EDDY CURRENT EXAMINATION (ET)CLIENT: REPORT NO: PAGE:
SBM Offshore do Brasil Ltda - FPSO Capixaba 550075-01-209-XX-ET 1CONTRACTOR: PROJECT NO:
Axess do Brasil Ltda 550075-01SUBJECT: DRAWING NO:
Structural Welds of the Beam M6 BT 03 (15 Ton) N/A
EDDY CURRENT PROCEDURE: ACCEPTANCE STANDARD:
324-P AWS D1.1MATERIAL QUALITY: TYPE OF JOINT: DATE OF EXAMINATION:
Carbon steel Welded 6/12/2015MATERIAL THICKNESS: HEAT TREATMENT: OPERATOR:
Variable N/A Flávio Henrique Ramos GuerraWELD PROCESS: COATING: SURFACE CONDITION: EXTENT OF EXAMINATION:
N/A Painted Variable 100% of weldsEQUIPMENT: PROBE TYPE: FREQUENCY:
Phasec 3d, ID: 801BEZO GE insp diff. 100 KHzCALIBRATION DATA
X/Y-GAIN: PHASE: ALARM:
51.2 180⁰ NoneFILTER HP/LP: REFERENCE OBJECT/INDICATOR:
DC / 300 GE Insp. S/N ECO4260/09EXAMINATION/TEST RESULT
WELD NO: ACC/REJ: CALIBRATION AND COMMENTS:
ATTACHMENT:
COMPLETED BY: APPROVED BY: ACCEPTED BY:
NDT - Operator AXESS Repr. Client
EXTENT OF EXAMINATION:
Eddy current inspection was performed on structural welds of the beam M6 BT 03 located on module 6, according to AWS D1.1 .
RESULT OF EXAMINATION: No indications were observed at time of inspection. Accepted according to standard.
Flavio Guerra CREA RJ 2010141597 ASNT-3743 ET-N2 PM-N2-SY-Coil US-N1-ME IRATA N1
![Page 2: ET_Beams Module 6.1](https://reader036.vdocument.in/reader036/viewer/2022081808/56d6bdce1a28ab30168f64f2/html5/thumbnails/2.jpg)
EDDY CURRENT EXAMINATION (ET)
CLIENT: REPORT NO: PAGE:
SBM Offshore do Brasil Ltda - FPSO Capixaba 550075-01-209-XX-ET 2
CONTRACTOR: Axess do Brasil Ltda PROJECT NO: 550075 - 01
COMPLETED BY: APPROVED BY: ACCEPTED BY:
NDT - Operator AXESS Repr. Client
Flavio Guerra CREA RJ 2010141597 ASNT-3743 ET-N2 PM-N2-SY-Coil US-N1-ME IRATA N1
![Page 3: ET_Beams Module 6.1](https://reader036.vdocument.in/reader036/viewer/2022081808/56d6bdce1a28ab30168f64f2/html5/thumbnails/3.jpg)
OF:
1
550075-01
N/A
AWS D1.1
6/12/2015
Flávio Henrique Ramos GuerraEXTENT OF EXAMINATION:
100% of welds
100 KHzCALIBRATION DATA
None
GE Insp. S/N ECO4260/09EXAMINATION/TEST RESULT
EXTENT OF EXAMINATION:
Eddy current inspection was performed on structural welds of the beam M6 BT 03 located on module 6, according to AWS D1.1 .
RESULT OF EXAMINATION: No indications were observed at time of inspection. Accepted according to standard.
![Page 4: ET_Beams Module 6.1](https://reader036.vdocument.in/reader036/viewer/2022081808/56d6bdce1a28ab30168f64f2/html5/thumbnails/4.jpg)
OF:
2
PROJECT NO: 550075 - 01