HMVTRS presents at CSME conference, October 2013 Amsterdam 29 October 2013 HMVTRS was asked to present at the 2013 Contaminated Site Management Europe conference in Amsterdam (CSME). HMVTRS is a Joint Venture between HMVT and TRS. We presented globally the Electrical Resistance Heating Technology (ERH) and the results of two ERH in-situ remediation projects. The first presented project was a chlorinated solvent location on a bedrock location in Clark’s Summit. The second presented project was a mineral spirits and a chlorinated solvent site in Seattle. On this second site various more classical in-situ remediation technologies over the last 20 years failed to solve the problem. TRS was able by using the ERH technology to reduce on both sites the concentration levels over 99%. More information on ERH and the two cases can be found in the presented powerpoint presentation. HMVTRS was asked to present at the 2013 Contaminated Site Management Europe conference in Amsterdam (CSME). HMVTRS is a Joint Venture between HMVT and TRS. We presented an overview of the Electrical Resistance Heating Technology (ERH) and case studies of two ERH in-situ remediation projects. The first project was a chlorinated solvent (PCE) location on a bedrock site in Pennsylvania. The second presented project was a mineral spirits and a chlorinated solvent site in Seattle. On this second site various more classical in-situ remediation technologies applied over the last 20 years failed to solve the problem. TRS was able to apply the ERH technology to reduce the concentration levels on both sites by over 99%. More information on ERH and the two case studies can be found in the PDF of the presentation.

TRANSCRIPT

Page 1: Erh various applications - SCME 2013

Electrical Resistance Heating (ERH)

For Various Applications

Jerry Wolf(817) 379-0536

[email protected]

[email protected]

October 2013

CSME - Amsterdam

Page 2: Erh various applications - SCME 2013

TRS ERH Global Network

TRS Group, Inc.

TRS International B.V.(‘s Hertogenbosch, The Netherlands)

TRSDoxor, Limitada(Sao Paulo, Brazil)

HMVTRS B.V.(Ede, The Netherlands)

Page 3: Erh various applications - SCME 2013

Electricity is directed into the subsurface area.TRS ERH PROCESSTRS ERH PROCESS

TRS Power Control Unit

What is ERH?What is ERH?

PCU

Electrode/Vapor Recovery Wells

CondenserGACVR Blower

Site Building

Page 4: Erh various applications - SCME 2013

• In Situ Soil and Groundwater – simultaneously

• VOCs and Semi-VOCs

• Heterogeneous Lithology

• Under Buildings, Roadways, Railroads

• Rapid Remediation – Brownfields/Property Transfer

• Mass Removal (Source) – Reduce Downgradient Migration

When Does ERH Apply?

Page 5: Erh various applications - SCME 2013

TCE in Soil and Fractured BedrockClark’s Summit, PA

• TCE in soil

• Treatment Area: 260 m2; 1 to 34 m bgs; 8,487 m3

• Sand and clay between 3.3-6.6 m bgs; bedrock -fractured sandstone with occasional siltstone; coal seams at depths of 23 and 34 m bgs. Groundwater: 5 m bgs

• Baseline levels in soil (maximum): 560 mg/kg

• Remedial goal(s):

• remove estimated mass - 219 kg TCE

• Negligible/asymptotic concentrations observed in the vapor stream

• total design energy

Page 6: Erh various applications - SCME 2013

Project Site Plan

Page 7: Erh various applications - SCME 2013

ERH Design• 17 Electrodes (6 intervals each)

• VGAC for vapor treatment

Page 8: Erh various applications - SCME 2013

Vapor Concentrations vs. EnergyV

apo

r C

on

cen

trat

ion

s (p

pm

)

En

erg

y (k

Wh

)

Page 9: Erh various applications - SCME 2013

Results

• Asymptotic vapor concentrations in vapor stream reached after 79 days of operations (estimate of 69-90)

• 181 kg of CVOC mass recovered

Page 10: Erh various applications - SCME 2013

Seattle Site History • Active chemical warehouse and distribution facility

• Contaminated soil first found at the site in 1990

• Previously applied technologies• 1995-1997: Soil Vapor Extraction with Pump & Treat

• 1998: DVE/Hydrogen peroxide injection Pilot

• 2003~2004: Potassium Permanganate and Sodium Permanganate Injection

• 2003~2004: SVE

• 2005~2007: Expanded SVE and Potassium Permanganate Pilot

• 2008~2011: Enhanced Reductive Dechlorination – downgradient

• 2010: Expanded ERD and Expanded SVE Pilot Testing

Page 11: Erh various applications - SCME 2013

Guaranteed ERH Remediation of PCE and Mineral Spirits - Seattle 2013

• Silt, sand; 7.1 x 10-3 cm/sec

• GW at 2 m bgs; flow 0.6 m/day

• 2,484 m2; variable depths; 32,188 m3

• 163 electrodes

• Elevated TOC from mineral spirits

• Active work areas & RR spurs

• Beginning maximum TCE+PCE: 4,210 mg/kg

• Remedial goal: <10 mg/kg PCE + TCE• Contaminant mass estimate – 10,200 kg

Page 12: Erh various applications - SCME 2013

ERH Modeling – 5 Areas

The site was divided into 5 Areas for purposes of modeling

Page 13: Erh various applications - SCME 2013

Energy & Power Design Targets

AREADesign Energy

(kWh)Design Energy

Density (kWh/m3)

1 804,000 328

2 356,000 358

3 1,064,000 383

4 5,962,000484 shallow209 deep

5 1,235,000 209

Total Estimated Energy Required: 9,421,000 kWh

Page 14: Erh various applications - SCME 2013
Page 15: Erh various applications - SCME 2013
Page 16: Erh various applications - SCME 2013
Page 17: Erh various applications - SCME 2013
Page 18: Erh various applications - SCME 2013
Page 19: Erh various applications - SCME 2013

Results• Cumulative Energy – 7,377,000 kWh– 78% of total

• Average Power Input Rate – 2,557 kW (max weekly 3,438 kW)

• Average subsurface temperature – 95.2⁰C• All treatment areas met clean up goals set by Washington

Department of Ecology

• Total cumulative mass removed – 9,404 kg

• 56% Mineral Spirits, 44% TCE, PCE

• Total project cost - €96/m3

“I am impressed to say the least, I expected things to clean up but not be this clean!” - Seattle Client

Page 20: Erh various applications - SCME 2013

Results

“I have reviewed the compliance soil sample results. I agree that the soil remediation level of 10 ppm specified in the CAP (Corrective Action Plan) has been met, and that the thermal treatment system can be shut down.” – Washington Department of Ecology

Page 21: Erh various applications - SCME 2013

Seattle Potassium Permanganate

Page 22: Erh various applications - SCME 2013

ERH Summary• GFPR or SFPR – nearly 100 remediation

projects• Perfect safety record• In situ remediation of VOCs, semi-VOCs • Unaffected by heterogeneity – easy to control• Does not cause desiccation – Self-regulating• Achieve >99% reduction• Low cost compared to life cycle costs

Page 23: Erh various applications - SCME 2013

QUESTIONS?

www.thermalrs.com 1-817-379-0536www.hmvtrs.eu31.318.624.624