Excellence in Safety and Quality for NPP Outages
Joseph Redmond, PEAREVA NP
Calidad en Instalaciones Nucleares
SNE April 13, 2016
Page 2 Calidad en Instalaciones Nucleares SNE April 13, 2016
Safety Message
Behind the wheel, nothing is more important than
focus. A laser focus on what’s ahead, around and
behind your vehicle. Stay aware of road and weather
conditions, traffic, pedestrians, your speed, and your
need to be in complete control of your vehicle.
Do not take a call, make a call, text, apply makeup,
eat, let your eyes or mind wander to other people in
your car, or do anything other than focus on your
driving.
If any of the above things must be done, pull safely
off the road and out of the traffic flow to do them.
Every day people are killed and injured simply
because a driver is distracted. Don’t be one of them.
DID YOU KNOW
THE ONLY THING YOU SHOULD BE DOING
WHEN YOU’RE DRIVING IS DRIVING.
Page 3 Calidad en Instalaciones Nucleares SNE April 13, 2016
How Did Our Cultural Change Start?
New AREVA CEO (Mike Rencheck) arrived in 2009
from AEP where he held the position of Chief
Nuclear Officer.
Immediately after Mike arrived he started a
change in how AREVA approaches safety.
Mike Observed that our culture did not place
safety as the highest priority.
Started to Change the Way we think and Behave
Every Meeting Starts with a Safety Message
All Employees Asked to Perform Safety Observations
Employees Started Coaching Management
Employees Coaching Each Other
Policies and Procedures Implemented to Solidify the Change
process
Safety became embedded in our planning, management and
execution strategies
The Changes Made at AREVA Changed Our
Behavior at Work and at Home
Page 4 Calidad en Instalaciones Nucleares SNE April 13, 2016
Our Actions Are Systematically Driven by our Four Pillars of Excellence
SA
FE
TY
► Industrial
► Radiological
► Nuclear Safety
► Culture starts
with results
better than
industry
standard
► Focus on
prevention
QU
AL
ITY
► Healthy CAP
► Strong
Continuous
Improvement
Culture
► Do the Right
Thing the First
Time
PE
RF
OR
MA
NC
E
► Predictable
Financial
Results
► Projects on
Time & within
Budget
DE
LIV
ER
Y
► High Customer
Satisfaction
► Skilled, Trained,
and Motivated
Work Force
► Technology
Innovation
► Environmentally
Sustainable
These Four Pillars Establish the Foundation and
Guiding Principles of Our Company
Page 5 Calidad en Instalaciones Nucleares SNE April 13, 2016
Supervisor in Role
Work Instruction Planning / Procedures
Training & Qualifications
Industrial & Radiological Safety
FME Prevention
Real Time Feedback for Focused Observations
Top Fundamental Focus Areas for AREVA
AREVA Empowers Our Workforce to Achieve Full
Engagement at All Levels of the Organization
AREVA Is Committed to Nuclear & Personnel Safety
SAFETYAREVA’s Commitment
to Health & Safety
Page 6 Calidad en Instalaciones Nucleares SNE April 13, 2016
Nuclear Services
TISA Rate vs. Hu Observations
Nuclear Services
ALARA
# o
f P
ers
on
nel
Dose Range in Rem
1.8
Rem
Bu
ffer
No
On
e >
2 R
em
HU
Ob
se
rva
tio
ns
Inju
rie
s /
20
0,0
00 W
ork
ho
urs
67
204
9082
50 53
27 2190 0 0
0
50
100
150
200
250
0
0 -
0.2
0.2
-0.4
0.4
-0.6
0.6
-0.8
0.8
-1.0
1.0
-1.2
1.2
-1.4
1.4
-1.6
1.6
-1.8
1.8
-2.0
> 2
.0
AREVA Is Committed to Nuclear & Personnel Safety
SAFETYHuman Performance
Observation Program
0
2.053
5.106
8.600
10.613
13.36912.866
10.947
1.192
0,40
0,27
0,10 0,100,07
0,00
0,37
0,11
0,00
0,10
0,20
0,30
0,40
0,50
0,60
0,70
0,80
0,90
1,00
0
2000
4000
6000
8000
10000
12000
14000
16000
2008 2009 2010 2011 2012 2013 2014 2015 2016YTD
HU Observations TISA
Our Human Performance Observation Program has
Improved Our Performance
Page 7 Calidad en Instalaciones Nucleares SNE April 13, 2016
Daily HU
Performance Update
Weekly Safety
Focus
Leadership Reinforcing Proper Behaviors
AREVA Is Committed to Nuclear & Personnel Safety
SAFETYAREVA’s Commitment
to Health & Safety
Page 8 Calidad en Instalaciones Nucleares SNE April 13, 2016
A timely intervention based on an
observation, if not addressed, has the
potential to cause an error or adverse
incident. Encourages all to be
proactively identify potential problems
Individual carrying this
card is expected to Stay
In Role as a Supervisor
and will not perform any
physical labor
Drive the Solution and Management Must be a Role
Model
One standard is
personal accountability
for task, equipment
refurbishment, or
actions
AREVA Is Committed to Nuclear & Personnel Safety
SAFETYOperational Excellence
Programs
Page 9 Calidad en Instalaciones Nucleares SNE April 13, 2016
Operational Excellence Dashboard
1• Operational Excellence Dashboard
2• Condition Report Summary
3• HU Performance Tracking
4• HU Observation Characteristics
5• HU Observation Ratings
6• HU Observation Highlights
7• Conclusions
(Trending, Focus Areas, & Actions)
Observation Characteristics
AREVA Is Committed to Nuclear & Personnel Safety
SAFETYExecutive Human
Performance Reviews
Page 10 Calidad en Instalaciones Nucleares SNE April 13, 2016
Strong Focus on Human Performance and the following Guiding
Principles
Error recognition, error mitigation, and proper human behaviors.
Event and Near Miss investigations - identifying the minor events that may
point toward the possibility of incidents with more severe implications
Human performance reinforcement – ensuring an error-free and healthy work
environment by including human performance in all pre-job briefs and 2-Minute
Drills.
Continuous process improvement by focusing on human performance goals
toward the possibility of incidents with more severe implications.
Policy Exceptions
Exemptions to PPE requirements are only allowable when all attempts have
been made to eliminate hazards, comply with local PPE policy, and requested
exemptions are approved in accordance with site policy.
Safe Outages are Well-Planned Outages
AREVA Is Committed to Nuclear & Personnel Safety
SAFETY AREVA Outage Safety Plan
Page 11 Calidad en Instalaciones Nucleares SNE April 13, 2016
Safe Outages are Well-Planned Outages
Our Safety Guiding Principles
All injuries are preventable.
All employees are responsible for their own safety.
Management is accountable for preventing injuries.
Workplace safety is a critical success factor and will not be compromised.
Intend to work safely every day.
Strong Emphasis on the Fundamentals
Following our Safety Standards and Manual.
Ensure that our Job Briefings are adequate and timely.
Be Methodical & Engaged! Take the TIME to do our work safely AND correctly
the first time.
Use and follow all procedures and guidelines.
Use our Error Prevention Tools with rigor knowing that error traps exist.
Look out for EACH Other
AREVA Is Committed to Nuclear & Personnel Safety
SAFETY AREVA Outage Safety Plan
Page 12 Calidad en Instalaciones Nucleares SNE April 13, 2016
90, 60, 30 day standard pre-outage reviews
Pre-outage evaluation with senior management
Facilitates team participation from Utility / AREVA team
Allows time to react and make corrections
Review is documented with follow-up action
Readiness Review focus
Resources – personnel and equipment
Procedures
Schedules
Training / mock-up activities
Safety / ALARA goals
Risk reduction and contingencies
Lessons learned
Industry operating experience
Readiness Reviews
Safe Outages are Well-Planned Outages
AREVA Is Committed to Nuclear & Personnel Safety
SAFETYAREVA Management
Safety Reviews
Page 13 Calidad en Instalaciones Nucleares SNE April 13, 2016
Our Nuclear Power Industry must be at the top of the ladder
Who cares as long as we’re not caught
Quality is important, we do a lot every time we have an incident
We have systems in place to manage all potentials risks
Quality leadership and values drive continuous improvement
Quality is how we do business here
Pathological
Reactive
Calculative
Proactive
Generative
QUALITYQuality Culture
Ladder
Page 14 Calidad en Instalaciones Nucleares SNE April 13, 2016
We Train Like We Work:
Integrated Team Mock Outages
Entire crew at Training Center if needed
Playbooks reviewed
Pre-job briefs
OE and Lesson Learned incorporated
Plant Specific Procedures
Site Work Orders process
Execute task in accordance to schedule
Full scale mockups
Procedure use and adherence evaluated
during practical exam
Most Comprehensive Training Program in the Industry
QUALITYAREVA Training
Center
Page 15 Calidad en Instalaciones Nucleares SNE April 13, 2016
Refuel Training Capabilities
Refueling cavity
Reactor internals
Mock fuel assemblies
Spent fuel rack
BWR & PWR bridges
Fuel Transfer System
Refueling cavity and underwater training
Train & Qualify in Actual PWR / BWR Environment
QUALITYAREVA Training
Center
Page 16 Calidad en Instalaciones Nucleares SNE April 13, 2016
Reactor Head Mock-up
Upper Internals
CRGTs
Bullet-nose connections
Thermocouple runs
FME removal
Flux thimble cut up
Seal Table Maintenance
Fuel Assemblies
Burnable Position Rod Assembly Handling Tool
QUALITY Full Scale Mock-Ups
Page 17 Calidad en Instalaciones Nucleares SNE April 13, 2016
QUALITYAREVA Training
Center
CRD shaft latch / unlatch
tool
Biach Stud Tensioners and
Hydranuts
Transfer Tube Flange
Bolted & Cam lock NI /
Sandbox covers on cavity
floor
Page 18 Calidad en Instalaciones Nucleares SNE April 13, 2016
Under Vessel Training
Tip tubing removal and installation
Shoot-out steel removal and installation
CRDM removal (multiple location), teardown, rebuild, and replacement
Training done in anti-contamination clothing
Use of full carousel and leveling tray
Thermal sleeve removal and installation
Blind flange install and removal
I&C Maintenance
All New UV Tools are Tested & Qualified on the
State of the Art Full Scale UV Mock-up
QUALITYAREVA Training
Center
Page 19 Calidad en Instalaciones Nucleares SNE April 13, 2016
Internals
Lift Rig Stud Hole
Plug
CET Extraction
by Vibration
Thimble Tube
Puller / CutterThimble Tube
Hydraulic
Jacking Tool
Core FOSAR
Vacuum
Developing & Deploying Innovative Solutions to
Improve Outage Performance
QUALITYInnovative Tools
For Quality Services
Page 20 Calidad en Instalaciones Nucleares SNE April 13, 2016
NEZ RangerSUSI
AIDA G-3
TWS
NUMAN
Dual Blade Probe
Industry Leading PWR Inspection Tools
to Help Reduce Costs
QUALITYInnovative Tools
For PWR Inspections
Page 21 Calidad en Instalaciones Nucleares SNE April 13, 2016
Hawkeye
Dryer ID
Dryer OD
CRGT Top GuideLPRM /
Dry Tube
Access Hole
Cover
Jet Pump
Beam
JP Mixer /
Diffuser
Core Spray
Proven, Innovative and Reliable Inspection Solutions
QUALITYInnovative Tools
For BWR Inspections
Page 22 Calidad en Instalaciones Nucleares SNE April 13, 2016
Outage Control Center
Promote a strong Safety and Human Performance culture
Create a forum for leadership to communicate daily with AREVA Outage Management
Promote “one face of AREVA” to support Integrated Outage Management
Strengthens outage service delivery performance with centralized, 24/7 monitoring and emergent issue response
Engineering Control Center
24/7 hotline, providing customer’s with the benefit of a direct method for obtaining robust technical support from AREVA’s highly skilled experts
Centralized, 24/7 Support For Outage and Engineering
Support
QUALITYAREVA Outage
Control Center