ERCOT Updates Matthew Tozer ERCOT COPS 2/12/2014. Updates and FYIs. NPRR 570: Transition to posting Initials on OD + 6 has been smooth No issues to report from ERCOT NPRR 568: Project is on Track for June 1 delivery NPRR 591 introduced detailed settlements implementation - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: ERCOT Updates Matthew Tozer ERCOT COPS 2/12/2014](https://reader030.vdocument.in/reader030/viewer/2022020800/56812d44550346895d924a58/html5/thumbnails/1.jpg)
ERCOT Updates
Matthew TozerERCOT
COPS2/12/2014
![Page 2: ERCOT Updates Matthew Tozer ERCOT COPS 2/12/2014](https://reader030.vdocument.in/reader030/viewer/2022020800/56812d44550346895d924a58/html5/thumbnails/2.jpg)
2
Updates and FYIs
• NPRR 570:• Transition to posting Initials on OD + 6 has been smooth
• No issues to report from ERCOT
• NPRR 568:• Project is on Track for June 1 delivery
• NPRR 591 introduced detailed settlements implementation
• QSEs should use NPRR 591 when creating shadow settlements
• New NPRR will be at the 2-13-2014 PRS meeting that introduces some additional minor changes
• Removes STARTUP and SHUTDOWN status from PRC and ORDC calculations
• Sets Real-Time Off-Line available reserves used in the ORDC calculation to zero when Real-Time On-Line available reserves minus Real-Time On-Line reserves available in 10 minutes becomes less than or equal to 2,300 MW which is the PRC MW at which EEA Level 1 is initiated
• Training materials are in progress.