eurailspeed - uic · pdf file1 joachim janle director sales,international business transport...
TRANSCRIPT
1
Joachim JanleDirector Sales,International Business Transport Solutions Division, Alcatel
EurailspeedParallel Session D.5
Alle Rechte vorbehalten © 2005, Alcatel
ETCS Interoperability
J. Janle, Director Sales, International Business
A Suppliers Point of View
Page 3
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
ETCS/ERTMS Targetsn Increase of Speed and Decrease of headway n Increase of SafetynEuropean Specifications -> Acceleration of Cross-Border Rail TrafficnCompetitive Open market for suppliers and railways
-> Increasing Competitiveness of Railways
Current StatusnApproximately 60 ETCS projects have been contracted so farnETCS solutions for approx. 10.100 km of track and 1.200 OBUsnCorresponding value project value roughly 1.000 M€ in totalnMostly to be realised until 2007, around 30% already completed
ETCS Interoperability
Page 4
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
Definition of Interoperabilityn Interoperability is achieved when a system is able and allowed to
operate together with other systems of different origin within predefined limitsn Interoperability is possible in many different areas
-> Most important Interoperability areas for ETCS Level 2nRBC-OBU interfacenRBC-RBC interfaces
ETCS Interoperability
Page 5
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
Why do we need Interoperability Testing ? We have Specifications !
ETCS Interoperability
UNISIG 2.2.2 + Subsets XXX UIC ETCS FRS
EEIG 97SO66 EIRENE FRS
MORANE FFFIS TSIs CENELEC EN 50XXX
Page 6
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
Syntax and Semantic
ETCS Interoperability
COW ?
Page 7
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
Why do we need Interoperability Testing ? We have Specifications !
ETCS Interoperability
So:nThe solutions defined by UNISIG 2.3.0 (= 2.2.2 + Subset 108 + …) will
only form the basis to reach interoperabilitynUNISIG does not specify operational interoperability
SYNTAX = UNISIG SEMANTIC = Operational Scenarios
Page 8
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
Jüterbog –Halle/Leipzig
ETCS L2
Seetallinie,Delemont
ETCS L1
Seetallinie,Delemont
ETCS L1
Ludwigsfelde –Jüterbog
ETCS L2,L3
Czech Validation CircuitETCS L1
LötschbergTunnel
ETCS L1,L2
LötschbergTunnel
ETCS L1,L2
Ankara –IstanbulETCS L1
Ankara –IstanbulETCS L1
Vienna –HU Border
ETCS L1
Sofia –BurgasETCS L1
Hungaria –SloveniaETCS L1
Vienna –Budapest
ETCS L1
Budapest –HU Border
ETCS L1
Budapest –HU Border
ETCS L1
LuxembourgETCS L1
LuxembourgETCS L1
Amsterdam –Antwerpen
ETCS L2
EMSETETCS L1
La Sagra –Toledo
ETCS L1,L2
La Sagra –Toledo
ETCS L1,L2
Lleida –BarcelonaETCS L1,L2
Lleida –BarcelonaETCS L1,L2
Segovia –ValladolidETCS L1,L2
Segovia –ValladolidETCS L1,L2
Brucoli –MegaraETCS L1
Brucoli –MegaraETCS L1
ETCS Interoperability, Alcatel ETCS Projects
Page 9
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
Germany: Ludwigsfelde-Jüterbog Projectn 1 RBC for 35 km
Germany: Jüterbog-Halle/Leipzig Projectn 2 RBCs for 120 km
ETCS Interoperability, Alcatel ETCS Level 2
Page 10
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
ETCS Interoperability, Alcatel ETCS Level 2
RBCALCATEL OBU
ALCATELSIEMENS √
Germany: 2 ETCS Level 2 Projectsn Interoperability Status
Page 11
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
Switzerland: Lötschberg Base Tunnel Projectn 200 km/hn 1 RBC for 35 km n 5 Alcatel Electronic Interlockings
ETCS Interoperability, Alcatel ETCS Level 2
Page 12
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
ETCS Interoperability, Alcatel ETCS Level 2
RBCOBUALCATEL ALSTOM
OBU
OBU SIEMENS
BOMBARDIER
√
Switzerland: Lötschberg Base Tunnel Projectn Interoperability Status
Page 13
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
ETCS Interoperability, Alcatel ETCS Level 2
Spain: 3 ETCS Level 2 Projects
Lleida - Barcelonan 350 km/hn 4 RBCs for 176 km
La Sagra - Toledon 250 km/hn 1 RBC for 20 km
Segovia - Valladolidn 350 km/hn 2 RBCs for 91 km
Page 14
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
ETCS Interoperability, Alcatel ETCS Level 2
RBCOBUALCATEL ALSTOM
OBU SIEMENS
Spain: 3 ETCS Level 2 Projectsn Interoperability Status
OBU CSEE
Page 15
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
Netherlands: HSL Zuidn 350 km/hn 2 RBCs for 45 km
ETCS Interoperability, Alcatel ETCS Level 2
Page 16
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
ETCS Interoperability, Alcatel ETCS Level 2
RBCALCATEL
OBU
OBU SIEMENS
ANSALDO
√
Netherlands: HSL Zuidn Interoperability Status
Page 17
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
ETCS Interoperability, Alcatel ETCS Level 2
Netherlands (HSL Zuid) / Belgium (L4)n Interoperability Status
RBCALCATEL √ALSTOM
RBC
SolutionnNew Specification for RBC-RBC-Interface based on UNISIG (Subset
039) will become the new standard in EuropenGateway Solution: Alstom and Alcatel Adaptation of Communication
Protocol separately in RBC, joint specification and implementation of UNISIG Application Protocol in Alcatel RBC and Alstom RBC
Page 18
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
ETCS Interoperability, Alcatel ETCS Level 2
Netherlands (HSL Zuid) / Belgium (L4)n Interoperability Status
RBCALCATEL √ALSTOM
RBC
Alcatel and AlstomLeader in Interoperability Verification
Page 19
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
OBU
IL ProductTest IL
ProductTest RBC
ProductTest OBU
IntegrationInfrastructure
IntegrationETCS
System testInfrastructure
System testETCS
LocoProduct
Test Loco
IntegrationTrainborne
System testTrainborne C
ompl
ete
Sig
nalli
ng S
yste
m
Fit
for
Pur
poseRBC
Project Content
Interoperability Test
ETCS Interoperability, Testing
Page 20
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
Interoperability Testing Example: RBC-OBUnActivation and DeactivationnMode- and Level-ChangenReversingnEmergency StopnData Transmission LimitsnTemporary Speed RestrictionsnTrain Data ChangenMessaging
-> Around 1200 Test Cases for Laboratory and Field !
ETCS Interoperability, Testing
Page 21
All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT
SummarynAwareness of Interoperability Verification requirednProvide the Basis for Definition of Test SpecificationsnRailways to maintain Differences in operational Scenarios as small
as possiblenExchange Experience in Definition of Operational Scenarios
between RailwaysnDefinition of which CR requests are relevant for the individual
Railway
ETCS Interoperability