuwaisHousing complex expansion Phase III, Design and construction of new Mosque and shopping facilities.

Main

Contractor

6,000,000.00 2012

ADNOC P-6027, ADNOC Housing complex in Mirfa City

Main

Contractor

3,537,000.00 2012

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

CLIENT PROJECT Contract Type

VALUE (AED) DATE OF

CMPL.

BUILDING AND INFRASTRUCTURE PROJECTS

ADNOC P-6000 - High School accommodation at SasAl Nakhil, Design and Construction of external cladding for Buhasa, Ruwais & Zirkhu at Petroleum institute.

Main

Contractor

7,709,000.00 2012

AL AIN MUNICIPALITY

T/FM/16 Renovation of 4th and 5th floor all bathroom block B Al AinMunicipality.

Main

Contractor

8,500,000.00 2012

TOURIST

DEVELOPME

NT AND

INVESTMENT

COMPANY.

Re-furbishment works for Al Hili Fun City

Main

Contractor

23,000,000.00 2010

Recent and Completed Major Projects

COMPANY.

NAEL

RASHID AL

SHAMSI

G+7 Storey Commercial Building

Main

Contractor

6,500,000.00 2009

NAEL

RASHID AL

SHAMSI

G+5 Storey Commercial Building

Main

Contractor

6,000,000.00 2009

UAE

UNIVERSITY

Building for HRD, Finance, Contracts & Purchase department for UAE University.

Main

Contractor

7,100,000.00 2008

AL AIN MUNICIPALITY

Infrastructure in Al Shabhat, Al Ain.

Sub –

Contractor

7,000,000.00 2008

MR. SULTAN

KHAMES AL

DHAHRY

Private Building, Abu Dhabi

Main

Contractor

7,000,000.00 2007

ADNOC ADNOC Filling station, Abu Dhabi.

Main

Contractor

4,000,000.00 2007

AL AIN MUNICIPALITY

Al Ain, Al-Qua and Al-Wagan Phase 3

Sub –

Contractor

13,650,000.00 2006

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

CLIENT PROJECT Contract Type

VALUE (AED) DATE OF

CMPL.

BUILDING AND INFRASTRUCTURE PROJECTS

AL AIN MUNICIPALITY

Infrastructure for 130 low cost houses at Al Dahra & Al Arad.

Sub –

Contract

17,000,000.00 2006

AL AIN MUNICIPALITY

Development of NdoodJaham Area with the border road in Al Ain

Sub –

Contractor

34,000,000.00 2004

ABU DHABI

UNIVERSITY

Abu Dhabi University Al Ain Campus at Markhania

Main

Contractor

100,000,000.00 2001

IRRIGATION PROJECTS

AL AIN MUNICIPALITY

Construction and Development of Irrigation networks and reservoirs in Al Ain.

Sub –

Contractor

12,000,000.00 2007

Recent and Completed Major Projects

reservoirs in Al Ain.

AL AIN MUNICIPALITY

Irrigation, Beautification and Development of different roundabouts in Al Ain.

Sub –

Contractor

13,000,000.00 2007

DOMESTING SEWAGE, WATER AND SMALL DIA PIPELINE PROJECTS

AL AIN MUNICIPALITY

Green Mubazzara Main

Contractor

1,828,517.00 2014

AADC DN600MM Dia water main line dimension works at Ain Al FaydaEmirati Housing Development Project.

Main

Contractor

3,250,000.00 2014

AADC Contract A-11493 : Supply and install new buld and domestic water connections, Pipeline diversions and existing system improvement / modification works at different area in Al AinRegion.

Main

Contractor

5,609,484.00 2014

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

CLIENT PROJECT Contract Type

VALUE (AED) DATE OF

CMPL.

OPERATIN & MAINTENANCE PROJECTS

AL AIN MUNICIPALITY

Operation & Maintenance of Al AinTown Centre - Phase 4

Main

Contract

11,840,822.00 2010

AL AIN MUNICIPALITY

Operation & Maintenance of Al AinTown Centre - Phase 3

Main

Contract

6,922,358.00 2007

AL AIN MUNICIPALITY

Operation & Maintenance of Al AinTown Centre - Phase 2

Main

Contract

5,392,045.00 2005

AL AIN MUNICIPALITY

Operation & Maintenance of Al AinTown Centre - Phase 1

Main

Contract

4,634,800.00 2002

SOLID

WASTE

MANAGEME

Operation and Maintenance of Waste Management &

Main

Contract

308,000,000.00 10 Years

Recent and Completed Major Projects

MANAGEME

NT &

TREATMENT.

Management & Treatment solutions

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

Major ProjectsMajor ProjectsMajor ProjectsMajor Projects

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

N6820 DESIGN AND CONSTRUCTION OF ADMINISTRATION

BUILDING & SERVICE BLOCK AT SAS AL NAKHIL (G+1+1).

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

21,914,950.00

ON GOING

ADNOC

MAIN CONTRACTOR

The Project 7007 is an EPC Contract and the contractual scope of the Project includes Design

and Construction of Administration Building &

Service Block at Sas Al Nakhil (G+1+1).

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

N6820 - EPC WORKS FOR AL AIN DISTRIBUTION PUMP

STATION AT AARC

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

220,000,000.00

2014

TRANSCO

SUB-CONTRACT

� Construction of Pumping station with

capacity of 274 MIGD (including steel

structure with aluminium sandwich panel),

Electrical Building, Transformer boxes, 33KV

Substation, Utility building and WQM

Buildings.

• Construction of chambers, Drainage system,

Sewage system, Drinking water system and

Utility water system.

• Construction of Internal Roads, Kerbstone,• Construction of Internal Roads, Kerbstone,

Pasco laying and landscaping works.

• Pipeline works : Excavation, Fit-up, Welding

and backfilling of CS Pipeline upto DN2200

dia and approximate length of 12,000 mtr.

• Supply (partial), installation, testing and

commissioning of Mechanical equipments

such as Main Pumps (with capacity 205m

head – 8 Nos.), Surge vessels (154m3

capacity – 18 Nos.), Air compressor system,

Sump Pumps, Utility water pumps, Cooling

water system (SS and CS Pipe welding), EOT

Crane etc.

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

• Complete HVAC System supply, installation,

testing and commissioning, including Chiller,

Condensing unit, Air Handling Unit, Split AC,

Ventilation Fans etc.

• Fire Fighting system; Supply, installation,

testing and commissioning Fire Detection

system, Water spray system, sprinkler

system, CO2 system and Hydrant system.

• Supply (partial), installation, testing and

commissioning of Electrical Equipments such

as Motors, MV VFD, LV Panles, Phase Shift

Transformers, Distribution Transformers, DBs,

Street and area lighting, Earthing & Lightining

system and Cathodic protection system.

• Supply, Laying and Testing of MV Power

cables, LV Cables, Control cables and Fibre

Optic Cables.

• Supply, Installation, Testing and

commissioning of Field Instruments, CCTV,

Access control system, Hotline system, PA

System and Telephone system .

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

D6881 - WATER SUPPLY TO ADCO-GASCO FACILITIES IN

ASAB.

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

94,000,000.00

2009

ADWEA

MAIN CONTRACTOR

•Supply & construction of 1.95 MIGD pumping

station complete with all equipments.

•Supply & construction of suitably rated

electrically operated overhead traveling crane

complete with all equipments.

•Supply & installation of sump pumping

system and recirculation system complete

with all requirements.

•Supply & construction of HVAC system, fire

fighting system , fire detection and protection

system.system.

•Supply and construction 1 x DN 600 K9 DI

pipeline of approximately 82.85 Km length

complete with valves and fittings, associated

civil and earth works from the tie-in point at

the existing DN 900 up to pump station CS

pipeline work.

•Supply and construction of 2 x 2000 m3 steel

tanks with necessary valves, fittings etc. and

associated civil and earth works at GASCO

AGD-0 (NGL) plant facility at Asab.

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

•Design, manufacture, assembly, softwaredevelopment, factory acceptance test,delivery, installation, site acceptance test andcommissioning the followings :-

•Control system at the AFPS pump stationincluding servers, work stations, software’s,PLCs, distributed I/O’s, printers … etc.

•All field instruments, local control panels,instrumentation / control cables, earthing /grounding facilities, telephone system.

•All necessary signal interfaces between theexisting reservoirs (Transco) from which thesuction line to AFPS originate and the AFPScontrol system.

•All field instruments, instrument / controlcables, etc. at the branches to the mainpipeline.

•All hardwares / softwares required fortelemetry system including the Smart RTUs /local controllers at branches to the mainpipeline and Etisalat leased line or GSMfacilities to transfer signals to the AFPS pumpstation.

•Supply, installation, testing and•Supply, installation, testing andcommissioning of 11 kV/433 V / 1000 kVAtransformers, EVSDS system, LV motors, DCsystems, AC UPS system, MV/LV switchboards, MV/LV cables, control cables, etc. forthe pump station at Madinat Zayed, DIpipeline and tie-in connections atADCO/GASCO facilities at Asab.

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

N2664 - Mussafah Al Ain Water Transmission Scheme (MAWTS)

Mussafah to Al Wathba - Lot F.

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

40,000,000.00

2008

ADWEA

SUB-CONTRACT

Pumping Station Capacity : 40MIGD

•Five variable speed pumps with frequency

converters for water supply to Al-Wathba.

• CS Pipes Suction and discharge pipe work

inside the pump hall up to the first joint out

side the pump hall.

•Discharge pipe work from the first joints out

side the pump hall on the discharge side up to

the connection with the underground DI

pipelines including connection to surgepipelines including connection to surge

vessels.

•Rubber lined anti-surged vessel with

respective air supply system , DI piping

system, drainage piping system etc. for water

supply system to Al-Wathba.

•Dosing pumps, pipe work, instrumentation,

etc. for upgrading sodium hypochlorite

system.

•Fire detection , extinguishing , fire fighting

system to cover Al-Wathba Electrical Room.

Sprinkler system to cover Al-Watrhba cable

basement.

•One (1) No. 11KV circuit breaker extension

panel for powering the 5th Al-Wathba pump

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

•Modifications to existing ABB 11KV

switchgear Al-Wathba feeders.

•Electrical variable speed system for the main

motors.

•Electrical protection relay panels for motor

and isolation transformer.

•Harmonic filters to suppress Harmonics

within the limits specified.

•415V switchgear Extension / modification to

existing ABB switchboard as required ,

including addition of feeders in exiting spaces.

•Sub distribution boards 415/240V for

auxiliary equipment , lighting and small power,

UPS power supplies.

•Addition of feeders in exiting 24V DC, 110V

& 240V AC UPS system.

•Motors and motor operated valves.

•Electrical equipment forming part of the•Electrical equipment forming part of the

package units for Air Compressor(Surge

System).

•11KV cables and accessories.

•LV power , auxiliary and control cables,

•Lighting fixture, equipment and materials for

indoor and our door lighting and small power,

including modification / relocation of existing

lighting circuits

•Earthing and lighting protection equipment

and materials.

•Cable terminations, cable trays / ladders,

glands , auxiliary equipment and materials.

• Interface with the PLC based Control

System

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

N1918- EXPANSION AND MAINTENANCE OF TAWEELAH TO AL

AIN WATER TRANSMISSION SYSTEM

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

80,000,000.00

2005

ADWEA

SUB-CONTRACT

Design , supply and installation of :

• PN25 motorized valves up to DN 1200Supply and installation of 2.2MW MV motorsand VFD.

•Control system including software process/development RTU panels for the operation ofthe complete pumping station.

• Modification of the existing PLC system tointegrate new additional equipment into thesystem

•Modification of existing SCADA system to incorporate additional equipment.

•Design , supply and installation of complete cabling system including MV, LV ,instrumentationand fiber optic cables with all accessories.

•Construction of VFD rooms at Ajban and Sweihan.

•Engineering , procurement , installation and commissioning of HVAC system to incorporatethe implications of the station upgrade.

•Engineering , procurement , installation and commissioning of additional pumps at Ajban andSweihan pumping station to increase the pumping capacity from 48MGID to 84 MGID.

•Design, supply and installation of surge protection equipment at Ajban, Sweihan and Taweelahincluding 76m3 (4 Nos.) and 60m3 (4 Nos.) surge vessels, compressors and accessories.

•Design , supply and installation of PN25, and up to DN1200 DI and CS fittings.

•Supply, installation, testing and commissioning of the following:-

MV (6.6 KV) Vacuum circuit breaker panels.

6.6 KV motors for Main Pumps.

Variable frequency drive for 1850 KW 6.6 KV motors.

Auxiliary distribution board – Power.

Auxiliary distribution board – UPS.

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

•6.6 KV XLPE cabling.

•LV power and control cabling.

•Cable Trays.

•Earthing of equipment

•Supply, installation, testing andcommissioning of 6.6 KV. Switchgear.Supply, installation, testing andcommissioning of 2200 KW. VariableFrequency Drive.

•Supply, installation and testing of 6.6 KV.Cable.

•Supply, installation and commissioning of 11KV. Cable.

•Supply, installation of LV cable (35mm2,70mm2, 120 mm2, 630 mm2,240mm2).

•Supply, installation of heat shrinkable 11 KV.Joints.

•Supply and installation of MV switchgearincluding modification / extension of existingMV switchgear.

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

D3116 - WATER WORKS IN DIFFERENT LOCATIONS IN THE

WESTERN REGION

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

4,000,000.00

2006

ADWEA

SUB-CONTRACT

Construction of a pumping station and Ground Water Tank at GHANADA

Refurbishments of existing pump station, Ground Water and Elevated Tanks at KHATIM

Supply & installation of Pilot Operated Flow Control Valve on existing Tanks Inlets and RTU system in connection with Shewayhat Transmission Scheme.

GHANADA PUMPING STATION

• Supply & install pumps and suction / discharge pipe work

• Supply & install field instruments

• Supply & install A/C & ventilation system

• Supply & install surge equipments

• Supply & install electrically

• operated overhead crane

• Supply & install lighting protection & grounding equipments

• Supply & install power supply system

• Supply & install control system (Hot standby redundant PLC system)

• Supply & install SCADA work station

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

KHATIM PUMPING STATION

• Dismantle existing pumps

• Supply & install new pumps

• Supply & install field instruments

• Supply & install control panel

• Supply & install SCADA work station

SALMIYAH AREA

• Supply & install pilot operated valve on four existing tanks inlet

• Supply & install UPS system

• Supply & install OTN (Open Teensport network)

• Supply & install RTU system

• Supply & install SHELTER KIOSK

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

260,000,000.00

2008

NAEL INVESTMENT

SUB CONTRACT

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

BAWADI MALL, AL AIN

Construction of District cooling plant :

The District Cooling Plant (DCP) within Al Ain

Central Market consists of a 2,500m² building.

The DCP comprises 7 Chillers of 1,200TR

each (Carrier Make) resulting in a total cooling

capacity of approximately 8,000TR and it is

designed to serve with cooling all the other

buildings within the Central Market premises,

i.e. Bawadi Mall, Heritage Village, Hotel and

Accommodation Apartments via 700mm dia

pre-insulated cooled water pipes. It also

comprises 4 Cooling Towers, 7 primary

pumps, 7 condenser pumps and 5 secondary

pumps. It has an independent power

substation consisting of 6 transformers

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

substation consisting of 6 transformers

(3x2.5MVA and 3x1.5MVA) and related HV

and LV switchgears. The plant operation is

monitored and controlled by a BMS (Building

Management System)

Construction of 11kv sub-stations

Supply, Install and commissioning of lighting

system, power system ,distribution boards,

isolators for mechanical equipment, fire alarm

system, public address system, CCTV,

SMATV, BMS ,central battery system ,

telephone system , low voltage cables and

lightning protection system.

Install and commissioning of light fixture, low

voltage panels , stand by generator , 1500

KVA transformers, 11 KV panels and 11 KV

cables.

1. Construct new pumping station PS W8

suitable for the new flow rate and head, on

higher ground to the north of the existing

PS W8.

2. Blank off at manhole MH W8/7 the outlet

for sewage flows to the existing pump station

3. Construct 500 mm GRP gravity sewers

between existing inlet sewer and the new PS

W8

4. Construction of 15 Nos. of 1500dia

Manhole.

5. Carry out N.D.R.C.(Non-Destructive Road

Crossing) work.

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

90,000,000.00

2013

ADSSC

MAIN CONTRACTOR

O1797 - REHABILITATION OF PUMPING STATIONS

Crossing) work.

6. Construct new 350 mm GRP pumping main

between the new pumping station PS W8 and

the discharge chamber

7. Lay a new 600 mm GRP sewer between

the weir chamber and the new deep manhole

out falling to the new AES deep sewer to take

the flows from W7 and W8.

8. Blank off the inlet of 250 mm GRP rising

main at the pressure vessel chamber at the

existing PS W8.

9. Provide all associated civil works related to

surge protection at PS W8.

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

10. Decommission and demolish the existing

PS W8 after commissioning PS W8, the new

600 mm GRP gravity sewer and the new 350

mm GRP rising main and discharge chamber.

11. Provide 3 Nos. submersible pumps of

capacity 57 l/s and mano-metric head 35 m,

complete with duck foot bends, guide rails,

lifting chains, motors and accessories.

12. Provide 1 No. electrically operated

overhead travelling crane complete with

column, rails, hoist and swiveling hook of 1

ton capacity.

13. Provide electrically operated penstock for

500mm dia sewer gravity line at the inlet

chamber.

14. Provide 2 Nos. electrically operated

penstocks for 300mm opening for the wet

wells and one no electrically operated

penstock for 500mm opening for the

interconnection between the wet wells.

15. 16.Provide 2 Nos. channel mounted

macerator 169l/s, 440mm x 328mm complete

with all accessories

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

•Replacement of the existing inlet works

structure with a new and enclosed inlet works,

building containing screens, vortex type grit

removal chambers, a headwork lift

pumping station , flow measurement and an

odor control system.

• Replacement of the existing surface

aerators at the aeration tanks with sub

surface diffused aeration system, including

the installation of 10 air blowers in two

separate buildings. The existing surface

aerators will be removed.

• Treatment capacity 130,000m3/day.

M35 – SEWAGE PLANT (ZAKHER)

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

120,000,000.00

2008

ADSSC

SUB -CONTRACT

• Replacement of the existing sand filter

media.

• Refurbishment of 20 Nr. Existing sludge

drying beds.

• Implementation and installation of a new

SCADA for the treatment plant.

• Installation of approximately 4.0 km of 1400

mm diameter reinforced concrete sewer.

• Siemens Simatic PCS7 (Process Control

System) DCS System based on Siemens S7-

400H PLC System (417-4H PLCs)

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

ARKAN CEMENT FACTORY PROJECTS : PHASE 2 & PHASE 3

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

39,710,293.13.00

2014

ARKAN

MAIN -CONTRACTOR

Phase 2: DESIGN, CONSTRUCTIONCOMPLETION & MAINTENANCE OFPHASE II AUXILIARY BUILDING &EXTERNAL MEP WORKS

Supply & Installation of all Civil,

Electromechanical works including all

services, testing & Commissioning, handing

over and maintenance to the Project for

Constructing Auxiliary Buildings including

Prayer Hall & Substations and External MEP

Services including water supply, irrigation,

internal sewerage network, fire fighting,

electrical and fire alarm services

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

electrical and fire alarm services

Phase 3: ARKAN ACF MAIN ACCESSROAD PROJECT- PHASE 3 MEP WORKS

Supply & Installation of all Electromechanical

works including all services, testing &

Commissioning, handing over and

maintenance to the Project for ACF main

access road & transportation packages.

P-6035 : RUWAIS HOUSING COMPLEX EXPANSION PHASE III,

DESIGN AND CONSTRUCTION OF NEW MOSQUE AND

SHOPPING FACILITIES.

• Design & Construction of new mosque

• Construction of Shopping facilities

• Infrastructure works.

• Landscape and Hardscape

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

6,000,000.00

2008

ADNOC

MAIN CONTRACTOR

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

PI HIGH SCHOOL ACCOMMODATION AT SAS AL NAKHL

DESIGN AND CONSTRUCTION OF EXTERNAL CLADDING FOR

BUHASA, RUWAIS AND ZIRKU BUILDINGS AT

PETROLEUM INSTITUTE

.

Supply and installation of External cladding dry

fixed with stainless steel clamps including

waterproofing, sealants, damp proofing and 50

mm thickness heat insulated material, air/vapor

barriers as per COMPANY Specifications.

• BUILDING NO: 1a) 30mm thick, Natural stone flamed Roso

porino cladding made of 60 mm high slabs.

b) 4mm thick, Composite Aluminium Panels

(Optional Work).

c) Glass curtain wall 90 mm height at parapet.

d)Aluminium cladding (parapet caping) including

steel supporting system.

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

7,709,150.00

2013

ADNOC

MAIN CONTRACTOR

steel supporting system.

e) Rerouting of any MEP services, removal of

the existing elevation finishes & make any

required works to be ready for the new cladding

• BUILDING NO: 2a) 30mm thick, Natural stone flamed Roso

porino cladding made of 60 mm high slabs.

b) 4mm thick, Composite Aluminium Panels

(Optional Work).

c) Glass curtain wall 90 mm height at parapet.

d)Aluminium cladding (parapet caping) including

steel supporting system.

e) Rerouting of any MEP services, removal of

the existing elevation finishes & make any

required works to be ready for the new cladding

• BUILDING NO: 3a) 30mm thick, Natural stone flamed Roso

porino cladding made of 60 mm high slabs.

b) 4mm thick, Composite Aluminium Panels.

c) Glass curtain wall 90 mm height at parapet.

d) Aluminium cladding (parapet caping)

including steel supporting system.

e) Rerouting of any MEP services, removal of

the existing elevation finishes & make any

required works to be ready for the new cladding

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

PRIVATE BUILDING (ABU-DHABI)

•Construction of G+5 Building

• MEP works

• HVAC Worsk

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

7,000,000.00

2007

Mr. SULTAN KHAMES

MAIN CONTRACTOR

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

6014 – RUWAIS HOUSING COMPLEX EXPANSION, PHASE 3 –

LANDSCAPING WORKS

• Irrigation and Landscaping Works

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

24,218,000.00

2012

ADNOC

MAIN CONTRACTOR

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

ADNOC P-6048// CONSTRUCTION OF CAR PARKING SHED IN

PETROLEUM INSTITUTE AT SAS NAKHIL

Construction works for providing a car park

area and modifying an existing parking including

Shading, Rubber, Flooring for jogging track,

exercise nodes and outdoor sport round with all

related marking & sport equipment, in addition

to soft and hard landscape and other facilities

including V.Os Nos. 1, 2 and 3 for Habshan and

Arzanah Buildings

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

8,078,373.66

2012

ADNOC

MAIN CONTRACTOR

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

CONSTRUCTION OF REGISTRATION BUILDING AND ADDITIONAL

FACILITIES IN EXISTING SERVICE STATIONS IN ABU DHABI, AL

AIN & RAS AL KHAIMAH.

• Mussafah Car care Center-New Vehicle

Registration Building (M24)

•Al Samha-1 Additional Parking

•Al Samha-2 New Vehicle Registration

Building and Additional Car Parking

• Al Dhafra - New Accommodation Block

• Bawaba - Additional Pump and Island

Canopy Extension

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

16,339,178.26

2013

ADNOC

MAIN CONTRACTOR

Canopy Extension

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

A10481.2 – INSTALLATION OF MV / LV CABLES, EQUIPMENTS

AND DIGITAL ENERGY METERS

• MV/LV Cable Laying

• Installation of Electrical Equipments.

• Installation of Energy Meters

• Related Civil construction works

• Testing and pre-commissioning works.

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

16,229,550.00

2015

AADC

MAIN CONTRACTOR

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

CONSTRUCTION OF 3 NEW POLICE STATIONS (AL JIMI, AL SAAD

& AL MAQAM AREA)

• MEP WORKS

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

44,000,000.00

2011

ABU DHABI POLICE

SUB - CONTRACT

• HVAC WORKS

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

CITY SEASON HOTEL (ABU DHABI

• MEP & HVAC WORKS

•Supply, Install and commissioning of

Six water chiller machines with all

ducts and requirements.

•Supply, Install and commissioning of

SMDB, FDB & CCTV.

•Supply & installation of Fire alarm

and fire fighting system with all

requirements.

•Supply & installation of L.V switch

gear, L.V cables, lighting fixtures, and

MATV

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

24,000,000.00

2010

SHIEKH MUSALEM

SUB - CONTRACT

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

OPERATIONAL & MAINTENANCE FOR AL AIN TOWN CENTER

(PUMP STATIONS)

Civil Works: - Construction of irrigation pump

station, involving maintenance of roads,

parking, hard landscapes, street furniture,

traffic signs and concrete works

Pumping Stations: - Regular operation and

planned maintenance of pumping station

having Pumps, Filters, and VFD control

panels and other instrumentation systems.

Fountains: - Regular operation and

maintenance of all 41 No. fountains in Al Ain.

Street lighting works: - Maintenance &

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

28,790,025.00

2010

AL AIN MUNICIPALITY

MAIN CONTRACTOR

Street lighting works: - Maintenance &

installation of decorative street lighting and

installation of new lighting..

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

SOLID WASTE MANAGEMENT AND TREATMENT SOLUTIONS

•Transfer Station

• Sorting Plant

• Incinerator

• LandfillSupply, install , test & commission twomedical waste incinerators of capacity 250kg/hr. eachDesign ,supply , install , test & commissionmunicipal solid waste sorting station inclusiveof conveyors , bailers , shredders, bagsplitters and other machinery , all linked by acentral computer system able to control anysingle machine. Design will foresee citygrowth till the year 2015 for which thethroughput capacity is estimated to be438,000 tones per year.

CONTRACT VALUE

COMPLETION DATE

CLIENT

TYPE OF CONTRACT

102,000,000.00

2006

SOLID WATER MANG.

MAIN CONTRACTOR

438,000 tones per year.

Supply , install , test & commission of eightcompactors capable of processing 45 tonesper hour, in the regions surrounding Al-Ain.Supply of seventeen compaction containerscompatible with above mentionedcompactors.

Supply ,install , test and commission specialequipment including ground water levelsensors, water sampling devices ,landfill gasmonitors ,weather monitoring equipment andmobile pumps.

Supply ,install , test & commission of fourweighing bridges and road barriers.Design , supply, install , test & commissioncomplete fire fighting system for entire facility.Supply ,install ,test & commission of eightpower generators ,with their capacitiesranging from 200 kVA to 1700 kVA.

Supply ,install ,test & commission completeelectrical installations for the entire facility.Supply ,install , test , & commission completedrainage , hot/cold water services and allsanitary fixtures for the entire facility

Nael Energy & General Ent. Est., P.O. Box-15253, Al Ain, U.A.E.: Ph-03 7621400, Fax-03 7630401

e ae

l.ae

ww

.na

ww

e 19

77A

.E’s

lea

din

g

cto

r fo

r :

PC

&

ON

ST

RU

CT

ION

JEC

TS

EN

ER

GY

&

AL

EN

T. E

ST

.

71 3

762

1400

2 67

7675

7

1 3

7630

401

3 67

7644

9

nfo

@n

ael.a

e

ww

.nae

l.ae

Sin

ceO

ne

of

U.A

Co

ntr

a

EP

GE

NE

RA

L C

O

PR

OJ

NA

EL

EG

EN

ER

A

TE

L :

+97

+97

1 2

Fax

: +

97

+97

1 3

Em

ail :

in

We

b :

ww