et_beams module 6.1

4
EDDY CURRENT EXAMINATION (ET) CLIENT: REPORT NO: PAGE: SBM Offshore do Brasil Ltda - FPSO Capixaba 550075-01-209-XX-ET 1 CONTRACTOR: PROJECT NO: Axess do Brasil Ltda 550075-01 SUBJECT: DRAWING NO: Structural Welds of the Beam M6 BT 03 (15 Ton) N/A EDDY CURRENT PROCEDURE: ACCEPTANCE STANDARD: 324-P AWS D1.1 MATERIAL QUALITY: TYPE OF JOINT: DATE OF EXAMINATION: Carbon steel Welded 6/12/2015 MATERIAL THICKNESS: HEAT TREATMENT: OPERATOR: Variable N/A Flávio Henrique Ramos Gue WELD PROCESS: COATING: SURFACE CONDITION: EXTENT OF EXA N/A Painted Variable 100% of welds EQUIPMENT: PROBE TYPE: FREQUENCY: Phasec 3d, ID: 801BEZO GE insp diff. 100 KHz CALIBRATION DATA X/Y-GAIN: PHASE: ALARM: 51.2 180⁰ None FILTER HP/LP: REFERENCE OBJECT/INDICATOR: DC / 300 GE Insp. S/N ECO4260/09 EXAMINATION/TEST RESULT WELD NO: ACC/REJ: CALIBRATION AND COMMENTS: ATTACHMENT: COMPLETED BY: APPROVED BY: ACCEPTED BY: NDT - Operator AXESS Repr. Client EXTENT OF EXAMINATION: Eddy current inspection was performed on structural welds of the beam M6 B on module 6, according to AWS D1.1 . RESULT OF EXAMINATION: No indications were observed at time of i Accepted according to standard. Flavio Guerra CREA RJ 2010141597 ASNT-3743 ET-N2 PM-N2-SY-Coil US-N1-ME IRATA N1

Upload: pablodidone

Post on 13-Apr-2016

218 views

Category:

Documents


0 download

DESCRIPTION

NDT report

TRANSCRIPT

Page 1: ET_Beams Module 6.1

EDDY CURRENT EXAMINATION (ET)CLIENT: REPORT NO: PAGE:

SBM Offshore do Brasil Ltda - FPSO Capixaba 550075-01-209-XX-ET 1CONTRACTOR: PROJECT NO:

Axess do Brasil Ltda 550075-01SUBJECT: DRAWING NO:

Structural Welds of the Beam M6 BT 03 (15 Ton) N/A

EDDY CURRENT PROCEDURE: ACCEPTANCE STANDARD:

324-P AWS D1.1MATERIAL QUALITY: TYPE OF JOINT: DATE OF EXAMINATION:

Carbon steel Welded 6/12/2015MATERIAL THICKNESS: HEAT TREATMENT: OPERATOR:

Variable N/A Flávio Henrique Ramos GuerraWELD PROCESS: COATING: SURFACE CONDITION: EXTENT OF EXAMINATION:

N/A Painted Variable 100% of weldsEQUIPMENT: PROBE TYPE: FREQUENCY:

Phasec 3d, ID: 801BEZO GE insp diff. 100 KHzCALIBRATION DATA

X/Y-GAIN: PHASE: ALARM:

51.2 180⁰ NoneFILTER HP/LP: REFERENCE OBJECT/INDICATOR:

DC / 300 GE Insp. S/N ECO4260/09EXAMINATION/TEST RESULT

WELD NO: ACC/REJ: CALIBRATION AND COMMENTS:

ATTACHMENT:

COMPLETED BY: APPROVED BY: ACCEPTED BY:

NDT - Operator AXESS Repr. Client

EXTENT OF EXAMINATION:

Eddy current inspection was performed on structural welds of the beam M6 BT 03 located on module 6, according to AWS D1.1 .

RESULT OF EXAMINATION: No indications were observed at time of inspection. Accepted according to standard.

                                       Flavio Guerra CREA RJ 2010141597 ASNT-3743 ET-N2 PM-N2-SY-Coil US-N1-ME IRATA N1

Page 2: ET_Beams Module 6.1

EDDY CURRENT EXAMINATION (ET)

CLIENT: REPORT NO: PAGE:

SBM Offshore do Brasil Ltda - FPSO Capixaba 550075-01-209-XX-ET 2

CONTRACTOR: Axess do Brasil Ltda PROJECT NO: 550075 - 01

COMPLETED BY: APPROVED BY: ACCEPTED BY:

NDT - Operator AXESS Repr. Client

Flavio Guerra CREA RJ 2010141597 ASNT-3743 ET-N2 PM-N2-SY-Coil US-N1-ME IRATA N1

Page 3: ET_Beams Module 6.1

OF:

1

550075-01

N/A

AWS D1.1

6/12/2015

Flávio Henrique Ramos GuerraEXTENT OF EXAMINATION:

100% of welds

100 KHzCALIBRATION DATA

None

GE Insp. S/N ECO4260/09EXAMINATION/TEST RESULT

EXTENT OF EXAMINATION:

Eddy current inspection was performed on structural welds of the beam M6 BT 03 located on module 6, according to AWS D1.1 .

RESULT OF EXAMINATION: No indications were observed at time of inspection. Accepted according to standard.

                                      

Page 4: ET_Beams Module 6.1

OF:

2

PROJECT NO: 550075 - 01