eurocae ed-250: roaas mops 7/7...eurocae wg-101 established, kick-off meeting august 2015...

12
Pierre GEORGES Safety Strategy, DGT , Dassault Aviation WG-101 Chairman EUROCAE ED-250: ROAAS MOPS Runway Overrun Alerting and Awareness System Minimum Operational Performance Specifications GRSS 2017 Lima, Peru 21/11/2017 ICAO GRSS 2017 1

Upload: others

Post on 24-Feb-2021

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EUROCAE ED-250: ROAAS MOPS 7/7...EUROCAE WG-101 established, kick-off meeting August 2015 Deliverable : MOPS for a ROAAS Target duration: 18 months EUROCAE WG-101 21/11/2017 ICAO GRSS

Pierre GEORGES Safety Strategy, DGT , Dassault Aviation WG-101 Chairman

EUROCAE ED-250: ROAAS MOPS Runway Overrun Alerting and Awareness System Minimum Operational Performance Specifications GRSS 2017 Lima, Peru

21/11/2017 ICAO GRSS 2017 1

Page 2: EUROCAE ED-250: ROAAS MOPS 7/7...EUROCAE WG-101 established, kick-off meeting August 2015 Deliverable : MOPS for a ROAAS Target duration: 18 months EUROCAE WG-101 21/11/2017 ICAO GRSS

✈Recommendations in EAPPRE to develop on board real time monitoring and alerting systems to assist in land/go around decision and braking management

ICAO GRSS 2017 2

European initiative

21/11/2017

Page 3: EUROCAE ED-250: ROAAS MOPS 7/7...EUROCAE WG-101 established, kick-off meeting August 2015 Deliverable : MOPS for a ROAAS Target duration: 18 months EUROCAE WG-101 21/11/2017 ICAO GRSS

✈EUROCAE WG-101 established, kick-off meeting August 2015

✈Deliverable : MOPS for a ROAAS

✈Target duration: 18 months

EUROCAE WG-101

ICAO GRSS 2017 3 21/11/2017

✈Fair cross section of stakeholders community: ✈Europe, US and other regions ✈Aircraft manufacturers, avionics manufacturers, airlines,

pilots, authorities , and more…

✈Resulting ED-250 to be published by end of 2017

Page 4: EUROCAE ED-250: ROAAS MOPS 7/7...EUROCAE WG-101 established, kick-off meeting August 2015 Deliverable : MOPS for a ROAAS Target duration: 18 months EUROCAE WG-101 21/11/2017 ICAO GRSS

✈"System intended to reduce risk of overrun during landing by providing a timely and distinctive alert to the flight crew when the airplane is at risk of not being able to stop on the available distance to the end of the runway"

✈ROAAS is intended as a safety net ✈ROAAS does not alleviate crew responsibility to perform a

safe landing ✈ROAAS is not a piloting system

"ROAAS 101": what is a ROAAS?

21/11/2017 ICAO GRSS 2017 4

Page 5: EUROCAE ED-250: ROAAS MOPS 7/7...EUROCAE WG-101 established, kick-off meeting August 2015 Deliverable : MOPS for a ROAAS Target duration: 18 months EUROCAE WG-101 21/11/2017 ICAO GRSS

✈ On-board software running in boxes/avionics ✈ Computes stopping point at landing in real time

✈ Is based on A/C sensors information, giving access to position, energy state ✈ Models A/C landing performance, with possible input of runway conditions

(friction) , and possibly operation type (e.g steep approach) ✈ Compares this stopping point to the end of the runway intended for

landing, taken from a Runway database. ✈ Raises an alert if the computed stopping point lies beyond the end of

the runway ✈ Depending on implementation, phase of flight and mode raising the

alert, flight crew reacts per procedure

Principles

21/11/2017 ICAO GRSS 2017 5

Page 6: EUROCAE ED-250: ROAAS MOPS 7/7...EUROCAE WG-101 established, kick-off meeting August 2015 Deliverable : MOPS for a ROAAS Target duration: 18 months EUROCAE WG-101 21/11/2017 ICAO GRSS

ROAAS context

21/11/2017 ICAO GRSS 2017 6

Read only airfield database

On Ground

In Air

Modes: at least two Warnings and Alerts

Audio, Visual

System status : Inhibit

Inoperative Unavailable

Other displays (optional)

Airfield information

Controls (inhibit)

Aircraft state

Runway conditions

Runway selection

Set up & control

interface

Sensors and avionics interface

ROAAS software

Page 7: EUROCAE ED-250: ROAAS MOPS 7/7...EUROCAE WG-101 established, kick-off meeting August 2015 Deliverable : MOPS for a ROAAS Target duration: 18 months EUROCAE WG-101 21/11/2017 ICAO GRSS

ROAAS Flight phases

21/11/2017 ICAO GRSS 2017 7

Decelerationphase

Transitionphase

Airphase

Touchdown Committed to stop

Runway threshold

Final Approach Segment

LEGEND

In air

ROAAS Entry Point(AIR mode arming)

ROAAS Exit Point(GND mode disarming)

ArmingDisarming

On groundMode transition

Landing Segment

RWY

ROAAS Exit Point(AIR mode disarming)

Note: arming and disarming of modes during transition phase is design dependent

Page 8: EUROCAE ED-250: ROAAS MOPS 7/7...EUROCAE WG-101 established, kick-off meeting August 2015 Deliverable : MOPS for a ROAAS Target duration: 18 months EUROCAE WG-101 21/11/2017 ICAO GRSS

✈Selection of runway intended for landing (manual or automatic)

✈Necessary data found in ROAAS runway database ✈No data= ROAAS unavailable ✈Database supplier will create the

database with the accuracy and coverage specified by the ROAAS manufacturer

✈Temporary updates by flight crew for NOTAMs or other reasons are possible

ROAAS and Runways

21/11/2017 ICAO GRSS 2017 8

"Would you tell me, please, which way I ought to go from here?" "That depends a good deal on where you want to get to", said the Cat.

Page 9: EUROCAE ED-250: ROAAS MOPS 7/7...EUROCAE WG-101 established, kick-off meeting August 2015 Deliverable : MOPS for a ROAAS Target duration: 18 months EUROCAE WG-101 21/11/2017 ICAO GRSS

Testing guidelines

21/11/2017 ICAO GRSS 2017 9

II Software & algorithms

I Hardware & environmental

III Simulated integration bench

IV Integrated testing

V simulator

VI Flight

Mainly ROAAS manufacturer

Mainly OEM/ integrator

Page 10: EUROCAE ED-250: ROAAS MOPS 7/7...EUROCAE WG-101 established, kick-off meeting August 2015 Deliverable : MOPS for a ROAAS Target duration: 18 months EUROCAE WG-101 21/11/2017 ICAO GRSS

✈ "RMD: ROAAS Model Distance“ computed on board

✈ Testing the design by off-line comparisons with high fidelity aircraft performance models ✈ multiple combinations of input conditions to cover the domain certified for ROAAS

Testing the on-board ROAAS model

21/11/2017 ICAO GRSS 2017 10

shorter

Non conservative Conservative

PLD

RMD >PLD

Safety

Best performances, no margins

TLD

Optimistic Pessimistic RMD<TLD

Nuisance alerts

What a normal crew is expected to achieve, with margins

RMD longer

Non conservative useful nuisance alerts

Performance Landing Distance

Typical Landing Distance

Page 11: EUROCAE ED-250: ROAAS MOPS 7/7...EUROCAE WG-101 established, kick-off meeting August 2015 Deliverable : MOPS for a ROAAS Target duration: 18 months EUROCAE WG-101 21/11/2017 ICAO GRSS

✈ ED-250 ROAAS MOPS results from a consensus on minimum requirements, leaving flexibility to ROAAS manufacturer and integrator.

✈ ED-250 represents a major step forward for runway safety. Created by the industry, for the industry, it establishes a true baseline which future ROAAS manufacturers can use to ease the development and design.

✈ It is expected that this will result in more ROAAS being

available on the market and encourage adoption of these technologies by aircraft operators.

✈ The MOPS is only the beginning

Conclusions

21/11/2017 ICAO GRSS 2017 11

With many thanks from the chairman to all working group members

✈Happy landings !

Page 12: EUROCAE ED-250: ROAAS MOPS 7/7...EUROCAE WG-101 established, kick-off meeting August 2015 Deliverable : MOPS for a ROAAS Target duration: 18 months EUROCAE WG-101 21/11/2017 ICAO GRSS

21/11/2017 ICAO GRSS 2017 12

Thanks to group members representing: - Airbus - ATR - BAE Systems - Boeing - Bombardier - Dassault Aviation - EASA - Embraer - Eurocae - Eurocontrol - European cockpit association - FAA

- Garmin - General Electric - Gulfstream - Honeywell - IANS - IATA/ Air France - IFALPA - Lufthansa - Lufthansa Technik - Rockwell Collins - RTCA - Thales Avionics - Zodiac Aerospace