excellence runs with us - ingegneria di sistema per le ... s.p.a. - rome astef - fortaleza balfour...
TRANSCRIPT
Professionalism, integration, technology: these are but a few of the characteristics that have helped Sistra 2000 establish itself in an evolving sector in just a few years, esteemed by prestigious clients which have found Sistra 2000 to be an ideal partner.
Excellenceruns with us
SISTRA 2000 S.r.l. Società italiana sistemi trasporti
www.sistra2000.it
eng
SISTRA 2000 S.r.l.Società Italiana Sistemi Trasporti
Via Francesco Satolli, 3000165 Roma
P. +39 06 393 77 937F. +39 06 393 86 547
e-mail: [email protected]
NET Engineering S.p.A.Via Squero, 12
35043 Monselice (PD)P +39 0429 787 111F +39 0429 787 105
www.netspa.com
NET Engineering International S.p.A.Via Belle Putte, 34/B
35030 Bosco di Rubano (PD)P +39 049 89 72 211F +39 049 89 72 248
www.net-international.com
Since NET International’s acquisition of the majority stake of Sistra 2000 in December 2008, our expertise and professionalism have been merged with those of NET Engineering S.p.A., the Italian operating company belon-ging to the NET Engineering International Group.This new ownership structure is a tangible opportunity for us to face the new challenges of the global market, sustained by the NET Engineering International Group which is active in infrastructure and civil engineering, and which is currently among the biggest European engineering companies with a total turnover of approximately 50 million Euro and a full-time staff of over 450 individuals
Professionalism, integration, technology: these are but a few of the characteristics that have helped Sistra 2000 establish itself in an evolving sector in just a few years, esteemed by prestigious clients which have found Sistra 2000 to be an ideal partner.
Excellenceruns with us
SISTRA 2000 S.r.l. Società italiana sistemi trasporti
www.sistra2000.it
eng
SISTRA 2000 S.r.l.Società Italiana Sistemi Trasporti
Via Francesco Satolli, 3000165 Roma
P. +39 06 393 77 937F. +39 06 393 86 547
e-mail: [email protected]
NET Engineering S.p.A.Via Squero, 12
35043 Monselice (PD)P +39 0429 787 111F +39 0429 787 105
www.netspa.com
NET Engineering International S.p.A.Via Belle Putte, 34/B
35030 Bosco di Rubano (PD)P +39 049 89 72 211F +39 049 89 72 248
www.net-international.com
Since NET International’s acquisition of the majority stake of Sistra 2000 in December 2008, our expertise and professionalism have been merged with those of NET Engineering S.p.A., the Italian operating company belon-ging to the NET Engineering International Group.This new ownership structure is a tangible opportunity for us to face the new challenges of the global market, sustained by the NET Engineering International Group which is active in infrastructure and civil engineering, and which is currently among the biggest European engineering companies with a total turnover of approximately 50 million Euro and a full-time staff of over 450 individuals
We are based in Rome, but work all over Italy and abroad with an excellent position in the transport sector, due to the high quality realization of our projects, which have consequently enabled us to acquire prestigious and discriminating clients. Sistra 2000 can guarantee the execution of clients’projects for integrated and specialized facilities for rail and underground systems, based upon our expertise in the following areas:
Track work
Power Supply and Traction Power
Signalling and Telecommunications
Automation & SCADA
Lighting & Low-voltage power system and Special Equipments
Depots and Maintenance Rail Yards
Safety Systems for Tunnels
Sistra’s technological knowledge and the experience acquired through managing and solving complex multidisciplinary problems enable the company to address all the infrastructure markets including road, highway, airport and tunnel sectors, collaborating in large-scale projects.
To ensure exceptional and competitive performance for a full range of services to our Clients
Preliminary, Final and Detailed Design
Detailed construction design & construction planning
Commissioning
Certification and Approval
Technological Project Management
Security, Safety & Coordination Plans
Construction Supervision
several services...
... one goal
2
Mastery of the know-how of technological systems
Expertise in traditional and innovative technologies for transport systems
Solid operational skills to guarantee our clients the execution of projects for specialized, as well as integrated, systems
Sound quality assurance skills to achieve European-standard quality levels
3
In addition to its in-house organization with qualified professionals and highly skilled technicians, Sistra 2000 employs a network of external partners, whenever necessary, who work in perfect harmony with the standards and operational methods of the company. Our flexible organization ensures our clients the possibility to realize projects of different sizes with the same support and competitiveness.
Thanks to more than 20 years of expertise, we can offer our clients:
our expertise
Corne
Batt
Shaft A
Shaft A
Alstom Transport S.p.A - Bologna
Ansaldo STS S.p.A
Astaldi S.p.A. - Rome
Astef - Fortaleza
Balfour Beatty Rail S.p.A - Milan
Bonifica S.p.A. - Rome
Consorzio Metro C - Rome
Ducati Sistemi S.p.A - Bologna
Gemmo Impianti - Vicenza
Gestione Governativa Circumvesuviana - Naples
Intermetro S.p.A. - Rome
Italferr S.p.A. - Rome
Metrofor - Fortaleza
Pegaso - Rome
R.F.I. S.p.A. - Rome
Roma Metropolitane
Società Consortile Tor Vergata - Rome
Vianini Lavori S.p.A. - Rome
our primary clients ...
4
Cinecitta'Subaugusta
Giulio Agricola
NumidioQuadrato
Lucio Sestio
Anagnina
Porta Furba
Arco Di TravertinoColli Albani
Furio Camillo
PontelungoRe Di Roma
Manzoni
San Giovanni
VittorioTermini
Shaft Q
Barberini
SpagnaFlaminio
Lepanto
Repubblica
Ottaviano
To Depot
Shaft Z2
Shaft Z1Shaft Y2Shaft Y1
Shaft XShaft W
Shaft V
Shaft UShaft T
Shaft S1Shaft S2
Shaft RShaft P
Shaft OShaft N
Shaft M
Shaft L
Shaft KShaft I2
Shaft JShaft H
Shaft G
Shaft F
Cipro
Valle Aurelia
Baldo Degli UbaldiCornelia
Battistini
Shaft E
Shaft D
Shaft C
Shaft BShaft A1
Shaft A
Ponte Nenni
Q1 Drainage Shaft
The Rome Underground, Line ”A”Detailed Design for the Phase III of the renovation of the underground line "A" called "The New AMLA 3 – Urgent integrated upgrade”.
Client: Intermetro S.p.A. - Municipality of RomeBeginning in: October 2004
Sistra 2000 was the engineering company in the consortium of the ATI ABB that implemented the renovation of the metro line “A”, to increase the safety standards of the transport system.
The whole line from Battistini Station to Anagnina Station was upgraded, including the total renovation of the Manzoni station.
The works planned, or in progress, include the technical upgrading of facilities and technical services, and the integration of station and line ventilation systems for the disposal of fumes in the event of fire. Sistra 2000 designed the following facilities:
Remote control of the electrification system, the fibre optics network to control station and line systems; information systems for communication to the public; Implementation of technological systems in the stations, lines and the half-way shafts to be managed by means of a fibre optic monitoring network that transfers information to the Central Operating Unit in Garbatella, to the security centre in Termini Station, to the fire brigade and to the central police station in Rome; Public Address System for emergencies;Fire detection systems throughout the premises and in public areas of all stations, in coordination with the fumes disposal systems; Burglar alarm system to control all accesses and all ventilation grids;Telecommunication system and upgrade of the emergency telephone network, in stations and tunnels; CCTV video-security camera systems in all stations (a priority since December 2005, after the terrorist attacks in London).
5
... and our best references
Grotte Celoni
T3
T2T4
T5
T6A
T7
Clodio-Mazzini
OttavianoRisorgimento
S. Pietro
Chiesa Nuova
Venezia
Colosseo
Amba Aradam
S. GiovanniPignetoLodi
Malatesta
Teano
Gardenie
Alessandrino
Torre Spaccata
Giglioli
GiardinettiTorrenova
Torre AngelaTorre Gaia
Borghesiana
Finocchio GranitiPantano
Fontana Candida
Bolognetta
Centocellepark
Mirti
“line A” branch
“line B” branch
“line A”branch
“line FR1”branch
6
The Rome Underground, Line ”C” Design of power-feeding plants, lighting and traction systems, and special equipments. “Graniti” depot and railway yard.
Client: Metro C - AnsaldoExecution period: 2006 - In progress
The new “C” metro line is the first major public transport infrastructure in Italy remotely controlled by an integrated automation system. The ”C” line will be 25.5 kilometres long when completed and it will cross the city from north-west to south-east, doubling the current network. It will carry 24,000 passengers per hour per direction. A large part of this project is underground (almost 18 km), at a depth of 25-30 meters below road level. There will be 30 train stations, including three stations interconnecting with the other metro lines, one station connected to the FR1 (Fiumicino Airport-Fara Sabina Regional Railway) and four stations that will be connected to tramways. For this project Sistra 2000 has collaborated in the following engineering services:
Final/Detailed Design of the Power-Supply Subsystem of Line C, sections T4, T5, T6A, T7 and the Depot
Final/Detailed Design of the electric systems and special systems for the sections T3, T4, T5, T6A
Final/Detailed Design of the equipment for the “Graniti” railway yard and depot
Section T7 Torrenova connection - Pantano, length km 8.2 Section T6A Alessandrino - Torrenova connection, length km 2.8
Section T5 Malatesta - Alessandrino, length km 4.3 Section T4 San Giovanni - Malatesta, length km 3 Section T3 Venezia San Giovanni, length km 3.2
Rome-Naples Section of the High Speed Railway: advisory and support to Site Supervision of the railway superstructure
Client: Consortium of IRICAV UNO - S.F. STUDI FERROVIARI S.a.s.Period: 1996 - 2004
The railway line has been operating since December 2005. It runs from Rome to Naples for 184 Km; the final section entering Naples is currently under construction.
The double track line includes: 5 operating control points, 4 central communication points and 4 interconnection points with the historical line. The railway superstructure was built starting from the waterproofing layer, using a first layer of crushed stone, then sleepers and rails were laid, then track were lifted to the height indicated in the design, and ultimately the adjustment operations for the long welded rail and finishes were performed.
Its execution was completed using two moving construction sites to produce approximately 780 metres of railway tracks per day. Inspections during transport and installation were performed by the local Site Manager, who applied the Quality Control procedures of the General Contractor, Pegaso Scrl.
7
CIRCUMVESUVIANA lineAdvice and support to the Site Management for the installations relating to the expansion project of the Napoli-Barra section and development works (as per law 211/92).ANSALDO RAILWAY SIGNALLING Structural Design of the ACEI systems adjustments (V401/V350M) along the section from Livorno Central Station to Civitavecchia.S.T.A (currently “Roma Metropolitane”) Final and Detailed Design of the Met.ro deport-yard at Roma Centocelle; power-supply system, train washing system and track work along the T5 section from Malatesta to Alessandrino.R.F.I . Detailed Design of the lighting and low-voltage power and traction systems in the Tiburtina Railway Station in Rome.ASTEF Line 1 of the Fortaleza underground, Brazil. Verification of the supplier’s Detailed Design compliance with the specifications on the requirements listed by the client for rolling stock, power and traction systems,
Signalling Systems and Telecommunications. Analysis of Factory Test Procedures, applied to subsystem equipment, and inspections to monitor the procedures applied in the factories in Brazil and Europe.ITALFERR Site Management and Assistance in the building of a Static Central System in the Ostiense / Trastevere rail station in Rome. DUCATI SISTEMI S.p.A. Detailed design for the adaptation of station- and line-safety systems to the SCMT (train gears control system) in the three districts of Turin, Florence, and Verona. TOR VERGATA S.c.r.l. (in progress) Design of electrical and special systems in the new premises of the Department of Mathematics, Physics and Natural Sciences of the University “Tor Vergata” in Rome.ERREGI / ROME METROPOLITANE (in progress) Termini hub: Detailed Design of automation and monitoring systems, remote control of electrification system, telecommunications, special installations and turnstiles.
Other major projects
All our activities are performed in full complian-ce with quality standards.
The engineering services follow the procedures described in the Quality Manual that the Company has adopted, and which is in accor-dance with the requirements of UNI EN ISO 9001:2000.
We have also been awarded the Quality Certifi-cate no. 9175.SSTR by CSQ-Certificazione Sistemi-Qualità e Sistemi di Gestione delle Aziende on July 28, 2004. Since April 1995 we have been listed among the engineering companies qualified by Ferrovie dello Stato S.p.A. (the Italian National Railway Company).
SISTRA 2000 S.r.l.Società Italiana Sistemi Trasporti
Via Francesco Satolli, 3000165 Roma
P. +39 06 393 77 937F. +39 06 393 86 547
e-mail: [email protected]
NET Engineering S.p.A.Via Squero, 12
35043 Monselice (PD)P +39 0429 787 111F +39 0429 787 105
www.netspa.com
NET Engineering International S.p.A.Via Belle Putte, 34/B
35030 Bosco di Rubano (PD)P +39 049 89 72 211F +39 049 89 72 248
www.net-international.com
Since NET International’s acquisition of the majority stake of Sistra 2000 in December 2008, our expertise and professionalism have been merged with those of NET Engineering S.p.A., the Italian operating company belon-ging to the NET Engineering International Group.This new ownership structure is a tangible opportunity for us to face the new challenges of the global market, sustained by the NET Engineering International Group which is active in infrastructure and civil engineering, and which is currently among the biggest European engineering companies with a total turnover of approximately 50 million Euro and a full-time staff of over 450 individuals
Professionalism, integration, technology: these are but a few of the characteristics that have helped Sistra 2000 establish itself in an evolving sector in just a few years, esteemed by prestigious clients which have found Sistra 2000 to be an ideal partner.
Excellenceruns with us
SISTRA 2000 S.r.l. Società italiana sistemi trasporti
www.sistra2000.it
eng