ewea workshop lyon - 4-1 jose carlos araujo martin iberdrola

11
7/27/2019 EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola http://slidepdf.com/reader/full/ewea-workshop-lyon-4-1-jose-carlos-araujo-martin-iberdrola 1/11 Key Performance Indicators Wind Farm Availability TIME Vs ENERGY 2 Julio 2012

Upload: rochdibahiri4184

Post on 02-Apr-2018

230 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

7/27/2019 EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

http://slidepdf.com/reader/full/ewea-workshop-lyon-4-1-jose-carlos-araujo-martin-iberdrola 1/11

Key Performance Indicators

Wind Farm Availability

TIME Vs ENERGY

2 Julio 2012

Page 2: EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

7/27/2019 EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

http://slidepdf.com/reader/full/ewea-workshop-lyon-4-1-jose-carlos-araujo-martin-iberdrola 2/11

2

Index

1. Iberdrola Wind Energy Overview/Portfolio

2. Wind Farm Availability 

3. Conclusions

Page 3: EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

7/27/2019 EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

http://slidepdf.com/reader/full/ewea-workshop-lyon-4-1-jose-carlos-araujo-martin-iberdrola 3/11

3

1. Iberdrola Wind Energy Overview/Portfolio

> 13 500 MW Wind Energy

13 Different Turbine Manufacturers

Spain 5 546 MW

Hungary 158 MW

Poland 184.5 MW

UK

1 183 MWUSA 5 177 MW 

Brazil 49 MW 

98.5 MW

Portugal 92 MW

Germany 63 MW 

France 303 MW

Greece

255.3 MW

Mexico

209 MW

Italy

Romania 80 MW

Cyprus

20 MW

350 Wind Farms

16 Different Countries

Page 4: EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

7/27/2019 EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

http://slidepdf.com/reader/full/ewea-workshop-lyon-4-1-jose-carlos-araujo-martin-iberdrola 4/11

 

• Develop standard and global solutions for the Asset Management

during Commercial Operation, regardless of their location or size.

• One company, only one way of working! 

• Create common automatic tools which facilitate the Wind Asset

Management such as Standard Indicator Calculations, StoppageCharacterization, etc.

• Help detect problems in real time, in order to minimize the action

times and maximize the production.

• Create corporate culture. The experiences gained, can be sharedacross the entire business to support overall optimization of our

assets. 

• All of this, in the same way for > 13 500 MW!

4

1. Iberdrola Wind Energy Overview/Portfolio: Challenges

Page 5: EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

7/27/2019 EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

http://slidepdf.com/reader/full/ewea-workshop-lyon-4-1-jose-carlos-araujo-martin-iberdrola 5/11

5

2. Wind Farm Availability

The Availability of a Wind Farm is possibly the most popular KPI used to follow the

performance of a Wind Farm.

Availability indicators:

1. Contractual Availability2. Standard in-house Availability indicators:

Time-based Availability (traditional one)

Operational Range Time based Availability

Energy-based Availability

The Wind Farm Energetic Unavailability should be the final goal of the standardization

on the availability indicators development process.

Page 6: EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

7/27/2019 EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

http://slidepdf.com/reader/full/ewea-workshop-lyon-4-1-jose-carlos-araujo-martin-iberdrola 6/11

6

2. Wind Farm Availability

Contractual Availability signed between the owner and the turbine manufacturer. It is used

to manage the agreements within the contract.

Possible penalties depending on the figures

Only causes attributable to the manufacturer are considered within the formula

One Availability  per manufacturer. Difficult to benchmark within the whole fleet 

Normally (today) based on Time at all Onshore sites

Difficulties in double checking the figures. Potential problems and disagreement with

manufacturers

Is the Contractual Availability enough for checking Wind Farm Performance? 

We do not agree…. Why?  

Page 7: EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

7/27/2019 EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

http://slidepdf.com/reader/full/ewea-workshop-lyon-4-1-jose-carlos-araujo-martin-iberdrola 7/11

7

2. Wind Farm Availability

STANDARD AVAILABILITIES BASED ON TIME & ENERGY have been calculated in

IBERDROLA for many years

Standard in-house Availability indicators calculated in-house with internal

procedures and development.

Same formula for the Whole Fleet . All Wind Farm downtime and performance

issues are characterized according to a Standard Procedure

Easy and automatic calculation, independent to manufacturers and to the

SCADA data

Every month all the Availability figures are automatically  published in the

internal reporting tools (also standardized)

Easy to benchmark  areas, size, site, etc… 

Powerful information to double check Manufacturer /Contractor Availability 

 figures

Page 8: EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

7/27/2019 EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

http://slidepdf.com/reader/full/ewea-workshop-lyon-4-1-jose-carlos-araujo-martin-iberdrola 8/11

Page 9: EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

7/27/2019 EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

http://slidepdf.com/reader/full/ewea-workshop-lyon-4-1-jose-carlos-araujo-martin-iberdrola 9/119

2. Wind Farm Availability

Availability based on ENERGY

Advantages 

Detect poorly Scheduled Maintenance / Improved Preventive Maintenance Detect Performance Issues when the Wind Turbine is running

Evaluate the impact from TSO’s curtailments 

Incentives for maintenance suppliers

Drawbacks

More difficult calculation, more variables required:  Actual Production and Potential Generation

Potential problems on the accuracy of the models for pot. Gen.

Multiple methods of calculation

New, not widespread for maintenance suppliers

0

200

400

600

800

1000

1200

14001600

1800

           0        :           0           0

           2        :           0           0

           4        :           0           0

           6        :           0           0

           8        :           0           0

           1           0        :           0           0

           1           2        :           0           0

           1           4        :           0           0

           1           6        :           0           0

           1           8        :           0           0

           2           0        :           0           0

           2           2        :           0           0

           0        :           0           0

           2        :           0           0

           4        :           0           0

           6        :           0           0

           8        :           0           0

           1           0        :           0           0

           1           2        :           0           0

           1           4        :           0           0

           1           6        :           0           0

           1           8        :           0           0

           2           0        :           0           0

           2           2        :           0           0

           0        :           0           0

           2        :           0           0

           4        :           0           0

           6        :           0           0

           8        :           0           0

           1           0        :           0           0

           1           2        :           0           0

           1           4        :           0           0

           1           6        :           0           0

           1           8        :           0           0

           2           0        :           0           0

           2           2        :           0           0

26/02/2010 27/02/2010 28/02/2010

      G      W      h

Product ion vs Producible

Producible (GWh) Producción (GWh)

Page 10: EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

7/27/2019 EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

http://slidepdf.com/reader/full/ewea-workshop-lyon-4-1-jose-carlos-araujo-martin-iberdrola 10/11

10

3. Conclusions

Results expected:

In-house Availability Indicators are convenient.

Calculation within the Availability based on Time does not present Major

Difficulties, for this reason is being used as a reference point for Wind Farm

Performance in most cases.

Energetic Availability goes a step further in terms of a Wind Farm performance

indicator, bringing out energy losses instead of downtimes.

Lost Energy:

• Stop due External Causes

• Stop due to Manageable Unavailable Time Causes• Stops

• Running• Partial Curtailments /other External Causes

• Power Curve Performance Issues

Page 11: EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

7/27/2019 EWEA Workshop Lyon - 4-1 Jose Carlos Araujo Martin Iberdrola

http://slidepdf.com/reader/full/ewea-workshop-lyon-4-1-jose-carlos-araujo-martin-iberdrola 11/11

THANK YOU ALL

FOR YOUR ATTENTION

2 Julio 2012