examination outline submittals for the kewaunee retake ... · es-po1 examination outline qualitv...

20
EXAMINATION OUTLINE SUBMITTALS FOR THE KEWAUNEE RETAKE EXAMINATION - AUGUST 2006

Upload: others

Post on 09-Jan-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

EXAMINATION OUTLINE SUBMITTALS

FOR THE KEWAUNEE RETAKE EXAMINATION - AUGUST 2006

Page 2: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

Dominion Energy Kewaunee, Inc. N490 Highway 4 2 . Kewaunee, W’l 54216-951 1

APR 2’1 2006 Regional Administrator, Region Ill U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 21 0 Lisle, Illinois 60532-4352

DOMINION ENERGY KEWAUNEE, INC. KEWAUNEE POWER STATION RETAKE EXAMINATION OUTLINE

In accordance with the guidelines NUREG 1021, “Op

Dominion‘

Serial No. 06-364 KPS/LIC/GR: RO Docket No. 50-305 License No. DPR-43

3ting Li en e Examination Standard for Power Reactors” Revision 9, Dominion Energy Kewaunee, Inc. (DEK) is providing the enclosed Senior Reactor Operator outline for the retake examination of Mr. Randall W. Beck and Mr. Timothy J. Bunkelman scheduled for the week of August 7, 2006.

As discussed in a telephone conversation between Mr. Dell McNeil of Nuclear Regulatory Commission (NRC) Region Ill and Mr. Frank Winks of DEK, the outline was also provided on April 24, 2006 to the NRC Senior Resident Inspector assigned to the Kewaunee Power Station for delivery to Mr. Dell McNeil.

NUREG-1 021 physical security requirements state that the enclosed examination materials must be withheld from public disclosure until after the examinations are complete.

If you have questions or require additional information, please feel free to contact Mr. Frank Winks at 920-388-8303.

Very truly yours,

Site Vice President, Kewaunee Power Station

E nc I os u re

Commitments made by this letter: NONE

cc without enclosure: NRC Senior Resident Inspector Kewaunee Power Station

Page 3: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

Dominion Energy Kewaunee, Inc. N490 Highway 4 2 , Kewaunee. WI 54216-951 1

JUN 5 2006 Regional Administrator, Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 21 0 Lisle, I L 60532-4352

ominion'

Serial No. 06-416 KPS/LIC/GR: RO Docket No. 50-305 License No. DPR-43

DOMINION ENERGY KEWAUNEE, INC. KEWAUNEE POWER STATION RESPONSE TO FURNISH WRllTEN EXAMINATIONS, OPERATING TESTS, AND SUPPORTING REFERENCE MATERIALS

In response to a letter from the NRC dated April 27, 2006 regarding the administration of licensing re-take examinations at the Kewaunee Power Station, enclosed are the written examination and the following documents as required by NUREG 1021 Revision 9:

ES-401-2 PWR Exam Outline (Revised) ES-401-3 Generic WA Outline (Revised) ES-401-4 Record of Rejected WAS ES-401-6 Written Exam Quality Checklist ES-401-7 RO Written Exam Cover Sheet and RO Written Exam

ES-401-8 SRO Written Exam Cover Sheet and SRO Written Exam (Ready to give with handouts)

(Ready to give with handouts)

NUREG-1 021 physical security requirements state that the enclosed examination materials must be withheld from public disclosure until after the examinations are complete.

If you have questions or require additional information, please feel free to contact Mr. Frank Winks at 920-388-8303.

Very truly yours,

c-:;y7 7/4f Leslie N. Hartz Site Vice President, Kewaunee Power Station

Enclosures

Commitments made by this letter: NONE

Page 4: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

Serial No. 06-416 Page 2 of 2

cc: Without enclosures Mr. S. C. Burton NRC Senior Resident Inspector Kewaunee Power Station Madison, WI 53707

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Page 5: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2

1. w , R I

E

Date of Examination: 08/09/06 Facility: Kewaunee Power Station

a. Verlfy that the outline(s) fit@) the appropriate model, in accordance with ES-401.

b. Assess whether the outline was systematically and randomly prepared in accordance with Section D.l of ES-401 and whether all KIA categories are appropriately sampled. $& h u b

&#I& p"- c.

d. Assess whether the justifications for deselected or rejected K/A statements are appropriate.

Assess whether the outline overemphasizes any systems, evolutions, or generic topics.

Initials a [ b * ( c #

Task Description Item

2

S

v a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications. and major transients.

I M U L A T 0 R

b. Assess whether there are enough scenario sets (and spares) to test the projected number and mix of applicants in accordance with the expected crew composition and rotation schedule without compromising exam integrity, and ensure that each applicant can be tested using at least one new or significantly modified scenario, that no scenarios are duplicated from the applicants' audit test@), and that scenarios will not be repeated on subsequent days.

c. To the extent possible, assess whether the outline@) conform(s) with the qualitative and quantitative criteria specified on Form ES-3014 and described in Appendix D.

hIA

fib - 3.

W I T

t

a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2: (1) the outline(s) contain(s) the required number of control room and in-plant tasks

distributed among the safety functions as specified on the form (2) task repetition from the last two NRC examinations is within the limits specified on the form (3) no tasks are duplicated from the applicants' audit test@) (4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria

$

Y

a. Author b. Facility Reviewer r) c. NRC Chief Examiner (#) d. NRC Supervisor

Note. # Independent NRC reviewer initial items in Column -c", chief examiner concurrence required

ES-201, Page 25 of 27

Page 6: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

__-

ES-401 PWR Examination Outline Form ES-401-2

Categories

lote: 1. Ensure that at least two topics from every applicable WA category are sampled within each tier of the RO and SRO-only outlines (Le., except for one categoty in Tier 3 of the SRO-only outline, the "Tier Totals" in each KIA category shall not be less than two).

2.

3.

The point total for each group and tier in the proposed outline must match that specified in the table. The final point total for each group and tier may deviate by i 1 from that specified in the table based on NRC revisions The final RO exam must total 75 points and the SRO-only exam must total 25 points

Systemdevolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems that are not included on the outline should be added. Refer to ES-401, Attachment 2, for guidance regarding the elimination of inappropriate KIA statements.

4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.

Absent a plant-specific priority, only those WAS having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively.

Select SRO topics for Tiers 1 and 2 fiom the shaded systems and WA categories.

The generic (G) WAS in Tiers 1 and 2 shall be selected from Section 2 of the WA Catalog, but the topics must be relevant to the applicable evolution or system.

On the following pages, enter the WA numbers, a brief description of each topic, the topics' importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than Category A2 or G' on the SRO-only exam, enter it on the lefl side of Column A2 for Tier 2, Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.

For Tier 3. select topics from Section 2 of the WA catalog, and enter the WA numbers, descriptions, IRs, and point totals on Form ES-401-3. Limit SRO selections to WAS that are linked to 10 CFR 55.43.

5.

6.

7.'

8.

9.

Page 7: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

PWR Examination Outline id Abnormal Plant Evolutions - Tier 1 I Grow 1 RO

F o ~ ES-401-2

A G KA Topic(s) IR # 2

EIAPE # I Name I Safety Function

000007 Reactor Trip - Stabilization - Recovery I 1 I EA2 04 - If reactor should have tnpped but has not done so.

manually trip the reactor and carry out actions in ATWS EOP

000008 Pressurizer Vapor Space Accident /

000009 Small Break LOCA I 3

000027 Pressurizer Pressure Control System Malfunction / 3

AK2 01 -Valves

EK3 14 - RCP tripping requirement 4 1 1

AA1 05 - RCS flow 3 8 1

AK1.O1 - Loss of RHRS during all modes of operation -1 I 3.9 1 1

AK3 01 - Isolation of PZR spray followng loss of PZR heaters

000029 ATWS I 1 I X EA2 05 - System component valve position indications 34' 1

000038 Steam Gen Tube Rupture / 3 I 1 4 3 1 1 EA1 04 - PZR spray, to reduce coolant system pressure

AKl 01 - MFW line break depressurizes the S/G (similar to a steam line break) 000054 Loss of Main Feedwater I 4

000055 Station Blackout I 6 2 4 20 - Knowledge of operational implications of EOP warnings cautions. and notes

2 1 14 - Knowledge of system status criteria which require the notification of plant personnel 000056 Loss of Off-site Power I 6 I

000057 Loss of Vital AC lnst Bus 16 I AA1 01 - Manual inverter swapping 3 7' 1

X 2 1 32 ~ Ability to explain and apply all system limits and precautions 3 4 1 000062 Loss of Nuclear Svc Water I 4 Y 000065 Loss of Instrument Air / 8 I 1 3 7 1 1

AK3 08 - Actions contained in EOP for loss of instrument air

EK2 1 - Components and functions of control and safety systems including instrumentation. signals, interlocks, failure modes and automatic and manual features

EK1 2 - Normal, abnormal and emergency operating procedures associated with Loss of Emergency Coolant Recirculation

WE05 Inadequate Heat Transfer - Loss of Secondary Heat Sink 14

/E l 1 Loss of Emergency Coolant Recirc. I

WE12 - Steam Line Rupture - Excessive Heat Transfer I 4

Page 8: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

Form ES-401-2 PWR Examination Outline Emergency and Abnormal Plant Evolutions - Tier I I Group 2 RO

ES - 401

€/APE # I Name I Safety Function K K K A A 1 2 3 1 2

000003 Dropped Control Rod I 1 X

100024 Emergency Boration I 1

100032 Loss of Source Range NI I 7 X

100036 Fuel Handling Accident I 8

100061 ARM System Alarms I 7

X

X

NE03 LOCA Cooldown - Depress I 4

ME10 Natural Circ I4 X

N/E13 Steam Generator Over-pressure I4 X

WE16 High Containment Radiation I 9 X

WA Category Totals: 1 1 1 4 2 1 1 1 1

KA Topic(@ = I AK3 09 - Recording of group bank position for dropped rod (reference point used to withdraw dropped rod to equal height with other rods in the bank)

2 4 45 - Ability to prioritize and interpret the significance of each annunciator or alarm

AK3 02 - Guidance contained in EOP for loss of source-range nuclear instrumentation

AK1 01 - Radiation exposure hazards

AK2 01 - Detectors at each ARM system location

X 2 1 27 - Knowledge of system purpose and or function

EA2 2 -Adherence to appropriate procedures and operation within the limitations in the faciliNs license and amendments

ons of control and safety systems Is interlocks failure modes and

_c

IR

3 0‘

3.3

3 7’

3 5

25’

2.8

3 4

3 0

-

2 9 -

1

-

1

1

1

1

1

1

- 1 - 9 -

1

Page 9: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

PWR Examination Outline Form ES-401-2 i -401 Plan

ii

I K 1

KA Topic@) 'stem # I Name

K5 02 - Effects of RCP coastdown on RCS parameters

A4 08 - RCP cooling water supplies

13 Reactor Coolant Pump

3 Reactor Coolant Pump + -

IK1 23 - RWST 84 Chemical and Volume Control X -

2 1 28 - Knowledge of the purpose and function of major system components and controls

K5 09 - Dilution and boration considerations

K6 02 - Core flood tanks (accumulators)

I4 Chemical and Volume Control

15 Residual Heat Removal

16 Emergency Core Cooling -

A3 01 - Components which discharge to the PRT

K4 01 -Automatic start of standby pump

A2 07 - Consequences of high or low CCW flow rate and temperature. the flow rate at which the CCW standby pump will start

K3 03 - ESFAS

A2 06 - Failure of RPS signal to trip the reactor

27.1 1 17 Pressunzer Relief/Quench Tank

I8 Component Cooling Water

)8 Component Cooling Water

10 Pressurizer Pressure Control

+ 3 1 I

-t-

I2 Reactor Protection -

I I3 Engineered Safely Features luation

K6 01 - Sensors and detectors

A3 02 - Operation of actuated equipment I

13 Engineered Safely Features ctuation

-

K3 02 - Containment instrumentation readings

K4 04 - Reduction of temperature and pressure in containment afler a LOCA by condensing steam to reduce radiological hazard, and protect equipment from corrosion damage (spray)

K3 03 - AFW pumps

K4 16 -Automatic tnps for MFW pumps

K1 01 - SIG system

2 4 45 -Ability to pnoritize and interpret the significance of each annunciator or alarm

K2 01 - Major system loads

A3 01 - Meters annunciators dials recorders and indicating lights

~ ~~

22 Containment Cooling * 3 1'

!6 Containment Spray

19 Main and Reheat Steam

i9 Main Feedwater

$1 AuxiliaryEmergency Feedwater

j l AuxiliatyIEmergency Feedwater

$2 AC Electrical Distribution

$3 DC Electrical Distribution 2 7 I 1

1

Page 10: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

b 064 Emergency Diesel Generator

064 Emergency Diesel Generator

073 Process Radiation Monitorin

076 Service Water L t 078 Instrument Air

078 Instrument Air

A1 01 - Radiation levels

2

Page 11: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

~ Form ESdOi-2 IES - 401

002 Reactor Coolant

01 1 Pressurizer Level Control

01 5 Nuclear Instrumentation

K/A Category Totals:

. . . . . -.

a

KA Topic@)

A2.01 - Loss of coolant inventory

A1 02 - Charging and letdown flows

K6 01 - Sensors detectors and indicators 1 IK1 01 - Plant computer

K4 01 - SIG level control

K3.01 - Remainder of the plant

A4 02 - Remote radwaste release

2 1 32 -Ability to explain and apply all system limits and precautions

K2.03 - Emergencylessential SWS pumps

- IR -

4 3 -

3 3

2 9 - 3 2' -

3 6 - 2 9

3 2' -

3 4

2 6'

3 1 -

1

Page 12: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

ES-401 PWR Examination Outline Form ES-401-2

Tier

1 Emergency &

Abnormal Plant

Evolutions

2 Plant

Systems

Facility: Kewaunee Power Station Date Of Exam: 08/09/2006 I I II

SRO-On1 Points Group K K K K K K A A A A G t x l -k -p RO WA Categoy Points

1 2 3 4 5 6 1 2 3 4 * T o t a l

, o 1 0 0 0 0 0

2 0 0 0 NIA 0 0 N/A 0 0

TierTotals 0 0 0 0 0 0 0 5 10

1 0 0 0 0 0 0 0 0 0 0 0

2 0 0 0 0 0 0 0 0 0 0 0 0

TierTotals 0 0 0 0 0 0 0 0 0 0 0 0 5 3 8

3. Generic Knowledge and Abilities 1 2 Categories 0 0 ~ 10 3

0 0

Ensure that at least two topics from every applicable WA category are sampled within each tier of the RO and SRO-only outlines (Le., except for one category in Tier 3 of the SRO-only outline, the 'Tier Totals" in each K/A category shall not be less than two).

~

Note 1

2

3

4

5

6

7'

8

9

The point total for each group and tier in the proposed outline must match that specified in the table The final point total for each group and tier may deviate by fl from that specified in the table based on NRC revisions The final RO exam must total 75 points and the SRO-only exam must total 25 points

Systemslevolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems that are not included on the outline should be added. Refer to ES-401, Attachment 2, for guidance regarding the elimination of inappropriate WA statements.

Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.

Absent a plant-specific priority, only those WAS having an importance rating (IR) of 2.5 or higher shall be selected Use the RO and SRO ratings for the RO and SRO-only portions, respectively.

Select SRO topics for Tiers 1 and 2 from the shaded systems and WA categories.

The generic (G) WAS in Tiers 1 and 2 shall be selected from Section 2 of the WA Catalog, but the topics must be relevant to the applicable evolution or system.

On the following pages, enter the WA numbers, a brief description of each topic, the topics' importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than Category A2 or G' on the SRO-only exam, enter it on the left side of Column A2 for Tier 2, Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.

For Tier 3, select topics from Section 2 of the K/A catalog, and enter the WA numbers, descriptions, IRs, and point totals on Form ES-401-3. Limit SRO selections to WAS that are linked to 10 CFR 55.43.

Page 13: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

P - Form ES-401-i PWR Examination Outline

Emergency and Abn mal Plant Evolutions -Tier 1 I Group 1 SRO ES - 401

1 - E/APE # I Name I Safety Function K K K A A

1 2 3 1 2

X 000022 Loss of Rx Coolant Makeup I 2

000026 Loss of Component Cooling Water 18

000038 Steam Gen Tube Rupture I 3

000040 Steam Line Rupture - Excessive Heat Transfer I 4

000058 Loss of DC Power I 6 X

WIE04 LOCA Outside Containment / 3

KIA Category Totals:

KA Topic(s)

IAA2 02 - Charging pump problems I 3 7 2 2 25 - Knowledge of bases in technical specifications for limiting conditions for operations and safetv limits

EA2 08 - Viable alternatives for placing plant in safe condition when condenser is not available

X 2 1 32 - Ability to explain and apply all system limits and precautions 3 8

AA2 02 - 125V dc bus voltage, lowlcritical low, alarm 1 I 3 6

c_

#

1

1

-

1

1

- 1 -

1

- 6 -

1

Page 14: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

FO~III ES-401-2 PWR Examination Outline is - 401

2 4 4 ~ Ability to recognize abnormal indications for system operating

abnormal operating procedures UE10 Natural Circ I 4

UE14 Loss of CTMT Integrity I 5

I

Page 15: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

F o ~ ES-401-2 PWR Examination Outline

(IES - 401

Syntem # I Name I 005 Residual Heat Removal

006 Emergency Core Cooling

059 Main Feedwater

062 AC Electrical Distnbution

103 Containment

KIA Category Totals:

3 K K 1 2 3

r 2 I Group 1 SRO I

01 KA Topic(s)

A2 02 - Pressure transient protection during cold shutdown

2 4 30 - Knowledge of which events related to system operations/s!atus should be reported to outside agencies

4 36

A2 04 - Feeding a dry S/G T 1 3 4 '

2 4 49 - Ability to perform without reference to procedures

components and controls X those actions that require immediate operation of system 4

A2 02 - Necessary plant conditions for work in containment

1

-

1

-

1

=

6

I

Page 16: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

Form ES-401-1 PWR Examination Outline r nt Svstems -Tier 2 I Group 2 SRO

I 1 1

KA Topic(8)

A2 02 - Loss of power to the RPlS

2 4 45 - Ability to pnoritize and interpret the significance of each annunciator or alarm

A1 02 - Water level in the refueling canal

Group Point Total:

I

Page 17: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

ES .401 Gensnc Knowkdpe and Abhlk~s Outline (Tnr 3) Form ES4Ol.l

2 3 4

2 3 €! Knowledge 01 the wocess for perlorminp a containment prpe 3 4 I 1 I

2 3 11 Abilily to wnlrol radialion releases 2 7 1 1

Knowledpe of rsdfalion exposure llmils and wnlamlnalion conlrol mcludmng permissible levels m excess of those aulhonzed 3 1 1

,

SuMolal 2 2

2 4 4 operating pmcedures 4 0 1 Ablllly lo r e q n l z e abnwmal indicaIiOnS for Synem operaling paramelen which are enlry-level wndnmns for emergency and abnormal

I 2 4 9 Knowledge of low power Ishutdown implicallons In aaden l (e g LOCA or loss of RHR) mitigation lralegler

and heal removal, 3 Reanor wolanl system inlwmy. 4 Containment wndmns, 5 Radloadivily release control

1 3 3 ) 1

Knowledge of Ihe parameten and lwlc used lo assess lhe status of safely IunnlOnS includfng 1 Reauivny wnlrol 2 Core Vxrlinp j 1 ' 4 21 ! 1 7 , 1

I 2 4 38 Abolny to lake anions called lor in the facclily emerpency plan. Including (11 requlrea) s u w m n g or ading as emergency coordinator I ! 1 4 0 I I

2 4

SUMOlal 3 1

Page 18: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

ES-401, Rev. 9 Record of Rejected WAS Form ES-401-4

Randomly Selected WA

007EA2.05

038EA2.04

058AA 1 .03

WlE04 2.4.10

WlE14EA2.2

005A4'05

006 2.4.45

' O3 2'1 '23

029A1 '03

034K1 '02

2.1.25

Tier I Group

1 1 1

1 1 1

1 1 1

1 1 1

1 I 2

211

211

211

212

212

3

Reason for Rejection

"FIRST OUT" annunciators do not exist at KPS. Unable to generate question for topic. Replaced with randomly selected KA 007EA2.04.

KA 038EA2.08 was selected for the SRO outline. This KA overlaps the same area. Replaced with randomly selected KA 038EA1.04.

KA 058AA2.08 was selected for the SRO outline. This KA overlaps the same area. Replaced with randomly selected KA that is from a previously unselected APE, 054AK1.01

KA WlE04 2.4.48 was selected for the SRO outline. This KA overlaps the same area. Replaced with randomly selected KA that is from a previously unselected APE, 062A 2. I .32.

KA W/E14EA2.1 was selected for the SRO outline. This KA overlaps the same area. Replaced with randomly selected KA that is from a previously unselected APE, 003AK3.09.

Two KAs had already been chosen from SRO and RO outlines for 005. This KA resulted in overpopulation of the system and overlap. Replaced with randomly selected KA from less populated system, 003A4.08.

Two KAs had already been chosen from SRO and RO outlines. Also KA 006 2.4.30 was selected for the SRO outline. This KA resulted in overpopulation of the system and overlap. Replaced with randomly selected KA from less populated system, 004 2.1.28.

Two KAs had already been chosen from SRO and RO outlines for 103. This KA resulted in overpopulation of the system and overlap. Replaced with randomly selected KA from less populated system, 064 2.1.33.

KA 029 2.4.45 was selected for the SRO outline. This KA overpopulates the system and overlaps the same area. Replaced with randomly selected KA from a system previously not sampled, 01 1Al.02.

KA 034A1.02 was selected for the SRO outline. This KA overpopulates the system and overlaps the same area. Replaced with randomly selected KA from a system previously not sampled, 01 7K1.01.

This KA was selected for the SRO outline. Replaced with randomly selected KA 2.1.10.

Page 19: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

Tier / Group

1 / 1 [SRO]

[SROI

Randomly Reason for Rejection Selected WA

040A 2.1'33 A question could not be developed suitable to the event. Replaced with randomly selected KA 040A 2.1.32.

This KA is the same KA that was selected for another APE in the same group (026A 2.2.25). To prevent overlap, it was replaced with randomly selected KA WlE04E 2.4.48.

W/E04E 2.2.25

A question at SRO level could not be developed suitable to 11 I WlE15E 2.1.33 Replaced with randomly selected KA W/E06

112 [SRO]

An SRO level question could not be developed for this KA. Replaced with randomly selected KA 067AA2.08. 067AA2.02

2 / 2 [SRO]

3

211 tSRO1

An SRO level question could not be developed for this KA. Replaced with randomly selected KA 014A2.02. 0 I 4A2.03

A question at SRO level could not be developed since operations involvement in leak rate testing is minimal. Replaced with randomly selected KA 103A2.02.

103A2.01

2.3.2

2 / 1

2 / 1

The combined RO and SRO tier 3 was imbalanced with 5 WAS selected in Categories 2 and 3, and only 3 KAs selected in Category 4. Category 3 was selected for reduction due to the limited number of KAs as compared to Category 2. Replaced with randomly selected KA 2.4.9 in Category 4.

(Post-submittal) The KA supports only questions that overlap in area with the other selected KA 007A3.01. To prevent double jeopardy condition selected KA from next System in Group, 008K4.01 ( only selected once previously)

(Post-submittal) An operationally valid question could not be developed for KA. Replaced with random-selected KA 063A3.01.

007K4'01

063A2.01

211

212

(Post-submittal) An operationally valid question could not be developed for KA. Replaced with random-selected KA 064K2.02.

(Post-submittal) A question could not be developed to fit KA. Redaced with random-selected KA 035K4.01.

064K2.0 1

035K4.05

112 ' [SROI

~ ~~

2.4.43

(Post-submittal) A SRO-only level appropriate question could not be developed for KA. Replaced with random-selected KA W/E06 2.1.12.

W/E06 2.4.7

(Post-submittal) An operationally valid question could not be developed for KA. Replaced with random-selected KA

Page 20: Examination Outline Submittals for the Kewaunee Retake ... · ES-PO1 Examination Outline Qualitv Checklist Form ES-201-2 1. w, R I E Date of Examination: 08/09/06 Facility: Kewaunee

(1 Tier/ I Randomly Grow Selected WA

111

1 Reason for Rejection

(Post NRC Comments) An acceptable level of difficulty question could not be written. Replaced with KA 029EA2.01. 029EA2.05

211

(Post NRC Comments) An acceptable SRO-only level auestion could not be written. Redaced with KA 058AA2.01 'I1 1 058AA2.02 1 11 lSROl

(Post NRC Comments) An acceptable SRO-only level