Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

European Workgroup

European Workgroup

5th June 2014

1. General Update

2

Code Status Update

Code Current Status Implementation date

Congestion Management (CMP)

Implemented 1st October 2013 (Fixed)

Capacity Allocation Mechanism (CAM)

CAM approved for EU wide implementation at relevant EU IPs. 1st November 2015 (Fixed)

Gas Balancing (BAL)

BAL approved for EU wide implementation 26th March 2014 (Commission Regulation (EU) No 312/2014 establishing a Network Code on Gas Balancing of Transmission Networks.)

1st Oct 2015 (subject to NRA approval for additional 12 months) (Fixed)

Interoperability & Data Exchange (INT)

In comitology. Comitology meetings postponed from 28 th April and 11th July 2014, now to take place July and September/October 2015 (dates TBC).

Q4 2015 (Estimated)

Tariffs Under development. Code to be submitted 31st December 2014. Estimated earliest mid January 2017. Applicable from October 2017.

Incremental Capacity

Under development. Incremental Capacity to be introduced via combination of new articles in CAM Network Code and via Tariffs Network Code. Code amendment to be submitted 31st December 2014.

Applicable from March 2017

Gas Codes Timeline

  

Status of Development of European Gas Network Codes

Future dates are subject to change KEY

Dates shown in italics are best approximations based on current understanding. Activities undertaken by ACER

It has been necessary to 'round' some dates for the benefits of the diagram Activities undertaken by ENTSOG

Activities undertaken by European Commission

TODAYM

ar

Ap

r

May

Jun

Jul

Au

g

Sep

Oct

No

v

Dec

Jan

Feb

Mar

Ap

r

May

Jun

Jul

Au

g

Sep

Oct

No

v

Dec

Jan

Feb

Mar

Ap

r

May

Jun

Jul

Au

g

Sep

Oct

No

v

Dec

Jan

Feb

Mar

Ap

r

May

Jun

Jul

Au

g

Sep

Oct

No

v

Dec

Jan

Feb

Mar

Ap

r

May

Jun

Jul

Au

g

Sep

Oct

No

v

Dec

Stakeholder Workgroups

ACER Develops Framework

Guidelines on Interoperability & Data Exchange

Interoperability & Data Exchange

Tariffs

Go

Liv

e

Balancing

ACER Review

Post-Comitology Capacity Allocation Mechanisms (CAM)

ENTSOG Drafting

Consultatio

n

Network Code / Guideline

Congestion Management Principles (CMP)

Next Step

Implementation of CMP obligations for 1st October

2013

Comitology

2014

Finalise drafting

Comitology

2012 2013

ACER Review

ENTSOG revision of Code

Initial draftin

g

ACER Review

Go

Liv

e (

?)

FG Extension

20162015

Go

Liv

e

Consultation

Finalise drafting

Comitology Phase

ACER Develops Framework

Guidelines on Tariffs

ACER ReviewComitology

ENTSOG Drafting

Initial draftingConsultation

Go

Liv

e (

?)

Go

Liv

e

ENTSOG Drafting

ACER Review

Finalise drafting

Comitology(duration unknown)

Comitology(duration unknown)

Initial drafting

Road Map

Notes: 1) Long term capacity auctions may need to be delivered in conjunction with short term auctions

2. EU Code Updates

CAMMatthew Hatch

CAM & Bacton UNC Modifications

First Modification Development Workgroup held 3 June 2014

Key principles CAM Mod 500

Key principles Bacton split Mod 501

Next Workgroup planned for early July 2014 (date to be confirmed)

8

Consultation on Capacity Booking Platforms

ENTSOG press release 16th May 2014

ENTSOG launched consultation on Capacity booking platforms

The consultation started 19 May 2014 and will be open until 30 June 2014

ENTSOG website can be found at http://www.entsog.eu/

9

Tariff Code & Incremental Capacity AmendmentColin Hamilton

EU Tariff Code update

Draft TAR NC completed and approved by ENTSOG Board 28th May

Draft Code and supporting document published end May

http://www.entsog.eu/publications/tariffs

Public Consultation on the draft TAR NC will take place from the end of May to the end of July

Next Stakeholder Workshop – 25th June

EU Incremental Amendment update

Draft INC Amendment now completed and approved by ENTSOG Board 28th May.

Draft Code and supporting document published end May

http://www.entsog.eu/publications/incremental-capacity

Public Consultation on the draft INC amendment will take place from the end of May to the end of July

Next Stakeholder Workshop – 24th June

For further information, please contact Colin Hamilton [email protected], 07971 760360)

3. UNC Modification Plans

Phase 2 UNC ModificationsPotential Timescales

EU Network Code Area of change Panel Submission Workgroup Development

UNC Consultation

Gas Balancing (BAL) Information Provision March 2014 2 Months June 2014

SMP Buy & Sell April 2014 1 Month June 2014

Nomination Process at IP’s April 2014 6 - 9 Months Q4 -2014

Capacity Allocation (CAM)

CAM / CMP Compliant Capacity Auctions

Q2 - 2014 6 - 9 Months Q4 - 2014

Interoperability & Data Exchange (INT)

OBAs / allocations Jul/Aug 2014 6 Months Q1 - 2015

Interconnection Agreements/Contract Changes(facilitating Modification )

Q1 - 2015 3 Months Q2 - 2015

Data Exchange Q3 - 2014 3 Months Q4 - 2014

4. Draft Modifications

Draft Tariff Code – Walk ThroughColin Hamilton

ENTSOg publishing document Friday 30th May therefore not available until Monday 2nd June

REMITMichael Jenner

REMIT

Insider InformationWholesale Energy Market

TransactionsTransparency

Standard ContractsJan 2015

NG’s Spectron etc

Data feed to ACERJan 2015

Non Standard ContractsJun 2015

NG’s OM Contracts

Primary Capacity TradesJan 2015

NG’s & others Xoserve

Secondary Capacity TradesJan 2015

Market Participants Buybacks ( Xoserve on behalf of

market participants)

Balancing ServicesApril 2017

NG’s & othersNon Xoserve

Fundamental DataJan 2015

Nomination DataNG or Xoserve

REMIT: Secondary Trade Reporting

TSOs not obligated to provide secondary capacity trading data - we are not one of the counter-parties and therefore do not hold the relevant data.

Those trading on the secondary market need to provide this data.  

However, NG are very happy to work with market participants to find an effective solution to provide this data to ACER. 

We suggest that one solution could be for Xoserve to become the delivery agent for secondary data in much the same way as it will become for primary data as per the NG project.  NG is now beginning work with Xoserve on designing the IT systems to

provide primary data to ACER. We offer shippers and traders an opportunity to collaborate with our REMIT reporting project such that it could become a solution to secondary reporting requirements for GB markets participants.

However, Xoserve would need the price data which it does not currently hold. 

If market participants wanted Xoserve to provide this REMIT data service on their behalf, they may need to formally contract Xoserve to do so. Confidentially assurances on how Xoserve would deal with and store the relevant price data may be needed.

Bridge to 2025 & GTMMichael Jenner

Bridge to 2025 and GTM

Bridge to 2025 Bridge to 2025 consultation closes 16 June 2014

Consultation can be found here:

http://www.acer.europa.eu/Media/Events/Launch-of-Energy-Regulation-A-Bridge-to-2025/default.aspx

Final bridge paper to be published September 2014

Gas Target Model (GTM) update Comments on GTM invited now

Latest slides and updates from 15 May workshop can be found here:

http://www.acer.europa.eu/Media/Events/3rd-Gas-Target-Model-Stakeholders-Workshop/default.aspx

Final GTM to be published September / October 2014

EU Gas Quality Harmonisation UpdatePhil Hobbins

EU Gas Quality Harmonisation

CEN has issued its draft gas quality standard for public consultation to national standardising bodies

BSI has published the standard on its website at https://drafts.bsigroup.com/Home/Details/53031

BSI committee GSE/4 will co-ordinate GB comments on the standard

BSI deadline for comments is 31st August 2014

CEN deadline for BSI to send GB comments is 8th October 2014

The EC are proposing to hold a Gas Quality workshop in Brussels on 1st July 2014